Vadodara: Pilots and Implementation - W5
Vadodara: Pilots and Implementation - W5
PILOT 2 - NEIGHBOURHOOD
SCHOOL CONNECT
Connecting to 10 schools
Cycle Track Length – 9.6 km
Area of impact - 7.15 sq.km
PILOT 3 - CORRIDOR
GOVERNMENT CONNECT
Jail Road – Sayaji baug
Cycle Track Length – 6.13 km
Design for Corridor
SOLAR PARK :
SUSTAINABLE CONNECT
7.2 km
SCHOOL CONNECT
Design for Corridor
PAIN POINTS
Design of traffic calming elements
Tree in between Cycle Track, Clip-on on the Tree as a Cycle Parking Stand.
Wrong side Vehicles.
And Adding Barricades to stop motorised
movement (at the beginning of the road)
Design of Street Furniture - from available scrap of VMC
Design & placement of Signages
Lack of proper lighting during night time Adding signages & lights
Improving Safety & Security
Initiatives
Tie-ups
Proposals
Campaigns
Competition
Mentorship sessions
Partnerships
Scale-up
Leader boards
Awareness
Accessories
Future Designs
Campaigns
Impact assessment
Inspire- brand ambassadors
Prizes
Training
Art
From the schools Influencers
Fitness
Crowd-sourcing
Pilot Projects Promote Inspire
Kids sourced designs
SCALE UP plan + Innovative funding + Inclusivity
INDUSTRY CONNECT
SCALE UP plan + Innovative funding + Inclusivity
INDUSTRY CONNECT
Adopt a Junction
INCLUSIVITY
Empowering Cyclopreneurs - Building support
3.5 CYCLE REPAIR
KARACHIYA
INCLUSIVITY SIDE ELEVATION
CHANNI
KARADIYA
Fig. 3.5 Cycle repair on street, Vadodara
ADVANTAGES
GORWA
• Empowement
NIZAMPURA HARNI • Easy access
LAKSHMIPURA
SHUBHANPURA • Availability
GOTRI
ALKAPURI DISADVANTAGES ELEVATION
• Informal
• Lack of design aesthetic
MANDVI
AKOTA
WAGHODIYA
BHAYLI
VISUAL CATALOGUE
SOMA TALAV
MANJALPUR
ATLADARA Metal Sheet
MAKARPURA
GIDC
Concrete
PLAN
Timber
INCLUSIVITY
Our support partners
& growing
Thank you