Estimation For Villa
Estimation For Villa
1 Reinforced Cement Concrete = 623.34 m3
2 nd Levelling Floor = 168.79 m3
1 st Levelling Floor = 166.37 m3
Ground Floor = 154.10 m3
First Floor = 91.37 m3
Staircase Room = 13.03 m3
Add 5 % = 29.68 m3
2 d L lli Fl
2 nd Levelling Floor = 18 37
18.37 ttonn
1 st Levelling Floor = 17.95 tonn
Ground Floor = 18.82 tonn
First Floor = 12.32 tonn
Staircase Room = 2.10 tonn
Add 5 % = 3.48 tonn
3 Reinforced Blockwork = 62.54 m3
2 nd Levelling Floor = 28.48 m3
1 st Levelling Floor = 19.54 m3
Ground Floor = 11.54 m3
Add 5 %
Add 5 % = 2 98
2.98 m3
4 Solid Blockwork = 407.03 m3
2 nd Levelling Floor = 59.10 m3
1 st Levelling Floor = 59.62 m3
Ground Floor
Ground Floor = 115 68
115.68 m3
First Floor = 129.98 m3
Staircase Room = 23.28 m3
Add 5 % = 19.38 m3
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY suman
Vijay
DESCRIPTION 2nd Levelling Floor
CHECKED BY Suman
Length
Length RCC Quantity
RCC Quantity Reinforcement
Reinforcement
No cm Width cm Height cm m3 tonn
Length
Length RCC Quantity
RCC Quantity Reinforcement
Reinforcement
No cm Width cm Height cm m3 tonn
iv RCC Wall 31.35 3.10
1 2640.00 25.00 475.00 31.35 3.10
Length
Length RCC Quantity
RCC Quantity Reinforcement
Reinforcement
No cm Width cm Height cm m3 tonn
3 Total Quantito of Solid Block Work 59.10
Block Work 64.00
Compound Wall 1 2450.00 20.00 290.00 14.21
Al
Along Grid 1,3,6 &8
G id 1 3 6 &8 4 700
700.00
00 20
20.00
00 505
505.00
00 28
28.28
28
Along Grid A 1 780.00 20.00 505.00 7.88
Along Grid A 1 620.00 20.00 505.00 6.26
Along Grid C 1 730.00 20.00 505.00 7.37
Reduction For Openings 4.90
D 2 1 220.00 20.00 150.00 0.66
D 3 1 220.00 20.00 110.00 0.48
D 4 1 220.00 20.00 100.00 0.44
D 5 1 220.00 20.00 80.00 0.35
W 1 1 740.00 20.00 160.00 2.37
W2
W 2 1 300
300.00
00 20
20.00
00 100
100.00
00 0
0.60
60
JOB NO.
CUSTOMER DATE 23-Dec-2009
St PREPARED BY Vijay
DESCRIPTION 1 Levelling Floor
CHECKED BY Suman
3 Total Quantito of Solid Block Work 59.62
Block Work 68.45
Part 1 2 1185.00 20.00 370.00 17.54
Part 2 2 1530.00 20.00 370.00 22.64
Part 3 1 420.00 20.00 370.00 3.11
Part 4 1 1210.00 20.00 370.00 8.95
Part 5 3 490.00 20.00 370.00 10.88
Part 6 1 540.00 20.00 370.00 4.00
Part 7 1 180.00 20.00 370.00 1.33
Reduction For Openings 8.83
D 3 4 220.00 20.00 110.00 1.94
D 5 4 220.00 20.00 80.00 1.41
W 1 1 740.00 20.00 160.00 2.37
W 3 2 200.00 20.00 100.00 0.80
W 5 1 250.00 20.00 200.00 1.00
SD 2 1 300.00 20.00 220.00 1.32
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY Vijay
DESCRIPTION Ground Floor
CHECKED BY Suman
RCC Quantity Reinforcement
No Length cm Width cm Height cm m3 tonn
1 Concrete Works 154.10 18.82
RCC Quantity Reinforcement
No Length cm Width cm Height cm m3 tonn
P 5 1 620.00 20.00 60.00 0.74 0.08
RCC Quantity Reinforcement
No Length cm Width cm Height cm m3 tonn
Ribbed Slab 1 1 720.00 620.00 12.00 5.36 0.49
Ribbed Slab 2 1 500.00 450.00 12.00 2.70 0.28
3 Total Quantito of Solid Block Work 115.68
Block Works 130.17
Compound Wall 1 2450.00 20.00 290.00 14.21
Part 1 2 2200.00 20.00 370.00 32.56
Part 2 1 870.00 20.00 370.00 6.44
Part 3 1 1140.00 20.00 370.00 8.44
Part 4 1 700.00 20.00 370.00 5.18
Part 5 2 1530.00 20.00 370.00 22.64
Part 6 1 420.00 20.00 370.00 3.11
Part 7 1 730.00 20.00 370.00 5.40
Part 8 1 620.00 20.00 370.00 4.59
Part 9 1 890.00 20.00 370.00 6.59
Part 10 2 620.00 20.00 370.00 9.18
Part 11 1 600.00 20.00 370.00 4.44
Part 12 2 500.00 20.00 370.00 7.40
Reduction For Openings 14.49
D 1 1 220.00 20.00 150.00 0.66
D 3 4 220.00 20.00 110.00 1.94
D 4 3 220.00 20.00 100.00 1.32
D 5 4 220.00 20.00 80.00 1.41
W 1 1 740.00 20.00 160.00 2.37
W 2 2 300.00 20.00 100.00 1.20
W 3 2 200.00 20.00 100.00 0.80
W 4 2 400.00 20.00 120.00 1.92
W 5 1 250.00 20.00 200.00 1.00
W 6 2 120.00 20.00 80.00 0.38
W 7 2 220.00 20.00 20.00 0.18
SD 2 1 300.00 20.00 220.00 1.32
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY Vijay
DESCRIPTION First Floor
CHECKED BY Suman
2 Total Quantito of Solid Block Work 129.98
Block Work 143.95
Part 1 2 2200.00 20.00 370.00 32.56
Part 2 1 1500.00 20.00 370.00 11.10
Part 3 1 700.00 20.00 370.00 5.18
Part 4 1 1880.00 20.00 370.00 13.91
Part 5 1 320.00 20.00 370.00 2.37
Part 6 1 360.00 20.00 370.00 2.66
Part 7 4 1530.00 20.00 370.00 45.29
Part 8 1 420.00 20.00 370.00 3.11
Part 9 1 620.00 20.00 370.00 4.59
Parapet 2 1530.00 20.00 120.00 7.34
Parapet 2 2200.00 20.00 120.00 10.56
Parapet Car Park 1 2200.00 20.00 120.00 5.28
Reduction For Openings 13.98
D 3 4 220.00 20.00 110.00 1.94
D 5 4 220.00 20.00 80.00 1.41
D 6 1 220.00 20.00 120.00 0.53
D 7 1 220.00 20.00 90.00 0.40
W 1 1 740.00 20.00 160.00 2.37
W 3 3 200.00 20.00 100.00 1.20
W 4 1 400.00 20.00 120.00 0.96
W 5 1 250.00 20.00 200.00 1.00
SD 1 400.00 20.00 220.00 1.76
SD 1 1 250.00 20.00 220.00 1.10
SD 2 1 300.00 20.00 220.00 1.32
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY Vijay
DESCRIPTION Staircase Room
CHECKED BY Suman
Length Height RCC Quantity Reinforcement
3
No cm Width cm cm m tonn
1 Concrete Works 13.03 2.10
2 Total Quantito of Solid Block Work 23.28
Block Work 23.76
Part 1 2 720.00 20.00 320.00 9.22
Part 2 2 330.00 20.00 320.00 4.22
Parapet 2 720.00 20.00 120.00 3.46
Parapet 2 330.00 20.00 120.00 1.58
Parapet Car Park 1 2200.00 20.00 120.00 5.28
Reduction For Openings 0.48
D 3 1 220.00 20.00 110.00 0.48