Installation Guide: DC Power Supply System, 16kW, 48VDC
Installation Guide: DC Power Supply System, 16kW, 48VDC
Information in this document is subject to change without notice and does not represent
a commitment on the part of Eltek Energy.
No part of this document may be reproduced or transmitted in any form or by any means
— electronic or mechanical, including photocopying and recording — for any purpose
without the explicit written permission of Eltek Energy.
Power Distribution
Centre for NS-EN ISO 14001: NS-EN ISO 9001:
Communications 1996 Certificate 1994 Certificate
Equipment No: 900005E No: 900005Q
35KS
This product is CE marked and complies with all current requirements for relevant
standards and directives.
This product is made according to EU directive 2002/95/EC (RoHS) and 2002/96/EC (WEEE).
EMC LVD
EN61000-6-2 Industrial Environment LVD73/23/EEC Low Voltage Directive
EN61000-6-3 Residential, Commercial and Light Industry EN60950 Safety of Technology Equipment
ETS 300386 Telecommunication Equipment UL60950,UL1801
Published 2007-06-19
Mfm
2 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
1 Welcome
Table of Contents
1. Welcome 4
About this Guide ............................................................................................................. 4
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 3
1 Welcome
1. Welcome
The Flatpack2 PS System, 16kW, 48VDC, ICab 2.0m is a DC power supply for telecom
equipment suitable for indoor applications.
Read also the generic documentation included in the system’s documentation set, Art.
No. 351475.003
2. System Description
The Flatpack2 PS System, 16kW, 48VDC, ICab 2.0m is a DC power supply system based
on the Flatpack2 2000W 48V rectifier.
The system contains AC termination blocks, DC distribution, Flatpack2 Power Rack,
Flatpack2 2000W rectifier modules and the Flatpack2 Smartpack control unit. The system
is designed for cable entry from top and the cabinet size is 600x600x2000 mm
(23.6”x23.6”x78.7”) (WxDxH).
4 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
2 System Description
Smartpack AC Earth
controller unit Mains Protective Earth (PE)
Connection
(Cabinet main ground bar) DC Earth
Telecom Earth (TE)
Connection
AC Mains
Flatpack2 Terminals
rectifier modules
AC Input Terminals
Battery strings Located behind the front cover
and fuses in the
lower part of the
cabinet
DC Distribution
MCB Load, Alarm and Signal
Terminals located behind the front
cover
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 5
2 System Description
AC Mains
Cable
Fish Plate AC Mains
Fish Plate AC Mains Cable
L1 L2 L3 AC Mains Cable
wires AC Mains
N N L1 L2 L3 Fish Plate wires L1 L2 L3
L1 L2 AC Mains
Wires wires
Links N N L1 L2 L3
N N L1 L2 L3
AC Mains
Terminal
Block AC Mains
AC Mains Terminal
N2 N4 Terminal Block
Block
(To internal connections) Rewire!
N4 N2
N2 N4 Swap the position of internal cables
Flatpack2 DC Power System N2 and N4.
(To internal connections) (To internal connections)
Factory configured
AC Mains terminal block. Flatpack2 DC Power System Flatpack2 DC Power System
Υ Mains, TN Mains Δ Mains, IT
Three-phase & N, 400VAC One-phase, 230VAC/208VAC Three-phase, 230VAC/208VAC
6 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
2 System Description
GMT fuses
F12 Max. 10A each
F5
F8
2
Figure 2 GMT fuse board (max. cable size 1.5mm , AWG 16)
The table below shows the pin-out location for the GMT load fuse card:
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 7
2 System Description
external equipment)
Digital Input 2 + 3 Input Circuit 2
−
Alarm Circuit 4
Load & Battery NC 14
Relay 5 NO 15
Battery Alarm: -10°C >Temp>50°C COM 16 Alarm Circuit 5
& Rectifier Alarm NC 17
Relay 6 NO 18
Mains Alarm & COM 19 Alarm Circuit 6
Mains Low & High Alarms NC 20
2
(Customer Connections) 1.5 mm , max.
wire section
The figure shows the position of the relay contacts when the relay coils are de-energized
(PS system in alarm mode. Factory Settings in bold).
8 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
2 System Description
System Connections
15 − 2
JP2
LVD1A
Pos. Distr. 11−,Pos.D. 8 LVD Common LVD1
JP1 Neg. Distr. 1+/− 9
LVD2A
JP1 JP2 3 3+/− 10 LVD Common LVD2
2 JP2
1 2+/− 11
1 (To latching contactors
2 LVD1 & LVD2)
X***** 3
(Internal Connections)
Neg. Distr.
1 11 CON5A Pos. Distr. JP1 and JP2 are used to configure the
System Connections Card, Art. 200625 system for Negative DC distribution (48 and
60V systems) or Positive DC distribution
(24V systems)
The coil of latching contactors is not energized in any state. They change state from open
to close, or vice versa, when a reversed pulse is applied to the coil.
1
LVBD, Low Voltage Battery Disconnect; LVLD, Low Voltage Load Disconnect
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 9
2 System Description
System Monitoring
The Smartpack Control Unit monitors and controls the entire rectifier system including
distribution and batteries, as well as other equipment on site. The unit also incorporates
a communication port for connecting computers via the USB interface.
The Flatpack2 system can be operated and configured locally via the keypad on the
Smartpack unit, by selecting commands from set-up menus in a hierarchical menu
system.
Remote system monitoring and configuration may also be performed using PowerSuite --
a Windows-based program that runs on a connected PC.
Please, refer to the Smartpack controller’s User’s Guide --Art. No. 350003.013 – and to
the PowerSuite program’s online help (press function key F1) for detailed information
about system monitoring and functionality.
10 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
2 System Description
System Specification
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 11
3 Installation
3. Installation
This section describes how to install the Flatpack2 PS System, 16kW, 48VDC, ICab 2.0m.
Step-by-step procedures will guide you through the installation.
Read also the generic documentation included in the system’s documentation set, Art.
No. 351475.003
Safety Precautions
To be installed only in restricted access areas or the like, in accordance with
articles 110-16, 110-17, and 110-18 of the National Electrical Code,
ANSI/NFPA 70
For supply connectors use wires suitable for at least 75˚C (167˚F)
Type: FEPW, RH, RHW, THHW, THW, THWN, ZHHW, USE, ZX or similar.
Use copper conductors only
There are hazardous voltages inside the power system. As the modules
incorporate large charged capacitors, it is dangerous to work inside the
system even if the mains supply is disconnected
Products into which our components are incorporated have to comply with a
number of requirements. Installation is to be in accordance with the
recommendations herein
12 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
3 Installation
Handle in
unlocked position
Handle in locked position
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 13
3 Installation
Flatpack2
Smartpack rectifier Phase 2
controller
02 05 Position 4
01 04
Position 1 --- --- Position 8
03 06 Phase 3
--- ---
--- --- ---
---
Position 9 --- --- ID number
(Assigned CAN
bus address)
14 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
3 Installation
System Installation
Site Preparation
Refer also to chapter “Location of Components ~ General Arrangement” on page 5.
Step Action OK
o Check min. clearances for cabinet access:
front access, 60cm, top access, 20cm.
If Flexi Kit(s) are going to be installed,
ensure sufficient space behind the cabinet to
allow access to rear panel
1. Organize the
o Check that the levelled surface is able to
installation site
support 600 kg (cabinetized systems). Refer
to System Specification, page 11.
o Ensure the installation site is suitably
ventilated and in a non-explosive
atmosphere. 60V systems in RAL areas
2. Prepare the Check that insulated tools suitable for telecom
installation tools installations are used
3. Prepare AC Supply: AC Check the AC supply is the correct type, and that
input cable(s) and the external AC fuses and AC input cable(s) are
fuses suitably rated. Refer to page 6
Mechanical Installation
Step Action OK
o Check you have received all the parts,
correct cabinet, documentation, batteries (if
applicable), etc
4. Remove packaging o Inspect the equipment for physical damage
and check equipment (report any damages)
o Leave rectifier modules in their packaging or
in the selves, if factory installed.
(commissioning task)
o This is required for accessing the connection
terminals
o Check that cable entry from the top is
5. Remove top cover,
possible
dummy front panels
o Please refer to “Assembly Guide for IFC”,
and Tool Kit
doc. no. 351478.033, chapter 2 “Description
of the Toolbox” for detailed information on
how to remove the tool kit.
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 15
3 Installation
Step Action OK
6. Position and fasten Cabinets on levelled surface, adjust the legs. If
the cabinet necessary, unscrew the legs and fasten the cabinet
to floor
Electrical Installation
Refer also to chapter “Location of Components ~ General Arrangement” on page 5.
Step Action OK
8. Make the system
Switch OFF or remove ALL load fuses (MCB1, MCBx),
completely
battery fuses (Fb1, Fbx) and external AC supply fuses
voltage free
o Check AC configuration: The AC terminals are
correct configured to the external AC supply
16 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
3 Installation
Step Action OK
o Terminate DC Earth (TE)
- Terminals DC Earth (TE) is mechanically connected
to cabinet chassis. Refer to page 5.
- The Common Positive Bus bar is internally cabled
to DC Earth (TE); thus the positive output of the
rectifiers is connected to ground (TE), and the
negative output represents the –48VDC supply
voltage. Refer to Figure 1 General Arrangement
Flatpack2 PS System, 16kW, 48VDC,
ICab 2.0m, on page 5.
10. DC Connections The Common DC Output Rail is to be connected to
Load Circuits TE at only one place.
- If required, you can remove the internal cable that
connects the positive bus bar to local TE.
2
The bus bar is prepared for connection of cables with lugs or ferrules. M8 bolts are fitted at delivery.
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 17
3 Installation
Step Action OK
The positive and negative (-48V) battery cables are
connected from factory to the common positive bus bar and
to the battery MCBs (additional battery string kits are not).
18 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
4 Commissioning
4. Commissioning
The commissioning of Flatpack2 PS System consists of following stages:
I. Perform a pre-start check before the PS system is switched ON
II. Switch ON the system with disconnected load; adjust output voltage
III. Adjust the nominal output voltage with connected batteries and load
I Pre-Start Check
Power is
OFF! Check off in the Commissioning Procedure, that you find in the pullout section of this folder.
If you have just finished the system installation successfully and filled in the Installation Check
List, jump over the Pre-Start Check and continue with stage II.
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 19
4 Commissioning
4. Mount all Flatpack2 rectifier modules in the power shelves (keep original location)
o Push all rectifiers firmly inwards ⎯ one module at a time, allowing a 2s delay ⎯ to
plug them in the same shelf location. Lock their handles. Refer also to page 13
o Mount blanking panels over unused positions
5. Ensure that the Smartpack and all rectifier modules are working: LEDs are ON
o Verify correct operation, by monitoring the modules’ LED lamps and display:
No alarms are present on rectifiers; The Smartpack displays fuse alarms
6. Connect a PC to the PS system (to facilitate operation)
o Plug a standard USB A-B cable between the PC and the Smartpack controller
o Start PowerSuite on the PC by selecting: Start > All Programs > Eltek > PowerSuite
o On the toolbar, click the “Connect” button to establish connection
7. Measure and adjust DC output voltage
o Read the DC output voltage on the controller’s display
o With a multi-meter, measure the DC output voltage at the most accessible point, e.g.
between the common DC rail and the lower connection of one of the priority load MCBs
o If required, adjust the voltage using the controller’s front keys or via PowerSuite
8. Verify the alarm relays are working correctly (alarm relay test)
o Run the alarm relay test using the controller’s front keys or via PowerSuite (select the menu
Go > Output Test)
9. Make sure the System Setup is in accordance with configuration
o Verify system settings using the controller’s front keys or via PowerSuite
o Use the opportunity to enter site related information, number of used AC phases, type
of batteries, etc.
20 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
4 Commissioning
Load Adjustments
III
Power is
Now, you can begin with stage III, where you will adjust again the output voltage to the battery ON!
voltage, and connect the batteries and the load. Carry out the following:
10. Adjust DC output voltage to equal measured battery voltage
o Measure the battery voltage is within range (check connections have correct polarity)
o Adjust DC output voltage — using the controller’s front keys or via PowerSuite— to Device
hazard
equal the measured battery voltage.
(Important adjustment to avoid arcing when connecting the batteries)
11. Unplug all rectifiers but one, and connect the battery fuses /MCBs
(CAUTION: Have only one rectifier connected, when switching ON the battery fuses.
Thus, avoiding damaging all rectifiers, due to possible incorrect polarity connections, etc.)
o Disconnect all rectifiers but one, by unlocking the handles and pulling them partially Device
hazard
out (fan housing visible). Do NOT physically remove them from the power shelves
o Switch ON all battery fuses or MCBs
12. Adjust DC output voltage again to equal the nominal battery voltage
o Adjust DC output voltage — using the controller’s front keys or via PowerSuite — to
equal the nominal battery voltage (or the nominal load voltage, when not using batteries)
13. Plug in again all rectifiers, and verify the rectifiers’ current sharing
o Connect all rectifiers again by pushing them firmly inwards ⎯ Repeat step 4, in stage II
o Wait for about 2 min., and check — using the PowerSuite application —that each of the
rectifiers delivers the same output current. A deviation of 1A is acceptable.
14. Connect the load breakers and verify that no alarms are displayed
o Switch ON all load MCBs/ fuses
o Verify correct operation: rectifiers and controller display no alarms
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 21
5 Forms, Schematics & Drawings
Commissioning Procedure
Maintenance Procedure
22 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
INSTALLATION CHECK LIST
System Data Flatpack2 PS System
Flatpack2 Power Supply System, type: Article No.:
Site, name:
Serial No.: Software, version No.: Rectifiers, type & number of:
AC Input Voltage, measured: Battery Type: Battery Capacity: Installation carried out by, name:
Site Preparations
CARRY OUT FOLLOWING: OK
1. Organize the installation site
o Check min. clearances for cabinet access: front access, 60cm, top access, 20cm
o Check that the levelled surface is able to support 600 kg (cabinetized systems)
EMC o Ensure the installation site is suitably ventilated and in a non-explosive atmosphere. 60V systems in RAL areas
regard 2. Prepare the installation tools
o Check that insulated tools suitable for telecom installations are used
3. Prepare AC Supply: AC input cable(s) and fuses
o Check the AC supply is the correct type, and that the external AC fuses and AC input cable(s) are suitably rated
Approval
Responsible of installation, sign.: Date: Approved by customer, sign.:
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 23
24 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
COMMISSIONING PROCEDURE
System Data Flatpack2 PS System
Supplier’s Order No.: Flatpack2 Power Supply System, type: Article No.:
Site, name:
Serial No.: Software, version No.: Rectifiers, type & number of:
AC Input Voltage, measured: Battery Type: Battery Capacity: Commissioning carried out by, name:
I Pre-Start Check
CHECK FOLLOWING:
Power is OFF!
OK
1. Flatpack2 system installation is completed; The Flatpack2 Installation Check List is filled in.
All cabling is securely terminated with correct polarity
Device 2. All battery and load MCBs/ fuses are disconnected
hazard
3. AC input cable(s) and AC earth wire (PE) are terminated
Device
2. Switch ON the system (external AC fuses ON)
hazard
3. AC input voltage is correct; Measure and verify
4. Insert all Flatpack2 rectifiers in their original locations in the power shelves
5. The Smartpack and all rectifier modules are working, LEDs are ON; Verify
8. Alarm relay test; Verify all alarm relays are working correctly
9. System Setup is in accordance with configuration Enter site spec. info in PowerSuite
III 10. Adjust DC output voltage to equal measured battery voltage Check correct polarity!
11. Unplug all rectifiers but one, and connect all battery fuses/ MCBs
Device 12. Adjust DC output voltage to equal nominal battery or load voltage
hazard
13. Plug in again all rectifiers, and verify the rectifiers’ current sharing
14. Connect all load MCBs/ fuses, and verify no alarms are displayed
Approval
Responsible of commissioning, sign.: Date: Approved by customer, sign.:
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 25
26 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
MAINTENANCE PROCEDURE
System Data Flatpack2 PS System
Flatpack2 Power Supply System, type: Article No.:
Site, name:
Serial No.: Software, version No.: Rectifiers, type & number of:
AC Input Voltage, measured: Battery Type: Battery Capacity: Maintenance carried out by, name:
4. All cabling and copper bars are securely terminated and supported.
Correct any loose connections, excessive cable temperature, defective insulation, etc.
5. The Smartpack & all rectifier modules are ON, no alarm present; verify.
Otherwise, correct and put the PS system in normal mode of operation.
6. All rectifier’s functionality & Smartpack’s keys and display work OK; verify
Correct possible abnormalities before continuing.
System Adjustment
CARRY OUT FOLLOWING: OK
1. DC Output Voltage Calibration; ensure correct display readings.
If measured DC output voltage at the load terminals deviates more than ±1% from the display reading, calibrate the
output voltage from the Smartpack’s keypad or the PC.
4. Alarm Relay Test; verify all alarm relays are working correctly.
From the Smartpack’s keypad or PC use the Relay Test function; verify activation of external equipment
Approval
Responsible of maintenance control, sign.: Date: Approved by customer, sign.:
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 27
28 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
AC Mains Connection, located
42U behind the panel, on the right side
36U
34U
32U
30U
Battery MCB
FB4*
28U
26U
24U
Battery MCB22U
FB3*
20U
18U
16U
Battery MCB14U
FB2*
12U
10U
8U
6U
Battery MCB
FB1*
4U Max. Battery
Height: 7U
2U
* Optional
HxDxW: 2000x600x600mm
Figure 3 General Arrangement Flatpack2 PS System, 16kW, 48VDC, ICab 2.0m Doc, 24nnnn.yy, XvX
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 29
30
Figure 4
0V
CU-bar common +
DC Earth (TE)
AC terminal 16
connections F12 15
14
F11 13
Load
Alarm
Star (400Vac) 12
3-phase F10 11
L3 L2 L1 N + F9 10
9
F8 8
48Vdc
LVBD - 7
203929
SH1
F7 6
System Connection Board 5
Load
Alarm
- + 4
200625 *X5
GMT Load circuits -
OVP kit Y X F6 3
Con 5A* System Connection 2
15 + 1 F5 1
* System Connections Power Input
- 2
+ 3
Battery Current
- 4
Battery Fuse Fail + 5
- 6 - FB1
Load Fuse Fail 1 7
LVD 1A 8
LVD Common 9
LVD 2A 10
LVD Common 11
- FB2*
NEG. DIST.
POS. DIST.
NEG. DIST.
POS. DIST.
JP1 JP2
1 2 3 1 2 3
- FB3*
Battery Strings
Circuits -48Vdc
2 PE CON13
Backwiring FP2
L1 CON9 Low Current 2AC
L1 CON11 4 rectifier positions *X1
L2 CON10 105581 Alarm Outputs and Alarm I/O Connections - FB4*
L2 CON12
Digital Inputs + 1
Digital Input 1
+ 105954 - 2
+ 3
Digital Input 2 - 4
Customer connections
NO 5
- Relay 1 COM 6
NC 7 - F1
NO 8
PS 1 Relay 2 COM 9
8 NC 10
Smartpack Power Con8, pin 1-8
- /CAN bus 8 Con 1A*
interconnections 10
Con8, pin 9-16 Alarm I/O Connections *X2
Ext. Alarm I/O Connections
26 Con 2A* + 1
- F2
Ext. Alarm I/O Connections Digital Input 3 -
Backwiring FP2 2
PE CON13 + 3
L1 CON9 Low Current 2AC Digital Input 4 - 4
L1 CON11 4 rectifier positions + 5
L2 CON10 Digital Input 5 -
105581 6
L2 CON12 + 7
Digital Input 6 - 8 - F3*
Customer connections
+ NO 9
Load circuits -48Vdc
Relay 3 COM 10
NC 11
NO 12
- Relay 4 COM 13
NC 14
PS 2 NO 15
8 Relay 5 COM 16
- F4*
Smartpack Power Con8, pin 1-8 NC 17
- /CAN bus 8 NO 18
interconnections Con8, pin 9-16 Relay 6 COM 19 Rear connections Front connections
NC 20
Smartpack
monitoring and
15 control unit
CON5
System Connections USB 2.0 type B port USB
(PC connection)
351475.033, v3-2007-06
Note! The values in this table are default factory settings. The settings of a Smartpack controller in
an installed system may be different from the above settings, depending on the system’s final
configuration of optional kits, number/type of batteries, alarm setup and/or any other changes done
to the system and/or the Smartpack controller after the system was shipped from the factory.
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 31
32 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06 33
34 Installation Guide Flatpack2 PS System, 16kW, 48VDC, Indoor 2.0m Cabinet 351475.033, v3-2007-06
LOAD DISTRIBUTION LIST
System Data
Flatpack2 PSS, type: Article No.:
Site, name:
*Optional fuses/breakers.
Form xxx-gb-v1-C01_351476-033_instgde_fp2-pss-16kw-48vdc-ocab-fanc-2m0.doc_ts/mfm_2007-06-19
F3 & F4 are only fitted if optional BTS breaker kit(s) are installed in the cabinet.
F13-F20 are only fitted if optional LTE kit is installed in the cabinet
Breakers F1, F2 and GMT fuses F5-F12 are always part of cabinet
LTE MCB`s
(Optional)
For details, see installation manual
for LTE kit (351480.033)
BTS MCB`s
For details, see chapter
“Location of Components General
arrangement”
GMT FUSES
For details, see chapter
“Terminals and pin-out location
GMT fuse”