Determine the Sequence & Interactions, Input & Outputs, Criteria & yes-Organisational chart and RRA are defined in Annexure F
4.4 P
methods, Resources and RRA for the QMS activities? Eg,. Production I/c - Production planning
5.1.1 Demonstrate leadership and Commitment with respect to the Yes-Leadership and commitment with respect to the QMS is P
QMS? addressed in Annexure H for quality objectives and targets page 1.
Demonstrate leadership and Commitment with respect to the yes- Customer focus is addressed with statutory and regulatory
5.1.2 P
Customer Focus? aspects, risk oppurtunities are addressed in Annexure G page 1 to 6.
Establish, Implement and Maintain a Quality Policy, appropriate to
5.2.1 Yes-Quality policy is addressed in the quality manual in Annexure E. P
the purpose of the Organization?
Organizational Roles, Responsibilities and Authorities are Assigned, Yes- Organisational roles, responsibilities and authorities are
5.3 P
Communicated and Understood? addressed in Annexure F.
Establish Quality Objectives at relevant Process/Function, Yes-Quality objectives at relevant process are considered with
6.2.1 quality policy covering all the departments.Eg. In Process Quality P
Consistent with Quality Policy, Measurable & Monitoring?
Level, IQL : Less than 2%
6.2.2 Plan for Achieving Quality Objectives & Targets? Yes-Quality objectives and targets addressed in Anneture H page 1. P
Plan and Provide Resources necessary for the effective Planning & Yes-Resources are planned as per operations & is addressed in SAE-
7.1.1 P
Operations of the QMS? PM-01
Plan, Provide and Maintain Infrastructure necessary for the Yes-Good infrastructure Provided for effective planning,Operations
7.1.3 P
effective Planning & Operations and Product Conformity? & product confirmity
Plan and Provide Valid and Reliable Monitoring & Measuring Yes-Provided suitable, Qualified man power and Reliable monitoring
7.1.5.1 P
Resources to verify Conformity of the Product? systems are maintained & measuring equipments list maintained.
Determine the Documented Information necessary for the effective Yes-Documented information is addressed in the manual of
7.5.1 P
Planning and Operating the QMS? Annexure M page 1 to 6.
Create and update documented information with suitable Yes-Documented information is created by the concern responsibity
7.5.2 P
identification, format and review? with relevant information as per the activity.
Documented Information should be available and suitable for use, Yes- Documents are available and with appropriate identification
7.5.3.1 P
and adequately protected? with labels.
Plan, Implement and Control the Manufacturing Processes to Yes-To acieve the product conformity manufacturing plan,
8.1 Impliment, toolings & control methods are discussed in the P
achieve the Product Conformity?
Feasibility study report.
Determine the Acceptance Criteria for the Product? Yes- Product acceptance criteria is established through Drawings. P
Determine the Resources necessary for the Product Realization and Yes-Resources necessary for the product realization & product P
to achieve the Product Conformity? confirmity is provided .
Determine the methods for obtaining, monitoring and reviewing QMS program is evidenced for reciew the information and take P
this information? action against.
conduct internal audits at planned intervals to ensure that the QMS Yes-Internal Audit plan, schedule and frequency are evidenced for
9.2.1 P
implemented effectively? FY2018-2019. Internal Audit is conducted as per plan & Schedule
Plan, establish, implement and maintain an audit programme(s) Yes- Audit programmes evidenced for frequency, method,
including the frequency, methods, responsibilities, planning responsibility, planning requirements & reportings are evidenced. P
requirements and reporting? Annexure-O .
Yes- Audit criteria and scope for each audit is defined. Refer Internal
Define the audit criteria and scope for each audit? P
Audit Plan, Verified Production Department
Select auditors and conduct audits to ensure objectivity and the Yes-Qualified Internal Auditor (external) is engaged for Internal P
impartiality of the audit process Audit.
Ensure that the results of the audits are reported to relevant Yes - discussed in MRM, all Managing Partners are aware about the P
management NC's and OFI's observed during Internal Audit Cycle 02
Yes- All agenda points like Previous MRM points, N.C closure,
Plan and carryout the management review considering all agenda
Management objectives, & improvements points plans are P
points?
evidenced as per Annexure-P
Determine and select opportunities for improvement and Improvement and Opportunities are addressed in Annexure-S
10.1 implement any necessary actions to meet customer requirements Continual improvement. Improvement projects are to be discussed P
and enhance customer satisfaction? in the MRM.
Improve products and services to meet requirements as well as to The needs and expectaions of the intereseted parties were P
address future needs and expectations? addressed to meet requirements as well.
Improve the performance and effectiveness of the quality Periodic Internal Audits and Management Review. Plan evidenced
P
management system? for both during FY 2018-19
When a nonconformity occurs, react to the nonconformity, take When the nonconformity occurs, the details ere updated in NC
10.2.1 P
action to control and correct it and deal with the consequences? register and corrective action is initiated against it.
Evaluate the need for action to eliminate the cause(s) of the As per the procedure CA format to be used , currently using CA P
nonconformity, in order that it does not recur or occur elsewhere? Report for the customer complaint.
implement any action needed, and review the effectiveness of any Corrective action taken against for a complaint and the action
P
corrective action taken? implemented and the performance is reviewed.
continually improve the suitability, adequacy and effectiveness of The continuous improvements are initiatedand found discussed in
10.3 P
the quality management system? MRM-02
ABC-TMP-DIR-07
INTERNAL AUDIT REPORT
Process/Function: Administration Audit No.: IQA-01/20-21
Process Owner: Audit Date: 23.07.2020
Auditor Name: B. Vijay Kumar (External) Audit Ref.: QMS Manual A-00 dt. 01.06.20
Audit Time: 10.30AM to 11.30AM
Clause Requirements Observation Result
(ISO 9001:2015) (Process/Activity) (Objective Evidence) C NC OFI
Yes- Human Resources are planned as per planning & Operations
Plan and Provide Human Resources necessary for the effective
7.1.2 .Training Calender for the year 2018, competency standard, List of P
Planning & Operations of the QMS? Employees updated verified
Plan, Provide and Maintain Work Environment for the effective Yes- Good enviroment provided for efficient operation; Shop Floor,
7.1.4 P
Planning & Operations and Product Conformity? Lab, etc,.
Determine and Ensure Personnel Competency with necessary Yes-Competency standard maintained for all the employees and
7.2 Actions? verified Skill Matrix for Verified for Devi, Eg. Chemical Addition P
knowledge: B (Can work Independently)
7.2 Determine and Ensure Personnel Competency with necessary Yes - evidenced via Skill Evaluation and OJT (On the Job Training) P
Actions? Record, Eg. Colour Finish dated 05.10.2018 for P.Devi
Maintain the infrastructure necessary for the operation of its Yes- Operators: Required - 4, Available - 5;
7.1.3 processes and to achieve conformity of products? Powder coating Booth: Required: 4, Available: 4 P
Found reviewed in MRM and provided.
Maintain the environment necessary for the operation of its Yes-Suitable environment is provided for the operation process &
7.1.4 P
processes and to achieve conformity of products? conformity of the Product
ABC-TMP-DIR-07
INTERNAL AUDIT REPORT
Process/Function: Marketing Audit No.: IQA-01/20-21
Process Owner: Audit Date: 23.07.2020
Auditor Name: B. Vijay Kumar (External) Audit Ref.: QMS Manual A-00 dt. 01.06.20
Audit Time: 11.30AM - 12.15 PM
Clause Requirements Observation Result
(ISO 9001:2015) (Process/Activity) (Objective Evidence) C NC OFI
Yes - evidenced via Inspection Report, Invoice Copy along with each
8.2.1 (a) Communicate with Customer regarding Product Information? despatch. Verified for Part Name: Yoke; Part No.: 26261570F; P
Invoice No. 2018192123 dated 22.11.2018, Qty: 2450 Nos.
Communicate with Customer regarding Enquiry, Contract or Order Yes-Customer communication regarding the product enquiry -
8.2.1 (b) P
including Amendments? through e-mail. Verified Enquiry Record
Communicate with Customer regarding Handling and Controlling Yes. Customer Property maintained.
8.2.1 (d) P
Customer Property? Eg. Customer: Lucas TVS, Property: Go-No Go Guage
Conduct Order/Schedule Review before committing to supply the Yes- Order reviewed by Managing Partner . Verified the Customer
8.2.3.1 Purchase Order, Customer: Lucas TVS; Part: PRD3 Yoke & Pole P
Product? Assembly; PO No. 07013231 dated 27.06.2018
Retain the Documented Information for the results of the review Yes- Documented information for the results of review are
8.2.3.2 P
and any new or change in Requirements? maintained.
Monitor customers’ perceptions of the degree to which their needs Yes- Customer satisfaction report is maintained. Verified the report.
9.1.2 P
and expectations have been fulfilled? [Eg. Lucas TVS: 91%]
Yes- Customer feed back form evidenced . Lucas TVS Jan-18 to June
18 -91% . Six Months Once.
Determine the methods for obtaining, monitoring and reviewing
this information? Lucas TVS Vendor Quality & Delivery Rating: Sep-18: 81.2%; Oct-18: P
85.4%
GIPL Vendor Rating: Sep-18: 97%; Oct-18: 96.88%
Improve the performance and effectiveness of the quality Yes- discussed in MRM held during June 2018 P
management system?
ABC-TMP-DIR-07
INTERNAL AUDIT REPORT
Process/Function: Purchase Audit No.: IQA-01/20-21
Process Owner: Audit Date: 23.07.2020
Auditor Name: B. Vijay Kumar (External) Audit Ref.: QMS Manual A-00 dt. 01.06.20
Audit Time: 02.00PM - 02.45 PM
Clause Requirements Observation Result
(ISO 9001:2015) (Process/Activity) (Objective Evidence) C NC OFI
Determine the controls to be applied to externally provided Yes- Risk analysis assesment evidenced for control of the product. P
processes, products and services? Eg. Purchasing Process - Delivery Delay
Retain documented information of these activities and any Yes- Supplier/Sub Contractor Registration form is maintained. P
necessary actions arising from the evaluations? Verified for MBI Powder Coatings Pvt Ltd.
Ensure that externally provided processes remain within the control Yes-Externally provided process remain within the control of the
P
of its quality management system? QMS.
Define both the controls that it intends to apply to an external Yes- Powder (TC, Visual - No moisture) P
provider and those it intends to apply to the resulting output? Chemical (Test Certificate, In-process Inspection, Visual)
Monitoring the potential impact of the externally provided Yes-Incoming Inspection carried out , if N.C Found recorded in
products, processes and services, and the effectiveness of the Customer DC. Eg. For powder - Test certificate verified for Batch No. P
controls applied by them, and take necessary action? and Expiry Date.
Determine the verification, or other activities, necessary to ensure Yes- External processed items are Verifed during Receipt and In- P
that the externally provided processes? process stages.
Ensure the adequacy of requirements prior to their communication Yes- Order placed to supplier through phone and recorded in
8.4.3 P
to the external provider? Telephonic order register. Specification communicated to Supplier.
Communicate to external providers the approval of products and Yes- Approval of Raw material- Powder - by Test Certificate DC one
services, methods, processes and equipment, the release of copy signed and handed over to supplier. In case of rejection, P
products and services? information communicated to supplier.
Communicate to external providers the verification or validation Yes- Communication through e-mail. Terms & Conditions to be
activities that the SAE, or its customer, intends to perform at the communicated clearly to Supplier P
external providers’ premises?
ABC-TMP-DIR-07
INTERNAL AUDIT REPORT
Process/Function: Production Audit No.: IQA-01/20-21
Process Owner: Audit Date: 23.07.2020
Auditor Name: B. Vijay Kumar (External) Audit Ref.: QMS Manual A-00 dt. 01.06.20
Audit Time: 02.45PM - 03.45 PM
Clause Requirements Observation Result
(ISO 9001:2015) (Process/Activity) (Objective Evidence) C NC
Plan, Implement and Control the Manufacturing Processes to Yes- WI Displayed in Shop floor for each process. Powder Coating
8.1 P
achieve the Product Conformity? Booth : Volt & Pressure spec. available.
Implement Process Controls inaccordance with the Acceptenace Yes- WI followed and Parameters Recorded in respective Records.
P
Criteria? Eg. Phospating Record.
Maintain and Retain Documented Information necessary to have Yes- Phospating Record, Shift Register & Bath Analysis maintained P
confidence on the Process and Product Conformity? to update process parameters
Conduct Order/Schedule Review before committing to supply the Yes- Order review on receipt of Material through DC.
8.2.3.1 P
Product?
Plan, implement and control production process under controlled Yes- Planning & Review mechanism is in place. Eg. Evidenced via
8.5.1 P
conditions? Control Plan, Daily Production Plan
Ensure the availability of the Documented Information? Yes- WI displayed in Production area, PCB-I P
Ensure the availability and use of suitable monitoring and Yes- measuring suitable instruments like Temperature Controller, P
measuring resources? Timer, Coating Thickness Guage.
Ensure the use of suitable infrastructure and environment for the Yes-Suitable infrastructure and proper environment provided for P
operation of processes? operation.
Ensure the appointment of competent persons, including any Yes- Qualified and competent persons are employed for performing P
required qualification? the operation. Eg. Ms.S. Devi - In-process Quality
Ensure the validation, and periodic revalidation, of the ability to Yes- Process validation done for Powder Coating. Frequency of
achieve planned results of the processes for production, where the validation is yearly once. Eg. Yoke machining Dt 20.09.2018. Next P
resulting output cannot be verified by subsequent monitoring or Due on 19.09.2019. Hot Degreasing Temp. - 76 (70 - 80 deg. C);
measurement? Result - ok
Use suitable means to identify outputs when it is necessary to Yes- Identification & traceability is maintained in each stage of the
8.5.2 P
ensure the conformity of products? process. Identification Tag is available
Yes- Process are recorded in Hot Phospating Register, Shift Report &
Bath Analysis Report.
Date: 20.11.2018; Shift: I; Part: Yoke;
Identify the status of outputs with respect to monitoring and Hot Phosphating - Temp. : 76 (70-80); P
measurement requirements throughout production?
Bath Analysis Report - Concentration : 23 (18-25)
Shift Report - 600 Nos. Qty; Oven Loading Time: 11am; Unloading:
11:35am; Temp. while loading: 168
Preserve the outputs during production to the extent necessary to Yes-Preservation, handling, and storage during production is
8.5.4 P
ensure conformity to product requirements? maintained.
8.6 Implement planned arrangements, at appropriate stages, to verify Yes- Process is Monitored at each stage and recorded in respective P
that the product and service requirements have been met? Report. Eg. Shift report for Oven Curing process.
Take appropriate action based on the nature of the nonconformity Yes- Date: 07.11.2018, Yoke: 4 Pole Yoke; Thickness Low; Rej. Qty: P
and its effect on the conformity of products? 50 Nos.
ABC-TMP-DIR-07
21
0
01.06.20
45 PM
esult
OFI
INTERNAL AUDIT REPORT
Process/Function: Maintenance Audit No.: IQA-01/20-21
Process Owner: Audit Date: 23.07.2020
Auditor Name: B. Vijay Kumar (External) Audit Ref.: QMS Manual A-00 dt. 01.06.20
Audit Time: 02.45PM - 03.45 PM
Clause Requirements Observation Result
(ISO 9001:2015) (Process/Activity) (Objective Evidence) C NC
Maintain the infrastructure necessary for the operation of its Yes- List of machines is availabe - Powder coating Gun & Booth I.
7.1.3 P
processes and to achieve conformity of products? Monthly Preventive Maintenance Checklist available.
Machine History Card Available for Powder coating Gun & Booth I. P
On 07.09.2018 Complete Checkup and dust collected.
8.5.1 Plan, implement and control production process under controlled Yes- Planning & Review mechanism is in place. Eg. Evidenced via P
conditions? Preventive Maintenance Schedule
Ensure the availability of the Documented Information? Yes- WI available P
Ensure the use of suitable infrastructure and environment for the Yes-Suitable infrastructure and proper environment provided for P
operation of processes? operation.
Ensure the appointment of competent persons, including any Yes- Qualified and competent persons are employed for performing P
required qualification? the operation. Eg. Mr.Sathya, Maintenance In-charge
ABC-TMP-DIR-07
21
0
01.06.20
45 PM
esult
OFI
INTERNAL AUDIT REPORT
Process/Function: Quality Assurance & Control Audit No.: IQA-01/20-21
Process Owner: Audit Date: 23.07.2020
Auditor Name: B. Vijay Kumar (External) Audit Ref.: QMS Manual A-00 dt. 01.06.20
Audit Time: 03.45PM - 04.45 PM
Clause Requirements Observation Result
(ISO 9001:2015) (Process/Activity) (Objective Evidence) C NC OFI
Determine, Maintaining and retaining documented information to Yes-Conformity of the product is maintained. Hot Phospahting &
Shift Report for Oven to record Process Parameters and Supplier P
to demonstrate the conformity of product? Quality Assurance Certificate available.
Implement Process Controls inaccordance with the Acceptenace Yes- Process controls & Acceptance criteria is addressed in the P
Criteria? Control Plan for Hot Phosphating, SAE/CP/002 for Part: Yoke.
Maintain and Retain Documented Information necessary to have Yes- process controls & Acceptance criteria is addressed in Control P
confidence on the Process and Product Conformity? Plan for Hot Phosphating, SAE/CP/002 for Part: Yoke.
Yes- After receipt of Product - Powder verified for batch No. and
Determine the verification, or other activities, necessary to ensure expiry Date in Test Certificate. Powder Metallic Silver Grey - P
that the externally provided processes? Supplier MBI Powder Coating Pvt Ltd. Batch No.HS0002703384
Date:17.07.2019.
Ensure the characteristics of the products to be produced, or the Yes- Process Parameters are specified in the control Plan for Hot
8.5.1 P
activities to be performed? Phosphating, SAE/CP/002 for Part: Yoke.
Ensure the use of suitable infrastructure and environment for the All required Machines , Eg- Oven, Power coating booth with Panel, P
operation of processes? Generator and Proper Workplace with Ventilation and Lighting
Ensure the appointment of competent persons, including any Yes- Qualified and competent persons are employed for performing P
required qualification? the operation. P.Prakash with 15 years Experience.
Ensure the validation, and periodic revalidation, of the ability to
Yes- Process validation done for Powder Coating. Frequency of
achieve planned results of the processes for production, where the
validation is yearly once. Eg. Yoke machining Dt 20.09.2018. Next P
resulting output cannot be verified by subsequent monitoring or
Due on 19.09.2019. Result - ok
measurement?
Use suitable means to identify outputs when it is necessary to Yes- Identification & traceability is maintained by keeping in
8.5.2 P
ensure the conformity of products? respective area.
Identify the status of outputs with respect to monitoring and Yes- Inspection is maintained in process note for Inprocess and final P
measurement requirements throughout production? inspection - certificate available.
Maintain documented information regarding the status of the Yes - Calibrated by Customer periodically, Eg. Plug Guage P
property belongs to the customer or external provider?
Review and control changes for production, to the extent necessary Yes-Preservation, handling, and storage during production is
8.5.6 P
to ensure continuing conformity with requirements? maintained .
The release of products to the customer shall not proceed until the
planned arrangements have been satisfactorily completed, unless
Yes- without Certificate - Material is not despatched to customer P
otherwise approved by a relevant authority and, as applicable, by
the customer?
Retain documented information on the release of products, include Yes- Verified Supplier Assurance Certificate, Eg. Customer - Lucas
evidence of conformity with the acceptance criteria, traceability to TVS, Part Name: Yoke; Part No.: 26261570F; Invoice No. P
the person(s) authorizing the release? 2018192123 dated 22.11.2018, Qty: 2450 Nos.
Take appropriate action based on the nature of the nonconformity Yes- Date: 07.11.2018, Yoke: 4 Pole Yoke; Thickness Low; Rej. Qty: P
and its effect on the conformity of products? 50 Nos.
Monitoring the potential impact of the externally provided Yes- Material Inward Register maintained. Eg. On 12/11/2018
8.4.2 products, processes and services, and the effectiveness of the Received Material- Part No. 26262399 Yoke from Lucas TVS limited- P
controls applied by them, and take necessary action? Qty - 1380 Nos. through DC No. 2904.
8.5.2 Use suitable means to identify outputs when it is necessary to Yes- Finished Products are kept in Finished Goods area . P
ensure the conformity of products?