0% found this document useful (0 votes)
625 views

Standard Method of Measurement PDF

Uploaded by

Zuraifah Mohamed
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
625 views

Standard Method of Measurement PDF

Uploaded by

Zuraifah Mohamed
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 171

DRAFT

MALAYSIAN 15D014R0

STANDARD
STAGE: PUBLIC COMMENT (40.20)
DATE: 01/02/2017 - 01/04/2017

t
en
m
om
Civil engineering - Standard method of
measurement
C
lic
ub
rP

OFFICER/SUPPORT STAFF: (NAAS/sat)


Fo

ICS: 91.010.01; 92.010


Descriptors: civil engineering, standard, method of measurement

© Copyright 2017
DEPARTMENT OF STANDARDS MALAYSIA
15D014R0 f

Contents

Page

Committee representation .................................................................................................... iv

Foreword .............................................................................................................................. vi

Introduction ......................................................................................................................... vii

SECTION 1: SCOPE AND GENERAL

1.1 Scope ....................................................................................................................... 1


1.2 Normative references................................................................................................ 1

t
en
1.3 Terms and definitions................................................................................................ 2
1.4 Symbols and abbreviations........ ....................................................... ........................4

m
SECTION 2: APPLICATION OF WORK CLASSIFICATION
om
2.1 Item description ........................................................................................................ 5
2.2 Modes of description ................................................................................................. 5
2.3 Separate items ......................................................................................................... 5
2.4 Units of measurement ............................................................................................... 5
C

2.5 Measurement rules ................................................................................................... 5


2.6 Definition rules .......................................................................................................... 5
lic

2.7 Coverage rules ......................................................................................................... 6


2.8 Additional description rules ....................................................................................... 6
ub

2.9 Application of rules ................................................................................................... 6

SECTION 3: CODING AND NUMBERING OF ITEMS


rP

3.1 Coding ...................................................................................................................... 7


3.2 Items numbers .......................................................................................................... 7
Fo

3.3 Coding of unclassified items...................................................................................... 7


3.4 Numbering of items with additional description .......................................................... 7

SECTION 4: PREPARATION OF THE BILL OF QUANTITIES

4.1 Purpose of the bill of quantities ................................................................................. 8


4.2 Measurement of completed work .............................................................................. 8
4.3 Sections of the bill of quantities ................................................................................. 8
4.4 Preamble .................................................................................................................. 9
4.5 Work items - division of the bill of quantities into parts ............................................... 9
4.6 Daywork schedule .................................................................................................... 9

© STANDARDS MALAYSIA 2017 - All rights reserved i


15D014R0 f

Contents (continued)

Page

SECTION 4: PREPARATION OF THE BILL OF QUANTITIES (continued)

4.7 Heading and sub-headings ....................................................................................... 9


4.8 Extent of itemisation and description ....................................................................... 10
4.9 Descriptions............................................................................................................ 10
4.10 Ranges of dimensions ............................................................................................ 10
4.11 Prime cost items ..................................................................................................... 10
4.12 Provisional sums..................................................................................................... 11
4.13 Quantities ............................................................................................................... 11
4.14 Work affected by water ........................................................................................... 11
4.15 Form and setting ..................................................................................................... 11

t
4.16 Grand summary ...................................................................................................... 11

en
SECTION 5: COMPLETIONS, PRICING AND USE OF THE BILL OF QUANTITIES

5.1
5.2 m
Insertion of rates and prices .................................................................................... 12
Parts to be totalled .................................................................................................. 12
om
SECTION 6: METHOD-RELATED CHARGES
C

6.1 Insertion by a tenderer ........................................................................................... 13


6.2 Itemisation .............................................................................................................. 13
lic

6.3 Descriptions............................................................................................................ 13
6.4 Contractor shall not be bound to adopt method ....................................................... 13
6.5 Charges shall not be measured............................................................................... 13
ub

6.6 Payment ................................................................................................................. 13


rP

SECTION 7: WORK CLASSIFICATION

Table 1 Class A: General items ................................................................................... 15


Table 2 Class B: Environmental protection and enhancement ...................................... 24
Fo

Table 3 Class C: Traffic management and control ........................................................ 32


Table 4 Class D: Site investigation work ...................................................................... 35
Table 5 Class E: Demolition and site clearance............................................................ 42
Table 6 Class F: Earthworks ........................................................................................ 46
Table 7 Class G: Geotechnical work ............................................................................ 52
Table 8 Class H: Piling work ........................................................................................ 60
Table 9 Class I: Concrete work .................................................................................... 66
Table 10 Class J: Brickwork, blockwork and masonry .................................................... 75
Table 11 Class K: Timber work ...................................................................................... 78
Table 12 Class L: Metalwork.......................................................................................... 79
Table 13 Class M: Building work .................................................................................... 83
Table 14 Class N: Painting work .................................................................................... 89
Table 15 Class O: Pipework .......................................................................................... 91
Table 16 Class P: Pipe rehabilitation work ................................................................... 102
Table 17 Class Q: Drainage work ................................................................................ 108

ii © STANDARDS MALAYSIA 2017 - All rights reserved


15D014R0 f

Contents (concluded)
Page

SECTION 7: WORK CLASSIFICATION (continued)

Table 18 Class R: Roads and pavings ........................................................................ 112


Table 19 Class S: Tunnel work ................................................................................... 120
Table 20 Class T: Rail track ........................................................................................ 130
Table 21 Class U: Mechanical and electrical work....................................................... 139
Table 22 Class V: Miscellaneous work ........................................................................ 156
Table 23 Class W: Provisional and prime cost sum ..................................................... 158

Bibliography....................................................................................................................…..159

t
en
m
om
C
lic
ub
rP
Fo

© STANDARDS MALAYSIA 2017 - All rights reserved iii


15D014R0 f

Committee representation

The Industry Standards Committee on Building, Construction and Civil Engineering (ISC D) under whose authority this
Malaysian Standard was developed, comprises representatives from the following organisations:

Association of Consulting Engineers Malaysia


Construction Industry Development Board Malaysia
Department of Irrigation and Drainage Malaysia
Department of Standards Malaysia
Federation of Malaysian Manufacturers
Jabatan Bomba dan Penyelamat Malaysia
Jabatan KerajaanTempatan
Jabatan Kerja Raya Malaysia
Malaysian Iron and Steel Industry Federation
Malaysian Timber Industry Board
Master Builders Association Malaysia
Pertubuhan Akitek Malaysia
Pertubuhan Perancang Malaysia

t
Projek Lebuhraya Utara-Selatan Berhad

en
Real Estate and Housing Developers' Association Malaysia
SIRIM Berhad (Secretariat)
Suruhanjaya Perkhidmatan Air Negara
The Cement and Concrete Association of Malaysia
The Institution of Engineers, Malaysia
Universiti Putra Malaysia
m
om
Universiti Sains Malaysia
Universiti Teknologi Malaysia

The Technical Committee on Construction Practices which supervised the development of this Malaysian Standard
C

was managed by Construction Industry Development Board Malaysia (CIDB) in its capacity as an authorised
Standards-Writing Organisation and consists of representatives from the following organisations:
lic

Association of Consulting Engineers Malaysia


Construction Industry Development Board Malaysia
ub

Construction Industry Development Board Malaysia (Secretariat)


Jabatan Kerja Raya Malaysia
Master Builders Association Malaysia
rP

Persatuan Kontraktor Melayu Malaysia


Pertubuhan Akitek Malaysia
Real Estate and Housing Developers' Association Malaysia
Royal Institution of Surveyors Malaysia
Fo

The Institution of Engineers, Malaysia


Universiti Malaya
Universiti Putra Malaysia

iv © STANDARDS MALAYSIA 2017 - All rights reserved


15D014R0 f

The Working Group on Malaysian Standard Civil Engineering Standard Method of Measurement which developed this
Malaysian Standard was managed by Construction Industry Development Board Malaysia (CIDB) in its capacity as an
authorised Standards-Writing Organisation and consists of representatives from the following organisations:

Association of Consulting Engineers Malaysia


Board of Engineers Malaysia
Board of Quantity Surveyors Malaysia
Construction Industry Development Board Malaysia
Construction Industry Development Board Malaysia (Secretariat)
Department of Irrigation and Drainage Malaysia
Gamuda Berhad
Indah Water Konsortium Sdn Bhd
Jabatan Kerja Raya Malaysia
Jabatan Perkhidmatan Pembetungan
JUB Central Sdn Bhd
Lembaga Lebuhraya Malaysia
Mass Rapid Transit Corporation SdnBhd
Pengurusan Aset Air Berhad
Prasarana Malaysia Berhad
Projek Lebuhraya Usahasama Berhad

t
Royal Institution of Surveyors Malaysia

en
Suruhanjaya Perkhidmatan Air Negara
Tenaga Nasional Berhad
The Institution of Engineers, Malaysia
Universiti Teknologi Malaysia

m
om
C
lic
ub
rP
Fo

© STANDARDS MALAYSIA 2017 - All rights reserved v


15D014R0 f

Foreword

This Malaysian Standard was developed by the Working Group on Malaysian Standard Civil
Engineering Standard Method of Measurement under the authority of the Industry Standards
Committee on Building, Construction and Civil Engineering. Development of this standard was
carried out by Construction Industry Development Board Malaysia which is the Standards-
Writing Organisation (SWO) appointed by SIRIM Berhad to develop standards for construction
practices.

In developing this Malaysian Standard, reference was made to Malaysian Civil Engineering
Standard Method of Measurement (MyCESMM), 2011.

Compliance with a Malaysian Standard does not of itself confer immunity from legal obligations.

t
en
m
om
C
lic
ub
rP
Fo

vi © STANDARDS MALAYSIA 2017 - All rights reserved


15D014R0 f

Introduction

The measurements in this Malaysian Standard are for civil engineering work in Malaysia
conditions.

The standard method of measurement in this Malaysian Standard had been designed to cater
for various aspects of local construction practices and is published to accommodate a
comprehensive coverage of civil engineering work in Malaysia.

There are two(2) other publications have been produced to complement this standard method
of measurement in order to provide detailed clarification of the work items and to assist
measurers in simplifying their tasks when describing the work items.

a) ‘A Guide to Malaysian Civil Engineering Standard Method of Measurement’ offers detailed


technical clarifications on work items found in this standard.

t
en
b) ‘Library of Standard BQ Descriptions for Malaysian Civil Engineering Standard Method of
Measurement’ contains a comprehensive option of list of descriptions of work items from
which measurers can extract to facilitate efficiency in the preparation of the bill of quantities.

m
om
C
lic
ub
rP
Fo

© STANDARDS MALAYSIA 2017 - All rights reserved vii


Fo
rP
ub
lic
C
om
m
en
t
15D014R0 f

Civil engineering - Standard method of measurement

SECTION 1: SCOPE AND GENERAL

1.1 Scope

This Malaysian Standard set forth the procedure for measurement of the civil engineering work
according to which the bill of quantities shall be prepared and priced.

This Malaysian Standard is to be used in conjunction with the condition of contracts for civil
engineering work. It is applicable only for civil engineering work, simple building work,and
mechanical and electrical work incidental to civil engineering work.

This standard does not deal with the preparation of bill of quantities for complex mechanical

t
and electrical engineering work, or complex building work or work which is seldom encountered

en
in civil engineering contracts.

The use of other method of measurement not covered in this standard shall be stated in the
preamble to the bill of quantities.
m
om
1.2 Normative references

The following normative references are indispensable for the application of this standard. For
C

dated references, only the edition cited applies. For undated references, the latest edition of
the normative references (including any amendments) applies.
lic

MS145, Steel fabric for the reinforcement of concrete - Specification


ub

MS 146, Steel for the reinforcement of concrete - Weldable reinforcing steel - Bar, coil and
decoiled product - Specification
rP

MS 2318, Demolition of buildings - Code of practice (First revision)

BS 4449, Steel for the reinforcement of concrete -Weldable reinforcing steel - Bar, coil and
Fo

decoiled product - Specification

BS 8006-1:2010+A1:2016, Code of practice for strengthened/reinforced soils and other fills

Environmental Quality Act, 1974 (Act 127)

Solid Waste and Public Cleansing Management Act, 2007 (Act 672)

Water Services Industry Act, 2006 (Act 655)

Guidelines for the Safety Audit of Roads

Malaysian Sewerage Industry Guidelines (MSIG)

Minerals and Geoscience Department Guidelines

Manual SaliranMesraAlam (MSMA)

© STANDARDS MALAYSIA 2017 - All rights reserved 1


15D014R0 f

Malaysian Grading Rules by Malaysian Timber Industry Board

JKR ArahanTeknik (Jalan) 16/03

JKR Standard Specifications for Road Works

1.3 Terms and Definitions

For the purposes of this standard, the following terms and definitions apply, and shall have the
same meanings as defined in the bill of quantities, conditions of contract, and specification.

1.3.1 an extra over item for excavation

The additional work, over and above the normal excavation, for the removal of materials other
than earth.

1.3.2 a hyphen between two dimensions

t
en
A range of dimensions which includes all dimensions exceeding that preceding the hyphen but
not exceeding that following the hyphen.

1.3.3 bill of quantities


m
om
A list of items giving brief identifying descriptions and estimated quantities of the work
comprised in a contract.
C

1.3.4 commencing surface


lic

In relation to an item in a bill of quantities, the surface of ground before any work covered by
the item has been carried out. “Commencing surface also means, where appropriate in relation
ub

to a group of items in a bill of quantitiesfor work in different materials in an excavation, or a


bored, drilled, or driven hole, the surface of the ground before any work covered by any item in
the group has been carried out.
rP

1.3.5 conditions of contract


Fo

The conditions of contract used for civil engineering work.

1.3.6 daywork

The method of valuing work on the basis of time spent by the workmen, the materials used and
the plant employed.

1.3.7 drawing

Technical information given on an information carrier, graphically presented in accordance with


agreed rules and usually to scale.

2 © STANDARDS MALAYSIA 2017 - All rights reserved


15D014R0 f

1.3.8 excavated surface

In relation to an item in a bill of quantities, the surface to which excavation in the work covered
by the item is to be carried out. In relation to a group of items in a bill of quantities for excavations
in different materials, the surface to which excavation included in the work covered by any item
in the group is to be carried out.

1.3.9 expressly required

Details shown on the drawings, described in the specification or instructed by the Engineer/
Superintending Officer (SO)/ Project Director (PD)/Employer’s Representative (ER) pursuant
to the contract.

1.3.10 final surface

Indicated in the drawings or described in the specificationas the final finished level.

t
en
1.3.11 method-related charges

The sum for an item inserted in the bill of quantities by a tenderer in accordance with 6.1.

1.3.11.1 time-related charge


m
om
A method-related charge for work, the cost of which is to be considered as proportional to the
length of time taken to execute the work.
C

1.3.11.2 fixed charge


lic

A method-related charge which is not a time-related charge.


ub

1.3.12 original surface or original ground level

The existing surface of the ground as indicated on the drawings or as described in the
rP

specification.

1.3.13 site
Fo

The land and other places on, above, under, in, or through which the work are to be executed
and any other lands or places provided or approved for working space or any other purposes
as may be specifically designated in the contract and whether the same may be on the site or
not.

1.3.14 specification

Written document that states the requirements for construction works to be carried out.

1.3.15 work

Work to be carried out, goods, materials, and services to be supplied and the liabilities,
obligations, and risks to be undertaken by the contractor under the contract.

1.3.16 work classification

Work classification set out in Section 7.


© STANDARDS MALAYSIA 2017 - All rights reserved 3
15D014R0 f

1.4 Symbols and abbreviations

For the purposes of this standard, the symbols and abbreviations given in the following apply.

BS British Standard
CBR California bearing ratio
DOE Department of Environment, Malaysia
DOSH Department of Safety and Health
EMP Environment Management Plan
HDPE High-density polyethylene
JKR Jabatan Kerja Raya
LLM Lembaga Lebuhraya Malaysia
MS Malaysian Standard
QA Quality Assurance
QC Quality Control
PVC Polyvinyl Chloride
PAC system Picture Archiving Communication System

t
en
PMT Permit MesinTekanan
SBR Sequencial batch rotor
TNB Tenaga Nasional Berhad
UPS
UV
Uninterruptable Power Supply
Ultra Violet
m
om
ha hectare
hr hour
kg kilogram
C

man-hr man-hour
lic

man-mth man-month
m meter
ub

mm millimetre
mth month
rP

mm² or mm2 square millimetre


m² or m2 square metre
Fo

m³ or m3 cubic metre
nr number
pr pair
t tonne
wk week
% percentage

4 © STANDARDS MALAYSIA 2017 - All rights reserved


15D014R0 f

SECTION 2: APPLICATION OF WORK CLASSIFICATION

2.1 Item description

The work classification divides work that commonly encountered in a civil engineering contract
into twenty three (23) main classes. Each class comprises up to three (3) divisions which
classify work at successive levels of detail. Each division comprises a list of up to eight (8)
descriptive features of work. Each item description in the bill of quantities shall identify the
component of work covered with respect to one (1) feature from each division of the relevant
class.

2.2 Modes of description

Item description formworks shall generally identify the components of the works and not the
tasks to be carried out by the contractor.

t
en
EXAMPLE. An item should be described as “Mild steel bar to nominal diameter 20 mm”; not as “Supply,
deliver, cut, bend, and fix mild steel bar to nominal diameter 20 mm”.

m
Where the work identified by an item is specifically limited, the limitation shall be stated in the
item description.
om
EXAMPLE. “Mild steel bar to nominal diameter 20 mm excluding supply and delivery to the site”.

2.3 Separate items


C

The work shall be divided into items in the bill of quantities so that the component of work which
lic

is included in each item does not exhibit more than two items from the work classification.

EXAMPLE. Formwork may not be included with concrete; lined and unlined drains may not be covered
ub

in the same item, and so on.


rP

2.4 Units of measurement

The unit of measurement for each item shall be that stated for the item in the work classification.
Fo

2.5 Measurement rules

Measurement rules in the work classification set out the conditions under which the work shall
be measured and the method by which the quantities shall be computed in accordance with
4.13.

2.6 Definition rules

Definition rules in the work classification define the extent and limits of the class of work
represented by a word or expression used in the work classification and in a bill of quantities
prepared in accordance with this standard.

© STANDARDS MALAYSIA 2017 - All rights reserved 5


15D014R0 f

2.7 Coverage rules

Coverage rules in the work classification provide that the work stated is deemed to be included
in the appropriate items to the extent that such work is included in the contract. A coverage rule
does not state all the work covered by an item and does not preclude any of the work stated
being covered by a method-related charge.

2.8 Additional description rules

Description of an item in addition to that required in accordance with 2.1 shall be given where
required by any provision of Section 4 or by any applicable additional description rule in the
work classification. Where additional description is given, a separate item shall be given for
each component of work exhibiting a different additional feature.

EXAMPLE. Additional description rule A10 of Class I requires that the concrete mix type or mark number
in each precast concrete unit shall be stated. Accordingly, this rule also means that separate items shall
be given for units cast from concrete of different types.

t
en
2.9 Application of rules

m
Rules printed on a right-hand page above a double line apply to all work in the class. Other
rules on a right-hand page apply to particular groups of items as shown by the classification
table.
om
C
lic
ub
rP
Fo

6 © STANDARDS MALAYSIA 2017 - All rights reserved


15D014R0 f

SECTION 3: CODING AND NUMBERING OF ITEMS

3.1 Coding

For convenience of reference and computerised coding, each item in the work classificationhas
been assigned a code number consisting of a letter and not more than three digits. The letter
corresponds to the class in the work classification in which the item occurs and the digits give
the position of the item in the first, second, and third division of the class.
EXAMPLE.

Code I 4 2 0 identifies item as:

Class I concrete works


First division 4 precast concrete
Second division 2 beams
Third division 0

t
en
The symbol * is used in the rules to the work classification to indicate all numbers in the appropriate
division.

m
I 1 4 * means the group of code numbers from I 1 4 1 to I 1 4 8 inclusive.
om
3.2 Item numbers

Code numbers may be used to number the items in the bill of quantities which shall be listed in
C

the ascending order.

Code numbers used as item numbers in the bill of quantities shall not form part of the item
lic

description or be taken into account in the interpretation of the contract.


ub

3.3 Coding of unclassified items

Where a feature of an item is not listed in the work classification, the digit ‘9’ shall be used in
rP

the appropriate positions in the code number.

Where there is an item to which a division of classification does not apply or for which fewer
Fo

than three(3) divisions of classification are given, the digit ‘0’ shall be used in the appropriate
positions in the code number.

3.4 Numbering of items with additional description

Additional description given for an item in accordance with 2.8 is not represented by the code
number. Where code numbers are used as item numbers, a suffix number shall beused to
distinguish items which have the same code number but different additional descriptions.

EXAMPLE.Additional description rule A10 of Class I requires that additional descriptionbe given for
precast concrete units stating their position in the works and the types of concrete used. If three items are
required within one part of the bill of quantities to allow for precast concrete beams having the same code
but different additional descriptions, the items shall be numbered:

I 4 2 0. 1
I 4 2 0. 2
I 4 2 0. 3

© STANDARDS MALAYSIA 2017 - All rights reserved 7


15D014R0 f

SECTION 4: PREPARATION OF THE BILL OF QUANTITIES

4.1 Purpose of the bill of quantities

The purposes of the bill of quantities are:

a) to provide such information of the items, description, and quantities of the work to enable
tenders to be prepared efficiently and accurately;

b) when a contract has been entered into, to provide for the use of the priced bill of quantities
in the valuation of work executed; and

c) when a contract has been entered into, to provide for a basis in valuing variation, subject
to the provisions of the conditions of contract.

In preparation of bill of quantities, work shall be itemised with sufficient detail to distinguish

t
en
between the different classes of work and work of the same nature carried out in different
locations or in any other circumstances which may give rise to different considerations of cost.
Consistent with these requirements, the layout and content of the bill of quantities should be as
simple and brief as possible.
m
om
All works which are expressly required shall be covered in the bill of quantities.

This standard seeks to attain these objectives principally by the use of the work classification:
C

a) how work is to be divided into separate items in the bill of quantities;


lic

b) the information to be given in item description;


ub

c) the units in which the quantities against each item are to be expressed; and

d) how the work is to be measured for the purpose of calculating quantities.


rP

4.2 Measurement of completed work


Fo

This standard shall also apply to the measurement of completed work.

4.3 Sections of the bill of quantities

The bill of quantities shall comprise the following where appropriate:

a) Preamble

b) Work items (grouped into parts)

c) Daywork schedule

d) Grand summary

8 © STANDARDS MALAYSIA 2017 - All rights reserved


15D014R0 f

4.4 Preamble

The preamble shall state the method of measurement used is this standard and/or other method
of measurement, if any, which have been adopted in the preparation of the bill of quantities.
Such other methods of measurement shall comprise those work not covered by this standard
and any variation made to the measurement of this standard. The variation of this standard may
be necessary for contractor’s designed work and work which is intended to involve selection
between alternatives at the discretion of the contractor. The extent of the work affected by the
variation to this standard shall be stated in the preamble should be by agreement between the
employer/client with the contractor on a case to case basis and shall take precedence over this
standard.

Where excavation, boring, or driving is included in the work, definition of rock shall be given in
the preamble which shall be consistent with that provided in the specification and this definition
shall be used for the purposes of measurement.

Where complex mechanical and electrical engineering work, or complex building work or work

t
en
which is seldom encountered in civil engineering contracts is to be included in a contract for
civil engineering work, it shall be itemised and described in the bill of quantities in sufficient
detail to enable tenderer to price it adequately and their method of measurement which shall

m
be stated in the preamble to the bill of quantities.
om
4.5 Work items - division of the bill of quantities into parts

The items in the bill of quantities which are to be priced and to contribute to the tender total
may be arranged into numbered parts to distinguish between those parts of the work of which
C

the nature, location, access, limitation on sequence or timing or any other special characteristic
is thought likely to give rise to different methods of construction or considerations of cost.
lic

General items (Class A) may be grouped as a separate part of the bill of quantities. Items in
each part shall be arranged in the general order of the work classification.
ub

4.6 Daywork schedule


rP

The daywork schedule, if any, shall comprise a list of the various classes of labour, materials,
and plant for which daywork rates or prices are to be inserted by the tenderer together with a
statement of the conditions under which the contractor shall be paid for work executed on a
Fo

daywork basis.

Provisional sum, if any, for work to be executed on a daywork basis may be given with separate
items for labour, materials, plant, and supplementary charges.

4.7 Heading and sub-headings

Each part of the bill of quantities shall be given a heading, and groups of items within each part
shall be given sub-headings.Headings and sub-headings shall be read as part of the item
descriptions to which they apply. Headings and sub-headings shall be repeated at the start of
each new page to which they apply.

© STANDARDS MALAYSIA 2017 - All rights reserved 9


15D014R0 f

4.8 Extent of itemisation and description

All work shall be itemised and the items shall be described in accordance with the work
classification but further itemisation and additional description may be provided if the nature,
location, importance, or any other special characteristic of the work is thought likely to give rise
to special methods of construction or considerations of cost.

4.9 Descriptions

Descriptions shall identify the work covered by the respective items but the exact nature and
extent of work is to be ascertained from the drawings, specification, and conditions of contract,
as the case may be, and read in conjunction with work classification.

Any detail required to be given in accordance with the work classification may be omitted from
an item description provided that a reference is given in its place which identifies precisely
where the omitted information may be found on the drawings or in the specification.

t
en
Where an item description compiled in accordance with the work classification is insufficient to
identify clearly the particular work covered by the item, additional description shall be given to
identify the work by reference to its location or other physical features shown on the drawings

m
or described in the specification.
om
4.10 Ranges of dimensions

Where all the components of work included in an item are of a specific dimension within a range
given in the work classification, that dimension may be stated in the item description in place of
C

the range of dimensions given.


lic

4.11 Prime cost items


ub

The estimated price of work to be carried out by a nominated sub-contractor shall be given in
thebill of quantities as a prime cost item. Each prime cost item shall be followed by:
rP

a) an item for a sum for attendance in connection therewith which, in the absence of any
express provision in the contract to the contrary, shall include only:
Fo

i) use of temporary roads, standing scaffolding, hoist, canteen, welfare facilities, and
accommodation which are provided by the contractor for his own use and for providing
space for office accommodation and storage of plant and materials, for disposing of
rubbish and for providing light, power, and water for the work of the nominated sub-
contractor; and

ii) unloading, storing,and hoisting materials supplied by him (nominated sub-contractor)


and returning packing materials.

b) an item expressed as a percentage of the price of the prime cost item in respect of all other
charges and profit.

Where any goods, materials, or services supplied by a nominated sub-contractor/supplier are


to be used by the contractor in connection with any item, reference shall be made in the
description of that item, or in the appropriate heading or sub-heading, to the prime cost
itemunder which the goods or materials or services are to be supplied.

10 © STANDARDS MALAYSIA 2017 - All rights reserved


15D014R0 f

4.12 Provisional sums

Provision for contingencies where applicable shall be made by giving provisional sums in the
bill of quantities. A provisional sums for defined work shall be included where work is known to
be required and the scope can be defined but it cannot be completely designed. Provisional
sums for contingency allowance, where applicable, shall be given in the grand summary in
accordance with 4.16.

4.13 Quantities

The quantities shall be nett quantities computed by using dimensions from the drawings unless
directed otherwise by a measurement rule in this standard or by the contract and no allowance
shall be made for bulking, shrinkage, or wastage. Quantities may be rounded up or down where
appropriate. Fractional quantities are not generally necessary and should not be given to more
than one (1) place of decimal.

4.14 Work affected by water

t
en
Where an existing body of open water (other than groundwater) such as a river, stream, canal,
lake, or body of tidal water is either on the site or bounds the site, each body of water shall be

m
identified in the preamble and a reference shall be given to a drawing indicating the boundaries
and surface level of each body of water or, where the boundaries and surface levels fluctuate,
om
their anticipated ranges of fluctuation stated.

4.15 Form and setting


C

The bill of quantities shall be set out within column headed and ruled consecutively as follows:
lic

Column heading
Code
ub

Item Description
Unit
Quantity
rP

Rate
Amount
Fo

Provision shall be made for the amounts inserted on each page to be totalled and carried to a
summary of each part of the bill of quantities and for the total of each part summary to be carried
to the grand summary.

4.16 Grand summary

The grand summary shall contain a tabulation of the parts of the bill of quantities with provision
for insertion of the total of the amounts brought forward from the part summaries.

© STANDARDS MALAYSIA 2017 - All rights reserved 11


15D014R0 f

SECTION 5: COMPLETIONS, PRICING, AND USE OF THE BILL OF


QUANTITIES

5.1 Insertion of rates and prices

Rates and prices shall be inserted in the rate and amount columns of the bill of quantities in
Ringgit Malaysia with Sen inserted as decimal fractions of one Ringgit.

5.2 Parts to be totalled

Each part of the bill of quantities shall be totalled and the totals carried to the grand summary.

t
en
m
om
C
lic
ub
rP
Fo

12 © STANDARDS MALAYSIA 2017 - All rights reserved


15D014R0 f

SECTION 6: METHOD-RELATED CHARGES

6.1 Insertion by a tenderer

A tenderer may insert in the bill of quantities such items for method-related charges to cover
items of work related to the intended method of executing the work, the costs of which are not
to be considered as proportional to the quantities of the other items and for which has not been
allowed in the rates and prices for the other items.

6.2 Itemisation

Where possible, the itemisation of method-related charges should follow the order of
classification and the other requirements set out in Class A of the work classification,
distinguishing between time-related charges and fixed charges. Method-related charges may
be inserted to cover items of work other than those set out in Class A.

t
en
6.3 Descriptions

Each item for a method-related charge inserted in the bill of quantities shall be fully described

m
so as to define precisely the extent of the work covered and to identify the resources to be used
and the particular items of permanent work or temporary work, if any, to which the item relates.
om
6.4 Contractor shall not be bound to adopt method
C

The insertion by the contractor of an item for a method-related charge in the bill of quantities
when tendering shall not bind him to adopt the method stated in the item description in
executing the works.
lic

6.5 Charges shall not be measured


ub

Method-related charges shall not be subjected to re-measurement but shall be deemed to be


priced for the purposes of valuation of variation.
rP

6.6 Payment
Fo

Method-related charges shall be certified and paid pursuant to the interim payment certificate
clauses of the conditions of contract.

In the event of the satisfactory execution of any part of the works which has been the subject
of an item for a method-related charge using, whether in whole or in part, a method other than
that described in the item, the contractor shall nevertheless be entitled to payment of the
method-related charge or the balance thereof, as the case may be, by such instalments at such
times and upon such events as may from time to time be agreed between the
Engineer/SO/PD/ER’s and the contractor. The amount of a method-related charge shall neither
be increased nor decreased by reason only of any change in the method made by the
contractor, unless such change has been instructed by the Engineer/SO/PD/ER’s, in which
case the provisions of the appropriate variation clauses of the conditions of contract shall apply.

© STANDARDS MALAYSIA 2017 - All rights reserved 13


15D014R0 f

SECTION 7: WORK CLASSIFICATION

The twenty three (23) classes of work classification commonly encountered in a civil
engineering contract.

Class A : General items

Class B : Environmental protection and enhancement

Class C : Traffic management and control

Class D : Site investigation work

Class E : Demolition and site clearance

t
Class F : Earthworks

en
Class G : Geotechnical work

Class H : Piling work


m
om
Class I : Concrete work

Class J : Brickwork, blockwork and masonry


C

Class K : Timber work


lic

Class L : Metalwork
ub

Class M : Building work

Class N : Painting work


rP

Class O : Pipework
Fo

Class P : Pipe rehabilitation work

Class Q : Drainage work

Class R : Roads and pavings

Class S : Tunnel work

Class T : Rail track

Class U : Mechanical and electrical work

Class V : Miscellaneous work

Class W : Provisional and prime cost sum

14 © STANDARDS MALAYSIA 2017 - All rights reserved


Table 1. Class A
© STANDARDS MALAYSIA 2017 - All rights reserved

Additional description
Class A: General items Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes: M1 The unit of A1 Item description for
measurement for Engineer/SO/PD/E
general items shall be R's requirements
Method-related charges (refer Section 6).
the sum, unless shall state the
Plant and equipment (included in Class D: Site investigation work, Class G: otherwise stated. A provision for
Geotechnical work, and Class H: Piling work). quantity shall be given establishment,
Temporary road diversion (included in Class C: Traffic management and control and against all items for maintenance and
Class R: Roads and pavings). Engineer/SO/PD/ER’s removal where
Temporary staging for piling (included in Class H: Piling work). requirements of which applicable.

t
the value is to be

en
ascertained and
determined by
remeasurement. Theunit
of measurement shall be

m
stated for each such
item.

om
C
First division Second division Third division Unit

lic
1 Contractual 1 Bond 1 Performance sum M2 Design guarantee A2 Item description for
requirements bond bond shall cover design guarantee
2 Design sum sections of work that are bond shall state the

ub
guarantee bond designed by the section of work to
contractor. be designed by the
contractor.
rP
2 Insurances 1 Insurance of the sum M3 An item may be given
works for a parent company
2 Public liability sum guarantee where it is
insurance
Fo

envisaged a tenderer
3 SOCSO/ sum may be a subsidiary of a

15D014R0 f
Workmen larger company or
compensation group.
insurance
3 Parent company sum
guarantee
15
16

Table 1. Class A (continued)

15D014R0 f
Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Contractual 4 Statutory sum
requirements obligation M4 Statutory obligation
fee shall be determined
as required by the local
5 Stamp duty sum by-law.

2 Engineer/SO/PD/ 1 Facilities for the 1 Office sum M5 Measurement of office D1 All works other than C1 Engineer/SO/PD/E A3 Item description for
ER's requirements Engineer/SO/PD equipment can be the permanent R’s requirements office and
/ER’s 2 Maintenance of mth measured in number works which is shall be deemed to laboratories shall
office where applicable. expressly stated in include employer's specify type and

t
the contract such as requirements. area required.

en
3 Laboratories sum M6 A quantity shall be given facilities, equipment,
against all items for services, attendance C2 Items for
4 Maintenance of mth Engineer/SO/PD/ER's and work to enable Engineer/SO/PD/ER

m
laboratories requirements of which the SO to carry out ’s requirements shall
the value is to be the supervision of be deemed to
2 Equipment for 1 Office equipment sum A4 Item description for

om
ascertained and the work shall be include the
use by the determined by classed as provisions of water office equipment
Engineer/SO/PD 2 Maintenance of mth shall state the type
measurement. A unit of Engineer/SO/PD/ER supply, electricity,
/ER’s office equipment and quantity.
measurement shall be ’s requirements. sanitary, and
3 Laboratory sum stated for each such communication

C
© STANDARDS MALAYSIA 2017 - All rights reserved

equipment item. facilities.


4 Maintenance of mth C3 Items for A5 Item description for
laboratory Engineer/SO/PD/ER office, laboratory,

lic
equipment ’s requirements shall and surveying
5 Surveying sum be deemed to equipment shall
include the specify the type

ub
equipment
6 Maintenance of mth maintenance of and quantity
survey camera. required.
equipment
rP
3 Services for the 1 Provision of sum A6 Item description for
Engineer/SO/PD transport vehicle equipment and
Fo

/ER’s 2 Maintenance of mth transport vehicle


vehicle shall state when
3 Provision of sum items are to be
mobile phones reverted to the
4 Maintenance of mth employer or
mobile phones contractor after the
5 Provision of sum completion.
camera
Table 1. Class A (continued)
© STANDARDS MALAYSIA 2017 - All rights reserved

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Engineer/SO/PD/ 4 Attendance for 1 Drivers man-mth A7 Item description for
ER's requirements Engineer/SO/PD attendance for
/ER’s 2 Survey man-mth Engineer/SO/PD/
assistants ER’s
3 Laboratory man-mth representative
assistants shall state the
4 General labours man-mth number of staff
5 Security guards man-mth required.

5 Submission of 1 Project sum A8 Item description for


works

t
documents execution plan

en
2 Drawings sum programme shall
3 Method sum state the type and
statement format required

m
4 Works sum
programme

om
6 Miscellaneous 1 Progress report mth D2 As-built drawings C4 Progress report A9 Item description for
2 Project nr shall be defined in shall be deemed to progress report
signboard the standard include the provision shall specify the

C
3 As-built sum specifications or the of dated progress date and number
drawings Engineer/SO/PD/E photographs. of sets required.
4 Video recording sum R’s requirements in

lic
5 Temporary sum the contract.
fencing and
hoarding

3 Project's
requirements
1 Survey and
setting out
sum
ub A10 Item description for
survey and
rP
setting out shall
state type of
surveys and when
licensed surveyor
Fo

is required to carry

15D014R0 f
out the work.
17
Table 1. Class A (continued)
18

15D014R0 f
Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Project's 2 Quality 1 QA/QC plan sum M7 Items shall be given in D3 Testing and C5 Testing and A11 Item description for
requirements assurance/Quality 2 Testing of sum this class for all testing commissioning commissioning factory acceptance
control (QA/QC) materials for which items are shall be performed shall be deemed to test shall state the
3 Testing of works sum separately as set out in and fulfilled in comply with the material to be
other classes. accordance with requirements as tested, type of test,
4 Factory sum
relevant authorities/ expressly stated. and the number of
acceptance test
employer's person to witness
5 Testing and sum
requirements/ the test.
commissioning
specification.
D4 Testing and A12 Item description for

t
commissioning testing and

en
shall include man commissioning of
hours, mobilisation, plant shall state the
demobilisation, duration in months
competency

m
personnel, specific A13 Item descriptions for
tools and all other testing of the

om
required items to works shall state
operate fully particulars of
functional. samples and of the
methods of testing.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

A14 Item description for


testing and
commissioning

lic
shall state the
material to be tested
and type of test.

3 Operation and
maintenance of
1 Operation and
maintenance
sum
ub D5 The operation and
maintenance of
A15 Item description for
operation and
rP
plant manual plant only applies to maintenance of
2 Training of sum work where the plant shall state the
operating process plant is duration in months.
personnel required to be
Fo

3 Provision of sum tested. A16 Item description for


manpower operation and
4 Provision of sum maintenance of
chemicals and plant shall state the
consumables sequence/interval,
5 Utility cost sum type, requirement
and duration.
Table 1. Class A (continued)
© STANDARDS MALAYSIA 2017 - All rights reserved

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Project's 4 Maintenance 1 Schedule sum D6 Training shall C6 Item for schedule A17 Item description for
requirements maintenance include all training maintenance shall training of
2 Care of works mth materials, manhours, be deemed to operating
mobilisation, include labours, personnel shall
demobilisation, mobilisation and state the duration of
competency demobilisation of training.
personnel, specific plant, specialist
tools, personnel, specific
accommodation and tools and all other
all other required required items to
items to complete operate fully

t
the training functional.

en
D7 Operation and
maintenance

m
manual shall include
all operational

om
manual material,
man hours, A18 Item description for
competency special requirements
personnel, and all for training shall be
other required items stated.

C
to complete the
operation and
maintenance manual

lic
for the training.

ub
D8 Care of works shall C7 Items for care of
start after the works shall be
certificate of deemed to include
rP
practical completion providing security
until the end of services, payment of
defect liability period all the utilities
or line completion charges, maintain
Fo

whichever existing facilities until

15D014R0 f
applicable. defect liability
period/ line
completion.
19
Table 1. Class A (continued)
20

15D014R0 f
Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Project's 5 Maintenance of 1 Routine sum D9 Maintenance of C8 Routine and A19 Item description for
requirements road maintenance – existing road shall periodic maintenance of road
existing road be as defined in the maintenance shall shall state the type
2 Periodic sum standard be deemed to of maintenance
maintenance – specification for road comply with the required.
existing road works as specified. requirements as
3 Routine sum expressly stated.
maintenance – D10 Routine
temporary road maintenance is the
diversion road maintenance
4 Periodic sum works which include

t
maintenance – pothole patching,

en
temporary road drain cleaning, grass
diversion cutting, road
sweeping, and other

m
ancillary work.

D11 Periodic

om
maintenance refers
to the resurfacing
work required to be
done for the duration

C
© STANDARDS MALAYSIA 2017 - All rights reserved

or period as stated
in the contract.
6 Clearance of site sum C9 Clearance of site

lic
upon completion upon completion
shall be deemed to

ub
include making good
all affected works.

7 1 Traffic diversion sum


rP
Temporary
works 2 Traffic regulation sum D12 Item traffic C10 Traffic diversion A20 Item description for
3 Access roads sum diversion is shall be deemed to de-watering shall
4 Bridges sum diversion of traffic on include road state controlled de-
existing road diversion. watering when
Fo

5 Cofferdams sum
required.
6 Pumping sum
7 De-watering sum
8 Compressed air sum
for tunnelling
Table 1. Class A (continued)
© STANDARDS MALAYSIA 2017 - All rights reserved

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Project's 8 Access to site 1 Restrictions on sum M8 Items access to site
requirements working hours shall be provided
2 Restriction on sum where there are
working methods restrictions on working
hours.

4 Authorities' 1 Occupational 1 Occupational sum D13 HAZOP is a study C11 The appointment of A21 Item description for
requirements safety and health and safety on structured hazard the occupational health and safety
health plan and operational to safety and health report shall state the

t
en
requirements 2 Occupational man- identify and evaluate (OSH) officer shall number of sets
safety and health mth problems which may be deemed to required.
officer represent risks to include site safety
3 Personnel sum personnel or health supervisors

m
protective equipment. for the duration of
equipment the construction

om
4 Health and mth D14 HAZREV is the period.
safety report review of the
5 Training of sum HAZOP after C12 Items for health and
health and safety completion. safety report shall

C
6 Safety signages sum be deemed to
7 Safety tools, sum include tool box
appaaratus and meeting.

lic
equipment
8 HAZOP & sum
HAZREV

2 Permits and fees sum


ub D15 License shall be
classed as permit
A22 Item description for
permits and fees
rP
3 Deposit sum and fees. shall state the name
4 Licence to sum of the authorities
contravene and identify the
requirement under
Fo

the respective

15D014R0 f
contract.
21
22

Table 1. Class A (continued)

15D014R0 f
Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Contractor's 1 Facilities 1 Office sum M9 Items for method- C13 Item for A23 Item description for
requirements related charges, if contractor's laboratoriesequipm
2 Office equipment sum any, shall be inserted requirements shall ent shall specify
by the tenderer in be deemed to type and quantity of
3 Laboratories sum accordance with include the provision equipment required.
4 Laboratories sum Section 6. of facilities and their
equipment continuing operation
and /or
5 Stores sum maintenance.

t
6 Workshops sum

en
7 Workmen sum
accommodations
8 Transport sum

m
om
2 Temporary work 1 Access roads sum
2 Bridges sum
3 Cofferdams sum

C
© STANDARDS MALAYSIA 2017 - All rights reserved

4 Pumping and sum


dewatering
5 River diversion sum

lic
6 Jetty sum

ub
7 Staging sum
8 Compressed air sum
rP
3 Temporary work 1 Access sum
scaffolding
2 Support sum
Fo

scaffolding and
propping
3 Piling sum
4 Formwork sum
5 Shafts and pits sum
6 Hardstanding sum
Table 1. Class A (concluded)
© STANDARDS MALAYSIA 2017 - All rights reserved

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Contractor's 4 Services 1 Electricity sum
requirements 2 Water sum
3 Sanitary facilities sum

4 Hoardings sum
5 Site transport sum
6 Security sum
7 Other services sum

t
5 Site 1 Supervision sum D16 Supervisionshall

en
management 2 Administration man- include site agents
mth and QA/QC officer.
3 Labour teams man-

m
mth

om
6 Mobilisation and sum C14 Mobilisation and A24 Item description for
demobilisation demobilisationshall mobilisation and
be deemed to demobilisation
include state the conditions
remobilisation, if on how

C
expressly required. remobilisation is
required.

lic
6 Design and build 1 Preliminary sum D17 Design and build C15 Design fees shall
element engineering element applies to be deemed to

ub
studies the design and build include reimbursable
2 Design survey sum contract. but exclude
3 Utilities survey sum professional
rP
4 Site investigation sum indemnity insurance,
5 Design fees sum unless expressly
required.
Fo

6 Independent 1 Structural sum


checkers 2 Geotechnical sum

15D014R0 f
3 Road safety sum

7 Supervision fees sum


23
15D014R0 f
24

Table 2. Class B

Additional description
Class B: Environmental protection and enhancement Measurement rules Definition rules Coverage rules
rules
M1 Temporary C1 Preparation of EMP, flora
Measurement covered under other classes:
works and survey report, fauna survey
permanent report, environmental
Traffic management and control (included in Class C: Traffic management and works shall be monitoring report, and
control). clearly stated environmental audit report
Geotextile and geogrid items (included in Class G: Geotechnical work). and identified in shall be deemed to include
the item the cost of any survey
Bio-degradable erosion control blanket (included in Class F:
description. required, literature,
Earthworks).

t
references, consultation, and

en
the production of the
documents. It shall also
include the cost for the
engagement of the

m
environmental specialists
registered with DOE required

om
for carrying out the respective
survey and the preparation of
the said survey report

C
© STANDARDS MALAYSIA 2017 - All rights reserved

First division Second division Third division Unit D1 EMP is a document A1 Item description
describing the contractor's the preparation of
1 Environmental 1 Preparation of sum proposal on the structural the EMP shall

lic
management environmental organisation, work state additional
plan (EMP) management plan programme related to requirements.
2 Appointment of man- environmental abatement

ub
environmental mth and mitigating measures,
officer (EO) environmental monitoring
programmes, and
environmental auditing
rP
and reporting.

D2 EMP shall be prepared in


accordance with the
Fo

general guidelines for the


preparation of the EMP
published by the
Department of
Environment (DOE)
and/or JKR ArahanTeknik
(Jalan) 16/03.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 2. Class B (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules

2 Erosion and 1 Silt fence m D3 Requirements of silt C2 Items for silt fence, silt A2 Item description for
sediment control 2 Silt curtain m2 fence, silt curtain, curtain, sand bags, silt fence shall
plan (ESCP) 3 Sand bag nr sand bag, gabion wall, gabion wall, and rock stated the height.
and rock check dam check dam shall be
shall be in accordance deemed to include
4 Gabion wall m3 with JKR Arahan Teknik provisions as expressly
5 Rock check dam m3 (Jalan) 16/03 and required and removal of A3 Item description for
Manual the items upon gabion wall shall

t
SaliranMesraAlam completion, unless state material type

en
(MSMA). otherwise stated. and wire gauge
size.
C3 Items for gabion wall and

m
rock check dam shall be
deemed to include
excavation and other

om
requirements as expressly
stated.

6 Sediment basin 1 Excavation m3 D4 Requirements of C4 Items for granular filling A4 Items description

C
sediment basin and shall be deemed to for concrete shall
7 Silt trap 2 Granular filling m3
silt trap shall be in include imported fill as state the grade and
3 Concrete m3 accordance with expressly required. type.

lic
Manual
4 Reinforced m A5 Items description
SaliranMesraAlam
concrete pipe for reinforced
(MSMA) and as
5 Rock-filled m3 C5 Items for concrete shall concrete pipe shall

ub
specified.
gabion be deemed to include state the diameter
formwork and and class.
reinforcement.
6 Rock-filled m3 D5 A6 Item description for
rP
gabion mattress Gabions filled with rock-filled gabion
7 Riprap m2 rocks exceeding 300m and rock-filled
high shall be classed as gabion mattress
rock-filled gabion and shall state material
Fo

those not exceeding type and wire


300mm high as rock- gauge size.
filled gabion mattress.
Filling be deemed to be
A7 Item description for

15D014R0 f
imported, unless
otherwise rock-filled gabion
mattress and
riprap shall state
the thickness.
25
15D014R0 f
Table 2. Class B (continued)
26

Additional description
First Division Second Division Third Division Unit Measurement rules Definition rules Coverage rules
rules
2 Erosion and 8 Maintenance 1 Silt fence sum C6 Items for maintenance
sediment control 2 Silt curtain sum of silt fence, silt
plan (ESCP) curtain, sand bags,
3 Sand bag sum gabion wall, rock
4 Gabion wall sum check dam, sediment
basin, and silt trap
5 Rock check sum shall be deemed to
dam include disposal of
6 Sediment basin sum accumulated debris,
7 Silt trap sum sediment, and silt to
approved site, unless

t
otherwise stated.

en
3 Water quality 1 Skid tank bund sum M2 Water treatment D6 Water treatment facilities C7 Items for skid tank A8 Item description for skid
control and 2 Water treatment sum and sewage are used to treat effluent bund shall be deemed tank bund shall state

m
monitoring facilities treatment produced by the work to include traps, oil and the intended location,
3 Sewage treatment sum facilities shall only processes in the Work that grease separators, and material, and principal
facilities be measured are required to be its maintenance and dimensions.

om
where it is discharged off the site to removal upon
expressly required. comply with the completion.
Environmental Quality Act.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

D7 Waste water treatment


facilities is used to treat
sewage from the

lic
contractor's workmen
accommodation.

ub
4 Water quality 1 pH nr M3 Sewage and D8 Sewerage and effluent C8 Item for water quality A9 Item description for
sampling and in 2 Total nr effluent testing testing are tests and testing shall be deemed water quality testing
situ testing suspended shall be measured analysis carried out on raw to include testing by shall state interval and
rP
5 Water quality solid (TSS) for project involving sample to determine approved accredited type of testing, testing
sampling and 3 Biochemical nr sewage treatment. content of effluent or laboratory for analysing, location, duration of
laboratory testing oxygen wastewater within compile and submit the report and analysis on
demand (BOD) parameters stated. analysis report to the monthly basis for the
Fo

6 Sewage and 4 Chemical nr engineer on a monthly duration of the contract.


effluent testing oxygen basis for the duration of
demand (COD) the contract.
A10 Item description for
5 Dissolved nr water quality sampling
oxygen (DO) C9 Item forsewerage and shall state the water
6 Escherichia coli nr effluent testing shall be parameters required by
(E.coli) deemed to include DOE, the interval and
7 Ammoniacal nr testing and analysis by type of testing including
nitrogen accredited laboratory. the sampling location.
8 Oil and grease nr
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 2. Class B (continued)


Additional description
First Division Second Division Third Division Unit Measurement rules Definition rules Coverage rules
rules
3 Water quality A11 Item description for
control and sewage and effluent
monitoring testing shall state
(continued) the parameters and
as required by the
regulatory
requirements.
4 Air quality 1 Tyre washing set C10 Items for tyre washing A12 Item description for
control and facilities facilities shall be tyre washing

t
monitoring deemed to include facilities shall state

en
2 Wash trough nr
construction of tyre type and equipment
3 Water bowser truck nr washing concrete required
4 Water sprinkler sum platform, and provision

m
and maintenance of A13 Item description for
water supply system and wash trough shall
portable water jets. state the material

om
and principal
dimensions.

C11 Items for water bowser A14 Item description for

C
truck shall be deemed water bowser truck
to include the provision shall state the
and maintenance of the minimum number of

lic
vehicle, water supply, water spraying per
and driver. day.

ub
C12 Items for water A15 Item description for
sprinkler shall be water sprinkler
deemed to include shall state the type,
rP
provision and location, and
maintenance of water equipment required.
supply.
Fo

5 Air quality sampling 1 Total nr C13 Air quality sampling A16 Item description for
suspended shall be deemed to air quality
particulates include testing by sampling shall state
(TSP) accredited laboratory. the type of sampling

15D014R0 f
2 Wind velocity nr required and the
and direction sampling location.
3 Particulate nr
matter (PM10)
27
15D014R0 f
28

Table 2. Class B (continued)

Additional description
First Division Second Division Third Division Unit Measurement rules Definition rules Coverage rules
rules
5 Noise and 1 Noise barrier m M4 Measurement for C14 Items for noise barrier A17 Item description for
vibration control item of noise shall be deemed to noise barrier shall
and monitoring 2 Vibration control sum barrier shall be the include supply, state the height,
exposed plain fabrication, installation, type, material and
surface area on the bolts, nuts, posts, and enclosure.
traffic side of the other ancillary work.
barrier.
3 Noise level 1 Ambient noise nr C15 Noise level and A18 Item descriptions for

t
measurement level vibration noise level and

en
measurement measurements shall be vibration
2 Spot noise level nr deemed to include measurements
measurement services by accredited shall state the type

m
laboratory. of measurement
4 Vibration 1 Ground sum required and the
measurement vibration location.

om
2 Structural sum
vibration

6 Waste 1 Scheduled wastes sum M5 Household and D9 Scheduled wastes shall C16 Items for scheduled A19 Item description for

C
© STANDARDS MALAYSIA 2017 - All rights reserved

management 2 Household solid sum construction solid be those wastes as wastes shall be deemed Bio-solid waste shall
waste waste shall be prescribed in the to include storage, state conformance
3 Construction solid sum deemed to be Environmental Quality labelling, and with local authority

lic
waste included in Class A Act. transportation from site regulations,
4 Biomass disposal sum and shall be by a licensed contractor treatment required
measured only D10 Household solid waste for disposal as per the and parameters.

ub
5 Bio-solid waste sum where it is means any solid waste Department of
expressly required. generated by a Environment (DOE)
6 Temporary sum household, and of the kind regulation.
rP
treatment facilities that is ordinarily
(TTF) generated or produced by
M6 Biomass disposal any premises when
is deemed to be occupied as a dwelling C17 Items for household
Fo

included in Class E house, and includes and construction solid


and shall be garden waste as waste shall be deemed
measured only prescribed in the Solid to include provision of
where it is Waste and Public collection bins,
expressly required. Cleansing Management temporary storage area,
Act. and disposal to
approved site.
M7 Bio-solid waste
shall be measured
in sum.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 2. Class B (continued)


Additional description
First Division Second Division Third Division Unit Measurement rules Definition rules Coverage rules
rules
6 Waste D11 Temporary treatment C18 Items for biomass
management facility is required disposal shall be
(continued) whenever any existing deemed to include
treatment process to be preparation and
shut down during construction of
upgrading, refurbishment temporary area and the
or maintenance. disposal to approved

t
site.

en
D12 Thetemporary treatment C19 Item for temporary
facilities shall be treatment facilities

m
designed to comply to shall be deemed to
related parameters as include design and
expressly stated. construct prior to divert

om
existing flow into
temporary treatment
D13 Construction solid facility and able to
waste means any solid maintain existing

C
waste generated from any performance.
construction or demolition
activity, including

lic
improvement, preparatory, C20 Item for bio-solid
and repair or alteration waste shall be deemed
work as prescribed in the to include collection,

ub
Solid Waste and Public composting temporary
Cleansing Management storage area,
Act transportation and
haulage to designated
rP
locations.
D14 Organic matter including
forest and agricultural
waste generated from site
Fo

clearing activities shall be


classed as biomass.

D15 Bio-solid waste are

15D014R0 f
treated sewage sludge
converted to soil
conditioner for agricultural
purposes.
29
15D014R0 f
30

Table 2. Class B (continued)


Additional description
First Division Second Division Third Division Unit Measurement rules Definition rules Coverage rules
rules
7 Conservation/ 1 Preservation of 1 Flora survey sum D16 Flora survey report is a C21 Items for the relocation A20 Item description for
Preservation flora report document identifying the of flora shall be deemed the flora survey
2 Relocation of nr flora species and their to include the cost of report shall state the
flora to distribution, in particular relocation to the number, or sets, of
approved sites those of rare, temporary and the final documents to be
3 Relocation of nr endangered, and endemic sites specified. It shall produced.
flora to arboreta flora species that require also include excavation,
preservation and transportation,
conservation, which may protection, watering,

t
include possible relocation fertilising, and nurturing

en
to other designated sites. until the flora are
established at the
temporary and the final

m
sites of relocation.

om
2 Preservation of 1 Fauna survey sum D17 Fauna survey is to C22 Items for the relocation A21 Item description for
fauna report identify the fauna species of fauna shall be the relocation of
2 Relocation of nr and their distribution, in deemed to include the flora shall state the
fauna particular those of rare, cost of temporary flora species and the

C
endangered, and endemic relocation to the temporary and final
© STANDARDS MALAYSIA 2017 - All rights reserved

fauna species that require rehabilitation centres sites of relocation.


protection and and final relocation to
3 Preservation of 1 Report sum

lic
rehabilitation, which may sites specified. It shall
archaeological/ include possible relocation also include trapping,
heritage sites 2 Protection sum A22 Item description for
to other designated sites transportation and the fauna survey

ub
protection, and report shall state the
treatment required for number, or sets, of
the well being of the documents to be
fauna at the
rP
produced.
. rehabilitation centres
and before their release
at the final place of A23 Item description for
relocation/rehabilitation. the relocation of
Fo

fauna shall state the


fauna species and
sites of temporary
and final relocation/
rehabilitation.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 2. Class B (concluded)


Additional description
First Division Second Division Third Division Unit Measurement rules Definition rules Coverage rules
rules
8 Environmental 1 Environmental sum D18 Environmental A24 Item description for
report monitoring report monitoring report is the environmental
2 Environmental sum report on the assessment monitoring report
audit report of the effectiveness of the shall state the
3 Environmental sum environmental protection parameter
closure audit report measures and the compliance with
identifying of threshold current regulations,
value as a trigger indicating the

t
mechanism for corrective interval of report

en
and preventive actions in submission, number,
cases where the or sets of documents
environmental standards to be produced.
are breached.

m
D19 Environmental audit A25 Item description for

om
report is the report on the environmental
evaluation of the audit report shall
adequacy and compliance state the interval
of the environmental between report
management programme. submissions, and

C
the number, or sets,
of documents to be
D20 Environmental closure produced.

lic
audit report is the report
on the evaluation of the
adequacy and compliance A26 Item description for

ub
of the environmental environmental
management programme closure audit
prior to the issuance of report shall state the
rP
the certificate of practical number, or sets, of
completion. documents to be
produced.
Fo

15D014R0 f
31
15D014R0 f
32

Table 3. Class C
Additional description
Class C: Traffic management and control Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes: M1 Temporary road D1 The traffic C1 The preparation A1 Item description for
diversion involving management plan is oftraffic traffic
earthwork, roads, a document management plan management plan
Earthworks (included in Class F: Earthworks). and pavings shall be describing the shall be deemed to shall state the
measured contractor's proposed include the cost of number of copies
Roadwork (included in Class R: Roads and
separately under strategy and any survey required, and format of the
pavings).
their respective procedure to mitigate literature, report.
classes. and minimise the references,
impacts of the consultations, and

t
construction of the the production of the

en
work on the capacity, document. It shall
performance, and also include the cost
safety of the local for the engagement

m
road network and of qualified traffic
traffic system. engineers required
for carrying out the

om
respective study and
preparation of the
plan.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

First division Second division Third division Unit


1 Traffic 1 Traffic impact sum M2 Traffic impact D2 Traffic impact study C2 Traffic

lic
management plan study study to be is an assessment of management plan
2 Preparation of sum measured only as the impact of shall be deemed to
traffic expressly required. aconstruction include emergency

ub
management plan proposal on the response plan,
existing traffic. parking space for
3 Traffic 1 Traffic manager man- machinery and the
rP
management mth associated work.
team 2 Traffic man-
management mth
officer
Fo

3 Supervisor man-
mth
4 Traffic controller man-
mth
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 3. Class C (continued)


Additional description
First Division Second Division Third Division Unit Measurement rules Definition rules Coverage rules
rules
2 Temporary road 1 Temporary traffic 1 Non-illuminated nr M3 Lengths measured D3 Barriers and C3 Items for traffic A2 Item description for
furniture signs retro-reflective for linear temporary barricades are signals shall be temporary traffic
sheeting road markings shall impenetrable devices deemed to include signs shall state the
2 Portable nr not include gaps in meant to guide and signal posts or type, size,
changeable intermittent line. channel traffic away signal mast arms, substrate, the
message signs from hazardous work signal lanterns, reflective sheeting,
(PCMS) zone area. traffic controllers, material, grade, and
3 Traffic signals set cabling and removal whether they are
upon completion. fixed or portable.

t
D4 Delineators are

en
2 Barriers and 1 Heavy duty nr M4 Area measurement devices to guide and C4 Items for temporary A3 Item description for
barricades water/sand-filled for chevron channel traffic through road furniture shall traffic signals shall
PVC barrier markings shall be a work zone area. be deemed to state the number of

m
the gross area. include the supply, optical systems for
2 Concrete barrier nr installation, each set and the
maintenance, and mounting

om
3 Wooden nr D5 The colour of the
barricade temporary road removal upon requirements.
4 Sand bags m3 markings, unless completion.
5 Temporary m otherwise stated shall

C
guardrail be deemed to be A4 Item description
yellow. heavy duty PVC
C5 The supply of
3 Delineators 1 Cones nr D6 Heavy duty temporary road barrier shall state to

lic
water/sand filled furniture shall be be filled with water
2 String m PVCbarrier shall deemed to include or sand.
delineators include plastic base preparation,

ub
3 Flashing arrows nr hoarding where cost of material,
4 Beacon lights nr expressly required. fabrication, and A5 Item description for
5 Blinkers nr fixing including barriers and
rP
6 Delineator strip nr posts, struts, bolts barricades shall
and nuts, base, state the type,
storage, and material,
transportation. dimensions, and
Fo

D7 Super cones shall be whether fixed or


classed as cones C6 Installation of portable.
where expressly temporary road
required. furniture shall be
deemed to include A6 Item description for

15D014R0 f
cost for multiple super cones shall
shifting within the state the materials,
contractual size and shape
boundaries and its including fixed or
33

vicinities that is portable.


affected by the traffic
management plan.
15D014R0 f
Table 3. Class C (concluded)
34

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Temporary road 4 Temporary road 1 Letters and nr C7 Temporary road A7 Item description for
furniture markings shapes furniture shall be delineators shall
2 Continuous line m deemed to include state the type,
cost for the material, and
3 Intermittent line m inspection, dimensions.
4 Chevron m2 immediate repair
marking and replacement of
5 Transverse bars m2 any damaged,
missing, or stolen
items throughout the
duration of the

t
en
construction, and
removal upon
completion.

m
5 Mechanical robot nr C8 Mechanical robot A8 Item description for
flagman flagmanshall be mechanical robot

om
6 Temporary street nr deemed to include flagman shall state
lightings cost of power pack, whether half-man or
7 Vehicle-mounted nr installation, full-man.
impact attenuator maintenance and

C
removal upon A9 Item description
© STANDARDS MALAYSIA 2017 - All rights reserved

completions. forvehicle-
mounted

lic
impactattenuator
shall state the type.
3 Traffic 1 Traffic sum D8 Traffic management C9 The preparation of A10 Item description for

ub
management report management safety report is the road safety audit traffic
safety report report on the report shall be management
2 Road safety audit sum assessment of the deemed to include safety report shall
report effectiveness of the the cost of any state the interval of
rP
traffic management plan survey required, the report
and to identify any literature, submission and the
unsafe conditions and to references, number of
collect any road accident consultations, and documents, or sets,
Fo

data for the purpose of the production of the to be produced.


corrective and document. It shall
preventive action. also include the cost
to engage the road A11 Item description for
D9 The road safety audit safety auditor to road safety audit
report shall be prepared carry out the audit report shall state
in accordance with the and prepare the the interval of the
Guidelines for The audit report. report submission
Safety Audit of Roads in and the number of
Malaysia by the relevant documents, or sets,
authority. to be produced.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 4. Class D

Additional description
Class D: Site investigation work Measurement rules Definition rules Coverage rules
rules
M1 The depth of boring, D1 Plant movement is C1 Items for plant A1 Item description for
Measurement covered under other classes: drilling, sampling. and the shifting of plant movement shall be water sample
testing shall be and ancillaries / deemed to include shall state the
Excavation not carried out for the purpose of soil investigation work (included in Class F: measured from the equipment from one dismantling and volume.
Earthworks). commencing surface borehole/test erecting from one
Mobilisation and boring for piling (included in Class H: Piling work) as follows: position to the next position to another.
position.
Survey and setting out (included in Class A: General items)
A2 Item description for

t
a) Not exceeding 10 m. D2 Hillslopes is an C2 Sampling shall be disturbed sample

en
b) 10 – 20 m. access with gradient deemed to include shall state the
greater than 15 transportation and weight of samples.
c) 20 – 30 m.
degrees. preservation.
d) 30 – 40 m.

m
e) 40 – 50 m. A3 Item description for
f) Stated exceeding D3 Small disturbed C3 All field explorations block sample

om
50 m. samplesis less than and tests shall be shall state the size
5 kg. deemed to include of sample.
daily field records
and sample logging

C
in accordance with
relevant codes of
practice.

lic
First division Second division Third division Unit C4 Items for

ub
mobilisation and
1 Mobilisation and 1 Deep boring sum demobilisation
demobilisation 2 Cone penetration shall be deemed to
sum
tests include provision of
rP
3 Miscellaneous tests sum all plant, equipment
and ancillaries,
transportation to the
site and removal off
Fo

the site upon the


completion of the
operation.

15D014R0 f
35
Table 4. Class D (continued)

15D014R0 f
36

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Deep boring 1 Plant movement 1 Land nr C5 Deep boring shall A4 Item description for
2 Miscellaneous plant 2 Hillslopes nr be deemed to boring in soil shall
include ground water state type and
3 Over water nr
observation. make of boring
4 Swampy ground nr plant, ancillaries,
C6 Boring in soil shall inclination angle,
3 Boring in soil 1 Water m be deemed to diameter of boring
2 Water with m include provision of and depth as per
additives casing where measurement rule
3 Air/foam m necessary. M1.
A5 Item description for
C7 Drilling in rock shall testing shall state

t
4 Drilling in rock 1 Water with m be deemed to the type of test,

en
additives include core boxes cycles where
2 Air/foam m and become the applicable, nominal
property of the diameter, and the
3 Reaming casing m

m
employer, unless depth, as per
4 Grouting m3
otherwise stated. measurement rule
M1.

om
C8 Plant movement on
5 Test 1 Standard nr land, over water and Item description for
penetration test swamp area shall be A6
sampling shall
2 Vane shear test nr deemed to include
state the size, type,

C
© STANDARDS MALAYSIA 2017 - All rights reserved

3 Pressure meter nr stable platform. and depth, as per


test measurement rule
4 Field nr M1.

lic
permeability test
5 Dynamic cone m
test
6 Sampling 1

2
Disturbed
samples
Undisturbed ub
nr

nr
rP
sample using
thin wall tube
sampler
3 Undisturbed nr
Fo

sample using
mazier sampler
4 Undisturbed nr
sample using
piston sampler
5 Undisturbed nr
sample using
Denison sampler
6 Water sample nr

7 Miscellaneous 1 Borehole marker nr


© STANDARDS MALAYSIA 2017 - All rights reserved

Table 4. Class D (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Cone penetration 1 Plant movement 1 Land nr A7 Item description for
tests 2 Hillslopes nr cone penetration
test shall state the
type, capacity of
cone, machine
capacity, and depth,
as per measurement
rule M1.

2 Test 1 Mechanical cone m


2 Piezocone m A8 Item description for

t
3 Dissipation test nr dissipation test

en
shall state the
maximum hours of
3 Miscellaneous 1 Test location nr test required.
marker

m
4 Miscellaneous test 1 Hand auger 1 Augering in soil m C9 Miscellaneous A9 Item description for

om
tests shall be miscellaneous test
2 Disturbed nr deemed to include shall state special
sample plant movements on preparation for
3 Undisturbed nr the site. equipment when

C
samples using expressly stated to
thin wall tube be
sampler providedseparately.
4 Water sample nr C10 Hand auger shall be

lic
deemed to include
2 Trial pit 1 Excavation nr A10 Item description for
ground water
2 Small disturbed nr trial pit shall state

ub
observation.
sample the dimensions.
3 Bulk sample nr
4 Block sample nr
rP
5 Water sample nr C11 Trial pit shall be A11 Item description for
deemed to include miscellaneous tests
lateral support, shall state the
3 Testing 1 Mackintosh and m
Fo

ground water equipment used,


JKR probe observation, logging setting up where
2 Vane shear nr and mapping of site applicable, method,
3 Plate bearing nr wall, and backfilling, and depth.
4 In situ CBR nr unless otherwise

15D014R0 f
stated.
5 Pocket nr A12 Item description for
penetrometer plate bearing test
6 Field density nr shall state the
required plate size,
37

test load or
pressure, and
number of cycles.
15D014R0 f
Table 4. Class D (continued)
38

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules

4 Miscellaneous test 4 Sampling 1 Small disturbed nr D4 Samples taken from A13 Item description for
sample location other than sampling shall
2 Bulk sample nr borehole, hand state the location
3 Undisturbed nr auger or trial pit shall (which is other
samples using be classed as than borehole,
thin wall tube sampling. hand auger, and
sampler trial pit).
4 Block sample nr
5 Water sample nr

t
en
5 Laboratory tests 1 Classification test 1 Moisture content nr D5 A set, for soil C12 Laboratory tests A14 Item description for
2 Atterberg's set strength tests, shall shall be deemed to laboratory tests
limits. be defined as of include preparation shall state the
3 Specific gravity nr three specimens; of specimens. method of testing

m
4 Particle size nr except for and the standard
distribution for unconfined requirements.

om
fine grained soils compresssive test
shall be defined as
5 Particle size nr of two specimens. C13 CBR test shall be A15 Item description for
distribution for deemed to be soil strength
coarse grained carried out on both tests shall state

C
© STANDARDS MALAYSIA 2017 - All rights reserved

soils ends of each the size of testing


D6 A set, for soil specimen, unless specimen and type
2 Soil strength tests 1 Unconfined set compaction related otherwise stated. of soil sample, i.e.

lic
compressive test, shall be undisturbed or
strength test defined as of five remoulded.
2 Unconsolidated set specimen tests from

ub
undrainedtriaxial the same bulk
C14 Special preparation
compression test sample.
for equipment shall
3 Consolidated set be deemed to be A16 Item description for
rP
undrainedtriaxial provided separately direct shear box
compression test when expressly and multi reversal
with pore water stated. shear box tests
pressure shall state the size
Fo

measurement of the shear box.


4 Consolidated set
drained triaxial
compression test
with pore water
pressure A17 Item description for
measurement contaminants shall
state the standard
5 Direct shear box set requirements, and
6 Multi reversal set the contaminants
shear box to be analysed.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 4. Class D (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Laboratory tests 3 Soil compaction 1 Standard set
related tests compaction
(2.5 kg hammer)
2 Heavy set
compaction
(4.5 kg hammer)
3 Vibrating set
hammer
4 Unsoaked CBR nr
5 Soaked CBR nr

t
en
4 Chemical and 1 Organic matter nr
electro-chemical content
tests 2 Loss on ignition nr

m
3 Total sulphate nr
content
4 Sulphate content nr

om
5 Chloride content nr
6 pH value nr
7 Resistivity test nr

C
8 Contaminants nr

5 Rock strength tests 1 Unconfined nr

lic
compressive
strength test
2 Unconfined nr

ub
compressive
strength with
Young's
rP
Modulus and
Poisson's ratio
measurement
test
Fo

3 Point load test nr


4 Petrographic nr
examination test

15D014R0 f
6 Compressibility and 1 One dimension nr
permeability tests consolidation
2 Variable head nr
permeability
39

3 Fixed head nr
permeability
15D014R0 f
Table 4. Class D (continued)
40

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Instrumentation 1 Piezometer nr C15 Items for A18 Item descriptions
2 Inclinometer nr piezometer and for piezometer
inclinometer shall and inclinometer
be deemed to shall state the
include pre-boring type, depth, and
and installation. material used.

3 Settlement 1 Surface marker nr A19 Item description for


2 Settlement plate nr settlement plate
3 Displacement nr shall state the
marker dimensions of

t
plate, depth, and

en
material used.

4 Magnetic nr M2 Measurement of C16 Items for A20 Item description for

m
extensometer monitoring in monitoring shall be monitoring shall
5 Deep levelling datum nr number shall be deemed to include state the personnel
based on the trips to preparation of and number of

om
6 Monitoring nr
the location of the monitoring report. trips required.
instrumentation.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

7 Geophysical survey 1 Seismic refraction 1 Setting out sum M3 Intervals of D7 A spread of C17 Setting out for A21 Item description for
and mapping survey 2 Installation and spread geophones for installation and seismic refraction installation and

lic
readings seismic refraction readings for seismic survey and readings for
survey shall be refraction survey resistivity profiling seismic refraction
3 Preparation of sum measured along the shall include a 24- shall be deemed to survey shall state
bedrock and soil

ub
slope. channel include survey the interval of
contour maps seismograph with coordinates, geophones,
geophones at not reduced levels, and number of shots
more than 5-metre topographic profile per set, and the
rP
intervals. for each set of type of shots
2 Resistivity profiling 1 Setting out sum M4 Intervals of installation and required.
2 Installation and spread electrodes for D8 Resistivity profiling readings.
resistivity profiling
Fo

readings shall be two-


shall be measured dimensional with
3 Preparation of sum A22 Item description
along the slope. electrodes at not
resistivity profiles for installation
more than 5-metre and readings for
intervals. resistivity
profiling shall
state the type of
configuration,
number, and
interval of
electrodes
required.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 4. Class D (concluded)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
7 Geophysical survey 3 Geological terrain m2 M5 Area measured for D9 Geological terrain C18 Items for A23 Item descriptions
and mapping mapping geological terrain mapping shall be in verification with for seismic
mapping shall be the accordance with utilities provider refraction survey
plan area. guidelines by the shall be deemed to and geological
Minerals and include purchasing terrain mapping
Geoscience of necessary shall state the
Department documents and location and area
M6 A spread shall be Malaysia. verification on the of the site to be
115m line. utilities detected, as investigated.

t
en
compared with the
4 Utilities detection and 1 Locate, detect, sum records of the A24 Item description for
mapping and map all utilities provider. geological terrain
utilities and mapping shall

m
services state the
2 Verification with sum requirement in the

om
utilities provider Minerals and
3 Conduct site sum Geoscience
verification Department
guidelines.

C
8 Report 1 Preliminary report 1 Soil investigation sum D10 A reportshall C19 Items for soil A25 Item description for
2 Final report 2 Seismic sum include investigation reports shall state

lic
refraction survey instrumentation report shall be the number of sets
reading and data deemed to include and the format
3 Resistivity sum interpretation by laboratory test required.

ub
profiling professional results.
4 Geological sum engineers.
terrain mapping
rP
5 Utilities detection sum C20 Items for seismic
and mapping refraction survey
and resistivity
6 Instrumentations sum profiling report shall
Fo

be deemed to
include geological
sections and
interpretations of

15D014R0 f
data by specialists.
41
Table 5. Class E

15D014R0 f
42

Additional description
Class E: Demolition and site clearance Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes: M1 Relocation of existing D1 Site clearance shall C1 Items for demolition A1 Item description for
utilities and materials include general and site clearance shall work from which the
Stripping of top soil (included in Class F: Earthworks). reused shall be clearance, the be deemed to include materials arising
measured under this demolition and disposal of the materials remain the property
Scarifying of road surfaces (included in Class R: Roads and pavings).
class. removal of all arising and stating of the employer
Dismantling of rail track (included in Class T: Rail track). articles, objects, and disposal area on or off shall be stated as
obstructions which site. well as the handing
are expressly over and location of
M2 Relocation of existing required to be storage. Where the
utilitiesusing new cleared, except so stated materials
material shall be those for which are to be salvaged
measured under separate items are by the contractor, a

t
respective classes. given as set out in separate bill for the

en
this class. Clearing credit of the
shall also include the employer shall be
levelling of obsolete so described.

m
dikes, terraces,
ditches, etc.
M3 Area measured for D2 General C2 Items for general A2 Item description for

om
First division Second division Third division Unit
general clearance shall clearanceabove clearanceabove general
1 General clearance 1 Above ground ha be the plan area. ground shall consist ground shall be clearanceabove
of the cutting and/or deemed to include the ground shall state
2 Water bodies ha
M4 Where measurement for taking down, removal of trees and the type of

C
© STANDARDS MALAYSIA 2017 - All rights reserved

trees are expressly removal, and stumps (unless vegetation such as


disposal of otherwise stated in the primary forest,
required, it shall be
measured under item for everything above item description), bushes, oil palm

lic
trees. ground level, undergrowth, shrubs, estate, etc.
including objects roots, and the like.
overhanging the

ub
areas to be cleared. C3 General clearance at
water bodies shall be
A3 Item description for
deemed to include the
D3 Water bodies shall general clearance
rP
removal and disposal of
consist of, but not at water bodies
items in or at the water
limited to, rivers, shall state the type
bodies, including objects
lakes, and sea, of items, and
either floating,
unless expressly whether the object
Fo

submerged, or at the
required. is floating,
bed of the water bodies.
submerged, or at
D4 Site clearance using C4 the bed of the water
Items for general
plant and equipment bodies.
clearancewhich include
with the aid of the removal of hedges
floating mechanism shall be deemed to
shall be classed as include the removal of
general clearance hedges stumps of any
at water bodies. diameter where these
are also required to be
removed.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 5. Class E (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Trees 1 Trees of girth: 0.5 – nr M5 Girth of trees shall be C5 Items for clearance of A4 Item description for
1.0 m measured 1m above trees shall be deemed general clearance
2 Trees of girth: 1.0 – nr ground level. to include the uprooting and trees shall state
2.0 m and removal of stumps. the nature of the
3 Trees of girth: 2.0 – nr backfilling material
5.0 m where holes left by
4 Trees of girth: nr stump removal are
exceeding 5.0 m required to be
backfilled.

t
en
3 Buildings 1 Concrete 1 Individual sum D5 Methods of A5 Item description for
buildings demolition of building and
2 Brickwork and 2 Group of buildings shall be structures shall state

m
masonry buildings sum in accordance with the number of storeys
3 Timber MS 2318: Code of and principal

om
4 Practice for dimensions.
4 Structures Metal 1 Above ground sum
Demolition of
5 No predominant
Building.
5 Scrap materials material 2 Below ground sum

C
A6 Item descriptions for
D6 The material used building and
structures shall state

lic
in the classification
of buildings and special method of
structures shall be demolition where

ub
the predominant required.
material.
rP
A7 Item description for
scrap materials shall
state the principal
Fo

dimensions and state


special method of
demolition where
required.

15D014R0 f
6 Equipment and 1 Disposed off sum A8 Item description for
accessories 2 Dismantle and sum equipment and
refurbishment accessories shall
43

3 Dismantle and sum state the principal


reinstall dimensions.
15D014R0 f
44

Table 5. Class E (concluded)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules

7 Pipelines 1 Nominal bore: m M6 Pipelines within D7 Water mains, C6 Items for demolition of
exceeding 300 mm buildings and other sewers, ducts, and pipelines shall be
structures shall be other utility services deemed to include
measured separately shall be classed as demolition and removal
only where their pipelines. of supports.
nominal bore
exceeds 300 mm.

t
D8 Pipelines shall

en
include pipes laid
below and above
ground.

m
om
C
© STANDARDS MALAYSIA 2017 - All rights reserved

lic
ub
rP
Fo
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 6. Class F
Additional description
Class F: Earthworks Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes: M1 The quantities of D1 Earth shall be deemed to C1 Items for excavation A1 The commencing
earthwork shall be be materials other than shall be deemed to surface shall be
computed nett using topsoil, natural hard include disposal of identified in the
Geotextile &geogrid (included in Class G: Geotechnical work). dimension from the material, rock, artificial excavated material, description of each
Site clearance (included in Class E: Demolition and site clearance). drawings with no allowance hard material, or unless otherwise item of work involving
for bulking, shrinkage, or unsuitable material, stated. excavation for which
Excavation and backfill for drain and pipe in trenches (included in Class O: wastage. Where unless otherwise stated in the commencing
Pipework and Class Q: Drainage work). boundaries between item description. surface is not the
Excavation for : piles included (included in Class H: Piling work) different materials are not C2 Items for excavation original surface. The
Excavation for: tunnels, shafts, heading and other sub-terranian cavities shown on the drawings, D2 Natural hard material shall be deemed to excavated surface
(included in Class S: Tunnel work) measurement shall be shall be material other include upholding shall be identified in
Excavation for : foundation for fences and gates (included in Class V: made on the site. than rock and artificial sides of excavation, the description of

t
Miscellaneous work) hard material that require additional excavation each item of work

en
M2 The commencing surface ripping and other to provide working involving excavation
adopted in the preparation specialised equipment. space and removal of for which the
of the bill of quantities shall dead services. excavated surface is
be used for the not the original

m
measurement of the surface.
completed work. D3 Rock and artificial hard C3 Items description for

om
material shall be material excavation shall be A2 Item description for
that requires the use of deemed to include artificial hard
hydraulic rock breaker, removal of existing material shall state
M3 An item shall be given for
pneumatic tools, or pipes not exceeding the material, and
each separate stage of

C
explosives. of any material or depth to which extent
excavation where
diameter. it shall be excavated.
separate stages in the
D4 Disposal of excavated
conduct of the work are
material shall be deemed A3 Item description for

lic
expressly required.
to be disposal off the site, excavation in rock
unless otherwise stated in shall state the method
M4 Detached pieces of

ub
item description. of blasting, and
boulders shall only be whether for reuse or
regarded as natural hard D5 Sub-ballast shall be disposal.
material, rock, or artificial ballast placed before the
rP
hard material if each bottom ballast is laid.
individually exceeds 0.5 m³ A4 Item description for
in volume and shall be D6 The commencing excavation in natural
measured separately. surface shall be identified hard material and
Fo

in the description of each rock shall state the


M5 An isolated volume of item for work involving method of excavation,
artificial hard materialor excavation, boring, or where appropriate.
rock occuring within other driving for which the
material to be excavated commencing surface is

15D014R0 f
shall not be measured not the original surface
separately unless its
D7 The depths of excavation
volume exceeds 1m3
stated in accordance with
except that the minimum
45

the work classification


volume shall be 0.25m3
shall be measured from
where the net width of
the commencing surface
excavation is less than 2m.
to the excavated surface.
15D014R0 f
46

Table 6. Class F (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Excavation 1 Stripping 1 Topsoil m2 M6 Area measured for A5 Item description for
topsoil shall be the stripping of topsoil
plan area. shall state whether for
reuse or disposal.

A6 Item description for


stripping shall state
the thickness of
excavation.

t
en
2 Cut to fill 1 Earth m3 M7 Item classed as D8 Excavation to form a C4 Items classified as A7 Item description for
3 Cut and 2 m3 excavation to remove profile expressly excavation in cut excavation in cut
dispose Natural hard unsuitable material required shall be shall be deemed to shall state, where

m
material shall be measured, classed as cut. include transportation expressly required,
3 Rock m3 irrespective of the from source to place the excavation to be

om
4 Artificial hard m3 method of excavation D9 Excavation in or under of fill or disposal. carried out manually.
material adopted by the an embankment,
contractor. executed prior to
5 Unsuitable m3 placing of the fill, shall C5 Items classified as A8 Item description for
material excavation in cut excavation in cut for

C
be classed as
© STANDARDS MALAYSIA 2017 - All rights reserved

6 Hazardous m3 M8 The volume of excavation in cut. shall be deemed to rock shall state any
materials disposal of excavated include the trimming requirement for
materialmeasured and preparation of controlled blasting

lic
shall be the difference excavated surface. and pre-splitting.
between the total net D10 Hazardous material
volume of excavation shall include any

ub
A9 Item description for
and the net volume of material whose hazardous material
excavated material excavation and disposal shall state the nature
used for filling. is governed by of the material.
rP
legislation including
invasive plant species.
A10 Item description for
cut and dispose shall
D11 Material, either artificial
Fo

state backfilling in
or natural, that are not layers and
to be used for the works compaction, where
are classed as required.
unsuitable material.

D12 Disposal of excavated


materialshall be
deemed to be disposal
off the site unless
otherwise stated in item
descriptions.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 6. Class F (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Excavation 4 Foundation 1 Earth m3 M9 The volume measured C6 Items for excavation A11 Excavation for
2 Natural hard m3 for the excavation for for foundation shall foundation around
material foundation shall be include upholding pile shafts, and for
the volume which is to sides of excavation, underpinning, shall
3 Rock m3
be either occupied by, preparation of each be so described.
4 Artificial hard or vertically above, any excavated surface,
material m3 part of the structure or additional excavation
5 Unsuitable building. to provide working A12 Item description for
material m3 space, and removal of excavation for
dead services. foundation to be
carried out under

t
water shall be so

en
described.

A13 Maximum depth of

m
excavation for
foundation shall be

om
so described in the
item description.

5 Under water m3 M10 Measurement of C7 Items for excavation A14 Item description for
excavation under under water shall be excavation under

C
water shall be made deemed to include all water shall identify
from soundings, unless necessary temporary the water body, and
otherwise stated. work. the limit of excavation.

lic
M11 The volume measured

ub
for excavation below
a body of open water
shall be the nett
volume of excavation
rP
commencing from firm
ground level such as
river or sea bed as
shown on the drawing
Fo

to which reference is
given in the preamble
in accordance with
4.14.

15D014R0 f
M12 Item classed as
excavation under
water shall be
47

measured, irrespective
of the method of
excavation adopted by
the contractor.
15D014R0 f
Table 6. Class F (continued)
48

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Excavation 6 Dredging 1 Provision of sum M13 Item classed as C8 Provision of plant and A15 Item description for
plant and dredging shall be equipment for dredging shall state
equipment measured, irrespective dredging shall be the location and
2 Dredging work m3 of the method of deemed to include limits of dredging.
excavation by the mobilisation and
contractor. demobilisation.

M14 Measurement of
dredging shall be C9 Items classified as
made from sounding, excavation by

t
unless otherwise dredging shall be

en
stated. deemed to include
transportation from
M15 The volume measured source to disposal

m
for dredging shall be site.
the volume below
water when the water

om
surface is at the higher C10 Items coverage for
level of fluctuation, dredging shall be
unless otherwise deemed to include
stated. any mopping up of silt

C
which accumulates
© STANDARDS MALAYSIA 2017 - All rights reserved

after the final surface


M16 Dredging to remove
has been reached.
silt shall be measured

lic
only to the extent that
is expressly required.

ub
2 Excavation 1 Double handling 1 Earth m3 M17 Double handling of A16 Item description for
ancillaries of excavated excavated material excavation
material 2 Natural hard m3 shall be measured, ancillaries in
material
rP
only to the extent that it connection with
3 Rock m3 is expressly required. excavation by
dredging shall be so
4 Artificial hard m3 M18 The volume measured described.
Fo

material for double handling of


excavated material
shall be that of the void
2 Timber support m2 formed in the
left-in temporary stockpile
3 Metal support m2 from which the
left-in materials are removed.

M19 The volume measured


for excavation within
borrow pits shall be the
net volume measured
for filling.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 6. Class F (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Excavation M20 The area measured for
ancillaries timber or metal
(continued) supports left-in shall
be the area of
supported surface for
which the supports are
expressly required to
be left-in.

3 Filling 1 General 1 Excavated m3 M21 All filling shall be D13 Excavated material C11 Items for filling shall A17 Item description
material measured nett. shall be deemed to be be deemed to include for filling using

t
2 Embankments 2 Imported m3 Excavation after "filling" from cut, or from borrow filling in layers and imported

en
material shall only be measured pit on the Site. compaction. material and
3 Replacement 3 Mass concrete m3 where it is expressly excavated
required. material shall

m
4 To stated depth 4 Other stated m2 D14 Imported material shall C12 Items for filling shall state the type,
or thickness material be deemed to be be deemed to include gradation limit,
M22 Excavation from borrow

om
material from off site. additional filling and size, where
pit on the Site for
necessitated by applicable.
filling, shall not be
settlement or
measured separately,
D15 Filling shall be classed penetration into A18 Item description
unless expressly
as to stated depth or underlying material. for filling using

C
required.
thickness where material mass concrete
is provided of uniform shall state the
M23 The volume of total compacted depth or C13 Items for filling to specification of

lic
imported material thickness such as in embankments or on concrete.
measured shall be the drainage blankets, sloping ground shall
difference between the topsoiling, pitching and be deemed to include

ub
nett volume of filling beaching. Bulk filling benches.
and the nett volume of shall not be classed as
excavated material to stated depth or
rP
derived from work thickness
within classes F and S notwithstanding that it
used for filling. may be compacted in
M24 The volume of separate layers of
Fo

imported fill shall be material of stated


measured nett at the thickness.
place of fill.

15D014R0 f
M25 Backfill material for
excavation to remove
unsuitable material
shall be measured as
filling under item for
49

filling for replacement.


15D014R0 f
Table 6. Class F (continued)
50

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Filling 5 Below water m3 M26 When rock is
deposited into soft
areas, the volume shall
be measured as in the
transport vehicle at the
place of deposition.

M27 Filling of excavation


around completed
structures shall be
measured nett between

t
en
the volume of
excavation under rule
M9 and the completed
structure measured

m
from the commencing
surface.

om
M28 Where filling is to be
deposited below
water, and the quantity

C
© STANDARDS MALAYSIA 2017 - All rights reserved

cannot be measured
satisfactorily by any
other means, the

lic
volume shall be
measured as in the
transport vehicle at the

ub
place of deposition.
Where filling is by
pumping, the volume
shall be measured by
rP
settlement plates.

5 High energy 1 Selected m3 M29 High energy impact


Fo

impact excavated compaction general fill


compaction material other existing ground to be
general fill than topsoil or measured to the
rock surface area to be
2 Imported natural m3 treated.
material other
than topsoil or
rock
3 Existing ground m2
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 6. Class F (concluded)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
4 Landscaping 1 Turfing m2 M30 Measurement for spot D16 The girth of trees shall C14 Items for A19 Item description for
turfing shall include be measured from landscaping shall be landscaping shall
2 Hydroseeding m2 the areas of unturfed ground level to one-third deemed to include state the species of
3 Bio-degradable m2 space between the height of the trees or 1m digging, planting the turfing,
erosion control sods. from ground level, media, bedding, hydroseeding,
blanket whichever is lower. stalking, protection, hedges, and trees
4 Hedges m watering, weeding, required.
M31 The area of turfing and required fertilising,
5 Trees nr hydroseeding shall be and replacement of
the area to the slope, if D17 The height of trees shall dead items until the A20 Item description for
applicable. be measured from vegetation is turfing shall state

t
ground level to the established. the type of turfing

en
lowest branch or crown, (close or spot).
whichever is lower.
C15 Item forturfing on
slopes steeper than 1

m
M32 Ungrown areas of A21 Item description for
turfing and (vertical) and 3 hydroseeding
hydroseeding (horizontal) shall be shall state the

om
exceeding 1 m² shall deemed to include technical
not be measured. pegging down with specification.
stakes.

C
M33 The lengths of hedges C16 Items for bio- A22 Item description for
measured shall be degradable erosion bio-degradable
their developed lengths control blanket shall erosion control

lic
along the centre line. be deemed to include blanket shall state
fastening hooks and the location and the
netting required. spacing of the

ub
fastening hook.
M34 The area of bio-
degradable erosion A23 Item description for
control blanket shall
rP
trees shall state
be measured nett and the minimum girth
no allowance shall be and height.
made for laps.
Fo

A24 Item description for


landscaping and
hydroseeding
shall identify work
upon surface which

15D014R0 f
are inclined at an
angle exceeding
10° to the
horizontal.
51
Table 7. Class G

15D014R0 f
52

Additional description
Class G: Geotechnical work Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes: D1 Earth shall be deemed C1 Items for pull out test A1 Item description shall
to be materials other shall be deemed to state the location of
than topsoil, natural include all necessary the item if the work is
hard material, rock, equipment, and more than 6m above
Excavation, filling, and turfing for retaining structures (included in Class F: Earthworks). artificial hard material or submission of test or below the road
Reinforced concrete foundation & precast concrete panel for retaining structures unsuitable material, procedure, records, level.
(included in Class I: Concrete work). unless otherwise stated and reports.
Sand replacement for ground treatment (included in Class F: Earthworks). in the item description.
Sub-soil drainage (included in Class Q: Drainage work)
Pile embankment measured under respective classes (included in Class F: D2 Natural hard material
Earthworks, Class I: Concrete work, Class H: Piling work) shall be materials other
than rock and artificial

t
hard material, and

en
requires other
specialised equipment.

m
D3 Rock and artificial
hard material shall be

om
materials that require
the use of either
hydraulic rock breaker
or pneumatic tools or
explosives.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

First division Second division Third division Unit C2 Items for provision
shall be deemed to

lic
1 Plant and 1 Provision sum include provision of all
equipment 2 Moving and sum necessary plant and
handling

ub
equipment,
3 Temporary staging sum transportation to the
Site, handling,
assembling, and
rP
removal off the site
after completion of
operation.
Fo

C3 Items for moving and


handling shall be
deemed to include the
moving and handling of
all necessary plant and
equipment within the
site and from location
to location as often as
is, whenever necessary
for the execution of the
whole operation.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 7. Class G (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Retaining 1 Gabion 1 Rock-filled m3 D4 Gabions filled with A2 Item description for
structures gabion rocks exceeding gabion shall state
2 Rock-filled m2 300 mm high shall the type and grading
gabion mattress be classed as of filling, and the
3 Filter m2 rock-filled gabion, type, gauge, and
layer/separator and those not protective coatings
exceeding 300 mm of the wire mesh. If
high as rock-filled laying underwater is
gabion mattress. required, it shall be
Filling shall be so stated.

t
deemed to be

en
imported, unless
otherwise stated. A3 Item description for
rock-filled gabion

m
mattress shall state
the thickness.

om
2 Cribwall 1 Single cell m2 M1 The area of single C4 Items for cribwall A4 Item description for
cell cribwall shall shall be deemed to cribwall shall state
2 Double cell m2
be the sloping area include precast the concrete grade,
3 Triple cell m2

C
from the reinforced concrete length of precast
4 Quadruple cell m2 commencing components and concrete header,
5 Filter m2 surface. granular infill combination, and
materials. type of granular infill.

lic
layer/separator
M2 The area of
multiple cells

ub
cribwall shall be the
sloping area of the
highest cells from
rP
the commencing
surface.
Fo

15D014R0 f
53
15D014R0 f
54

Table 7. Class G (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Retaining 3 Reinforced soil 1 Reinforced earth m3 M3 Reinforced earth D5 Reinforced earth A5 Item description for
structures slope filling filling and filling and reinforced reinforced soil slope
2 Reinforced m3 reinforced granular filling is shall state the
granular filling granular filling defined as filling location, type, and
3 Erosion m2 shall be measured within the reinforced strength of material
protection mats nett volume within zone. used.
the reinforced
zone.
D6 Reinforced earth A6 Item description for
filling and reinforced erosion protection

t
4 Reinforced soil wall 1 Wall facing m2 M4 The area of granular filling shall mats shall state the

en
2 Reinforced earth m3 erosion be in accordance with type of material and
filling protection mat BS 8006-1:2010+ strength, where
3 Reinforced m3 shall be the nett A1:2016. applicable.
area to the slope

m
granular filling
4 Levelling pad m with no allowance
5 Pull out test nr for laps and D7 Precast concrete C5 Items for wall facing A7 Item description for

om
anchorage. panel shall be shall be deemed to wall facing shall
classed as wall include soil state the type, size,
M5 The area of facing in retaining reinforcement and and shape, where
reinforced soil stucture. galvanising where applicable; and the

C
© STANDARDS MALAYSIA 2017 - All rights reserved

wall is measured applicable, concrete grade, type


from the connections and/or of soil reinforcement,
commencing jointing, geotextile, and wall height.

lic
surface. and accessories for
wall joints.
M6 Sub-soil drainage A8 Item description for

ub
shall be measured levelling pad shall
under Class Q. state the dimension
and concrete grade.
rP
3 Slope stabilisation 1 Soil nailing 1 Stated length nr C6 Items for soil nailing A9 Item description for
shall be deemed to soil nailing shall
2 Pull out test nr include drilling of state the diameter of
Fo

borehole, corrugated the borehole and


HDPE pipe if reinforcement bar,
applicable, sleeve concrete grade, and
grouting, sealant the size of concrete
compound, pad.
galvanised steel
bearing plate, and all
necessary formwork.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 7. Class G (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Slope stabilisation 2 Rock bolt C7 Items for rock bolt A10 Item description for
shall be deemed to rock bolt shall state
include drilling of the diameter of the
borehole, borehole and
reinforcement bar, reinforcement bar,
reinforced concrete concrete grade, and
pad, sleeve grouting, the size of concrete
sealant compound, pad.
and all necessary
formwork.

3 Ground anchor 1 Earth m C8 Items for ground A11 Item description for

t
anchor shall be ground anchor shall

en
2 Natural hard m
material deemed to include state the size and
prestressed tendons, type of anchor
3 Rock m drilling, and grouting, tendons and grouting.

m
4 Pull out test nr concreting, and all
necessary formwork.

om
4 Concrete buttress m2 C9 Items for concrete A12 Item description for
buttress shall be concrete buttress
deemed to include shall state the grade

C
steel wire mesh, PVC and average
drain pipe, dowel thickness of the
bars, filter materials, concrete.

lic
and all necessary
formwork.

5 Horizontal drain 1
2
Earth
Natural hard
m
m
ub M7 Concrete channel
for horizontal
drain shall be
C10 Items for horizontal
drain shall be
deemed to include
A13 Item description for
horizontal drain shall
state the type and
rP
material
measured under drilling and perforated diameter.
3 Rock m
Class R740. pipe.
4 Artificial hard m
Fo

material
5 Unsuitable m
materials

15D014R0 f
55
Table 7. Class G (continued)

15D014R0 f
56

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
4 Surface protection 1 Guniting m2 M8 The area of C11 Items for guniting A14 Item description for
guniting and shall be deemed to guniting shall state
2 Articulating slab m2 articulating slab include steel wire the average thickness
3 Rock netting m2 shall be their nett mesh, pvc drain pipe, of the concrete and
area to the slope. dowel bar, filter the concrete grade.
4 Stone pitching m2 materials, and all
5 Stone revetment m2 M9 The area of rock necessary formwork.
netting shall be
measured nett with C12 Items for articulating A15 Item description for
no allowance made slab shall be deemed articulating slab
for laps. to include preparation shall state the

t
of surface, blinding, thickness, type, and

en
aggregate, geotextile, jointing of the slab.
and all necessary
concrete and
A16 Item description for
formwork.

m
rock netting shall
state the type and
C13 Items for rock netting gauge of chain mesh

om
shall be deemed to and anchoring
include all necessary system.
accessories.
A17 Item descriptions for

C
© STANDARDS MALAYSIA 2017 - All rights reserved

stone pitching and


stone revetment
shall state the stone

lic
size and thickness.

5 Ground treatment 1 Vertical drains m M10 Any filling required A18 Item description for

ub
2 Dynamic nr under this class to vertical drain shall
compaction be used as a state type and cross-
working platform sectional dimensions
rP
3 Vibro compaction nr
shall be measured of drainage tube,
4 Sand column m under Class F3**. wrapping material,
5 Stone / Aggregate m and vacuum
column consolidation where
Fo

6 Soil - cement m M11 Surcharge material required. Type of soil


column (for pre-loading) to be stated.
used with vertical
drains shall be
measured under A19 Item description for
Class F3**. dynamic
compaction shall
state the weight of the
drop hammer, number
of drops and height of
drop.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 7. Class G (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Ground treatment A20 Item description for
vibro compaction
shall state the depth
of treatment required.

A21 Item descriptions for


sand column, stone
/aggregate column
and soil -cement
column shall state
the diameter of the

t
columns and the size

en
of aggregate, where
applicable.

m
A22 Item description for
soil -cement column
shall state the grout

om
mix design.

7 Geotextile m2 M12 The area of A23 Item description for

C
8 Geogrid m2 geogrid and geotextile and
geotextile shall be geogrid shall state
measured nett with the type, grade and

lic
no allowance for the technical
laps. specification of the
materials or reference

ub
number of the
product.
rP
6 Grouting work 1 Drilling for grout 1 Earth m M13 Drilling through C14 Drilling for grout A24 Item description for
holes 2 Natural hard m previously grouted holes in rock shall be drilling for grout
material holes in the course deemed to include holes shall state the
3 Rock m of stage grouting drilling in natural and diameter and
Fo

shall not be artificial hard maximum depth.


4 Artificial hard
measured. Where materials.
material m
grout holes are
5 Unsuitable expressly required
materials m to be extended,

15D014R0 f
drilling through C15 Items for sleeve pipe A25 Item description for
previously grouted shall be deemed to sleeve pipe shall
2 Sleeve pipes m include grouting of state the diameter
holes shall be
mesured as drilling annulus space and type of material.
57

through rock. between the sleeve


pipe and the drilled
holes.
15D014R0 f
Table 7. Class G (continued)
58

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Grouting work 3 Injection 1 Cement t M14 The mass of grout
2 Sand t injection
3 Bentonite t measured shall not
include the mass of
4 Aluminium kg
mixing water.
powder
5 Chemical t
6 Pulverized fuel t
ash
7 Pea gravel t

t
en
4 Connection for nr C16 Connection for A26 Item description for
grouting grouting shall be connection for
deemed to include grouting shall identify

m
5 Water pressure test nr
provision of packer as those which are in
expressly required. stages, distinguishing

om
between those which
are in ascending and
descending stages.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

7 Diaphragm walls 1 Excavation 1 Earth m3 M15 The depths of D8 Diaphragm walls are C17 Items for excavation A27 Item description for
2 Natural hard m3 concrete in walls constructed with for diaphragm walls excavation shall
diaphragm walls the use of bentonite shall be deemed to state the maximum

lic
material
3 Rock m3 shall be measured slurry or other include preparation depth and thickness
from the cut-off temporary support and upholding sides of wall.
4 Artificial hard m3 level to the toe fluids. of excavation.

ub
material level.
5 Unsuitable m3
materials
rP
M16 The mass of steel
2 Concrete m3 reinforcement D9 The nominal diameter A28 The mix specification
shall be taken as stated in the item or strengths shall be
0.785 kg/m per 100 description for bar C18 Items for stated in item
Fo

mm² of cross- reinforcement shall reinforcement shall description for


3 Reinforcement 1 Mild steel bar t section (7.85 t/m³). be deemed to include
be the cross-sectional concrete in
2 High tensile steel t The mass of other diameter defined in labour for cutting, diaphragm walls.
bar reinforcing MS 146. bending, and placing.
3 High tensile steel m2 materials shall be A29 Item description for
fabric taken as stated in steel bars shall state
4 Fabric of other m2 the contract. the size of the bars.
stated material
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 7. Class G (concluded)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
7 Diaphragm walls 4 Waterproofed joints sum M17 The mass measured
5 Guide walls m for reinforcement
shall include the
6 Preparing top of m mass of
walls to receive reinforcement
cappings expressly required in
7 Preparing cast in m laps and special
pockets or chases chairs.

t
en
M18 The mass measured
for reinforcement,
in tonne, shall be up
to two decimal

m
place.

om
M19 Guide walls shall
be measured on
both sides of the

C
diaphragm walls.

lic
ub
rP
Fo

15D014R0 f
59
Table 8. Class H

15D014R0 f
60

Class H: Piling work Measurement rules Definition rules Coverage rules Additional description rules
Measurement covered under other classes: M1 Bored and driven C1 Items for piling work A1 Item description for piles shall
depths shall be shall be deemed to identify preliminary piles. Item
measured along the include disposal of description shall identify raked
axes of piles from the excavated and surplus piles and their inclination
Boring for site investigation work (included in Class D: Site investigation work). commencing surface: materials. stated.
Setting out of piles and as-built drawings (included in Class A: General items). a) to the toe levels of C2 Items for piling work A2 Item descriptions for piles shall
Ground anchor and stone column (included in Class G: Geotechnical work) bored piles; shall be deemed to state the materials composition.
include piling records
Walling and tie rod (included in Class L: Metalwork) b) to the bottom of casing and number stated. A3 Items descriptions for piles shall
of driven cast in-situ state the structure to be
piles; C3 Items for pre-boring supported and identify the
shall be deemed to commencing surface.

t
include backfilling

en
M2 The commencing A4 Item description for piles shall
surface adopted in the between the pile and identify initial piles and
preparation of bill of the bore. extension piles. Details of
quantities is the surface driving head and shoes shall be

m
C4 Items for depth driven
at which boring or so stated in item description.
shall be deemed to
driving is expected to
include handling, A5 Item description for depth

om
begin, and shall be
hoisting, pitching, and driven shall state jack-in
adopted for the
driving of piles. method when required.
measurement of the
completed work.
C5 Item for preparing A6 Item description for

C
© STANDARDS MALAYSIA 2017 - All rights reserved

M3 Each group items for head shall be deemed reinforcement shall state
piles to be driven shall to include pile plug, details of couplers when
starter bar, steel plates expressly required.

lic
comprise:
and welding works.
a) an item for the total A7 Item description reinforcement

ub
supply number of pile C6 Item for pre-boring shall state materials and grade
points of stated length; shall be deemed to including identifying straight or
b) an item for the total include grouting void helical and nominal diameter to
depth driven . with stated materials be stated as not exceeding
rP
between the piles and 20mm and exceeding 20mm.
the bores.
M4 Depth driven shall be A8 Item description for supply of
measured from the cut- pile shall state the cross-
Fo

off levels to the toe sectional type and cross-


levels sectional dimensions or
diameter, lengths, concrete
M5 The concreted lengths grade, class of piles, detail of
of cast in place concrete treatment and coatings required
piles shall be measured and working load, where jack-in
from the cut-off level to method expressly required.
the toe levels expressly
A9 Item description for jointings
required. shall state type, method and
detail of jointing required
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 8. Class H (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Plant and 1 Provision sum C7 Items for provision shall
equipment 2 Moving and sum be deemed to include
handling provision of all necessary
3 Temporary staging sum piling plant and
equipment, transportation
to the site, handling,
assembling, and removal
off the site after
completion of operation.

C8 Items for moving and

t
en
handling shall be deemed
to include moving and
handling all piling plant
and equipment within the

m
site, and from location to
location as often as is,

om
and whenever necessary
for the execution of the
whole piling operation.

C
2 Piles 1 Bored piles 1 Depth bored or m M6 Each group of items for D1 Piles consisting of C9 Items for bored piles and A10 Item description for
driven bored piles,barrette driven permanent barrette pilesshall be bored, cast in
2 Driven cast in situ 2 Boring through m pile, driven cast in-situ steel casing, which is deemed to include place, barrette piles

lic
concrete piles rock concrete piles, and filled with concrete, temporary casings, and caisson piles
3 Barrette piles 3 Permanent m caisson piles shall shall be classified as stabilising agent, and shall state the
casings comprise: driven cast in-situ enlar ged bases. diameter.

ub
4 Reinforcement t concrete piles
straight bars where the piles,
5 Reinforcement t barrette piles are A11 Item description for
helical bars designed for the load bored piles shall
rP
6 Concreted m a) An item for the total to be carried on the C10 Items for boring and state contiguous
length depth bored or total concrete. excavation through rock bored piles where
7 Cut-off piles nr depth driven or total shall be deemed to applicable.
Fo

8 Preparing head nr depth excavated, D2 The nominal diameter include natural and A12 Item description for
stating total number of used for classification artificial hard materials permanent casings
pile points, and of bar reinforcement including backfilling bore shall state materials,
b) An item for the total shall be the cross- with stated materials. thickness, and
concreted length of sectional diameter details of treatments

15D014R0 f
piles. defined in BS 4449 or C11 Items for permanent and coating.
MS 146. casing shall be deemed
to include the supply and
jointing of casings, driving
61

heads, and shoes, where


applicable.
Table 8. Class H (continued)

15D014R0 f
62

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Piles M7 The lengths of C12 Items for reinforcement A13 Item description for
permanent casings for shall be deemed to concreted length
bored piles shall be include supporting shall state when
measured from the cut- reinforcement. required particular
off level to the bottom of method of concrete
the casings. The length placement, concrete
of permanent casing C13 Items for driven cast in- grade, poured at a
for driven cast in situ situ concrete piles shall stated speed,
concrete piles shall be be deemed to include temperature,
measured from the cut- pre-boring, where compacted or cured in
off levels to the toe applicable. a particular method.
levels.

t
en
4 Caisson piles 1 Depth excavated m M8 The length of D3 Piles comprising
permanent casings for placement of
2 Excavation m caisson piles shall be permanent steel

m
through rock measured from the top casing, where the
3 Permanent m of casing to the bottom material within the

om
casings of the casings. casing is excavated
4 Reinforcement t and filled with
straight bars concrete, shall be
5 Reinforcement t M9 The mass of steel classified as caisson
helical bars reinforcement shall be

C
piles when the piles
© STANDARDS MALAYSIA 2017 - All rights reserved

6 Concreted length m taken as 0.785 kg/m per are designed for the
100 mm² of cross- load to be carried on
section (7.85 t/m³). The

lic
the concrete.
mass of other
reinforcing materials
shall be taken as stated

ub
in the contract.
5 Micropiles 1 Depth bored m M10 The mass measured for C14 Items for boring A14 Item description for
rP
2 Boring through m reinforcement shall through rock shall be micropiles shall state
rock include the mass of deemed to include the diameter.
3 Steel pipe as m reinforcement expressly artificial hard materials.
reinforcement required in laps.
Fo

4 Reinforcement t A15 Item description for


straight bars grouting shall state
5 Reinforcement t C15 Item for steel pipe as the grout design mix
helical bars reinforcement shall be and/or strength.
6 Grouting m3 deemed to include
7 Cut-off piles nr jointing/welding.
8 Preparing head nr
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 8. Class H (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Piles 6 Precast reinforced 1 Supply of piles nr M11 Each group of items for D4 The supply lengths of C16 Items for filling hollow A16 Item description for
concrete piles precast concrete and precast reinforced piles with concrete filling hollow piles
7 Precast prestressed 2 Depth driven m timber piles shall concrete piles and shall be deemed to with concrete shall
concrete piles comprise: precast prestressed include removal of state the specification
3 Pre-boring m concrete piles shall materials from within the of the concrete and
4 Jointing nr a) one or more items for be the total number piles before concreting. reinforcement.
5 Filling hollow m the number of piles of of piles of stated
piles with stated length lengths expressly
concrete required to be
supplied.

t
6 Cut-off piles nr b) an item for the total

en
7 Preparing head nr depth driven

m
8 Steel H-piles 1 Supply nr D5 The supply lengths A17 Item descriptions for
of steel H-piles and supply of steel H-
2 Depth driven m steel pipe piles shall piles and steel pipe

om
3 Pre-boring m be the total number piles shall state the
of piles of stated mass per meter,
4 Filling hollow m
lengths expressly cross-sectional
piles with
required to be dimensions and grade
concrete

C
supplied. of steel, length, and
5 Cut-off piles nr
concrete infill, where
6 Jointing nr applicable.

lic
7 Preparing head nr
3 Piles 1 Steel pipe piles 1 Supply nr A18 Item descriptions for
steel H-piles and

ub
2 Depth driven m steel pipe piles shall
3 Pre-boring m state details of
4 Filling hollow m treatments, coatings,
rP
piles with and cathodic
concrete protection where
required.
5 Cut-off piles nr
Fo

A19 Item descriptions for


6 Jointing nr steel H-piles and
7 Preparing head nr steel pipe piles shall
state type of jointing.

15D014R0 f
63
15D014R0 f
Table 8. Class H (continued)
64

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Piles 2 Timber piles 1 Supply nr M12 The areas of driven D6 The lengths of C17 Item for jetting deemed A20 Item description for
3 Precast concrete 2 Depth driven m precast prestressed timber pilesand to include jet pipes, supply of timber
sheet piles concrete sheet piles precast concrete hoses and jet pump. piles shall state the
4 Precast prestressed 3 Pre-boring nr shall be calculated by sheet pilesshall be grade of timber,
concrete sheet piles multiplying the the total number of cross-sectional
4 Jointing nr horizontal lengths of the piles, of stated dimensions, length,
pile walls formed by the lengths, expressly and any pressure
5 Cut-off piles nr average depths required to be treatment required.
6 Preparing head nr measured from the cut- supplied.
7 Jetting nr off levels. A21 Item description for
supply of precast

t
and prestressed

en
concrete sheet piles
shall state thickness,
length, and width.

m
5 Interlocking steel 1 Supply m M13 The areas of driven D7 Interlocking steel A22 Item descriptions for
sheet piles interlocking steel piles corner, junction, interlocking steel

om
2 Depth driven m2 shall be calculated by closure, and taper sheet pile shall state
multiplying the mean piles shall be the section reference
3 Pre-boring m undeveloped horizontal classified as special or mass per metre
lengths of the pile walls piles. and section modulus.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

4 Jetting m formed (including


5 Special piles m lengths occupied by D8 The supply lengths of
special piles) by the interlocking steel

lic
6 Cut-off piles m A23 Item description for
depths measured from piles shall be the
7 Ground nr supply area of piles
cut-off levels to the toe- total length expressly
anchorages shall state details of
levels. required to be

ub
8 Preparing head m treatment and
supplied. coatings required.
M14 Closure and taper piles
classed as special piles
rP
shall be measured only A24
Item descriptions for
where they are special piles shall
expressly required. state the type and
length.
Fo

M15 The lengths measured


for cutting of surplus
lengths of interlocking A25 Item description for
steel sheet piles shall ground anchorages
be the mean shall state the
undeveloped horizontal composition and
lengths to be cut working load.
(including lengths
occupied by special
piles).
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 8. Class H (concluded)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
4 Miscellaneous 1 Obstructions 1 Excavation m M16 Excavation through A26 Item description for
work through obstructions shall be excavation through
obstructions measured only for obstruction shall
breaking out state the cross-
obstructions or artificial sectional dimension or
hard materials diameters of the
encountered above the excavation.
founding stratum.

t
5 Pile tests 1 Static load tests nr A27 Item description for

en
2 Pile dynamic nr static load test shall
analyser (PDA) state the test loads.
3 Pile integrity test nr Where the load is

m
(PIT) applied to raked piles,
4 Sonic logging test nr it shall be so stated.

om
5 Lateral test nr
6 Statnamic test nr A28 Item description for
pile test shall identify
7 Bi-directional static nr those which are for
load tests

C
preliminary piles.
8 Global strain nr
extensometers
static

lic
6 Pile tests 1 Plate loading test nr A29 Item description for

ub
2 Shaft friction test plate loading test
nr and shaft test shall
state type of pile and
identify location of
rP
pile.
Fo

15D014R0 f
65
15D014R0 f
66

Table 9. Class I
Additional description
Class I: Concrete work Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes: M1 The volume of C1 Items for in situ A1 Item description for
concrete measured concrete shall be concrete shall state
shall include that deemed to include mass,
In-situ concrete for: occupied by: placing and reinforced,prestressed
a) reinforcement and compaction of concrete and maximum
Concrete diaphragm walls (included in Class G: Geotechnical work).
other metal sections; concrete. size of aggregate.
b) prestressing
Piling work (included in Class H: Piling work).
components;
Manholes for sewerage pipework (included in Class O: Pipework). c) cast-in components A2 Items description for
each not exceeding components classed as
Roads, pavings, and kerbs (included in Class R: Roads and pavings).

t
0.1 m³ in volume; other concrete forms

en
Concrete sleeper (include in Class T: Rail track). d) rebates, grooves, shall state the
throats, fillets, components and include
Foundations for fences and gates (included in Class V: Miscellaneous work). chamfers, or internal one of the following:

m
Concrete fencing (included in Class V: Miscellaneous work). splays each not a) the principal dimensions
exceeding 0.01 m² of the concrete
Formwork and reinforcement for sleeper (included in Class T: Rail track). cross-sectional area; component;

om
Formwork and reinforcement for fences and gates foundation (included in e) voids not exceeding b) a type or mark number
Class V: Miscellaneous work). 0.05 m³; of a concrete component
f) joints or joint for which principal
Formwork and reinforcement in manholes for sewerage pipework (included in
componentsbetween dimensions are given on
Class O: Pipework).

C
© STANDARDS MALAYSIA 2017 - All rights reserved

adjacent volume ofin- the drawings; or


Precast concrete piling work (included in Class H: Piling work). situ concrete, and c) a statement locating a
Precast concrete manholes for sewerage pipework (included in Class O: g) nibs or external splays concrete component for

lic
Pipework). not exceeding 0.01m2 which principal
cross-sectional area. dimensions are given on
Precast concrete pipeworks (included in Class O: Pipework). the drawings;

ub
Precast concrete paving, kerbs, and traffic sign supports (included in Class R:
Roads and pavings).
Precast concrete fencing (included in Class V: Miscellaneous work). A3 Item description for
rP
Concrete drain and sumps (included in Class Q: Drainage work) cement component
other than ordinary
portland cement shall be
so described.
Fo

A4 Item description for


concrete required to
be placed by a
particular method,
poured at a stated
speed, temperature, and
compacted or cured in a
particular way shall be
described.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 9. Class I (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 In-situ concrete 1 Grade: C15 1 Blinding m2 M2 Columns and piers D1 A concrete mix shall be A5 Item description for in-
designed mix 2 Grade: C20 2 Bases, m3 more than 1 m wide or classified as a situ concrete shall state
footings, pile long and integral with a designed mix where the concrete admixtures
3 Grade: C25 wall shall be measured the performance is when required.
caps, and
4 Grade: C30 ground slabs as part of the wall stated in the contract
except where expressly and the mix proportions
5 Grade: C35 3 Suspended m3 required to be cast are to be proposed by A6 Item description for
slabs separately. the contractor, subject blinding shall state the
6 Grade: C35A 4 Columns and m3 to conditions imposed thickness.
piers by specifications such
7 Grade: C40 5 Beams and m3 M3 Beams more than 1 m as minimum cement A7 Item description for
walls wide or long and content, water cement concrete which is

t
8 Grade: C50 6 Sprayed m2 integral with a slab ratio, etc. expressly required to be

en
concrete shall be measured as placed against an
7 Encasing to m3 part of the slab except D2 A concrete mix shall be excavated surface (other
metal sections where expressly classified as than building) shall so
8 Other m3 required to be cast prescribed mix where state.

m
concrete separately. the exact mix
forms proportions of cement,

om
sand, and aggregates A8 Item descriptions for
are stated in the sprayed concrete
contract. support shall state the
2 In-situ concrete 1 1:3:6 specification of the
prescribed mix D3 Concrete in

C
2 1:2:4 concrete and whether it
suspended slabs and is reinforced and the
3 1:1½:3 walls less than 1 m minimum thickness.
wide or long shall be

lic
4 1:1:2
classed as concrete in
beams and columns,
respectively.

ub
3 Proprietary
concrete D4 Concrete shall be
classed as proprietary
rP
concretewhere the
application is to achieve
a particular
performance outside
Fo

normal performance
criteria.

D5 Sprayed concrete shall

15D014R0 f
be classed as other
concrete forms.

D6 Reinforcing materials
added to mix for
67

sprayed concrete shall


not be classed as
reinforcement.
Table 9. Class I (continued)

15D014R0 f
68

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
4 Precast 1 Columns nr M4 Parapet shall be D7 Concrete components C2 Items for precast A9 Item description for each
concrete measured as wall. which are cast other concrete shall be type of precast
2 Beams nr
than in their final deemed to include concrete unit shall
3 Prestressed nr M5 Plank shall be position shall generally reinforcement, state the position of the
beams measured as slab. be classed as precast formwork, joint, and work and specification of
4 Walls nr concrete units. finishes. the concrete to be used.
5 Slabs nr D8 Where site precasting C3 Items for A10 Item description for
of units is adopted prestressed each precast concrete
6 Segmental units nr (excluding those with precast units shall unit shall state the
7 Units for nr multiple use of be deemed to concrete mix type or
subways, formwork), and the include mark number. Units with

t
vehicular or nature of the work is prestressing. different dimensions

en
pedestrian the characteristic of in shall be given defferent
culverts and situ concrete but types or mark numbers.
viaducts involves the movement

m
8 Other concrete nr of the cast units into A11 Item description for
forms their final positions, the prestressed beams
unit shall be classed as shall identify pre-

om
in situ concrete . tensioned or post -
tentioned beam
including stating
particulars of tendon

C
© STANDARDS MALAYSIA 2017 - All rights reserved

used.

A12 Item descriptions for

lic
columns, beams,
segmental units, units
for subways, and

ub
vehicular or pedestrian
culverts and ducts,
copings, other
rP
concrete forms, sills
and weir blocks shall
state the cross-section,
type and total length.
Fo

A13 Item descriptions for


walls and slabs shall
state the type, area,
average thickness.

A14 Items descriptions for


units for subways,
culverts, ducts,
copings, sills and weir
blocksshall state the
mass per metre.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 9. Class I (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Formwork 1 Sides 1 Bases, m2 M6 Formwork shall be D9 Formwork shall be C4 Items for formwork A15 Item description for
footings, pile measured for surfaces classified according to shall be deemed to formwork shall state
caps, and of in-situ concrete its angle of inclination include any when formwork left-in is
ground slabs which require as follows: temporary staging required.
temporary support required.
2 Soffit 2 Columns and m2 Angle of
during casting, except
piers inclination
where otherwise Class
from the
3 Sides and soffit 3 Beams m2 stated. A16 Item description for
horizontal
4 Sloping 4 Walls m2 Soffit 0° ‒15° C5 Items for formwork formwork adopting the
shall be deemed to use of travel form
5 Curved to one 5 Suspended m2 M7 Formwork shall not be Sloping 15° ‒ 80°
include the system, slipform system
radius in one slabs measured for the Sides 80° ‒ 90° projections and and the like shall be

t
plane following:
intrusions. stated.

en
6 Other curve 6 Other m2 a) edges of blinding
members concrete not exceeding
7 For concrete 0.2 m wide or deep; A17 Item description for

m
components of b) joints, associated formwork shall state the
constant cross- rebates, and grooves; required concrete finish
sections D10 Formwork for type F1, as follows:

om
c) temporary surfaces F2, and F3 finish shall
formed at the discretion be as defined in the
of the contractor; and standard specification a) F1: rough finish.
d) surfaces of concrete for road works as b) F2: fair finish.

C
which are expressly specified.
c) F3: smooth finish.
required to be cast
against an excavated d) Other stated finish.

lic
surface. e) Other surface features.

M8 Formwork to upper

ub
surfaces of concrete
shall be measured to A18 Item description for
surfaces inclined at formwork to upper
surfaces shall be so
rP
angle exceeding 15°
from the horizontal, stated, except where the
and to other upper surfaces are inclined at
sufaces for which an angle not exceeding
15° from the horizontal.
Fo

formwork is expressly
required.

M9 The area of formwork A19 Item description for


measured shall include formwork to curved

15D014R0 f
the area of formwork concrete components of
obscured by voids and constant cross-sections
inserts. shall state the radii.
69
15D014R0 f
70

Table 9. Class I (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Formwork A20 Item description for
formwork to concrete
constant cross section
shall state the principal
cross-section
dimensions of the
components, location or
other unique identifying
feature.

t
en
8 For voids 1 Depth not nr M10 Formwork for the D11 The size of voids for A21 Item description for
exceeding 1 m surfaces of voids I58* shall be as follows: voids shall state the

m
2 Depth m2 larger than the upper cross-section or
exceeding 1 m bound values as diameter, and the depth

om
defined in rule D11 Class of voids.
shall be measured as Cross-section
set out in this class.
Circular (diameter)

C
© STANDARDS MALAYSIA 2017 - All rights reserved

0.35 ‒ 0.7 m
Other voids (area)
0.1 ‒ 0.5 m²

lic
M11 No deduction shall be
made for formwork to
voids smaller than the
D12 The depth of voids

ub
lower bound values as
shall be measured
defined in rule D11.
perpendicularly to the
adjacent surface of
rP
concrete.

D13 The maximum


Fo

diameter or cross-
section shall be taken
when the voids have
two unequal diameters
or cross-sections.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 9. Class I (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Reinforcement 1 Mild steel bars 1 Nominal diameter: t M12 The mass of steel D14 The nominal diameter C6 Items for A22 Item description for
6 mm reinforcement shall be stated in item reinforcement special joint shall
2 High tensile bars 2 Nominal diameter: t taken as 0.785 kg/m description for bar shall be deemed to state the type of joint,
10 mm per 100 mm² of cross- reinforcement shall be include labour for and size of
3 Reinforcing bars 3 Nominal diameter: t section (7.85 t/m³). The the cross-sectional cutting, bending, reinforcing bars.
of other stated 12 mm mass of other diameter defined in MS and placing.
materials reinforcing materials 146.
4 Stainless steel 4 Nominal diameter: t shall be taken as
bars of stated 16 mm stated in the contract.

t
quality 5 Nominal diameter: t C7 Items for A23 Item description for

en
20 mm reinforcement shall steel fabric
6 Nominal diameter: t be deemed to reinforcement to MS
25 mm include supporting 145 shall state the

m
7 Nominal diameter: t D15 Sleeve joints, steel reinforcement other type, fabric ref
32 mm welded, swaged or than steel supports number or letter in
8 Nominal diameter: t M13 The area of additional screwed and the like in to top accordance with MS

om
stated exceeding fabric in laps shall not reinforcing bars shall reinforcemment. 145.
40 mm be measured. be classed as special
joints.
5 Special joints nr M14 The mass measured A24 Item descriptions for

C
for steel support to top other fabric
reinforcement shall reinforcement shall
6 Steel fabric 1 Nominal mass: not m2
include the mass of state the materials,

lic
exceeding 2kg/m2
reinforcement fabric reference sizes
7 Fabric of other 2 Nominal mass: 2- m2
expressly required in and nominal mass
stated material 3kg/m2
laps and special chairs. per square meter.

ub
3 Nominal mass: 3- m2
4kg/m2
4 Nominal mass: 4- m2 M15 The mass measured
5kg/m2 for reinforcement is in
rP
5 Nominal mass: 5- m2 tonne and shall be up
6kg/m2 to two decimal places.
6 Nominal mass: 6- m2
7kg/m2
Fo

7 Nominal mass: 7- m2
8kg/m2
8 Nominal mass: m2
stated exceeding

15D014R0 f
8kg/m2
71
15D014R0 f
72

Table 9. Class I (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
7 Concrete 1 Joints 1 Construction m M16 Joints shall be C8 Items for joints A25 Item descriptions for
ancillaries joints measured at locations shall be deemed to joints shall state the
2 Contraction m where they are include formwork. dimensions, materials
joints expressly required. and nature of
3 Expansion m components.
joints
4 Waterstops m C9 Items for
5 Sealed rebates m M17 The length of waterstops shall A26 Item description for

t
be deemed to

en
or grooves waterstops shall be waterstopsshall state
6 Dowels ‒ plain nr measured along their include cutting and the material and the
or greased centre lines. jointing of actual width.
7 Dowels ‒ nr waterstops and

m
sleeved or provision of special
capped fittings at angles
and junctions.

om
2 Post-tensioned 1 Horizontal nr M18 Prestressing shall be D16 Profiled tendons in C10 Items for A27 Item description for
prestressing internal measured by the horizontal components prestressing shall prestressing shall

C
© STANDARDS MALAYSIA 2017 - All rights reserved

tendons in in number of tendons shall be classed as be deemed to identify the concrete


situ concrete where tendons are horizontal tendons. include ducts, components to be
2 Inclined or nr used and by the jacking, grouting stressed, and stating the

lic
vertical internal number of external and other composition, strength,
tendons in in jacking operations components, and and length of the tendon
situ concrete where stress is induced tasks ancillary to and particulars of the

ub
3 Horizontal nr by jacking them. D17 The length of tendons prestressing. anchorage.
internal used shall be their
tendons in developed length
rP
precast between the outer
concrete faces of anchorage.
4 Inclined or nr
vertical internal
Fo

tendons in
precast
concrete
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 9. Class I (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
7 Concrete 3 Finishing of top 1 Class U1 finish m2 M19 The areas of tops of walls D18 Class U1, U2, U3 and C11 Items for A28 Item description for
ancillaries surfaces and other surfaces which U4 finishes shall be as granolithic and concrete ancillaries
2 Class U2 finish m2 are not given separate defined in the standard other stated applied shall state the materials,
3 Class U3 finish m2 finishing treatment shall specification for road finish shall be thickness and surface
not be measured as works as expressly deemed to include treatment of granolithic
4 Class U4 finish m2 finishings of top surfaces. stated. materials, surface and other stated applied
treatment, joints finish.
and formwork.

t
en
4 Finishing of 1 Aggregate m2 M20 Finishing of top surface C12 Items for finishing
formed surfaces exposure using shall be measured for of top surfaces
retarder areas or surfaces where shall be deemed to
2 Bush m2 expressly required. include wood float

m
hammering or steel trowel.
3 Other stated m2

om
surface M21 No deduction from the
treatment areas measured for
carried out finishing shall be made
after striking for holes and openings in
formwork

C
the finished surfaces
each not exceeding
0.5 m².

lic
5 Inserts 1 Linear inserts m M22 Where inserts are D19 Components cast or A29 Item description for
2 Other inserts nr expressly required to be grouted into in situ inserts shall identify the

ub
grouted intopreformed concrete, except components to be cast
openings theformwork reinforcement, or grouted-in and stating
shall be prestressing, and their principal
rP
measuredseparately. jointing materials shall dimensions.
be classed as inserts.
A30 Item description for
inserts shall
Fo

identify:
a) those which project
from one surface of the
concrete

15D014R0 f
surface of the concrete
b) those which project
from two surfaces of the
concrete
73

c) those which are totally


within the concrete
volume
15D014R0 f
74

Table 9. Class I (concluded)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
7 Concrete A31 Item description for
ancillaries inserts which are
expressly required to be
grouted into preformed
openings in concrete
items descriptions shall
so stated including
materials for grouting
and sizes of openings.

t
en
6 Grouting under nr A32 Item description for
plates grouting under plates
shall state materials and

m
area for grouting.

om
8 Ancillary work 1 Water proofing m3 M23 Items for water tightness C13 Items for water A33 Item description for
for water admixtures testing and sterilising of tightness testing water proofing
retaining 2 Water tightness m3 tanks shall be measured of tanks shall be admixtures shall state
structure testing of tanks up to the capacity of the deemed to include the type and the mix

C
3 Sterilising and m3 tanks as expressly stated. provision of water proportion.
© STANDARDS MALAYSIA 2017 - All rights reserved

flushing of tanks and all testing


equipment as
expressly required.

lic
C14 Items for sterilising

ub
and flushing of
tanks shall be
deemed to include
provision of potable
rP
water and
chemicals as
expressly required.
Fo

4 Linings and 1 High alumina m2 M24 Area of PVC and HDPE C15 Items for linings
coatings cement linings shall be and coatings shall
2 PVC m2 measured nett not be deemed to
3 HDPE m2 inclusive of laps. include supply and
installation/
4 Sodium silicate m2
application.
5 Epoxy coatings m2
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 10. Class J

Additional description
Class J: Brickwork, blockwork and masonry Measurement rules Definition rules Coverage rules
rules
M1 Each skin of brickwork, A1 Item description for
Measurement covered under other classes: blockwork, or masonry, brickwork,
either in cavity or blockwork, and
Prefabricated panels (included in Class M: Building work). composite wall masonry shall state
construction shall be the type and thickness
measured. of material used.

M2 Volumes and areas


measured for brickwork,
blockwork, and masonry
shall include the areas of

t
joint, and exclude those of

en
copings and sills. No
deduction from, or
addition to, areas
measured shall be made

m
for intruding or projecting
surface features. No

om
deduction from the areas
measured shall be made
for holes and openings in
walls where surfaceof the
hole/opening each not

C
exceeding 0.25 m² in
cross-sectional area.

lic
M3 Mean dimensions shall be D1 In determining the C1 Items for brickwork A2 Item descriptions for
First division Second division Third division Unit
used to calculate the thickness of walls, and blockwork walls, facing to

ub
1 Brickwork 1 Vertical straight walls m2 areas of wall, facing to facing, and casing, walls shall be concrete, casing to
2 Blockwork 2 Vertical curved walls m2 concrete,and casing to the presence of deemed to include metal sections, and
metal sections and the surface features joint reinforcement, columns and piers
3 Masonry 3 Battered straight walls m2
rP
heights of columns and shall be ignored. movement joints, shall either state the
piers. fixing ties, bonds to materials, nominal
4 Battered curved walls m2 D2 Walls or facing existing work, and dimensions and types
5 Vertical facing to m2 battered on one or fixing clamps. of brick, block, and
Fo

concrete both sides shall be stone or give


6 Battered facing to m2 classed as battered C2 Items for masonry equivalent references
concrete walls or battered shall be deemed to to the applicable MS
facing. include fair facing or BS.
7 Casing to metal sections m2 finish.

15D014R0 f
8 Column and piers m3 D3 The thickness of A3 Item descriptions for
battered walls masonry walls,
shall be their mean facing to concrete,
thickness. casing to metal
75

sections, and
columns and piers
shall state the
surface finish.
15D014R0 f
Table 10. Class J (continued)
76

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules

D4 Isolated walls A4 Item descriptions for


having a length on walls, facing to
plan not exceeding concrete, casing to
four times their metal sections,
thickness shall be columns and piers
classed as piers. shall state the
bonding pattern, type
of mortar, type of
jointing and pointing.

t
A5 Item descriptions for

en
walls, facing to
concrete, casing to
metal sections, and

m
columns and piers,
either in cavity or
composite wall

om
construction, shall be
so stated.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

4 Miscellaneous 1 Surface features 1 Copings and sills m M4 The length of surface D5 Columns and piers A6 Item description for
work features measured shall attached to walls or surface features
2 Rebates and chases m
be the mean lengths. The facing of the same shall include

lic
3 Cornices m areas measured for fair material shall be sufficient details to
4 Band courses m facing finishes shall be classed as identify the materials,
those expressly required, pilasters. special masonry,

ub
5 Corbels m and shall be measured at special or cut bricks
6 Pilasters m the face. and blocks. The
spacing of
7 Plinths m
rP
intermittent surface
8 Fair facing m2 features shall be
stated in the item
description.
Fo

A7 Iitem description for


surface features
shall state the cross-
sectional
dimensions.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 10. Class J (concluded)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
4 Miscellaneous 2 Ancillaries 1 Damp proof courses m M5 The length of additional C3 Items for built-in A8 Item description for
work material in laps of damp pipes and ducts damp proof
2 Infills of stated m2
proof course shall and shall be deemed to courses and infills
thickness joint reinforcement not be include their supply, shall state the
3 Built in pipes and nr measured. unless otherwise materials and
ducts stated. dimensions.
4 Bonds to existing m2
works

t
en
5 Movement joints m C4 Items forbonds to A9 Item description for
existing works built-in pipes and
6 Joint reinforcements m shall be deemed to ducts shall stated
include fixing and the length where

m
ties. they exceed 1.00 m.

om
A10 Item description of
built-in pipes and
ducts shall state the
cross-sectional area

C
where they exceed
0.05 m2.

lic
ub
rP
Fo

15D014R0 f
77
15D014R0 f
78

Table11. Class K

Additional description
Class K: Timber work Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes: D1 Grades A, B, C, and C1 Items for timber shall A1 Item description for
D shall be in be deemed to include timber shall state the
accordance with the fixing components, grade and treatment
Formwork to concrete (included in Class I: Concrete work). malaysian grading fixing, fastening, requirements or
Timber piles (included in Class H: Piling work). rules by Malaysian boring, cutting, and special surface
Timber sleepers (included in Class T: Rail track). Timber Industry jointing. finishes.
Board.
Timber fencing (included in Class V: Miscellaneous work).
Timber roof structure, doors, and windows (included in Class M: Building work).

t
en
M1 The length of timber D2 The size stated shall A2 Iitem description for
First division Second division Third division Unit
components shall be the finished size. timber components
1 Timber 1 Grade A 1 Length: not m be their overall shall state the

m
components exceeding 6 m lengths with no structural use and
2 Grade B 2 Length: exceeding m allowance for sizes.
6m scarfed or other

om
3 Grade C joints.
4 Grade D

C
© STANDARDS MALAYSIA 2017 - All rights reserved

2 Decking 1 Floors m2 M2 No deduction from D3 Surfaces of columns C2 Items for walls and A3 Item description of
the areas measured shall be classed as soffits shall include decking and
3 Boarding 2 Walls m2 for timber decking walls. Surfaces of any temporary staging boarding shall state
3 Soffits m2

lic
shall be made for beams shall be required. the use and thickness
openings and holes classed as soffits. of timber.
each not exceeding C3 Decking and

ub
0.50 m². boarding shall be
D4 The thickness stated deemed to include A4 Item description shall
shall be the nominal framework where state the size and
M3 Structural load thickness. spacing of the
rP
bearing timber expressly required.
members in framework
forming part of the where expressly
framework shall be required.
measured under
Fo

timber
components.

4 Miscellaneous 1 Skirting m A5 Item description shall


work 2 Hand rails m state the location, size
3 Cornice m of skirting, hand rails,
cornice, dado.
4 Dado m
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 12. Class L

Additional description
Class L: Metalwork Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes: M1 No allowance shall be D1 Frames shall include C1 Items for supply and A1 Item description shall
made in the plane frames, trusses, erection of state the surface
measurement for space frames, lattice structural members treatment and
Traffic signs (included in Class C: Traffic management and control and Class R: rolling margins and frames, and tower shall be deemed to painting carried out
Roads and pavings). other permissible structures. include delivery, prior to delivery of
deviations. The mass protective and/or components to site
Metalwork in piling work (included in Class H: Piling work).
of welds, fillets, bolts, decorative surface where required.
Metal formwork in concrete (included in F: Earthworks and Class I: Concrete washers, rivets, and treatment, jointing
work). protective coatings type, fabrication, and

t
Metalwork in roofing structure (included in Class M: Building work). shall not be measured. handling and hoisting. A2 Item description for

en
Metalwork in pipework (included in Class O: Pipework). supply and erection
Gantries (included in Class R: Roads and pavings). of structural
M2 No deduction shall be
members shall state
Permanent and temporary rail tracks and accessories (included in Class T: Rail made for the mass of C2 Items for supply and the materials, grades,

m
track). metal removed to form erection of and their use.
notches and holes structural members
Metalwork in fences (included in Class V: Miscellaneous work). each not exceeding shall be deemed to

om
0.10 m² in area include non- A3 Item description for
measured in plane. destructive testing as supply and erection
expressly required. of structural
members shall state

C
M3 The mass of the alignment on plan,
members, other than and camber
plates shall be requirements.

lic
calculated from overall
lengths of the
A4 Item description for
members with no
supply and erection

ub
deductions for splay
of structural
cut or mitred ends.
members shall state
separately and locate
M4 The mass of member
rP
separate structural
measured shall be that frames and, where
of rolled or extruded appropriate the parts
sections, built up and of the frames.
Fo

fabricated sections,
bracings, external
diaphragms, shear
connectors, stiffeners,
cleats, packs, splice

15D014R0 f
plates, and other
fittings.
79
15D014R0 f
80

Table 12. Class L (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Supply and 1 Hot rolled section 1 Vertical t M5 The mass of steel to D2 Decking shall include C3 Items for supply and A5 Item description for
erection of 2 Cold rolled members and BS 4449 or MS146 plates and deck erection of supply and erection
structural section columns shall be taken for panels. structural members of structural
members 3 Built-up box or 2 Horizontal t measurement as 785 shall be deemed to members shall state
fabricated members and kg/m² per 100 mm include bolted tapered or
sections beams thickness (7.85 t/m³), connections using castellated members.
4 Extruded 3 Portal frames t unless otherwise bolts of nominal
sections 4 Frames t stated in the D3 Ancillaries shall diameter less than 16

t
specification or in the include bracings, mm, together with

en
5 Decking panel t
supplier's catalogue. purlins, cladding rails, gusset and end
6 Ancillaries t The masses of other plates. A6 Item description for
and struts. supply and erection
7 Grillages t metals shall be taken
of structural

m
8 Overhead nr as stated in the D4 Overhead crane shall
specification or members other than
crane be permenant for portal frames
supplier's catalogue. structure with C4 Items for supply and

om
shall state cranked
platform, crane erection of members.
runways, bridge structural members
crane, hoist, frame, shall be deemed to
motor, track as include welded A7 Item for overhead

C
© STANDARDS MALAYSIA 2017 - All rights reserved

expressly stated. connections. Welded crane shall state the


connections shall be crane capacity
deemed to include tonnage, type,

lic
gusset and end materials, and
plates. principal dimensions.

ub C5 Items for overhead


crane shall be
A8 Item description shall
state where fixing
rP
deemed to include clips and resilient
runways, bridge, pads are used to
motor, track, secure overhead
fabrication, crane rails.
Fo

installation,
foundation work, and
protective and
decorative surface
treatment.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 12. Class L (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Supply and 5 Black bolts 1 Nominal diameter : nr C6 Items for black bolts A9 Items description for
erection of 6 High strength 16 – 20 mm and high-strength high-strength
structural friction grip bolts 2 Nominal diameter : nr friction grip bolts friction grip bolts
members 20 – 24 mm shall be deemed to shall state the grade
3 Nominal diameter : nr include nuts, and load limits.
24 – 30 mm washers, gusset and
4 Nominal diameter : nr end plates, and other
30 – 36 mm accessories.

t
5 Nominal diameter : nr

en
36 – 42 mm
6 Nominal diameter : nr
42 – 48 mm

m
7 Nominal diameter : nr
48 – 56 mm
8 Stated nominal nr

om
diameter exceeding
56 mm

7 Anchorage and nr M6 Anchorages and A10 Item description for

C
holding down bolts holding down bolt anchorages shall
assemblies assemblies shall be state particulars and
measured by the the type of

lic
number of complete anchorages.
assemblies.

ub
A11 Item description for
holding down bolt
assemblies shall
rP
state particulars of
the type, diameter,
and length of the
bolts.
Fo

15D014R0 f
81
Table 12. Class L (concluded)

15D014R0 f
82

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Miscellaneous 1 Stairways and nr M7 Painting carried out C7 Items for A12 Item description for
metalwork landings on the site for miscellaneous stairways and
2 Walkways and m2 miscellaneous metalwork shall be landings shall state
platforms metalwork shall be deemed to include the size, and number
3 Ladders m classed as painting fixing to other work, of risers and
4 Handrails m (Class N). supply of fixing landings.
components, and
5 Parapets m
drilling or cutting of
M8 No deductions from other work. A13 Item description shall
the area measured state the
6 Decking 1 Plate flooring m2 for miscellaneous specification and
2 Open grid flooring m2 metalwork shall be C8 Items for ladders and thickness of metal,
3 Welded mesh m2 made for openings parapetsshall be surface treatments,

t
paneling deemed to include

en
and holes each not and principal
4 Trench covers m2 exceeding 0.50 m². the full assemblies. dimensions of
5 Ducts covers m2 Items for handrails miscellaneous
shall be deemed to metalwork
M9 The lengths of

m
include balustrade. assemblies.
7 Cladding m2 ladders shall be
measured along the

om
8 Walings m lengths of stringers. C9 Items for decking A14 Item description shall
The lengths of shall be deemed to state where ladders
handrails and include supporting include safety loops,
parapets shall be metalwork, unless rest platforms or
measured along otherwise expressly returned stringers.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

their top members. stated.

lic
3 Miscellaneous 1 Miscellaneous 1 Angle section m M10 The length of A15 Item description for
metalwork framing miscellaneous miscellaneous
2 Channel section m framing shall be framing shall state

ub
3 I-section m measured along the the size and section
external perimeter of of members.
4 Tubular section m framing.
rP
2 Tie rod nr

4 Uncovered tanks 1 Volume: n.e 1m3 nr A16 Item description for


Fo

5 Covered tanks 2 Volume: 1-3m3 nr tanks shall state the


size and capacity of
3 Volume: 3 - 10m3 nr
tanks and
4 Volume: 10-30m3 nr specification of
5 Volume: 30-100m3 nr material.
6 Volume: nr
100-300m3
7 Volume: nr
300-1000m3
8 Volume: stated nr
exceeding 1000m3
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 13. Class M

Additional description
Class M: Building work Measurement rules Definition rules Coverage rules
rules

Measurement covered under other classes:

Concrete roof structure (included in Class I: Concrete work).

First division Second division Third division Unit


1 Roofing work 1 Roof structure 1 Timber of stated m M1 The area measured D1 Proprietary roofing C1 Timber roof A1 Item description for
member sizes for roofing system system shall be structure shall be roof structure shall
2 Timber of stated m2 and components to roofing system deemed to include state the member
roofing system be designed by the and components connecting plates, nominal size, grade
and components contractor shall be the to be designed by bolts and nuts, and of materials, and

t
to be designed by plan area of roof the contractor. other fastening structural locations

en
the contractor structures. system. for roof structures not
3 Metal of stated kg designed by the
roof structure contractor.
C2 Metal roof

m
member sizes
structure shall be
4 Metal of stated m2
deemed to include
roofing system

om
connecting plates,
and components
bolts and nuts, all
to be designed by
welding, and other
the contractor
fastening systems.

C
2 Roof covering 1 Flat sheet m2 M2 Roof covering, D2 Flat sheet shall be C3 Items for roof A2 Item description for
2 Profiled sheet m2 underlay, and classed for a broad, coverings,underlay roof covering shall
insulation for curved flat, and thin piece and insulation shall state the angle of

lic
3 Tiles m2
or domed surface of felt or material, be deemed to inclination to the
shall not be usually in square include preparing horizontal.

ub
distinguished by angle and rectangular surfaces, forming
3 Underlay 1 Wire mesh m2 of inclination. shapes. joints, overlaps, A3 Item description for
4 Insulation 2 Sisalation m2 mitres, angles, roof covering for
fillets, built-up curved or domed
rP
3 Rock wool m2 M3 The areas measured D3 Profiled sheet shall
edges, and laying to surfaces shall be
4 Fibreglass m2 for roof covering, be classed for
underlay, and material with falls or cambers, described, and the
cutting, notching, radius of the
insulation shall be alternating ridges
bending, and curvature of the
Fo

those of the surface and grooves,


covered. No usually in square bedding. surface shall be so
deduction from the and rectangular stated.
areas measured shall shapes.
be made for holes and A4 Item descriptions for

15D014R0 f
openings in the roof D4 Tiles shall be roof covering,
covering each not classed for discrete underlay, and
exceeding 0.5 m² in material either flat insulation shall state
area. or profiled, laid in the materials used,
locations, and the
83

overlapping rows,
and are usually number and
square or rectangle. thickness of coatings
or layers.
15D014R0 f
Table 13. Class M (continued)
84

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Roofing work 5 Roofing ancillaries 1 Eaves and m C4 Items for roofing A5 Item description for
verges ancillaries, roofing ancillaries
2 Fascia m flat/profiled sheet shall state the work
3 Flashing m componentsand to be covered, the
tile components type of materials, the
4 Kerbs m
shall be deemed to size, and the
5 Hood nr include forming thickness.
6 Roof ventilators nr holes, cutting, and
7 Soaker nr making good for
services.

t
6 Flat sheet 1 Crank and m C5 Items for roofing

en
components. upstand ancillaries,
7 Profiled sheet 2 Ridge, hip, and m flat/profiled sheet
components vertical angle components and

m
capping tile component
3 Roof light and nr shall be deemed to
special sheets include preparing

om
4 Transparent nr surfaces, forming
sheet joints, mitres,
5 Ventilator sheet nr angles, fillets, built-
6 Sheet with soaker nr up edges, and

C
© STANDARDS MALAYSIA 2017 - All rights reserved

flanges laying to cambers


7 Ridge ventilator nr or falls.

lic
8 Tiles components 1 Valley m

ub
2 Mitred hips m
3 Mitred vertical m
angles
rP
4 Ridge and hip m
capping
5 Vertical angle m
6 Saddles nr
Fo

7 Glass tiles nr
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 13. Class M (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Roofing work 1 Gutters and 1 Gutters m M4 Lengths of gutters D5 Fittings to gutters C6 Items for gutters A6 Item descriptions for
downpipes 2 Fittings to gutters nr and downpipes shall shall include bends, and downpipes gutters and
be measured along angles, stop ends, shall be deemed to downpipes shall
3 Down pipes m their centre lines and and outlets. Fittings include fixing and state the type,
4 Fittings to down nr shall include lengths to downpipes shall supply of fixing principal dimensions,
pipe occupied by fittings, include bends, components. and materials of the
with no allowance for swan necks, shoes, components.
laps. and roof outlet,
fixed directly to
downpipes.

t
en
3 Waterproofing 1 Asphalt 1 Sloping m2 M5 The areas measured D6 Sloping: Angle of C7 Items for water A7 Item description for
2 Bituminous 2 Horizontal m2 for water proofing inclination from the proofing and water proofing and
3 Sheet metal 3 Vertical m2 and sheet lining horizontal is 5 – 80 sheet lining sheet lining

m
4 Waterproofing 4 Surfaces of width m membrane shall be degrees. membrane shall be membrane shall
sheeting not exceeding those of the surfaces deemed to include state the materials
5 Waterproof 300 mm covered. No preparing surfaces, used, and the

om
coating 5 Isolated group of nr deduction from the D7 Horizontal: Angle forming joints, number and
6 Rendering in surfaces not areas measured shall of inclination from overlaps, mitres, thickness of coatings
ordinary cement exceeding 1m² be made for holes and the horizontal is 0 – angles, fillets, built- or layers.
mortar 6 Lining to other nr openings in the 5 degrees. up edges, and

C
7 Rendering in stated fixtures waterproofed laying to falls or
water proof surfaces each not cambers.
cement mortar exceeding 0.5m² in

lic
8 Sprayed or area. A8 Item description for
brushed isolated groups of
waterproofing surfaces shall

ub
D8 Vertical: Angle of identify the work to
inclination from the be waterproofed and
horizontal is 80 – 90 its location shall be
rP
degrees. so stated.
4 Sheet lining 1 Butyl rubber M6 Isolated groups of
membrane 2 EPDM rubber surfaces of different
shapes or dimensions
3 PVC
Fo

shall be measured as
4 Polypropylene separate items.
5 Polyethylene
6 Polyurethane

15D014R0 f
7 Proprietry system
85
Table 13. Class M (continued)

15D014R0 f
86

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Windows and 1 Timber 1 Windows sub- nr D9 All fire-rated doors C8 Items for windows and A9 Item description for
doors 2 Metal frames shall be obtained from doors shall be deemed windows and doors
3 Plastics 2 Windows nr approved to include fixing, supply shall identify the shape,
3 Doors sub-frames nr manufacturers and in of fixing components, size, type and limits of
or lining sets compliance with and drilling or cutting of the work.
4 Door leaf nr Jabatan Bomba dan associated work.
5 Ironmongery nr Penyelamat Malaysia. A10 Items for windows and
6 Anti-vermin nr D10 Hinges, door closers, C9 Items for windows and doors shall state glazing
netting locks, and handles doors shall be deemed requirements.
7 Screens and nr shall be classed as to include all associated
borrowed lights ironmongery. glazing work as
8 Roof lights nr expressly required. A11 Item description for

t
ironmongery shall state

en
C10 All necessary fixing with
screws to match the the materials, type and
ironmongery shall be design.
deemed to be included

m
with the items.

C11 All locks deemed to be

om
supplied with master
keys and keys.

6 Glazing 1 Glass m2 D11 Panels which exceed A12 Item description for

C
© STANDARDS MALAYSIA 2017 - All rights reserved

2 Glass in large m2 4 m² shall be classed glazing shall state the


panes as glass in large materials, their nominal
3 Special glass nr panes. thickness, the method

lic
of glazing, the method
4 Hermetically nr D12 The following
of securing the glass
sealed units materials used in
and incidental metal

ub
5 Mirrors nr glazing shall be
work supporting patent
6 Patent glazing nr classed as special
glazing.
glass:
a) Glass whose A13 Item description for
rP
thickness exceeds 10 glazing shall state work
mm. which is curved or
b) Non-rectangular faceted.
panes of glass.
Fo

c) Toughened, A14 Item description shall


laminated, solar state the construction of
control and other hermetically sealed
speciality glass. units.
d) Acrylic, polycarbonate
and similar materials. A15 Item descriptions for
special glass,
hermetically sealed
units,mirrors and
patent glazing shall
state the shape and
size of panes.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 13. Class M (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
7 Finishes 1 Floor finishes 1 Tiles m2 M7 No deduction C12 Items for floor A16 Item description for
2 Cement and sand m2 from areas of finishes, wall finishes finishes shall state
pavings finishes shall be and skirting to floor the materials and
3 Granolithic m2 made for holes shall be deemed to thickness.
and openings include fixing, supply of
4 Wash aggregates m2 A17 Item description for
each not fixing components, and
5 Carpet m2 carpet shall state
exceeding 0.5 m² drilling or cutting of
the knot density.
6 Vinyl m2 in area. associated work.
7 Floor hardener m2
8 Timber laminate m2 C13 Items for floor A18 Item description for
finishes, wall finishes skirting to floor

t
2 Skirting to floor m and skirting to floor shall state the

en
shall be deemed to height.
include preparing
surfaces, forming joints,

m
3 Wall finishes 1 Tiles m2 mitres, angles, fillets,
2 Cement and sand m2 built-up edge and A19 Item description for
plasterings laying to cambers or prefabricated

om
falls. panels shall state
3 Granolithic m2 the size and
4 Wash aggregates m2 C14 Items for floor number of panels.
5 Spray tiles m2 finishes, wall finishes

C
and skirting to floor
6 Prefabricated m2 with tiles shall be A20 Item description for
panel deemed to include suspended ceiling

lic
cement mortar screed shall state the type
where applicable. and material of
support system and

ub
material of ceiling.
4 Ceiling finishes 1 Skim coating m2 C15 Items for ceiling
2 Rendering finishes shall be A21 Item description
rP
3 Suspended deemed to include any shall state the
ceiling temporary staging overall dimensions
4 Cornices m required. of access panels in
5 Access panels nr ceilings.
Fo

C16 Items for suspended


ceilings shall be
deemed to include
associated primary

15D014R0 f
support or hanger
systems.

C17 Item Ceiling shall be


deemed to include
87

sloping ceiling.
15D014R0 f
Table 13. Class M (concluded)
88

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Floor and wall 1 Wall partition 1 Solid m2 M8 The length C18 Items for wall A22 Item description for
system 2 Full board m2 measured for wall partitions shall be wall partitions shall
partitions shall deemed to include state the materials,
3 Half board with m2
exclude the fixing, supply of fixing finishes and
fixed glass
length of voids components, and finished thickness.
4 Cubicle sets nr which extend to drilling or cutting of
the full height of associated work.
the partition. A23 Item description for
C19 Items for wall cubicle sets shall
partitions shall be state the overall
deemed to include dimensions.

t
forming holes, cutting

en
and making good for
services.

m
2 Raised access m2 D13 Item for raised
floor access floor refers

om
to a false floor
raised from the
ground to serve as
an accessible floor
system for the laying

C
© STANDARDS MALAYSIA 2017 - All rights reserved

of flooring services
such as power lines
and cables.

lic
ub
rP
Fo
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 14. Class N

Additional Description
Class N: Painting work Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes: M1 No deduction from C1 Items for painting A1 Item description for
the areas measured shall be deemed to painting shall state
shall be made for include preparation of the material used,
Painting for structural metalwork (included in Class L: Metalwork). holes and surfaces before number of coats, and
openings in the painting, including all whether it is for
Painting to gantries (included in Class R: Roads and pavings). painted surfaces necessary temporary internal or external
each not exceeding staging. surfaces.
0.5 m² in area.

t
C2 Items for painting A2 Item description for

en
shall be deemed to preparation of
include the application surfaces shall be
of base primer/sealer identified and stated
required before where more than one

m
painting the type of preparation is
subsequent coats. specified for the same

om
surface.

First division Second division Third division Unit

C
1 Oil paint 1 Metal other than 1 Surfaces of m2 M2 Isolated groups of D1 Concrete formed C3 Items for painting of A3 Item descriptions for
metal sections and members: surfaces of using class F1 metal shall be isolated groups of
2 Alkyd gloss paint
pipework exceeding different shape or formwork shall be deemed to include surfaces shall identify

lic
3 Emulsion paint or 300 mm girth dimensions shall be classed as rough painting the surfaces the work to be painted
acrylic paint 2 Timber measured as surfaces and of connecting plates, and its location.
4 Cement paint 3 Smooth surfaces 2 Surfaces of m separate items. concrete formed brackets, rivets, bolts,

ub
5 Epoxy or members: not using class F2 and nuts and similar
polyurethane paint exceeding F3 shall be classed projections.
300 mm girth as smooth
rP
6 Bituminous or coal 3 Isolated groups nr surfaces.
tar paint of surfaces
7 Chlorinated rubber
paint D2 Smooth concrete C4 Items for painting of
Fo

8 Fire resistance surfaces and timber shall be


paint plastered surfaces deemed to include
shall be classed as painting the surfaces
smooth surfaces. of recesses,

15D014R0 f
projections, and
D3 Rough concrete fittings.
surfaces and
rendered surfaces
89

shall be classed as
rough surfaces.
15D014R0 f
90

Table 14. Class N (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Oil paint 4 Rough surfaces 1 Surfaces of m2 M3 In calculating the C5 Items for painting of
members: painted area of pipework shall be
exceeding 300 mm metal, the presence deemed to include
girth of connecting painting the surfaces
2 Alkyd gloss paint 5 Masonry m2 plates, brackets, of flanges, valves,
3 Emulsion paint or 6 Brickwork and 2 Surfaces of rivets, bolts, nuts other projecting
acrylic paint blockwork members: not and similar fittings, and hangers.
exceeding 300 mm projections, and

t
inner surfaces of

en
girth
openings and outer
4 Cement paint 3 Isolated groups of nr edges shall be
surfaces ignored.

m
5 Epoxy or
polyurethane paint

om
C
© STANDARDS MALAYSIA 2017 - All rights reserved

6 Bituminous or coal 7 Metal sections m2


tar paint
8 Pipework m2 M4 The area measured

lic
7 Chlorinated rubber for painting
paint pipework shall be
the length multiplied

ub
by the girth of each
length of pipe or
8 Fire resistance lagged pipe with no
paint
rP
deductions or
additions for
flanges, valves,
other projecting
Fo

fittings, and
hangers.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 15. Class O

Additional description
Class O: Pipework Measurement rules Definition rules Coverage rules
rules
C1 Items for pipework A1 Item description for
Measurement covered under other classes: and the associated pipeworkshall
work shall be deemed identify separately
Steel pipe piles (included in Class H: Piling work). to include supply and work which is
Pipes and ducts built into brickwork (included in Class J: Brickwork, blockwork and laying or installation. expressly required
masonry). to be carried out by
Valve chambers and thrust blocks (included in Class I: Concrete work). hand.
Reinstatements works (included in Class R: Pipe rehabilitation work)

t
en
First division Second division Third division Unit

m
1 Excavation 1 Trench in earth 1 Depth: Not m M1 Length of trench D1 The depth used for C2 Items for trench A2 Item description for
exceeding 1.5 m excavation shall classification of excavation shall be excavation shall

om
2 Depth: 1.5 ‒ 2.0 m m be measured along trench excavation deemed to include identify the
3 Depth: 2.0 ‒ 2.5 m m the centre line of shall be measured preparation of commencing
the pipeline. from the surfaces, multiple surface of each
4 Depth: 2.5 ‒ 3.0 m m commencing handling, disposal of item for work

C
surface to the surplus excavated involving excavation
5 Depth: 3.0 ‒ 4.0 m m M2 Length of trench
inverts of the pipes. material (including which the
6 Depth: 4.0 ‒ 5.0 m m excavation shall
unsuitable material), commencing
be measured

lic
7 Depth: 5.0 ‒ 6.0 m m D2 Unless otherwise upholding sides of surface is also the
through and
8 Depth: Exceeding m expressly required, excavation, allowance original surface.
include any space
6.0 m the nominal width of for working space,
occupied by valves

ub
the trench shall be backfilling, and A3 Item description for
(except those in
the nominal removal of dead pipe shall state,
chambers) and
diameter of the pipe services. where more than
fittings.
or of the larger pipe
rP
2 Extra over 1 Rock m3 one pipe is
if laid one above the expressly required
2 Natural hard m3 M3 Excavation in rock, other, plus 500 mm. C3 Items for excavation in to be laid in one
material natural and Where pipes are roads and trench, and also
3 Artificial hard m3 artificial hard laid side by side, the pavements shall be
Fo

identify the pipe


material material, nominal trench deemed to include runs.
4 Unsuitable materials m3 unsuitable width shall be the road cutting and
5 Roads and m2 materials, roads sum of all the reinstatement. A4 Item description for
pavements and pavements internal diameters trench excavation

15D014R0 f
shall be measured and spacing shall state the pipe
as the volume of between the pipes, diameter and
the respective item plus 500 mm. location.
removed within the
limits of trench
91

excavation.
15D014R0 f
92

Table 15. Class O (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Excavation 3 Manhole and 1 Earth m3 M4 An isolated volume of D3 Earth shall be C4 Extra over excavation
chamber 2 Rock m3 rock or natural hard deemed to be shall be deemed to
3 Natural hard m3 material and artificial materials other than include for breaking up
material hard material occurring topsoil, natural hard rock, natural or
4 Artificial hard m3 within the trench material, rock, artificial hard materials
material excavation shall not be artificial hard material when it occur.
5 Unsuitable materials m3 measured separately, or unsuitable
6 Roads and m2 unless its volume material, unless C5 Item for trench
pavements exceeds 0.25 m³. otherwise stated in excavation shall be
the item description. deemed to include

t
M5 Excavation shall be reinstatement of

en
measured as excavation original surface unless
in earth to stated depth D4 Extra over item is covered by separate
and another item for measured as extra items in this class.
extra over breaking up and above

m
rock. excavation measured
in earlier item. C6 Item for trench
M6 Excavation in roads and

om
excavation shall be
pavements shall be deemed to include
measured vertically from excavation for bedding
the nominal trench width if applicable.
for pipes and up to the

C
© STANDARDS MALAYSIA 2017 - All rights reserved

external surfaces for


manholes and C7 Item for trench
chambers. excavation shall be

lic
deemed to include
M7 Volume of excavation excavation for trust
for manholes and blocks and anchor

ub
chambers shall be blocks.
measured vertically
between their external
rP
surfaces or extended
base and the limits of
trench excavation.
Fo

M8 The volume of extra over


excavation and
backfilling for pipe laying
in headings, in thrust
boring and pipe jacking
shall be measured by
multiplying together the
internal cross-sectional
area of pipe and the
length of the material
excavated or backfilled.
Packing in headings
shall not be measured.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 15. Class O (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Below ground 1 River, stream, culvert or nr M9 Below ground D5 River, stream, C8 Items for below A5 Item description for
crossings canal width: 1 ‒ 3 m crossings shall be culvert, and canal groundcrossings below ground
2 River, stream, culvert or nr measured as extras crossings shall be shall be deemed to crossings shall
canal width: 3 ‒ 10 m to items for pipes in classified by their include reinstatement, state where existing
3 River, stream, culvert or nr trenches. widths measured unless otherwise linings to rivers,
canal width: exceeding along pipe, duct or stated. streams, culverts or
10 m culvert centre line canals are to be
4 Fence nr M10 Below ground when the water broken through and
5 Sewer or drain nr crossings of surface is at the reinstated and the
6 Wall nr streams shall be higher level of type of lining.

t
measured only fluctuation.

en
7 Other stated nr
underground services where their width
exceeds 1m. A6 Item description for
below ground

m
crossings shall
M11 River, stream, state the diameter
culvert, and canal

om
and method of
crossings excavation.
exceeding 10m in
width shall be
measured where

C
special pipe laying
methods are not
used.

lic
3 Back filling , 1 Backfilling 1 Sand m3 M12 Backfilling of C9 Items for concrete A7 Item description for

ub
bedding, 2 Selected excavated m3 trenches with shall be deemed to bedding and
support and suitable granular excavated material include formwork and surround shall state
protection materials shall not be reinforcement as the type and
3 Imported granular m3 measured. applicable. dimensions.
rP
materials
4 Mass concrete m3 M13 The volume of
5 Reinforced concrete m3 backfilling in pipe
Fo

trenches shall be
calculated by
multiplying the
average depth by
the length of backfill

15D014R0 f
placed by the
nominal trench width
less volume
occupied by the
93

pipe.
15D014R0 f
94

Table 15. Class O (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Back filling , 2 Beds 1 Sand m A8 Item description for
bedding, 3 Surround 2 Selected excavated m bedding shall state
support and 4 Haunches suitable granular the pipe nominal
protection materials diameter.
3 Imported granular m
materials A9 Item description for
4 Mass concrete m bed, haunches and
5 Reinforced concrete m surrounds shall
state the depth and
material used.
5 Wrapping and lagging m

t
en
6 Concrete stools and nr A10 Item description for
thrust blocks bed, haunches and
7 Other isolated pipe nr surrounding to
supports multiple pipes shall

m
state the number of
pipes and maximum

om
nominal distance
between the inside
faces of the other
pipe walls.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

4 Pipes 1 Sewerage pipes 1 Vitrified clay pipes m M14 Lengths of pipes shall C10 Items for pipes shall A11 Item description for
2 Water supply pipes 2 Reinforced concrete m be measured along be deemed to include pipes shall state the
pipes their centre lines supply, and laying or joint types, nominal

lic
3 Other pipe works
3 Ductile iron pipes m between straight installation. pipe diameter,
4 Unplasticised m specials, fittings or internal and external
fittings connected to lining or protection

ub
polyvinyl chloride
manholes and C11 Items for pipes shall requirements and
pipes
chambers for pipes of be deemed to include reference given to
5 Stainless steel pipe m diameter more than all wrapping, lining, applicable Malaysian
rP
6 Polyethylene pipes m 100mm. and lagging as or other relevant
7 Mild steel pipes m required. standard.
8 Galvanised steel m M15 Length of pipes
pipes entering sewerage
Fo

manholes and other C12 Items for pipes shall A12 Item description for
chambers shall be be deemed to include pipes in steel shall
5 Pipes 1 Class reinforced m measured to the pipe cutting where state the type (mild
plastic pipes inside surface of the applicable, unless or carbon steel) and
2 Concrete/cement m chambers, except that otherwise stated. the grade.
lined pipes pipes and fittings
3 HDPE m comprising backdrops C13 Items for pipes of
4 Acrylonitrile m shall be included in diameters less than
butadiene styrene the items for 100mm shall be
manholes. deemed to include
fittings, valves, and
joints.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 15. Class O (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Fittings , valves 1 Straight specials 1 Plain ended nr M16 Fittings, valves and D6 A straight special C14 Item for straight A13 Item description for
and joints 2 Plain and flange nr joints of diameter is a length of pipe specials shall be fittings, valves, and
ended less than 100mm either cut to length deemed to include joints shall state the
3 Flange ended nr shall not be or made to order. cutting. material, nominal
4 Plain ended with nr measured. diameter, joint type,
puddle flange and pressure rating.
5 Plain and flange nr M17 Straight specials D7 Straight specials C15 Item for valves shall
ended with puddle shall be measured and joints on pipes be deemed to include
A14 Item description for
flange only where they are of different nominal reduction gears where
straight specials
6 Flange ended with nr expressly required diameter shall be applicable.
shall state the length
puddle flange classified according

t
and location of
to the nominal

en
flanges including
diameter of the
puddle flange.
largest pipe.

m
2 Fittings 1 Bends nr M18 Fittings and joints D8 Mechanical A15 Item description for
3 Fittings special 2 Junction and nr comprising backdrops cuoplingshall bend shall state the

om
branches to manholes shall be mean normal nominal diameter,
3 Tapers nr included in the items mechanical angle and type .
4 Bell mouths nr for manhole. coupling and
5 Blank flanges nr stepped A16 Item description for

C
mechanical junction and
6 Duckfoot bend nr
coupling. branches shall state
7 Hydrants nr
whether it is tee or

lic
wye.

4 Valve 1 Linear motion valve nr D9 Linear motion valve C16 Items for valve shall A17 ltem description for

ub
2 Rotary motion valve nr is the closure be deemed to include type of valves,
member moves in a all supply, jointing, penstock and
3 Quarter turn valve nr straight line throttle couplings, flange, actuatorshall state
the flow. bolting, washers, type, location to be
rP
4 Special valve nr gaskets and make installed,
good all joint. specification,
5 Penstock nr D10 Rotary motion material, size, and
valve is the closure capacity designed.
Fo

6 Actuator nr member travel C17 Item for actuator shall


along an angular or be deemed to include
circular path. valve where expressly
required.

15D014R0 f
D11 Quarter turn valve
is the valve that
required quarter
turn motion.
95
15D014R0 f
96

Table 15. Class O (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Fittings , valves 5 Pumps 1 Positive nr M19 Pumps shall be D12 Special valve is a C18 Items for pump shall A18 Item description for
and joints displacement pump categorises to types valve that the be deemed to include pumpshall state the
2 Dynamic pump nr pump ie dosing pump, operation is all fittings and specification,
3 Special pump nr metering pump, jet assisted by the accessories and any material, type, size,
pump etc. special medium modification works location and capacity
such as air or supplied, delivered design.
pressure or valve and install on site.
operated by ifself.

D13 Positive

t
en
displacement pump
is the pump which C19 Items for pumps shall
is categorised be deemed to include
whether as all supply, jointing,

m
reciprocating or couplings, flange,
rotary which the bolting, washers,
gaskets and make

om
flow volume is
driven by good all joint.
mechanical force.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

D14 Dynamic pump is


the pump which is
designed as

lic
centrifugal which
the flow diven by
rotaring vane

ub
impeller include
radial, axial and
mixed flow unit.
rP
D15 Special pump is
the pumps that be
determined to be
Fo

used for the special


purpose other than
positive
displacement and
dynamic pump.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 15. Class O (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Fittings , valves 5 Pumps 4 Motor nr M20 Item description for D16 Motors is a C20 Items for motor shall A19 Item description for
and joints replacement of motor machine which be deemed to include motor shall state the
to be stated converts electric all supply, jointing, type of motors,
separately when energy into couplings, flange, power, specification,
expressly required. mechanical energy bolting, washers, material, size, type
which categorised gaskets and make and capacity design.
under synchronous good all joint.
(plain and super)
and induction A20 Item description for
(squirrel cage and replacement of

t
slip ring) motors. motor to be stated

en
C21 Items for motor with separately.
pump shall be deemed
to include all supply,
A21 In description for
jointing, couplings,

m
motors with pumps
flange, bolting,
shall be stated when
washers, gaskets and
expressly required.

om
make good all joint.

6 Joints 1 Welded collar joints nr M21 Joints shall be C22 Items for joints shall
2 Welded slip joints nr measured separately, be deemed to include

C
unless otherwise thrust block and supply
3 Butt welded joints nr expressly stated. of all jointing materials,
4 Mechanical coupling nr bolts, nuts, washers,

lic
joints gaskets, making good
of joints both internally
5 Flange adaptor nr
and externally as
joints

ub
expressly required.
6 Expansion joints nr
7 Push-on collar joints nr
rP
8 Push-on slip joints nr C23 Items for welded
collar joints and
welded slip joints
shall be deemed to
Fo

include welding to the


internal of the pipe and
air testing of joints as
expressly stated.

15D014R0 f
97
15D014R0 f
98

Table 15. Class O (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Fittings , valves 7 Flow meter/bulk meter nr A22 Item description for
and joints flow meter shall
state the diameter
and type.
7 Special pipe 1 In heading 1 Jacking pit nr M22 Special pipe laying D17 Pipe made with C24 Items for special pipe A23 Item description for
laying method 2 Thrust boring 2 Receiving pit nr methods shall be reinforced concrete laying methods special pipe laying
3 Pipe jacking 3 Pipe sleeve m measured only where as the external excluding submarine methods shall
they are expressly shell and pipe from pipelaying shall be identify the material
4 Microtunneling 4 Composite pipe m
required. O4** and O5** shall deemed to include and nominal
5 Utility pipes in pipe m be classed as mobilisation and diameter, and the run

t
sleeves composite pipe. demobilisation. of pipes.

en
6 Pressure grouting m3
5 Horizontal directional m C25 Items for special pipe A24 Item description for
drilling laying methods shall pipe sleeves and

m
be deemed to include composite pipe
6 Submarine pipe laying 1 Bathymetric survey m excavation, sheet shall state the type of

om
2 m piles, shoring, and material, diameter,
Sub-sea geophysical backfilling. and the class.
survey
3 Mobilisation and sum A25 Item description for
demobilisation pipe bursting shall

C
© STANDARDS MALAYSIA 2017 - All rights reserved

4 Provision of winch sum C26 Items for sub-sea state the pipe
equipment geophysical survey diameter.
5 Trenching m shall be deemed to

lic
6 Concrete cladding to m include report by a A26 Item description for
pipes geophysicist. slip lining shall state
7 Pipes laid by float m the minimum finished

ub
and sink internal size, type of
8 Pipes laid by bottom m C27 Items for pipe sleeves lining, its thickness or
pull and composite pipe grade.
rP
shall be deemed to
include excavation A27 Item description of
within the pipe. pipe jacking pit shall
7 Submarine pipe laying 1 Pipes laid by lay m state pit size and
barge
Fo

depth of 2.0m
2 Tie in to land pipes sum stages.
3 Swabbing and m
gauging A28 Item description for
4 Inspection by divers sum special jacking
method to be stated.

A29 Item description for


8 Slip lining 1 Diameter stated m slip lining shall state
the offset where the
lining is curved to an
offset which exceeds
35 mm per metre.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 15. Class O (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Miscellaneous 1 Sewer manholes 1 Brick nr D18 The depth of C28 Items for manhole A30 Item description for
work 2 Chamber 2 Brick with backdrop nr manholes shall be shall be deemed to manhole shall state
measured from the include all items of type or mark
3 In-situ concrete nr top of covers to metalwork and numbers and depth
4 In-situ concrete with nr channel inverts or pipework, benching, where details are
backdrops the top of base plastering, painting, expressly given.
5 Precast concrete nr slabs, whichever is and excavation which Manholes with
lower. occur within or at the backdrops shall be
6 Precast concrete nr
surface of the item. so described.
with backdrops
D19 Reinforced C29 Items for brick A31 Item descriptions for

t
concrete manholes shall be manholes shall state

en
manholes shall deemed to include types and loading
include non- blinding, reinforced duties of manhole
standard cast in concrete base, and top covers.
situ manholes. slabs.

m
om
C30 Items for manhole
with backdrops shall
be deemed to include
the pipework and
associated fittings

C
comprising the
backdrops.

lic
ub
rP
Fo

15D014R0 f
99
15D014R0 f
100

Table 15. Class O (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Miscellaneous 3 Testing and inspection 1 Testing of gravity m M23 The unit of C31 Items for testing and A32 Item description for
work sewer measurement for inspection shall be testing and
2 Testing of vacuum m items O831 to O836 deemed to include inspection shall
sewer can be measured in provision and removal state the material
3 Pressure and m sum where of all equipment and and diameter of pipe
leakage testing applicable. ancillaries required for to be tested.
4 Flushing and m testing.
sterilising
5 Close circuit m

t
television inspection

en
6 Radiographic test nr
7 Holiday detector test sum C32 Items for testing of
8 Ultrasonic test sum gravity sewer shall be

m
deemed to include
provision of all water
required for testing.

om
C33 Testing of gravity
sewer shall be
deemed to include

C
© STANDARDS MALAYSIA 2017 - All rights reserved

testing by infiltration as
required.

lic
C34 Items for pressure
and leakage testing

ub
shall be deemed to
include provision of all
water required for
testing.
rP
C35 Items for flushing and
sterilising shall be
deemed to include
Fo

chemicals and
provision of water.

C36 Items for holiday


detector test and
ultrasonic test shall
be deemed to include
provision of
equipment, testing and
maintenance.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 15. Class O (concluded)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Miscellaneous 4 Temporary diversion 1 Temporary diversion sum C37 Items for temporary A33 Item description for
work of existing utilities diversion shall be temporary pumping
2 Temporary diversion sum deemed to include over of sewage
of sewage flows coordination with flows shall state the
relevant authorities, pipe and manhole
provision and removal of sizes and the
all equipment and distance between
ancillaries required manholes.
including pumping over.

5 Connections to existing 1 Existing manhole nr D20 Manhole junction C38 Items for connections A34 Item description for
sewer system 2 Manhole junction nr shall be as per to existing sewer connection to

t
connection Malaysian system shall be deemed existing sewer

en
3 Sewer saddle nr Sewerage Industry to include coordination system shall state
connection Guidelines (MSIG) with authorities, payment existing material,
4 New manhole nr typical detail. of fees, isolations for pipe and manhole
shutdown of flows, and sizes.

m
dewatering.

om
C39 Items for new manhole
shall be deemed to
include breaking away of
existing sewer pipe as
required, and all

C
pipework and metalwork
within the manhole.

lic
6 Connection to existing 1 Hot tapping nr C40 Items for shutdown A35 Item description for
water mains connection connection shall be connection to
2 Line stopping nr deemed to include existing water main

ub
3 Shut down nr coordination with shall state the
connection authorities, payment of material and sizes of
fees, isolations for the existing pipe to
rP
shutdown of flows, and be connected.
dewatering.

7 Pipework ancillaries 1 Marker posts nr C41 Items for marker post, A36 Item description for
Fo

2 Ring girder nr ring girder, straps, and ring girder, pipe


3 Pipe strap nr spike guards shall be strap, and spike
deemed to include guard shall state the
4 Spike guard nr supply and installation, type of material and
including painting. diameter of pipe.

15D014R0 f
8 Water sampling station nr C42 Water sampling station
shall be deemed to
101

include connection to the


mains.
15D014R0 f
Table 16. Class P
102

Additional description
Class P: Pipe rehabilitation work Measurement rules Definition rules Coverage rules
rules
M1 The lengths of C1 Items for work which A1 Item description shall
Measurement covered under other classes: sewers shall be is expressly required state the location of
measured along their to be carried out by work in each item or
New manhole and pipework (included in Class O: Pipework). centre lines between excavation shall be group of items. Work
the inside surfaces of deemed to include can be identified by
New fittings and valves used in pipe rehabilitation works (included in Class O: manholes but exclude preparation of reference to the
Pipework). lengths occupied by surfaces, disposal of drawing.
Extras to excavation and backfilling for new manhole and other chambers ( included in pipes and fitting excavated materials,
Class O: Pipework) comprising backdrops upholding sides of
to manholes. excavation,

t
backfilling and A2 Item description shall

en
removal of dead state the principal
M2 Where work is services. dimensions and profiles
expressly required to of sewer.
be carried out by

m
excavation, C2 Items for work which
crosssings, is expressly required
reinstatement and A3 Item description shall

om
to be carried out by
other pipework excavation shall be state work which is
ancillaries and extras deemed to include expressly required to be
to excavation and preparation of carried out manually or
backfilling shall be surfaces, disposal of by remote controlled.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

measured in Class O excavated material,


. upholding sides of
excavation,

lic
backfilling, and A4 Item description shall
removal of dead identify work which is
services. expressly required to be

ub
carried out by
excavation and (except
for manholes) shall state
rP
the maximum depth of
excavation in stages of
1m measured to the
invert level of sewer or
Fo

water mains.

A5 Item description for


preparation,
stabilisation, renovation
and laterals shall state
the material forming the
existing sewer or water
main.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 16. Class P (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Preparation of 1 Cleaning m M3 Lengths of D1 Items shall be classed C3 Item forsurveys A6 Item description for
existing pipeworkshall be as removing shall be deemed pipework shall state
pipework measured along intrusions where to include report the location of the
2 Removal of 1 Lateral bore n.e nr their centre lines intrusions into the by license work in each item or
intrusions 150mm between the inside bores of existing surveyor. group of items, so that
2 Laterals bore nr surfaces of pipework are to be it can be identified by
exceeding 150mm manholes/ removed prior to reference to the
3 Other stated artificial nr chambers but shall renovation. C4 Item for cleaning drawings.
intrusions exclude lengths shall be deemed
occupied by pipes

t
D2 The areas stated in to include pre-

en
and fittings the item description for cleaning.
3 Surveys 1 Closed -circuit m comprising local internal repairs A7 Item description for
television backdrops to shall be the finished pipework shall state
manholes. surface areas. C5 Items for local the principal

m
4 Pipe joint sealing 1 Materials and m internal repairs dimensions and pipe
diameter stated shall be deemed profiles.

om
M4 External grouting to include cutting
shall be measured out.
only where D3 External grouting A8 Item description for
5 Local internal m2 grouting is shall be grouting of C6 Item for cleaning surveys shall state
voids outside the type and copies

C
repairs expressly required shall be deemed
to be carried out existing pipework from to include required.
as a separate within the existing temporary
pipework other than

lic
operation from structure and A9 Work which is
annulus grouting. voids grouted in the removal after
course of annulus expressly required to
completion be carried out
grouting.

ub
manually or by remote
6 Pipe bursting 1 Diameter stated m C7 Items for controlled method
shall be each so
removing
stated in the item
rP
intrusions shall
be deemed to description.
include making
good. A10 Item description for
Fo

pipe bursting shall


state the pipe
diameter.

15D014R0 f
7 External grouting 1 Number of holes nr
2 Injection of grout m3
and materials stated
103
15D014R0 f
104

Table 16. Class P (continued)

Measurement rules Additional description


First division Second division Third division Unit Definition rules Coverage rules
rules
2 Desilting 1 Desludging , 1 Mechanical system sum A11 Item description shall
dewatering and identify, work which is
2 Non mechanised sum
disposal works expressly required to
3 Tanker sum be carried out by
excavation, shall
state the maximum
depth of excavation in
stages of 1 m
measured to the invert

t
of the pipework.

en
2 Special treatment of 1 Composting of sum D4 Only supernatant C8 Items for pipe joint A12 Item description shall
sludge cake sludge cake water (clear water sealing shall be identify where special

m
portion) shall be deemed to include treatment of sludge is
pumped for discharge. preparation of joints. expressly required in

om
desilting works.

D5 The treatment for wet C9 Desilting works shall


sludge for desilting be deemed to include
A13 Item description for

C
© STANDARDS MALAYSIA 2017 - All rights reserved

works shall be desludging and


conducted until dry dewatering of sludge removing intrusions
sludge has achieved a disposal to shall state the
materials forming the

lic
minimum of 20% dry contractors's own
solid content to the approved site. intrusions.
existing pond bed

ub
level.
C10 Items fordesludging, A14 Item description for
dewatering and desiltingworks shall
D6 Limit of the desilting disposal shall be state the estimated
rP
works for pond shall deemed to include wet sludge volume,
be approximately disposal of dewatered range of solid content,
100mm from the bed sludge cake to the desilting method,
level of pond.
Fo

approved disposal identify sludge


site including loading, disposal site.
D7 Desilting works for transportation,
structure other than unloading and
pond, full desludging dumpsite A15 Item description for
works shall be carried maintenance, removal desilting works for
out. or preservation of mechanical equipment
identified creatures ie tanks, chambers
under waters, and pumps shall state
cleaning works after the size of the
completion. equipment.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 16. Class P (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Desilting 2 Special treatment of 1 Composting of sum C11 Items for A16 Item description for
sludge cake sludge cake desludging, desilting works for
dewatering and mechanical equipment
disposal shall be ie tanks, chambers
deemed to include and pumps shall state
submission of the method for
monthly effluent cleaning works i.e
test result and water jetting.
laboratory test for
moisture content

t
during the desilting

en
works.
A17 Item description for
external grouting
C12 Items for

m
carried out through
desludging, pipe joints shall state
dewatering and number of holes

om
disposal by required.
mechanised and
non-mechanised
system shall be

C
deemed to include
treatment for wet
sludge.

lic
3 Interruptions 1 Preparation of hr A18 Item descriptions for
existing sewer cured in place lining,

ub
2 Stabilisation of hr in situ jointed pipe
existing sewers lining, segmental
lining and stated
rP
proprietary lining
shall state the type of
lining, its minimum
finished internal size
Fo

and its thickness or


grade and diameter of
pipe.

15D014R0 f
105
15D014R0 f
Table 16. Class P (continued)
106

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Interruptions 3 Renovation of 1 Cured in place lining hr M5 The volume D8 Annulus grouting A19 Item description for in
existing sewers measured for shall be grouting of the situ jointed pipe
2 In-situ jointed pipe hr
annulus grouting annular voids between lining and segmental
lining
shall not include new lining and existing lining shall state the
3 Segmental lining hr the volume pipework and of other offset where the lining
4 Stated proprietary hr measured for voids grouted in the is curved to an offset
linig external grouting. course of grouting which exceeds 35mm
annular voids. per metre.
5 Gunite coating hr

t
6 Annulus grouting hr

en
4 Work on lateral to hr M6 Construction of
renovated sewers new manholes

m
5 Work on manhole hr carried out under
sewer renovation

om
work shall be
measured under
O81*.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

4 Rehabilitation of 1 Abandonment of 1 Identification of lost nr M7 Interruption shall C13 Item for A20 Item description for
existing existing manholes manhole be measured only abandonment of rehabilitation of
manholes 2 Modification/ 2 Raise-up manhole nr where a minimum existing existing manholes

lic
alteration 3 Replace of manhole nr capacity is manholes shall be shall state the details
cover expressly required deemed to include of work required.
4 Reinstatement nr and for periods of sealing off the

ub
time during normal ends of existing
working hours pipework, breaking
when the flow in down of top of
rP
the sewer exceeds manhole to flush
the installed with existing
pumping capacity ground and
and work is backfilling.
Fo

interrupted.

5 Rehabilitation 1 Marker posts 1 Detail stated nr C14 Item for marker A21 Item description for
Ancillaries work 2 Ring girder nr post, ring girder, ring girder, pipe
straps, and spike strap, and spike
3 Pipe strap nr guards shall be guard shall state the
4 Spike guard nr deemed to include type of material and
supply and diameter of pipe.
installation,
including painting.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 16. Class P (concluded)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Rehabilitation 5 Water sampling C15 Item for water
Ancillaries work station nr sampling station
6 Special treatment of shall be deemed
sludge m3 to include
connections to the
mains.

6 Reinstatement 1 Landscaping sum C16 Item for A22 Item description for
2 Roads m2 reinstatement landscaping, road

t
works shall be and pavement shall

en
3 Pavements m2
deemed to include state depth and
4 Strip topsoil from m2 connection and to method.
easement and match existing
reinstate

m
work.
5 Connections to sum
existing manhole

om
and chambers
6 Connections to sum
existing pipes, ducts
and culverts

C
7 Other structure sum

lic
ub
rP
Fo

15D014R0 f
107
15D014R0 f
108

Table 17. Class Q


Additional description
Class Q: Drainage work Measurement rules Definition rules Coverage rules
rules

Measurement covered under other classes

Horizontal and vertical drains (included in Class G: Geotechnical work).


Cast in situ box culverts and sump (included in Class I: Concrete work).
Brick sidewall for surface drain (included in Class J: Brickwork, blockwork and
masonry).
Inlet and outlet structures (included in Class I: Concrete work).

t
en
First division Second division Third division Unit
1 Excavation 1 Drain trench in earth 1 Depth: Not m M1 The length of D1 The depth used for C1 Items for drain A1 Item description shall

m
exceeding 1.5 m drain excavation classification of drain excavation shall identify the
2 Depth: 1.5 ‒ 2.0 m m shall be measured excavation shall be be deemed to commencing surface
along the centre measured from the include of each item for work

om
3 Depth: 2.0 ‒ 2.5 m m line of the drain. commencing surface preparation of involving excavation
4 Depth: 2.5 ‒ 3.0 m m to the inverts of the surfaces, multiple for which the
drain. handling, disposal commencing surface
5 Depth: 3.0 ‒ 4.0 m m M2 The length of of surplus is also the original

C
© STANDARDS MALAYSIA 2017 - All rights reserved

drain excavation excavated material surface.


6 Depth: 4.0 ‒ 5.0 m m shall be measured D2 Earth shall be (including
up to inlet and deemed to be unsuitable
7 Depth: 5.0 ‒ 6.0 m m

lic
outlet structures, materials other than material),
8 Depth: Exceeding m and to the sumps. topsoil, natural hard upholding sides of A2 Item description for
6.0 m material, rock, artificial excavation, drain excavation

ub
hard material, or allowance for shall identify
unsuitable material, joints, backfilling, separately excavation
unless otherwise and removal of which is expressly
stated in the item the required to be carried
rP
dead services.
description. out by hand.

2 Extra over 1 Rock m3 M3 Excavation in C2 Items for drain


rock, artificial excavation shall
Fo

2 Natural hard m3 and natural hard be deemed to


material material shall be include
3 Artificial hard m3 measured as the reinstatement of
material volume of the original surface.
4 Unsuitable materials m3 respective item A3 Item descriptions for
removed within the drain excavation
5 Roads and m2 limits of drain C3 Items for shall state the size
pavements excavation. excavation in road and type of drain and
and pavement culvert.
shall be deemed
to include road
cutting and
reinstatement.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 17. Class Q (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Excavation 3 For inlet and outlet 1 Earth m3 M4 An isolated volume A4 Item description for
structure 2 Rock m3 of rock or artificial extra over
3 Natural hard m3 hard material excavation shall state
material occurring within the the width of trench.
4 Artificial hard m3 excavation shall not
material be measured
5 Unsuitable materials m3 separately, unless its
volume exceeds
6 Roads and m2 0.25 m³. A5 Item description for
pavements excavation in road

t
and pavement shall

en
M5 Excavation in road state thickness.
and pavement shall
be measured

m
vertically from the
drain excavation
width and up to the

om
external surfaces, or
to the extended base
for sumps.

C
M6 Volume of
excavation in sumps
shall be measured

lic
between their
external surfaces, or
extended base, until

ub
the limits of drain
excavation.
2 Surface drains 1 Interceptor drain m C4 Items for surface A6 Item description for
rP
2 Bench/berm drain m drains shall be surface drains shall
deemed to include state the material,
3 Roadside drain m cement jointing, type, size, shape, and
4 Median drain m sand and concrete the thickness of the
Fo

beddings, linings.
5 Toe drain m
shuttering, struts
6 Cascade drain m and weepholes. A7 Item description for
unlined surface
7 Monsoon drain m
drains shall be so

15D014R0 f
8 Grass swale m described.
109

A8 Item description for


cascade drains shall
state the location.
15D014R0 f
110

Table 17. Class Q (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Subsurface 1 Subsoil drain m C5 Items for A9 Item description for
drains 2 Outlet drain m subsurface subsurface drains
drains shall be shall state the
3 Drainage blanket m2 deemed to include material, type, size,
4 Scupper drain m geotextiles fabric, shape, spacing, pipe
lining and filter diameter, width and
5 Slotted drain m material. height.

C6 Items for outlet

t
drain shall be
A10 Item description for

en
deemed to include
drainage blankets
bends, filter fabric,
shall state the
and concrete
material, type and

m
surround.
thickness.

om
4 Drainage to 1 Down pipes m M7 The length of D3 Pipework such as C7 Items for A11 Item description for
structures above downpipes shall downpipes for downpipes shall downpipes shall state
2 Fittings to down nr
ground be measured drainage of structures be deemed to the type, diameter,
pipe
along their centre to ground level shall include fixing and and the materials of
lines, and shall be classed as supply of fixing the components.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

include the lengths drainage to components.


occupied by structures above
fittings, with no ground.

lic
allowance for laps.
D4 Fittings to downpipes

ub
shall include bends,
swan necks, shoes,
and outlet fixed
directly to downpipes.
rP
5 Drain covers 1 Precast concrete m C8 Items for drain A12 Item description for
2 Metal m covers shall be drain covers shall
Fo

3 Fibre reinforced m deemed to include state the type, loading


plastic lifting hook/ hole duties, size, and
and all associated thickness.
fittings.

6 Culverts 1 Precast concrete 1 Single m C9 Items for culverts A13 Item description for
pipe culvert 2 Twin m shall be deemed culverts shall state
to include all the class, type, and
2 Precast box culvert 3 Triple m
joints, water stop, the size or diameter.
3 Corrugated metal
concrete base or
pipe
bedding, unless
otherwise stated.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 17. Class Q (concluded)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
7 Sumps 1 Brick nr C10 Items for sumps A14 Item description for
2 Precast concrete nr shall be deemed sumps shall state the
to include sand type, size, and the
and concrete loading duties of
bedding, cement covers where
plastering, sump required.
cover and other

t
metalwork.

en
m
om
C
lic
ub
rP
Fo

15D014R0 f
111
15D014R0 f
Table 18. Class R
112

Additional description
Class R: Roads and pavings Measurement rules Definition rules Coverage rules
rules

Measurement covered under other classes: M1 The width of each D1 Sub-grade C1 Items for the work in
course of materials preparation, sub- this class involving
shall be measured base, road base, road in situ/precast
Earthworks (included in Class F: Earthworks). at the top of surface shoulder and concrete shall be
Maintenance of existing road and temporary road diversion (included in Class C: of that course. The pavement courses deemed to include
Traffic management and control). areas of manholes shall be classified as concrete,
Temporary traffic signs and barriers, barricades, and delineators (included in Class C: covers and other reference to ATJ 5/85 reinforcement,
Traffic management and control). intrusions into a (pindaan 2013) joints, formwork to
course shall not be form and shape and

t
Fences and gates (included in Class V: Miscellaneous work).
deducted where the finishes to concrete.

en
Drainage (included in Class Q: Drainage work) area of the intrusion
Geotextile &Geogrid (included in Class G: Geotechnical work). is less than 1m².

m
First division Second division Third division Unit

om
1 Subgrade 1 Earth m2 C2 The subgrade
preparation 2 Hard material m2 preparation shall be
deemed to include

C
© STANDARDS MALAYSIA 2017 - All rights reserved

3 Rock m2 clearing, grabbing,


stripping top soil, the
scarifying, levelling

lic
and compaction of
the top 300mm of
the subgrade.

ub C3 The subgrade
preparation on
rP
rock-filled
embankment shall
be deemed to
include the trimming
Fo

of protruding rock
above final surface,
4 Stabilised subgrade 1 Lime m2 filling of all cavities A1 Item description for
2 Cement m2 with lean concrete, stabilised subgrade
and filling with shall state the proportion
approved crushed of stabilisation agent,
rock or gravel to the and the thickness of the
final surface. subgrade to be
stabilised.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 18. Class R (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Sub-base 1 Drainage layer 1 Granular material m2 D2 The granular C4 The items for sub- A2 Item description for
2 Sub-base course 2 Laterite m2 material shall be base course, road- sub-base shall stated
classified according base shall be the type, thickness and
3 Lean concrete m2
to gradation limits for deemed to include grade where
sub-base material in chamfer spread over applicable.
the standard the full width of the
specification for road formation and to
works as expressly include attainment of
stated. the surface levels.

t
en
D3 Laterite material
shall be according to
the gradation limits

m
for gravel surfacing in
the standard

om
specification for road
works as expressly
stated.

C
3 Roadbase 1 Removal of flexible m2 D4 The crushed C5 Item for removal of A3 Item description for
surfaces aggregates shall be flexible surface roadbase shall state

lic
2 Crushed m2 classified according shall be deemed to the type, grade, and
aggregates to the gradation limits include scarifying thickness of the
3 Bituminous mix m2 for crushed the existing material.

ub
4 Wet mix m2 aggregates roadbase roadbase before
in the standard receiving the new
specification for road roadbase material. A4 Item description for
stabilised roadbase
rP
works as expressly
stated. shall state the
5 Stabilised roadbase 1 Lime m2 proportion of
stabilisation agent.
Fo

2 Cement m2

4 Road shoulder 1 Earth shoulder m2 M2 The areas of sub- C6 Earth shoulders A5 Item description for
base, road base and shall be deemed to road shoulders shall

15D014R0 f
2 Gravel shoulder m2 bituminous include verge. state the size,
3 Paved shoulders m2 pavement courses thickness, type, and
for road shoulder material used.
shall be measured
113

under Class R2**,


R3**, and R5*0.
15D014R0 f
Table 18. Class R (continued)
114

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Bituminous 1 Removal of flexible m2 D5 Item surface C7 Item removal of A6 Item description for
pavement surface dressing material flexible surface of bituminous pavement
courses 2 Prime coat m2 shall be in accordance bituminous courses shall state the
3 Tack coat m2 with the gradation pavement courses type and compacted
4 Polymer modified m2 limits for bituminous shall be deemed to thickness (where
asphalt surface dressing in the include scarifying appropriate).
5 Micro surfacing m2 standard specification the existing
for road works as exposed surface.
expressly stated. A7 Item description shall
state where removal of
6 Porous asphalt 1 Asphaltic concrete m2 C8 Item for bitumen

t
flexible surface is to
binder course pavement

en
be done by milling.
7 Gap graded asphalt 2 Asphaltic concrete m2 D6 Item regulating courses shall be
wearing course courses of stated deemed to include
materials shall consist attainment of

m
8 Regulating courses t but not limited to chip surface level. A8 Item description for
of stated materials seal, gap graded tack coat and prime
asphalt etc. coat shall state the

om
spread rate of applied
surface finishes.
6 Concrete 1 Membranes below 1 Plastic sheeting m2 M3 The areas of A9 Item description for
pavement concrete additional membranes shall state

C
© STANDARDS MALAYSIA 2017 - All rights reserved

pavements 2 Bond breaker m2 membranes in the materials and


3 Bitumen m2 laps shall not be thickness.
measured.

lic
2 Reinforcement 1 Mild steel bar t M4 The mass of steel D7 The nominal diameter C9 Items for A10 Item description for bar
reinforcement reinforcement stated in the item reinforcement shall reinforcement shall

ub
2 High tensile steel t shall be taken as description for bar be deemed to state the size of the
bar reinforcement 0.785 kg/m per reinforcement shall include labour for bars.
3 High tensile steel m2 100 mm² of cross- be the cross-sectional cutting, bending,
rP
fabric reinforcement section (7.85 t/m³). diameter defined in and placing.
4 Fabric of other m2 The mass of other MS 146. A11 Item description for
stated material reinforcing steel fabric
materials shall be reinforcement for MS
Fo

taken as stated in 145 shall state the


the contract. type, number or letter
in accordance with MS
145. Item description
for other fabric
reinforcement shall
state the material,
sizes, and nominal
mass per square
metre.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 18. Class R (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Concrete 2 Reinforcement M5 The mass
pavement measured for
reinforcement
shall include the
mass of
reinforcement
expressly required
in laps and special
chairs.

t
en
M6 The mass for
reinforcement,
measured in tonne,

m
shall be up to two
decimal places.

om
M7 The areas of
additional fabric
reinforcement in
laps shall not be

C
measured.

lic
3 Carriageway slab m2 C10 Items for A12 Item descriptions for
carriageway slab carriageway slab and
4 Other concrete slab m2 and other other concrete slab

ub
concrete slab shall state the grade
shall be deemed to and thickness of the
include trial mix, concrete and type of
mixing, laying, formwork including
rP
spreading, edge support used.
formwork,
treatment at
Fo

manholes and
gullies,
compaction,
finishing, curing
and surface

15D014R0 f
texturing. It also
deemed to include
attainment of
surface levels.
115
15D014R0 f
Table 18. Class R (continued)
116

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Concrete 5 Joints in concrete 1 Longitudinal joints m M8 Joints shall be D8 Sleeve joints, C11 Items for joint in A13 Item description for
pavement pavement measured at location connectors and the concrete joints shall state
2 Expansion joints m where they are like in bar pavements shall the depth of joint.
expressly required. reinforcement shall be deemed to
3 Construction joints m
be classed as special include base
4 Warping joints m joints. preparation, A14 Item description for
installing dowel special joints shall
5 Butt joints m bars and tie bars, state the type of
6 Special joints m debonding agent, joint, and type and
joint sealing size of the

t
7 Transverse joints m material, and saw reinforcing bar.

en
cutting.

6 Pavers 1 Interlocking m2 C12 Items for pavers A15 Item description for

m
concrete block shall be deemed to pavers shall state
2 Concrete flags m2 include base type, size, thickness

om
preparation, sand and whether it is
3 In situ concrete m2 bedding, lay in precast or in-situ.
pavers specified
interlocking

C
pattern,edge
© STANDARDS MALAYSIA 2017 - All rights reserved

segment, joints,
and cutting.

lic
7 Kerbs, channels 1 Precast concrete
ub
m M9 Excavation and filling C13 Items for kerbs, A16 Item description for
rP
and edgings kerbs for kerbs, channels channels, and kerbs, channels,
2 In situ concrete m and edgings shall be edgings shall be and edgings shall
kerbs classed as deemed to include state the type and
3 Concrete edgings m earthworks (Class F). beds, backings, size.
Fo

4 Concrete channels m reinforcement,


joints, and cutting.
A17 Item description for
in situ
concretekerbs,
concrete
channels, and
concrete edgings
shall state the use
of slip-form, if
expressly required.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 18. Class R (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Road furniture 1 Signage 1 Non-illuminated nr C14 Post-mounted A18 Item description for
retro-reflective signages shall be signages mounted on
2 Illuminated nr deemed to include gantry shall be so
3 Electronic m2 foundation, support stated.
post, excavation,
preparation of
surfaces, disposal A19 Item description for
of excavated
signages shall state
materials,
the material grade,
upholding sides of size, and diagram
excavation,

t
number taken from

en
backfilling, ArahanTeknik (Jalan)
concrete, issued by JKR or other
reinforcement, and
agencies.
joints.

m
2 Pavement markings 1 Letters and shapes nr M10 Lengths measured D9 The colour of the A20 Item description for

om
2 Continuous line m for linear pavement markings, pavement markings
pavement shall be deemed to be shall state the material
3 Intermittent line m
marking shall not white unless otherwise grade, size, and
4 Chevron marking m2 include gaps in stated. diagram number taken

C
intermittent line. from ArahanTeknik
(Jalan) issued by JKR
or other agencies.
M11 Area measured for

lic
chevron markings
A21 Item description for
shall be the gross
pavement markings
area.

ub
shall state the shape,
type, e.g.
thermosetting plastic,
and colour if required.
rP
A22 Item description shall
sate temporary
Fo

pavement markings
and its subsequent
removal.

15D014R0 f
3 Delineators 1 Chevron nr A23 Item description for
delineators shall state
2 Delineator posts nr
the type, size, and
3 Roadstud nr colour.
117
15D014R0 f
118

Table 18. Class R (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Road furniture 4 Traffic barrier 1 New Jersey barrier m M12 The length of C15 Items for guardrail A24 Item description for
traffic barrier shall and wire rope shall traffic barrier shall
2 Wire rope m
be measured be deemed to state excavation in
3 Guardrail m overall, no include the supply rock, where applicable.
4 Guardrail end- nr deduction shall be and installation of
treatment made for the gaps corrugated
for street lightings guardrail beam and
5 Pedestrian barrier m poles, sign and wire rope inclusive A25 Item description for
gantries. of bolts, nuts, new jersey barrier
6 Concrete barrier nr
posts, and other shall state the type and

t
ancillary work. dimension.

en
C16 Items for guardrail

m
end-treatment
A26 Item description for
shall be deemed to
new jersey barrier
include the supply

om
shall state the use of
and installation
slip form, if expressly
inclusive of bolts,
required.
nuts, post, and
other ancillary

C
© STANDARDS MALAYSIA 2017 - All rights reserved

work.
A27 Item description of
guardrail shall state

lic
the type and thickness
of beam element, type
of post, and post

ub
spacing.

A28 Item description for


rP
guardrail end-
treatment shall state
the type of treatment.
Fo
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 18. Class R (concluded)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Road furniture 5 Miscellaneous 1 Crash cushion nr C17 Items for crash A29 Item description of
2 Crash barrier nr cushion, crash crash cushion, crash
barrier, kilometre barrier, kilometre
3 Kilometre post nr post, hectometre post, hectometre
4 Hectometre marker nr marker, anti-glare marker, anti glare
screen,noise screen,noise barrier,
5 Anti-glare screen m barrier, and right and right of way
6 Noise barrier m of way marker marker shall state the
shall be deemed to size, type, and

t
7 Right of way (ROW) nr include the supply material.

en
marker and installation of
the said items
inclusive of bolts, A30 Item descriptions of
crash barrier, crash

m
nuts, posts, and
other ancillary work barrier,kilometre
required for the post, anti-glare

om
completion of the screen,noise barrier,
work. and right of way
marker shall state
excavation in rock,

C
where applicable.

6 Gantry nr C18 Items for gantry A31 Item description for

lic
shall be deemed to gantry shall state the
include fabrication, type, materials, and
installation, principal dimensions.

ub
foundation work,
and protective and
decorative surface
rP
treatment.
Fo

15D014R0 f
119
15D014R0 f
120

Table 19. Class S

Additional description
Class S: Tunnel work Measurement rules Definition rules Coverage rules
rules

Measurement covered under other classes:

External stabilisation work (included in Class G: Geotechnical work). C1 Plant and equipment
shall be deemed to
Micro tunnelling for pipework (included in Class O: Pipework).
include the
External drainage system (included in Class Q: Drainage work). purchase cost,
Excavation, filling, and turfing for external work (included in Class F: Earthworks). factory
acceptance test,

t
Cut and cover tunnel (included in Class F: Earthwork and Class I: Concrete work). assembly and

en
Temporary wastewater treatment facility (included in Class B: Environmental transportation to site
protection and enhancement). including
maintenance cost
Ground investigation (included in Class D: Site investigation work).

m
Unforeseeable situation (included in Class W: Provisional and prime cost sum).
Relocation of services (included in Class O: Pipework and Class Q: Drainage work).

om
First division Second division Third division Unit
C2 Items for temporary A1 Item description for

C
© STANDARDS MALAYSIA 2017 - All rights reserved

1 Temporary 1 Facilities 1 Power supply sum facilities shall be temporary


requirements system deemed launch/retrieval shaft
for Tunnel 2 Water supply sum to include all shall state the number of

lic
Boring Machine and/or treatment provision as shaft.
(TBM) system expressly required.
3 Ventilation sum

ub
system
4 Lighting system sum C3 Items for temporary
foundation for
5 Compressed air sum
surface plant and
rP
system equipment shall be
6 Telecommunicat sum
deemed to include
ion system
all provision as
7 Dewatering sum expressly required
Fo

system
to complete the
work. Including
2 Foundation for sum excavation, piling,
surface plant and geotechnical,
equipment concreting,
formwork,
reinforcement,
removal,
reinstatement and
make good.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 19. Class S (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Temporary 3 Launch shaft sum
requirements
4 Retrieval shaft sum C4 Items for temporary A2 Item description for
for Tunnel
launch/retrieval temporary launching
Boring Machine 5 Launching facilities set
(TBM) shaft shall be facilities and/or
6 Retrieval facilities set deemed to include temporary retrieval
retaining structure for facilities shall state the
shaft, excavation, thrust frame, blind steel
temporary support for ring, pressure ring,
shaft, reinforced temporary structure,
concrete, backfill and temporary support

t
all others necessary frame, shield cradle,

en
materials required to sealing system, tunnel
complete the work break in/break out
including facilities and all
reinstatement and necessary temporary

m
make good upon support and structures.
completion.

om
2 Plant and 1 Mobilisation and sum C5 Items for A3 Item description for
equipment demobilisation mobilisation and mobilisation and
demobilisation shall demobilisation state

C
be deemed to include the conditions on how
provision of all plant , remobilisation is
equipment and required.

lic
ancillaries,
transportation to the
site and removal off

ub
the site upon the
completion of the
operation.
rP
Fo

2 Tunnel boring 1 Earth pressure set C6 Item for tunnel Item description for
A4
machine balance boring tunnel boring machine
2 Slurry set machine shall be shall state the back-up
deemed system for tunnel boring
3 Hard rock set
to include the back-up machine.
4 Variable density set

15D014R0 f
system for tunnel
5 Hybrid set
boring machine.
121
15D014R0 f
122

Table 19. Class S (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Plant and 3 Surface plant and 1 Slurry treatment set C8 Items for surface Item description for
A5
equipment equipment plant plant ancillary equipment
2 Grout batching set and equipment shall state the type of
plant shall be deemed plant and equipment to
3 Water chiller plant set include be used.
transportation to the
4 Medical lock set
site handling,
5 Silo & storage tank set assembling which
include all

t
6 Lifting crane set

en
necessary piping
7 Ancillary set and
equipment electrical work and
removal off

m
site after completion
of operation as

om
expressly stated

Transportation Locomotive & C9 Items for


4 1 sum
system rolling stock locomotive &

C
© STANDARDS MALAYSIA 2017 - All rights reserved

Multi service rolling stock shall


2 set
vehicle be
Conveyor belts deemed to include
3 set

lic
system the rail for
transport of
locomotive and

ub
rolling stock shall be
including removal of
rail after
rP
completion.
Fo
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 19. Class S (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Excavation 1 Bored tunnel by 1 Single track m M1 The volume C10 Items for bored A6 Item description for
tunnel boring 2 Twin track m measured for tunnel shall be bored tunnel shall
machine excavation shall be be deemed to include state the external
the payment lines all plantsand diameter.
shown on the equipment during
drawings or, where tunnel construction , A7 Item description of
no payment lines major and minor disposal of
are shown, to the tunnel boring excavatedmaterial
nett dimensions of machine,wear and shall state the location
the volume to be tear parts, grease, of the approved

t
excavated. lubricants, setting up dumping Site.

en
andconnection for all
temporaryelectical
andmechanical
system, connection of

m
A8 Item description for
water and electical
excavation in rock
supply, including
shall state and

om
treatment, multiple
distinguish the different
handling and disposal
rock classes.
of excavatedmaterials
off site or to

C
designated area
within site.

lic
2 Tunnel 1 Earth m3 C11 Item for excavation A9 Where material from
3 Shaft 2 Natural hard m3 shall be deemed to excavation is for

ub
4 Other underground material include all alignment disposal to designated
space 3 Rock m3 and inclination area within the site,
item description shall
4 Artificial hard m3
rP
state the location of the
material designated site.
5 Unsuitable m3 C12 Items for excavation
material shall be deemed to
include scaling,
Fo

washing down,
multiple handling,
disposal off site or to
designated area

15D014R0 f
within the site.
123
15D014R0 f
124

Table 19. Class S (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Excavation C13 Items for A10 Item description for
excavation shall be other underground
deemed to include space shall state the
over break and dimensions of the
backfill with space.
concrete, shotcrete,
mortar, and grout.

t
en
5 Enlarged tunnel 1 Assembly and sum C14 Item for enlarged
section dismantle yard tunnel section shall
2 Vehicle turning sum be deemed to
3 Switching station sum include all

m
necessary tunnel
4 Transformer bay sum
support and
5 Pump sump sum

om
backfilling with
approved materials
to design profile
after completion of
tunnel work

C
© STANDARDS MALAYSIA 2017 - All rights reserved

lic
6 Drilling 1 Probe ahead hole m C15 Items for drilling A11 Item description for
2 Drain hole m probe ahead hole, drilling shall state the
3 Grout hole m drain hole and length and diameter of

ub
grout hole shall be hole.
deemed to include
installation of pipe
as expressly
rP
required.

7 Grouting 1 Surface m3 M2 The mass measured A12 Item description for


Fo

for injection of grouting shall state the


grouting materials type and mix of
shall be taken from grouting material.
the surface
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 19. Class S (continued)


Additional description
Second division Third division Unit Measurement rules Definition rules Coverage rules
First division rules
4 In situ lining 1 Shotcrete 1 Mass m2 M3 The are for D1 Shotcrete shall be C16 Items for shotcrete A13 Item description for
shotcreteshall be defined as expressly shall be deemed to shortcreteshall state
2 Reinforced m2
measured at the required. include smoothing the nominal thickness
payment lines the surface as and class of surface
shown on the expressly required. finish.
drawings or,
shown, to the nett
A14 Item description for
dimension of lining
reinforced

t
to be provided.

en
shotcreteshall
statethickness and the
reinforcing material
added to the mix.

m
2 In situ concrete 1 Mass m3 M4 The volume for cast D2 A15 Item description for

om
The nominal diameter
in situconcrete ststed initem shotcretereinforced with
2 Reinforced m3 shall be the nett fibres, shall state the
description for bar
dimension of the reinforcement shall be dosages of the fibres
lining volume. the cross- added to the mix.

C
sectionaldiameter
defined in MS 146.

lic
A16 Item description for in-
situ concrete shall state
3 Reinforcement 1 Mild steel bar t M5 The mass of steel C17 Items admixtures where
reinforcement shall forreinforcement

ub
2 High tensile steel t required.
bar be taken as shall be deemed to
3 High tensile steel m2 0.785 kg/m per include labour for A17 Item description for bar
fabric 100mm² of the cutting, bending, reinforcement shall
rP
cross-section and placing. statethe size of the bars.
4 Fabric of other m2 (7.85 t/m³).The mass
stated material of the other
reinforcing materials
Fo

shall be taken as
stated in the
contract.

15D014R0 f
125
15D014R0 f
Table 19. Class S (continued)
126

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
4 In situ lining 4 Formwork m2 M6 The mass measured C18 Item for formwork A18 Item description for
for reinforcement shall be deemed to steel fabric
shall include the include travel steel reinforcement shall
mass of form for all state the material, size
reinforcement, inclinations, and nominal mass per
expressly alignment and end square metre.
required in laps and form to the
special chairs construction joint
form for all
inclinations,
The areas of

t
M7 alignment, and end
additional fabric

en
form to the
reinforcement in
construction joint.
laps shall not be
measured.

m
.

om
5 Water proofing 1 Waterstop m M8 Formwork shall be D3 Membrane shall be a C19 Items for A19 Item description for
the nett surface of in layer of impermeable waterstopshall be water proofing shall
2 Membrane m2
situ concrete. materials installed in deemed to include state the type of
the tunnel before cutting, jointing and

C
materials and size.
© STANDARDS MALAYSIA 2017 - All rights reserved

placing in situ special fittings at


M9 The length of
concrete or shotcrete, angles and
waterstop shall be either using sheet junctions.

lic
measured along
system, to keep water
their centre lines.
from entering
C20 Items for membrane

ub
shall be deemed to
M10 The area for include cutting,
membrane shall be jointing and lapping.
the nett area.
rP
Lapping shall not be
measured.
Fo

6 Cross passage nr D4 Cross passage is a C21 Items for cross


tunnel connecting passage shall be
between tunnels for deemed to include
the purpose of excavation, grouting,
exit/emergency lining works tunnel
movement. support, backfill,
instrumentation,
finishes and all
necessary works to
complete the
construction.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 19. Class S (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Preformed lining 1 Concrete lining 1 Precast m M11 The length of C22 Items for preformed A20 Item description for
segmental ring preformed lining concrete lining precast segmental ring
shall shall be deemed to shall state the internal
be measured along include diameter and thickness.
the axis. reinforcement/ steel
fibre/ Polypropylene
fibre, formwork,
2 Steel lining m packing,caulking,
joint seal, finished,
3 Cast iron lining m M12 Volume for annulus

t
bolt and nut,
grouting shall be

en
waterstop and
4 Ductile iron lining m the nett volume of A21 Item description for
preformed threaded invert shall state the
gap between the
5 Annulus grouting m3 grout holes. principal dimension.
lining and the

m
excavation
profile.
C23 Items for steel, cast

om
ironductile iron
lining shall be A22 Item description for
deemed to include steel, cast iron and
cutting and jointing ductile iron lining shall
internal and state the grade,

C
external. thickness and internal
diameter.

lic
C24 Item for annulus
grouting shall be
A23 Item description for
deemed to include

ub
annulus grouting shall
corrosion protection,
stiffener, fish tails, state the type of grout
material.
and purpose made
rP
holes.

6 Tunnel support 1 Steel support 1 Steel rib t M13 Both temporary and C25 Items for the steel A24 Item description for
permanent tunnel support shall be steel support and
Fo

support shall be deemed to include lagging shall state the


measured. all necessary dimensions and nominal
accessories such as mass.
2 Lagging 1 C-channel t tie rod, end plate,

15D014R0 f
2 Steel plate t and bolts and nuts.
3 High tensile steel m2 A25 Item description for
fabric bolting shall state the
reinforcement length and diameter.
127
15D014R0 f
128

Table 19. Class S (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Tunnel support 3 Bolting 1 Rock dowel nr C26 Items for bolting A26 Item description for pull
2 Rock bolt nr shall be deemed to out test shall state the
3 Pull out test nr include all provision type of bolt, diameter,
as expressly length, and test load.
4 Shotcrete 1 Plain m2 M14 The areas for required.
2 Reinforced m2 shotcrete and fibre A27 Item description for fibre
mortar shall be the mortar shall state the
nett area of surface nominal thickness.
to be supported. No
5 Fibre mortar m2
allowance shall be

t
made for uneven A28 Item description for fore

en
surfaces. poling shall state the
6 Fore poling 1 Dowel bar nr length and diameter of
2 Canopy tube nr the dowel bar.

m
A29 Item description for
canopy tube system

om
shall statelength,
diameter, and thickness
of tube.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

7 Backfill 1 Invert 1 Concrete m3 M15 Volume for backfill


2 Behind lagging 2 Shotcrete m3 shall be the nett
dimension of volume

lic
3 Other underground 3 Mortar m3 to be filled. Backfill
space 4 Grout m3 to over break shall
not be measured.

ub
5 Tunnel muck m3
M16 Item for backfill
behind lagging
shall be the nett
rP
volume of gap
between the lagging
and the nett
Fo

excavation profile.

Convergence C27 Items for


8 Instrumentation 1 nr
measurement instrumentation
Settlement shall be deemed to
2 nr
measurement include all provision
as expressly
required.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 19. Class S (concluded)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Instrumentation 3 Stress measurement 1 Strain gauge nr
2 Pressure cell nr
3 Inclinometer nr
Pneumatic
4 nr
piezometer

t
en
m
om
C
lic
ub
rP
Fo

15D014R0 f
129
15D014R0 f
130

Table 20. Class T

Additional description
Class T: Rail track Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes:

Earthwork, sub-grade preparation and sub-ballast (included in Class F:


Earthworks).
Geotextile and geogrid (included in Class G: Geotechnical work).
Concrete track foundations (included in Class I: Concrete work).

t
en
First division Second division Third division Unit
1 Supplying 1 Track foundation 1 Bottom ballast m3 M1 The volume of top D1 Bottom ballast below C1 Items for supplying A1 Item descriptions for

m
ballast measured the soffit level of of bottom ballast supplying bottom
2 Top ballast m3 shall include the sleepers, timbers or shall be deemed to and top ballast shall
3 Waterproofing volume occupied by bearers of a track include delivery of state the type of

om
m2 sleepers. shall be classed as materials to the site. material, grading
membrane
bottom ballast. requirements and
thickness.

C
© STANDARDS MALAYSIA 2017 - All rights reserved

M2 Sub ballast shall be D2 Ballast above the C2 Items for supplying A2 Item descriptions for
measured under underside of the of top ballast shall waterproof
under Class F34*. sleepers, timbers of be deemed to membrane shall state

lic
bearers shall be include delivery of the type, grade and
classed astop materials to the site technical specification.
ballast. and stockpile of

ub
materials at site.
rP
2 Rails 1 Flat bottom t M3 The mass measured C3 Items for supplying A3 Item descriptions for
rails/ running for supplying of rails of rails shall be supplying of rails
ails shall exclude the mass deemed to include shall state either the
2 Check and t of twist rails and delivery of section reference and
Fo

guard rails combination rails. components to the the mass per metre,
3 Twist rail pair site. or the cross-sectional
4 Combination pair dimensions and the
rails mass per metre.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 20. Class T (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Supplying 3 Sleepers 1 Timber nr C4 Items for supplying of A4 Item description for
sleepers shall be supplying of sleepers
2 Concrete nr
deemed to include shall state the type, the
3 Steel nr fittings attached by the size, and identify the
supplier and delivery to fittings which are
4 Specialist ; type nr
the site. attached by the
stated
supplier.
4 Conductor rails 1 Mass, not m C5 Items for supplying of A5 Item description for
exceeding 20 conductor rails shall supplying of

t
kg/m be deemed to include conductor rails shall

en
2 Mass, 20 - 30 m delivery of components state the type.
kg/m to the site.
3 Mass, 30 - 40 m

m
kg/m
4 Mass, 40 - 50 m
kg/m

om
5 Mass, m C6 Items for supplying of
exceeding 50 conductor rails shall
kg/m be deemed to include
guard boards, fixings,

C
bolts, nuts, screws,
washers, insulating
bushes, cable

lic
terminals, rail
insulators, rail
supports, rail

ub
expansion joints,
ramps (high/low
speed), covers and
packing.
rP
5 Fittings 1 Chairs nr M4 Fishplates and rail C7 Items for supplying of A6 Item description for
2 Baseplates nr joints shall be fittings shall be supplying of fittings
Fo

measured by number deemed to include shall state the type.


3 Rail fastenings nr of pairs. fixings, keys, clips,
4 Plain fishplates nr washers, bolts, nuts,
screws, insulating
5 Insulated nr bushes, spikes,

15D014R0 f
fishplates ferrules, track circuit
6 Insulated rail nr insulator, shoulders,
joints pads, shims,
7 Glued insulated nr baseplates, inserts and
131

rail joints packing.


15D014R0 f
132

Table 20. Class T (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Supplying 6 Turnouts set C8 Items for supplying A7 Item description for
of fittings shall be supplying of turnouts
deemed to include and diamond crossing
7 Diamond crossing set all required fittings, shall state the type, type
fixings, fixtures and of joint and length.
accessories.

C9 Items for supplying


of turnouts and

t
diamond crossing

en
shall be deemed to
include delivery of
components to the

m
site.

C10 Items for supplying

om
of turnouts and
diamond crossing
shall be deemed to
include timbers,
fittings, and check

C
© STANDARDS MALAYSIA 2017 - All rights reserved

rails.

lic
2 Supplying 1 Sundries 1 Buffer stops nr C11 Items for supplying A8 Item description for
of sundries shall be supplying of sundries
2 Wheel stops nr deemed to include shall state the type.

ub
3 Lubricators nr delivery of
components to the
4 Switch levers nr site.
rP
5 Rail expansion pair A9 Item description for
joints supplying of buffer
6 Jumper cables nr stops shall state their
approximate weight.
Fo

7 Traction rail nr
bonds
8 Signalling rail nr
bonds

2 Sundries 1 Stray current nr Item description for


A10
continuity cables supplying of cross
2 Cross track nr track ductsshall state
ducts their duct size and
length.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 20. Class T (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Supplying 3 Rail furniture 1 Kilometers nr C12 Items for supplying A11 Item description for
markers of rail furniture supplying of rail
2 Change of shall be deemed to furniture shall state
geometry, include delivery of the type.
nr
horizontal and components to the
vertical markers site.
3 Turnout markers nr
4 Track slab nr C13 Items for supplying
markers of rail furniture

t
5 Conductor rail nr shall be deemed to

en
support marker include all required
6 Fouling point nr fittings, fixings,
markers fixtures and

m
7 Level crossing nr accessories.

om
4 Cable trough 1 Insitu m C14 Items for supplying A12 Item description for
of cable trough supplying of cable
2 Precast m
shall be deemed to trough shall state the
include delivery of type and size.

C
components to the
site.

lic
C15 Items for supplying
of cable trough

ub
shall be deemed to
include the cable
trough lid,
rP
reinforcement,
concrete, formworks,
jointing.
Fo

5 Emergency walkway 1 Side walkway m M5 Emergency C16 Items for supplying C16 Item for supplying A13 Item description for
walkwayshall be of emergency ofemergency supplying of
2 Centre walkway m measured nett across walkway shall walkway shall be emergency
the walkway ramps. deemed to include deemed to include walkwayshall state

15D014R0 f
delivery of delivery of the type and details.
components to the components to the
site. site.
133
15D014R0 f
134

Table 20. Class T (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Supplying 5 Emergency walkway C17 Items for supplying
of emergency
walkway shall be
deemed to include
all required fittings,
fixings, fixtures and
accessories
including walkway
slab, handrails and
cable containment.

t
en
3 Laying 1 Track foundation 1 Bottom ballast m3 M6 The volume of top D3 Bottom ballast below C18 Items for laying of A14 Item descriptions for
ballast measured the soffit level of bottom ballast shall laying bottom and top
2 Top ballast m3 shall include the sleepers, timbers or be deemed to ballastshall state the

m
3 Waterproofing volume occupied by bearers of a track include laying of type of material, grading
m2 sleepers. shall be classed as ballast using a requirements and
membrane
bottom ballast. ballast box and thickness.

om
compaction of
ballast.
D4 Ballast above the

C
underside of the
© STANDARDS MALAYSIA 2017 - All rights reserved

sleepers, timbers of C19 Items for laying of


bearers shall be top ballast shall be
classed as top deemed to include

lic
ballast. regulating and
tamping of ballast.

ub
2 Rails 1 Flat bottom rails/ m M7 The length of laying C20 Item for laying of A15 Item descriptions for
running rails of rails shall be rails shall be supplying of rails
2 Check and m measured along the deemed to include which is not to be
rP
guard rails centre line of the track all necessary works supplied by the
3 Twist rail pair (two rail) including the carried out in contractor, shall state
length occupied by accordance to the the form in which it is to
4 Combination pair turnouts and diamond specification. be supplied and the
rails
Fo

crossing. location.

C21 Items for laying of


rails shall be
A15 Item description for
deemed to include
laying of rails shall
transportation and
state the pre-fabricated
location stated when
lengths.
rails are not to be
supplied by the
contractor.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 20. Class T (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Laying M8 The length of laying C22 Items for laying of A16 Item descriptions for
check and guardrails rails shall be laying of rails shall
shall be measured deemed to include state either the section
along the length of the laying of twist rails, reference and the mass
rail (one rail). check rails and per metre, or the cross-
guardrails, and short sectional dimensions
lengths between and the mass per metre.
turnouts and
diamond crossings.

t
3 Sleepers 1 Timber nr C23 Items forlaying of A17 Item description for

en
sleepers shall laying of sleepers shall
2 Concrete nr deemed to include, state the type, the size,
3 Steel nr distribution, and identify the fittings

m
adjustment and which are attached by
4 Specialist: type nr laying. the supplier.
stated

om
4 Conductor Rails 1 Mass, not m M9 The length of laying C24 Items for laying of A18 Item description for

C
exceeding 20 of conductor rails conductor rails laying of conductor
kg/m shall be measured shall be deemed to rails shall state the type.
2 Mass, 20 - 30 m along the length of the include fixings, bolts,

lic
kg/m rail (one rail). nuts, screws,
3 Mass, 30 - 40 m washers, insulating
kg/m bushes, cable

ub
4 Mass, 40 - 50 m terminals, rail
kg/m insulators, rail
5 Mass, exceeding m supports, rail
50 kg/m expansion joints,
rP
ramps (high/low
speed), covers and
packing.
Fo

15D014R0 f
135
15D014R0 f
136

Table 20.Class T (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Laying 5 Fittings 1 Chairs nr M10 Fishplates and rail C25 Items for laying of A19 Item description for
joints shall be fittings shall be laying of fittings
2 Baseplates nr measured by number deemed to include shall state the type.
3 Rail fastenings nr of pairs. fixings, keys, clips,
washers, bolts, nuts,
4 Plain fishplates nr screws, insulating
5 Insulated nr bushes, spikes,
fishplates ferrules, track circuit
6 Insulated rail nr insulator, shoulders,

t
joints pads, shims,

en
7 Glued insulated nr baseplates, inserts,
rail joints packing and all
8 Alumino thermic nr required fittings,

m
welded joints fixing and
accessories.

om
6 Fittings 1 Flash butt nr C26 Item for alumino A20 Item description for
welded joints thermic welded welded joints shall
joints and flash state the rail section
butt welded joints and the type of weld.

C
shall be deemed to
© STANDARDS MALAYSIA 2017 - All rights reserved

include welding kits.

7 Turnouts set C27 Items for laying of A21 Item description for

lic
turnouts and laying turnouts and
8 Diamond crossing set diamond crossing diamond crossings

ub
shall deemed to shall state their type,
include timbers, type of joint and
fittings, and check length.
rails.
rP
4 Laying 1 Sundries 1 Buffer stops nr C28 Items for laying of A22 Item description for
sundries shall be laying of sundries
2 Wheel stops nr
deemed to include shall state the type.
Fo

3 Lubricators nr all required fittings,


4 Switch levers nr fixings, fixtures and A23 Item description for
5 Rail expansion pair accessories. laying of buffer
joints stops shall state their
6 Jumper cables nr approximate weight.
7 Traction rail nr
C29 Items for laying A24 Item description for
bonds
switch levers and laying of cross track
8 Signalling rail nr crossing shall be ductsshall state their
bonds deemed to include duct size and length.
laying check rails.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 20.Class T (continued)


First division Additional description
Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
4 Laying 2 Sundries 1 Stray current nr
continuity cables
2 Cross track nr
ducts

3 Rail furniture 1 Kilometers nr C30 Items for laying of A25 Item description for
markers rail furnitureshall laying of rail furniture
2 Change of be deemed to shall state the type.

t
geometry, include all required

en
nr
horizontal and fittings, fixings,
vertical markers fixtures and
3 Turnout markers nr accessories.

m
4 Track slab nr
markers

om
5 Conductor rail nr
support marker
6 Fouling point nr
markers

C
7 Level crossing nr

lic
4 Cable trough 1 Insitu m C31 Items for laying of A26 Item description for
cable trough shall laying of cable trough
2 Precast m
be deemed to shall state the type.

ub
include the cable
trough lid.
rP
5 Emergency walkway 1 Side walkway m M11 Emergency C32 Items for laying of A27 Item description for
walkwayshall be emergency supplying of
2 Centre walkway m measured nett across walkway shall be emergency
Fo

the walkway ramps. deemed to include walkwayshall state the


all required fittings, type.
fixings, fixtures and
accessories
including walkway

15D014R0 f
slab and cable
containment.
137
15D014R0 f
138

Table 20. Class T (concluded)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Dismantling 1 Flat bottom rails 1 Plain track m M12 The length of C33 Items for A28 Item description for
dismantling plain dismantling shall dismantling of track
2 Turnouts nr track shall be be deemed to shall state the
3 Diamond nr measured along the include taking up, approximate weight of
crossings centre line of the track lifting, packing, and taking up, details of
(two rail) taken over all slewing. disposal of the track and
roads and shall the type of rail, sleeper

t
exclude lengths and joint.
2 Check and guard m C34 Item for dismantling

en
occupied by turnouts
rails track shall be
and diamond
3 Conductor rails m deemed to include
crossings.
opening out, packing

m
and boxing in with
4 Sundries 1 Buffer stops nr ballast, and insertion A29 Item descriptions for
of closure rails. dismantling buffer

om
2 Wheel stops nr
stops shall state their
3 Lubricators nr M13 The lengths of approximate weight and
dismantling type of construction.
4 Switch levers nr C35 Item for dismantling
checkrail and

C
turnouts and
© STANDARDS MALAYSIA 2017 - All rights reserved

guardrails and
diamond crossings
conductor rails shall
shall be deemed to
be measured along

lic
include checkrail,
the lengths of the rail A30 Where extra ballast is
guardrail, and
(one rail) and shall required, item
conductor rails.
exclude lengths within descriptions for

ub
turnouts and dismantling shall so
diamond crossings. state.
rP
M14 Dismantling of
switch levers shall be
Fo

measured from the


toes of switches.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 21. Class U

Additional description
Class U : Mechanical and electrical work Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes :
M1 All supply and D1 All items C1 Items for equipment A1 All item for
installation shall be forequipment, fan, fan, diffuser, pump, mechanical and
Concrete structures (included in Class I: Concrete work) complete with all diffuser, pump, damper and other electrical shall state
Valve chambers and thrust blocks (included in Class I: Concrete work) fittings and damper and other paraphenalia in the specification, type,
accessories for fully paraphenalia in mechanical and material, size and
Valves and pumps (included in Class O : Pipework) functional work. mechanical and electrical works capacity design.
electrical work shall be deemed to
shall included include all fittings

t
supply, deliver and and accessories and

en
install. any modification
works to authority's
D2 All electrical items approval. A2 Item description for
supplied and electrical systems

m
installed shall be C2 Mechanical and shall state fire rated,
rated for the electrical items weather proof, water

om
intended voltage supplied and proof, explosion proof,
and be in installed shall be and other special
accordance with deemed to include requirements.
relevant and latest mimic-panel,
IEC Standards.

C
tagging, labelling,
D3 All mechanical and painting where
electrical items necessary.
supplied and

lic
A3 Item description for
installed shall equipment and
comply with C3 All mechanical and appliancesshall state
respective electrical items

ub
the specification,
employer's supplied and materials, size and
specification. installed shall be capacity designed.
deemed to include
rP
all ancillary works
and expressly
required
ascessories.
Fo

A4 ltem description for


C4 All mechanical and insulation shall state
electrical items the specification, type,
shall be deemed to thickness and density.

15D014R0 f
include supply,
deliver, install
including all fittings,
accessories,
139

modification and
making good
affected works upon
completion.
15D014R0 f
140

Table 21. Class U (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
1 Ducted services 1 Circular ductwork 1 Straight m M2 Lengths of ducted C5 Items for ducted A5 Item description for
and cabled services services shall be ducted services
2 Rectangular 2 Curved m work systems shall be deemed to include shall state the
ductwork measured along the all fittings and specification,
3 Flexible ducting 3 Fittings nr centre lines including accessories and any materials, size and
lengths occupied by modification works. design.
4 Insulation m fittings.
A6 Item description for
circular and
flexible ducting

t
shall state the size

en
and diameter
2 Cabled services 1 Cables 1 Laid/drawn into m A7 ltem description for
conduits, cable services

m
trunking or duct shall state the
2 Laid on trays m specification,

om
material, size and
3 Fixed to m design.
surfaces
4 Laid in trences m

C
© STANDARDS MALAYSIA 2017 - All rights reserved

5 Suspended m

2 Conduits 1 Plain m

lic
2 Flexible m
3 Box fittings m
4

5
Cable only final
conduit
Cable and
m

m ub
rP
conduit final
conduit
Fo

3 Trunking 1 Plain m
2 Fittings nr
3 Busbar trunking nr

4 Earthing and 1 Plain nr


bonding
2 Fittings nr
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 21. Class U (continued)

Additionaldescription
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
2 Cabled services 5 Accessories 1 Trays nr
2 Switches nr
3 Lighting outlets nr
4 Sockets nr
3 Air conditioning 1 Direct expansion 1 Window unit nr C6 Items for air A8 ltem description for
& mechanical system air 2 Air cooled split nr conditioning and air-conditioning and
ventilation conditioning unit mechanical mechanical
(ACMV) 3 Air cooled multi nr ventilation ventilation
split unit equipmentshall be equipmentshall state

t
deemed to include the specification,

en
4 Variable nr
refrigerant flow all fittings and materials, size and
system accessories and any capacity design.
modification works.

m
2 Precision air 1 Direct nr
conditioning expansion

om
2 Chilled water nr

3 Centralize system 1 Air side nr


air conditioning handling unit

C
2 Air side fan coil nr
unit
3 Chiller nr

lic
4 Cross flow nr
cooling tower
Counter flow nr

ub
5 cooling tower
Make up water nr
tank water
rP
6 treatment plant
Water treatment nr
7 plant
Fo

4 Fan 1 Propeller nr C7 Items for fan shall A9 Item description for


2 Axial nr be deemed to fan shall state type,
3 Forward curved nr include all fittings specification,
impeller and accessories and materials, size and

15D014R0 f
any modification design capacity .
4 Backward nr works.
curved impeller
5 Radial type nr
impeller
141

6 Airfoil type nr
impeller
15D014R0 f
142

Table 21. Class U (continued)

Additionaldescription
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
3 Air conditioning 5 Other paraphernalia 1 Insulation m C8 Items for diffuser,
& mechanical 2 Filter nr pump, damper and
ventilation 3 Diffuser nr other
(ACMV) 4 Pneumatic nr paraphernaliashall
actuator damper be deemed to
5 Electronic nr include all fittings A10 Item description for
actuator damper and accessories and filters shall state the
6 Conventional/m nr any modification specification.
anual preset works.
damper

t
7 nr

en
Acoustic grilles

6 Other paraphernalia 1 Variable air nr

m
volume
2 Silencers nr A11 ltem for diffuser,

om
3 Louvers nr pump, damper and
otherparaphernalias
4 Non nr hall state the
weatherproof specification, material,
grilles size and capacity

C
© STANDARDS MALAYSIA 2017 - All rights reserved

5 Weatherproof nr design.
grilles
6 Perforated nr

lic
grilles

ub
4 Fire fighting 1 Fire fighting 1 Portable fire nr A12 ltem description for
equipment extinguisher equipment and
2 Hose reel nr appliances shall state
system the specification,
rP
3 Landing valve nr material, size and
system capacity design.
4 Sprinkler nr
Fo

system

2 Fire detection & 1 Conventional/ad nr C9 Items for linear heat A13 ltem description for
alarm system dressable detector cable shall linear heat detector
2 Linear heat m be deemed to cableshall state the
detection include all fittings specification, material
3 Centralised nr and accessories and and design.
monitoring any modification
system works.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 21. Class U (continued)


Additionaldescription
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
4 Fire fighting 2 Fire detection & A14 Item description for
alarm system linear heat detector
shall identify and state
the type for linear heat
detector cable.

t
en
3 Total flooding fire 1 Gas kg C10 Items for gas A15 ltem description for
extinguishing 2 Gas cylinder nr system shall be gas systemshall state
system / wet deemed to include the specification,
3 Cylinder strap nr

m
chemical system all fittings and material, capacity
4 Outlet adapter nr accessories and any ,design and type of
5 Cylinder valve nr modification works. gas.

om
6 Electric control nr
head
7 Emergency nr
release handle

C
8 Nozzle nr
4 Total flooding fire 1 Control panel nr C11 Item for fire fighting A16 Item description for
extinguishing complete with shall be deemed fire fightingshall state

lic
system / wet built-in battery toincludes groove the specification,
chemical system and charger coupling, groove material, size and
end cap, bracket, capacity design.

ub
2 Warning light nr
junction box, flexible
3 Flashing/warnin nr
connectors,
g sign
strainers, c-channel,
rP
4 Alarm bell nr
jointing and other
5 Manual release nr accessories.
switch
6 Auto/manual nr
Fo

control unit

5 Accessories 1 Breeching inlet nr


2 Manual nr

15D014R0 f
selection switch
3 Pressure gauge nr
4 Pressure switch nr
143

5 Mechanical tee nr
15D014R0 f
144

Table 21. Class U (continued)

Additionaldescription
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
4 Fire fighting 5 Accessories 6 Neoprene pad nr
7 U-Bolt nr
8 Lightning surge nr
arrestor

6 Accessories 1 Fire rated power


cable nr
2 Twisted screen nr
loop cable
3 Interface m

t
terminal box

en
4 Fire shutter m
5 Flashing beacon nr

m
5 Piped services 1 Accessories 1 Pressure vessel nr M3 Piped services D4 Purpose made C12 Item description for A17 Item description for
2 Multimedia filter nr measured over all pipe piped services piped services piped services shall

om
3 Particle diverter nr fittings, short running shall be so shall be deemed to state diameter, jointing
4 First flush nr lengths and branches described and given include all fittings, method, materials and
device in linear metres. separately. jointing, fixing and location.
5 Basket strainer nr perforating the pipe
or flange.

C
6 Oil & grease nr M4 Flexible pipes and A18 Item description for
© STANDARDS MALAYSIA 2017 - All rights reserved

interceptor extensible pipes purpose made and


(measured as fully bare pipe shall be

lic
2 Pipework 1 Cold water sum extended) shall each C13 Items for water stated separately.
plumbing be so described and storage tanks shall
system measured seperately. be deemed to

ub
2 Soil & waste sum include supporting
plumbing frame.
system
3 Sanitary sum A19 Item description for
rP
appliances and piped services shall
fittings state where relevance
4 Recycle water sum fitting accessories,
Fo

plumbing type and nominal size.


system
5 Rain water sum M5 Pipes laid in or fixed A20 Item description of
harvesting in ducts, trenches and sanitary appliances
system chases or embedded and fittings shall
6 Gas pipe sum in in-situ concrete or statethe specification
7 Storage tank nr screeds shall be each materials, size or
be so described. capacity and method
of fixing.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 21. Class U (continued)

Additionaldescription
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
5 Piped services 3 Septic Tank 1 Cast in situ nr C14 Items for septic A21 Item description for
concrete tanks shall be water storage tanks
2 Pre-fabricated nr deemed to include shall state the material
foundation, and capacity.
excavation,
upholding sides of
excavation, bedding,
A22 Item description for
installation,
septic tank shall state
backfilling and all
the type, material, and
other related work
capacity in term of

t
where expressly
population (PE).

en
required.

m
6 Electrical 1 High voltage (50kv 1 Switchgear nr M6 All incoming electrical D5 The electrical C15 Item for A23 Item description for

om
services and above) 2 Cables m services and main services standby uninterruptible electrical services
incoming services/ installation shall be equipment supplied electrical power shall state the type,
main installation 3 Transformers nr described in and installed shall supply supplied and size and spacing.
4 Compact sub- nr conjuction with be inclusive of diesel installed shall be

C
station manufacturer's details generator, deemed to include
5 Metering kiosk nr and specification. alternator, AMF of batteries, UPS A24 Item descriptiom for
panels and all other module, coupling uninterruptible

lic
6 Generator set nr required panels, isolation electrical services
accessories. transformer and all power supplied and
7 VSD/ VFD nr other required installed shall state

ub
accessories. detail requirement as
8 Soft starter nr M7 The acoustic system D6 The electrical
for generator room services voltage expressly stated.
shall be measured categorisation shall
rP
2 Medium voltage separately under their be in accordance to
(1kv up to 50kv) respective classes of TNB classification.
main installation work.
Fo

15D014R0 f
145
Table 21. Class U (continued)

15D014R0 f
146

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Electrical 3 Low voltage (above 1 Main nr M8 The UPS room for wet D7 Theearthing C16 Items for sub- A25 Item description for
services 1 kv) main switchboard battery cell shall be system for the mains, busducts, expansion loops
installation 2 Standby nr measured separately whole electrical cabling works and shall state the limiting
equipment under respective installation shall final sub-circuits to dimensions, type of
3 Sub-mains m classes of work. include all the be in conduit / joint and the amount
necessary trunking / tray / of expansion to be
4 Final sub- point excavation, concrete ladder shall be accommodated.
circuits pit, make good, deemed to include
5 Light fittings & nr M9 Electronic motor copper rod/earth supporting brackets,
accessories starter shall be materials to achieve covers, tap-
measured in number the desired ohmic off/feeder units, fire
6 Earthing sum value. barriers, earthing

t
inclusive of enclosure

en
7 Ducts and nr and all other required conductors, cable A26 Item description for
manholes accessories where rmination. joints of a special or
8 Lightning nr expressly stated. ornamental charater
and extra

m
protection
C17 Item for incoming demountable couplers
electrical services in the running length

om
M10 Telephone ducts and shall be deemed to shall be stated.
manhole expressly include connection
required shall be cables ends and all
measured under Class cable tails and A27 Item description for

C
U637.
© STANDARDS MALAYSIA 2017 - All rights reserved

cables termination joints in the running


glands. length shall state
C18 Item for method of jointing.

lic
earthingshall be
deemed to include
conductors,

ub
chemical compound,
earth pit, earth rod,
ground bar,
rP
exorthemic welding,
saddles, cleats,
clips, holdfasts and
all other expressly
Fo

stated earthing
accessories.
C19 Item for light
fittings and
accessories shall
be deemed to
include supporting
brackets, covers,
cable termination,
accessories ancillary
works and all other
required
accessories.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 21. Class U (continued)


Additionaldescription
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
6 Electrical C20 Item for lightning
services protection shall be
deemed to include
all the necessary
excavation, make
good and all
required lightning
protection system
and all other
required
accessories.

t
en
4 Extra low voltage 1 Multi-media set C21 Item for multi-media
(below 12v) (AV) system (AV) system shall

m
2 Perimeter set be deemed to
security system include supporting
3 Intelligent tunnel set brackets, cable

om
emergency termination, ancillary
evacuation works and all other
system required
accessories.

C
C22 Item for perimeter
security system

lic
shall be deemed to
include supporting
brackets, cable

ub
termination, ancillary
works and all other
required
rP
accessories.

C23 Item for intelligent


Fo

tunnel emergency
evacuation system
shall be deemed to
include supporting
brackets, cable

15D014R0 f
termination, ancillary
works and all other
required
accessories.
147
Table 21. Class U (continued)

15D014R0 f
148

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
7 Communication 1 Telephone system 1 PABX set C24 Item for telephone
(digital/ system shall be
analogue) deemed to include
2 LAN set supporting brackets,
cable termination,
3 Wifi set ancillary works and
all other required
accessories.
2 Supervisory Control set C25 Item for
and Data Supervisory
Acquisition System Control And Data
(SCADA) Acquisition System

t
3 Programme Logic sum (SCADA) shall be

en
Control (PLC) deemed to include
4 Telemetry system sum supporting brackets,
cable termination,

m
ancillary works and
all other required
accessories.

om
8 Mechanical work 1 Mechanical 1 Screen nr M11 The mechanical D8 Static screen is a C26 Items for weir shall A28 Item description for
equipments equipment for screen screen that be fixed be deemed to forstatic and non
shall be classified as or stationary include all design, staticshall state the

C
© STANDARDS MALAYSIA 2017 - All rights reserved

static, non-static and condition. endorsement, specification, material,


weir. capacity, material, size and capacity
system, supply, design.

lic
D9 Non static screen
is a screen which is install and make
designed to be good.

ub
movable whether by Item description for
manual or A29 weir shall state the
automation motorise type of size, capacity,
operated. material, specification,
rP
type and capacity
D10 Weir is defined as a design.
barrier over which
the water flows in an
Fo

open channel which


is designed as
mechanical or non
mechanical which
inclusive rectangular
weir, triangular weir,
trapezodial weir,
broad-crested weir,
etc and to be
designed with
various type of
material.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 21. Class U (continued)


Additionaldescription
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Mechanical work 1 Mechanical 2 Aeration nr M12 Aeration shall be D11 Aeration is C27 Items for aeration A30 Item description for air
equipments classified as air the process by shall be deemed to diffusion and
diffuser, mechanical which air is include all supply, mechanical aeration
aerator, gravity fall circulated through, install and make shall state the type,
weir and biological mixed with good. function, size and
process. Structure or dissolved in location.
items for gravity fall a liquid or substance
aerator shall be which by designed
deemed to be as gravity based, air
measured under based or mechanical
Class I. based.

t
D12 Item for air diffusion C28 Items for air diffusion A31 Item description for

en
and mechanical and mechanical biological process
aeration type shall aeration shall be shall state the system
consist of but not deemed to include all plant type, capacity,
limited to air blower design, endorsed, function, size and

m
aerator, surface supply, install and location and
aerator, brush make good. associated and

om
aerator, fixed type integration with other
surface aerator, system.
submersible aerator,
paddle aerator,

C
ejector, diffuser,
membrane aerator
and etc

lic
D13 Item for biological
process system

ub
C29 Items for equipment A32 Item description for
plant type shall
and appliances equipment and
consist of but not
shall be deemed to appliancesshall state
limited to oxidation
include all fittings specification, material,
rP
pond, SBR
and accessories and size, type, and
(sequential batch
any modification capacity designed.
rotor) and etc.
works, supplied,
delivered and
Fo

installed on site.

3 Mixer nr D14 Mixer is the device C30 Items for mixer shall A33 Item description for

15D014R0 f
for mixing the be deemed to mixer shall state the
chemicals in the pre include all supply, type of mixers,
and post treatment install, jointing, specification, material,
process. integration with size, type and capacity
149

other structure and design.


make good.
15D014R0 f
Table 21. Class U (continued)
150

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Mechanical work 1 Mechanical 4 Flocculation nr M13 Other ancillaries work D15 Flocculation refers The flocculation A34 Item description
C31
equipments related to flocculation to the process by shall be deemed to forflocculation shall
andsedimentation which fine include all supply, state the type,
shall be measured particulates are install and make capacity, function, size
using their respective caused to clump good. and location.
classes. together into a
flocculation.
C32 Items for mechanical
and flow reactor
flocculator shall be
deemed to include

t
all supply, install and

en
make good.

m
5 Sedimentation nr D16 Gravity C33 Items for A35 Item description for
sedimentation is a sedimentation shall gravity sedimentation
process built with be deemed to shall state the type i.e

om
mechanical means include all design, clarifier or thickener
for continous endorsement, and to define the
removal of solids approval drawing, as process i.e lamella,
being deposited by built drawing, fittings tube settler, solid

C
© STANDARDS MALAYSIA 2017 - All rights reserved

sedimentation and accessories and contact, sand


inclusive of clarifier any modification ballasted, etc,
and thickener. works, supplied, material, size,

lic
delivered and function, associated
installed on site. works and location.
D17 Non gravity

ub
sedimentation is
the process that
solids or particles
raising to the
rP
surface. A36 Item description for
non gravity
sedimentation shall
state the type of
Fo

Diffuse Air
Flocculation (DAF),
etc, specification, type
of tank, size, function,
material, associated
works and location.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 21. Class U (continued)


Additionaldescription
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Mechanical work 1 Mechanical 6 Filteration nr M14 Alternatively D18 Filteration is any of C34 Items for A37 Item description for
equipments filteration shall be various operations filterationshall be filteration shall state
measured as lump that separate solids deemed to include the type, capacity,
sump and the from fluids by adding all fittings and function, size and
associated civil works a medium through accessories and any location.
elements to be which only the fluid modification works,
measured separately can pass supplied, delivered
under respective and installed on site
classes of work. inclusive of filter
nozzle and filter

t
slab.

en
7 Treatment sum M15 The treatment D19 The treatment C35 Item for treatment A38 Item description for

m
process and process and system process and process and treatment process
system shall be categorised system is the system shall be and system shall

om
as chemical system common steps used deemed to include state the system type,
and special system. in treatment process all design, drawings, size, capacity,
All associated works that comprises of endorsement, function, size, location,
elements to be various types and supply, deliver, associated and

C
measured separately duties in order to installation, testing, integration with other
under respective treat water for fittings, accessories system inclusive of all
classes of work. consumption or as built drawing and necessary
release to the any modification accessories.

lic
nature. works including to
achieve the output

ub
D20 The chemical design.
system plant type
shall consist of but
not limited to lime
rP
system, potassium
permangranate
system, aluminium
system, PAC
Fo

system, powder AC
system, main
polymer system,
sludge polymer

15D014R0 f
system, chlorination
system, schrubber
system, auto shut off
system, fluoride
151

system etc.
15D014R0 f
Table 21. Class U (continued)
152

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Mechanical work 1 Mechanical 8 Sludge sum M16 The sludge treatment D21 Item sludge C36 Item for sludge A39 Item description for
equipments treatment facility facililties/ dewatering treatment facilities treatment facilities/ sludge treatment
/dewatering system shall be /dewatering system dewatering system facilities/ dewatering
system categorised under the type shall consist of equipment shall be system shall state
specific system and but not limited to deemed toincluded type and capacity.
plant, measured in decanter, belt press, of all related
lump sum. The filter press, drum components.
associated civil works thickener, etc .
elements to be
measured separately C37 The sludge A40 Item description for
under respective treatment facilities/ mechanical type

t
classes of work. dewatering system sludge treatment

en
shall be deemed to facilities / dewatering
include all design, system shall state in
drawings, detail all related

m
endorsement, components and
supply, deliver, system plant type,
installation, testing, capacity, function,

om
fittings, acecssories size, location,
as built drawing and associated works
any modification components and
works including integrate works with

C
© STANDARDS MALAYSIA 2017 - All rights reserved

achieve the output other system.


design and related
components.

lic
A41 Item description for
non mechanical type

ub
sludge treatment
facilities / dewatering
system shall state in
rP
detail all related
components type i.e
sludge lagoon, sludge
drying bed, etc
Fo

inclusive of all
necessary capacity,
function, size, location,
associated works
components and
integrated works with
other system.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 21. Class U (continued)


Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Mechanical work 2 Mechanical 1 Lifting nr M17 The lifting equipment D22 The lifting C38 The motorised or non A42 Item description for
equipments equipment shall be categorised as equipment is the motorised lifting lifting equipment shall
motorised or manual specific system of equipment shall be state and the type
and all associated civil hoisting apparatus deemed to include all capacity, function, size
and metal work to be travelling overhead required design, and location, motorised,
measured separately for lifting and drawings, manual, current required
under the respective hoisting other endorsement, supply, for the motor, power
classes of work. equipments and is deliver, installation, supply, motor, switch
designed to carry testing, fittings, controller.
the specific load. acecssories and any
modification works A43 Item description for
including associated manual lifting
works with other equipment shall state

t
components. and the type, capacity,

en
function, size and
C39 The installation of location, controller.
lifting equipment

m
shall be deemed to
include obtaining of
the PMA Certificate

om
from DOSH.
2 Tanks nr M18 The tanks shall be C40 Pressure and non- A44 Item description for
classified as pressure pressure tanks shall pressuretanks shall
and non-pressure tank. be deemed to include state the system plant

C
All other associated all required design, type i.e surge vessel, air
work shall be drawings, receiver tank, etc
measured under endorsement, supply, inclusive of all

lic
respective classes of deliver, installation, necessary capacity,
work. testing, fittings, function, size, tank's
accessories and any thickness, location and

ub
modification works associated and
including associated integration with other
works with other system .
rP
components.
C41 The installation of A45 Item description for non
tanks equipment shall pressuretanks shall
be deemed to include state the system plant
Fo

obtaining of the PMT type i.e silo, storage


Certificate from tank, process tank,
DOSH. powder chemical tank,
liquid chemical tank, bin

15D014R0 f
activator, silo
dehumidifier etc
inclusive of all
necessary capacity,
153

function, size and


location and associated
and integration with
other system.
15D014R0 f
154

Table 21. Class U (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Mechanical work 2 Mechanical 3 Other nr D23 Other equipment
equipments equipment & and accessories
accessories shall be categorised
but not limited to
odour control,
exhaust fan, pump
pump guide rail,
guide-barholder and
float switch .

t
en
3 Miscellaneous 1 Rotating nr D24 Item rotating C42 The conveyor shall A46 Item description for
equipments equipmentsshall be deemed to miscellaneous

m
include but not incluside all fixing equipment shall state
limited to air blower, screw or belt based. the type, size and
air compressor, capacity.

om
conveyor, scapper,
scan skimmer,
fluoride crusher,
dust collector, arch

C
© STANDARDS MALAYSIA 2017 - All rights reserved

breaker,transporter
etc.

lic
2 Non-rotating nr D25 Item non-rotating
equipments equipments

ub
shall include but not
limited to tube
diffuser, universal/
flexible
rP
coupling/adaptor,an
alyser rack,
laboratory
equipments,
Fo

headstocks/spindler
s, portable
actuator,tools and
spare parts etc.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 21. Class U (concluded)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
8 Mechanical work 3 Miscellaneous 3 Effluent nr D26 Item effluent
equipments equipments
shall include but not
limited
flowmeter, parshall
flume,
thickener, UV
disinfection
system, ozone etc.

t
en
4 Instrumentation 1 Flow measuring nr M19 The associated works D27 Item for magnetic C43 Instrumentation A47 Item description for
equipments to flow measuring flow measuring shall be deemed to magnetic flow
2 Level measuring nr equipmentsshall be equipment based include all wiring, measuring equipment
equipments measured separately system plant type control panel, based shall state the

m
3 Pressure nr under respective shall consist of but fittings, hacking, system plant type,
measuring classes of work. not limited to conduit, related capacity, function, size

om
equipments magnetic flow meter, accessories and all and location and
4 Quality nr insertion flow meter associated works associated and
measuring and etc. including making integration with other
equipments good. system.

C
5 Water content nr
analyser
D28 Item water contents

lic
analyser type shall
consist of but not A48 Item description for non
limited to pH magneticflow

ub
analyser, measuring equipment
temperature, based shall state the
turbidity, system plant type i.e
ultrasonic, etc ,
rP
conductivity, iron,
aluminium, capacity, function, size
manganese, and location and
chlorine, colour, associated and
integration with other
Fo

fluoride,
hydrocarbon, system .
oxygen demand,
sludge stray,
chlorine, ammonia, A49 Item description for

15D014R0 f
salienity, stream water contents
current monitoring analyser shall state type
(CSM) and etc. of analyzer,
155

specification, material
and all associated works
as expresly stated.
15D014R0 f
156

Table 22. Class V

Additional description
Class V: Miscellaneous work Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes:

Silt fence (included in Class B: Environmental protection and enhancement).


Brickwall (included in Class J : Brickwork, blockwork, and masonry)

First division Second division Third division Unit


1 Fences 1 Timber m M1 The length of fences C1 Items for fences A1 Item description for
shall exclude lengths and gates shall be fences and gates

t
2 Metal m

en
occupied by gates. deemed to include shall state the types,
3 Chain link m excavation, principal dimensions
foundation, and size of
4 Barb/bladed wire m preparation of foundations.

m
5 Composite material m surfaces, painting,
disposal of
6 Concrete m A2 Item description for

om
excavated material,
upholding sides of fences shall state the
7 Precast concrete m
excavation, sizes, types, material
panel
backfilling, concrete, of post.
formwork and

C
© STANDARDS MALAYSIA 2017 - All rights reserved

reinforcement.

lic
2 Gates nr C2 Items for fences
shall be deemed to
include all posts and A3 Item description for

ub
their foundation. fences shall state the
types of metal and
grade of timber used.
rP
C3 Items for chain link
shall be deemed to
include all posts, A4 Item description for
raked angle, chain link shall state
Fo

straining wires, barb the size, gauge and


wires, kerbs where protective coating of
applicable, and their wire mesh.
foundation.
A5 Item description for
gates shall state
C4 Items for gates shall number and size of
be deemed to leaf.
include posts and
foundations, hinges,
bolts, rollers, A6 Item description for
lockplates, and all gate shall state the
necessary welding. mode of operation.
© STANDARDS MALAYSIA 2017 - All rights reserved

Table 22. Class V (continued)

Additional description
First division Second division Third division Unit Measurement rules Definition rules Coverage rules
rules
C5 If mode of operation
of gate is automatic,
the items shall be
deemed to include
the control system.

3 Signage for 1 Painting of logos nr C6 Items for internal A7 Item description for
buildings and and external painting of logo shall

t
tanks 2 External signage nr signage shall be state the location,

en
3 Internal signage nr deemed to include name of logo, and the
fixing cost. type of paint.

m
A8 Item description for
external and internal

om
signage shall state
the type of material,
size, and location.

C
4 Bearing pads 1 Bridge bearing 1 Roller nr C7 Item for bearing A9 Item description for
pads shall be bearing shall state the

lic
2 Other bearing 2 Slide nr deemed to include dimensions.
3 Rocker nr grouting and
temporary works.

ub
4 Plain rubber nr A10 Item description for
pot bearing shall state
5 Laminated nr
the type of material
rubber
rP
used.
6 Pot bearing nr
Fo

15D014R0 f
157
Table 23. Class W

15D014R0 f
Additional description
158

Class W: Provisional and prime cost sum Measurement rules Definition rules Coverage rules
rules
Measurement covered under other classes:

First division Second division Third division Unit


1 Provisional sums 1 Item stated sum M1 Each prime cost D1 The term ‘prime cost C1 Item for provisional A1 Item description for
sums item shall be sum’ is defined as a sums shall be provisional sums
followed by an item sum provided for work deemed to include and prime cost sums
for attendance and or services to be allowances to shall identify the work
2 Prime cost items 1 Item stated sum
percentage for executed by a programme, plan and included.
2 Attendance sum profit. nominated sub- price the works within

t
contractor, a the tenderer's general

en
3 Profit % A2 Where work under
government or a items.
provisional sums is
M2 Where provisional statutory authority or
to be procured by the
and prime cost for materials or goods

m
employer, it shall be
sum form a to be obtained from a
so stated, and
separate bills in the nominated supplier.
separate items for

om
bill of quantities, this Such sum shall be
attendance and profit
item shall make deemed to be
shall be allowed for.
reference to the exclusive of any profit
relevant bills required and/or
instead. attendance to be

C
© STANDARDS MALAYSIA 2017 - All rights reserved

provided by the main


contractor and
provision shall be

lic
made for the addition
thereof where
applicable.

ub D2 The term ‘provisional


sum’ is defined as a
rP
sum provided for work
or for costs which
cannot entirely be
foreseen, defined or
Fo

detailed at the time the


tender documents are
issued.

D3 Item stated is the item


identified to be
measured as
provisional sum or
prime cost sum.
15D014R0 f

Bibliography

[1] Civil Engineering Standard Method of Measurement, Fourth Edition, CESMM4 (UK),
Institution of Civil Engineers and the Civil Engineering Contractors Association, 2012

[2] JKR 20800-0183-14, Standard Specifications for Building Works 2014

[3] Malaysian Standard Method of Measurement for Civil Engineering Works, CESMM,
Construction Industry Development Board (CIDB), 2003

[4] Malaysian Standard Method of Measurement for Civil Engineering Works, MyCESMM,
Construction Industry Development Board (CIDB), 2011

[5] Malaysian Standard Method of Measurement of Building Works, Second Edition, SMM2,
Instituitionsof Surveyors Malaysia (ISM), 2000

t
en
[6] Rail Method of Measurement2- Detailed Measurement, July2014

m
om
C
lic
ub
rP
Fo

© STANDARDS MALAYSIA 2017 - All rights reserved 159


Acknowledgements

Members of Technical Committee on Construction Practices

Ir Noraini Bahri (Chairman) Construction Industry Development Board


Malaysia
Ms Nur Mastura Sahran (Secretary) Construction Industry Development Board
Malaysia
Mr Khairunnizam Sulaiman Construction Industry Development Board
Malaysia
Ir Patrick C. Augustin/ Association of Consulting Engineers Malaysia
Ir Sin Wai Ho
Ar Thulasaidas Sivasubramaniam/ JabatanKerja Raya Malaysia
Mr Muhammad Imraan Mohd Annuar
Mr Ong KaThiam/ Master Builders Association Malaysia

t
Mr Fong Fatt Kee/

en
Ir Tang Lai Peng
Ir Ahmad Redza Ghulam Rasool/ Ministry of Urban Wellbeing, Housing and Local
Ir Roslan Mat Sapri Government
Ir Kamaruddin Mohd Salleh/
Dato’ Ir Jamaludin Non m
PersatuanKontraktorMelayu Malaysia
om
Ar Jasmin Kamarudin PertubuhanAkitek Malaysia
Ir Tiah Oon Ling/ Real Estate and Housing Developers’
Mr Kamal Pasha Mokhtar Association Malaysia
C

Sr Amnah Salleh Royal Institution of Surveyors Malaysia


Ir Tu Yong Eng/ The Institution of Engineers, Malaysia
Ir Gunasagaran Kristnan
lic

Prof Ir Dr Mohd ZaminJumaat Universiti Malaya


Ir Dr Raizal Saifulnaz Muhammad Rashid/ Universiti Putra Malaysia
ub

Dr Sumarni Ismail
rP
Fo

© STANDARDS MALAYSIA 2017 - All rights reserved


Acknowledgements (continued)

Members of Working Group on Malaysian Standard Civil Engineering Standard Method


of Measurement

Datuk Ir Abdul Kadir Mohd Din (Chairman) Indah Water Konsortium Sdn Bhd
Mr Nazir Muhamad Nor (Secretary) Construction Industry Development Board
Malaysia
Ir K. Sundraraj Association of Consulting Engineers Malaysia
Prof Ir Dr Hajjah Siti Hawa Hamzah Board of Engineers Malaysia
Sr Nik Zainal Alam Hasan Board of Quantity Surveyors Malaysia
Ms Zainora Zainal Construction Industry Development Board
Malaysia
Sr Dr Mahmudah Yahya Department of Irrigation and Drainage Malaysia
Sr Alvin Chin Kok Wah Gamuda Berhad
Mr Abdul Rahim Abdul Salam/ Indah Water Konsortium Sdn Bhd

t
en
Mr Muhamad Zaidi Basri
Ir Abd Rahman Salleh Jabatan Kerja Raya Malaysia
Dato’ Ir Dr Zullkefle Nordin Jabatan Perkhidmatan Pembetungan
Mr Azmi Mohamed
Mr Chen SeongWai m
Lembaga Lebuhraya Malaysia
Mass Rapid Transit Corporation Sdn Bhd
om
Mr Azman Mohd Ihsan Pengurusan Aset Air Berhad
Sr Megat Ab Rahman Megat Wah Prasarana Malaysia Berhad
Ms Suzanna Sulaiman Projek Lebuhraya Usahasama Berhad
C

Sr Lim Kok Sang Royal Institution of Surveyors Malaysia


Mr Ahmad Hafizullah Amir Ahmad Razali Suruhanjaya Perkhidmatan Air Negara
lic

Mr Aminuddin Saidin Tenaga Nasional Berhad


Ir Gunasagaran Kristnan The Institution of Engineers, Malaysia
ub

Assoc Prof Sr Dr Zakaria Mohd Yusof Universiti Teknologi Malaysia


rP

The work of analysing the comments, suggestions and drafting this Malaysian Standard was
undertaken bySr Hajjah Sabaria Datuk Haji Hassan and Sr Jailani Jasmani from JUB Central.
The committee is indebted to for their invaluable advice and assistance throughout.
Fo

© STANDARDS MALAYSIA 2017 - All rights reserved


t
en
m
om
C
lic
ub
rP
Fo

© Copyright 2017
All rights reserved. No part of this publication may be reproduced or utilised in any form or by
any means, electronic or mechanical, including photocopying and microfilm, without permission
in writing from the Department of Standards Malaysia.

You might also like