Queue and Resources.: OBJECTIVE: To Define The Replication in ARENA and Plot Different Characteristics of Entities
Queue and Resources.: OBJECTIVE: To Define The Replication in ARENA and Plot Different Characteristics of Entities
LAB # 2
OBJECTIVE: To define the replication in ARENA and plot different characteristics of entities
queue and resources.
THEORY
Replication: When simulation replications are run, a replication output directory is created, and a
replication status report will be generated.
TASK 1:
Plot at least one characteristics of queue, entities and resources.
AREEBA ASHRAF
2017-CE-155
SIMULATION & MODELLING
Average Delay in queue Queue.Waiting Time- 4.1429 2.8531 2.4781 3.3623 3.0194
Average
Maximum Delay in queue Queue.Waiting Time- 16.0068 13.3107 19.4195 15.2324 21.2396
Maximum Value
Average Time in system Entity.TotalTime-Average 7.5681 6.1973 5.6901 6.7067 7.6738
TASK 2:
Make 5 replication of simulation run fill the PMT for each .
Average Delay in queue Queue.Waiting Time- 4.0708 2.8531 2.4781 3.3623 3.0194
Average
Maximum Delay in queue Queue.Waiting Time- 16.0068 13.3107 19.4195 15.2324 21.2396
Maximum Value
Average Time in system Entity.TotalTime-Average 7.5681 6.1973 5.6901 6.7067 7.6738
AREEBA ASHRAF
2017-CE-155
SIMULATION & MODELLING
TASK 3:
Change Arrivals from 5 to 7.5 run the model for 5 replications and fill PMT.
Average Delay in queue Queue.Waiting Time- 75.8563 95.0473 100.53 98.0262 115.45
Average
Maximum Delay in queue Queue.Waiting Time- 151.47 180.70 191.06 209.05 225.29
Maximum Value
Average Time in system Entity.TotalTime-Average 78.8706 97.9869 39.1385 100.83 118.23
AREEBA ASHRAF
2017-CE-155
SIMULATION & MODELLING
TASK 4:
Change the length of model to 720min.inter arrival time back to 5 and fill the PMT.
Average Delay in queue Queue.Waiting Time- 4.1429 2.8884 2.5330 3.4645 3.0758
Average
Maximum Delay in queue Queue.Waiting Time- 16.0068 13.3107 19.4195 15.2324 21.2396
Maximum Value
Average Time in system Entity.TotalTime-Average 7.6592 6.221 5.7767 6.8080 6.27
TASK 5:
Suppose that machine need to be setup for 2 min before processing each part. Change the delay
type and run length to 1440 min and fill PMT.
AREEBA ASHRAF
2017-CE-155
SIMULATION & MODELLING
AREEBA ASHRAF
2017-CE-155
SIMULATION & MODELLING
Average Delay in queue Queue.Waiting Time- 22.6192 20.5853 26.1626 48.5842 68.9632
Average
Maximum Delay in queue Queue.Waiting Time- 62.5481 71.9805 53.8709 103.24 115.60
Maximum Value
Average Time in system Entity.TotalTime-Average 2.0000 2.0000 2.0000 2.0000 2.0000
AREEBA ASHRAF
2017-CE-155