0% found this document useful (0 votes)
221 views30 pages

Vadodara: Pilots and Implementation - W5

Through their presentation, the city of Vadodara explains design interventions to be carried out for their corridor and neighborhood pilots. They describe the process of developing design solutions for the same, including interventions to curtail motorized traffic in dedicated cycle lanes.

Uploaded by

ITDP India
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
221 views30 pages

Vadodara: Pilots and Implementation - W5

Through their presentation, the city of Vadodara explains design interventions to be carried out for their corridor and neighborhood pilots. They describe the process of developing design solutions for the same, including interventions to curtail motorized traffic in dedicated cycle lanes.

Uploaded by

ITDP India
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 30

VADODARA

Design of corridor & neighbourhood


Title
Corridor
Text and Neighbourhood pilot
PILOT 1 - CORRIDOR
SUSTAINABLE CONNECT
Solar Canal : Chhani – Sama Road
Cycle Track Length – 7.2 km

PILOT 2 - NEIGHBOURHOOD

SCHOOL CONNECT
Connecting to 10 schools
Cycle Track Length – 9.6 km
Area of impact - 7.15 sq.km

PILOT 3 - CORRIDOR

GOVERNMENT CONNECT
Jail Road – Sayaji baug
Cycle Track Length – 6.13 km
Design for Corridor

SOLAR PARK :
SUSTAINABLE CONNECT

7.2 km

Solar Canal : Chhani – Same Road


CORRIDOR
Design for Neighbourhood
NEIGHBOURHOOD

SCHOOL CONNECT
Design for Corridor

GOVERNMENT CONNECT End Point : Saffron Tower (end of Sayaji


baug, Commissioner bungalow)

Start Point :Below Solar


Rooftop, before Akota bridge
LANDMARKS

PAIN POINTS
Design of traffic calming elements

Road Merging at a Junction.(Accidental Zone)


Removal of some part of the traffic island to get
easy flow of cycles on the track.

Adding Raised Crossing to slow down the speed


of motorised vehicles
Design of traffic calming elements

Providing raised crossing for traffic to slow down.


Accident Zone Adding Vertex Mirror, Signages, Landscaping and
street light.
Bollards to restrict motorised vehicles
Unauthorised Parking Adding bollards and Marking to avoid parking
Of motorised vehicles on the cycle track
Design of traffic calming elements - Junction

Cycle Track Mix traffic Track

Segregating cycle tack and other


Critical Junction due to merger of traffic
track to avoid accidents.
Design of cycle parking - street furniture

Tree in between Cycle Track, Clip-on on the Tree as a Cycle Parking Stand.
Wrong side Vehicles.
And Adding Barricades to stop motorised
movement (at the beginning of the road)
Design of Street Furniture - from available scrap of VMC
Design & placement of Signages

Lack of markings, signages, lights Adding signages, lights and landscape


Improving cycling conditions during Night time

Lack of proper lighting during night time Adding signages & lights
Improving Safety & Security

CCTV Surveillance - connected to command & control centre


Junctions to be re-designed Potential spots for cycle parking
Learnings from the design process (PILOT project)

TACKLING HOT WEATHER INNOVATIVE FUNDING METHODS INCLUSIVITY

LEARNINGS / SOLUTIONS LEARNINGS / SOLUTIONS LEARNINGS / SOLUTIONS

-dedicated inclusivity manager


-CSR funding from corporates
-School connect inclusivity for promoting
-Promoting Morning & Night Cycling -Help from partner institutes / Schools
Cycling in schools (specially girls)
-Plantations along the cycle track -Architects, Planners, Designers
- Cyclopreneur support structure with institutes
-requesting corporates to keep shower rooms -Retail of Merchandise
- Avoiding representations & bias
- Utilising waste resources of VMC
- Entries to school books
- Cycling in Industrial area for daily wage workers
SCHOOL CONNECT

Initiatives

Tie-ups
Proposals
Campaigns
Competition

Mentorship sessions
Partnerships
Scale-up
Leader boards

Awareness
Accessories

PILOT PROJECT Partnerships


Incentives

Future Designs
Campaigns
Impact assessment
Inspire- brand ambassadors
Prizes

Training
Art
From the schools Influencers
Fitness

Crowd-sourcing
Pilot Projects Promote Inspire
Kids sourced designs
SCALE UP plan + Innovative funding + Inclusivity

INDUSTRY CONNECT
SCALE UP plan + Innovative funding + Inclusivity

INDUSTRY CONNECT
Adopt a Junction

INNOVATIVE FUNDING METHODS

ART + LANDSCAPING + CORRIDOR DEVELOPMENT


Scale up strategy for Makarpura Industrial Estate

INCLUSIVITY
Empowering Cyclopreneurs - Building support
3.5 CYCLE REPAIR

KARACHIYA
INCLUSIVITY SIDE ELEVATION
CHANNI

KARADIYA
Fig. 3.5 Cycle repair on street, Vadodara

ADVANTAGES
GORWA
• Empowement
NIZAMPURA HARNI • Easy access
LAKSHMIPURA
SHUBHANPURA • Availability

GOTRI
ALKAPURI DISADVANTAGES ELEVATION

• Informal
• Lack of design aesthetic
MANDVI
AKOTA
WAGHODIYA
BHAYLI

VISUAL CATALOGUE
SOMA TALAV

MANJALPUR
ATLADARA Metal Sheet

MAKARPURA
GIDC
Concrete

PLAN
Timber

CYCLE REPAIR 0 0.5 1 2M


N 0 1000 2000 4000 M KEY PLAN
Bhayli
Vadodara, Gujarat
Empowering Cyclopreneurs - Building support

INCLUSIVITY
Our support partners

Meraki Design Studio

& growing
Thank you
Website - https://bit.ly/3ju3ZCY
Facebook - India Cycles4Change

A programme of

Conducted by

www.itdp.in

You might also like