0% found this document useful (0 votes)
164 views13 pages

Estimation For Villa

The document is a quantity summary for a construction project containing the following information: - RCC quantities and reinforcement requirements for the 2nd levelling floor totaling 168.79 cubic meters of RCC and 18.37 tons of reinforcement. - The RCC and reinforcement quantities are broken down into items like foundations, columns, walls, beams, etc. with their respective lengths, widths, heights and quantities. - Other items mentioned are reinforced blockwork, solid blockwork, etc. but quantities are only provided for the 2nd levelling floor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
164 views13 pages

Estimation For Villa

The document is a quantity summary for a construction project containing the following information: - RCC quantities and reinforcement requirements for the 2nd levelling floor totaling 168.79 cubic meters of RCC and 18.37 tons of reinforcement. - The RCC and reinforcement quantities are broken down into items like foundations, columns, walls, beams, etc. with their respective lengths, widths, heights and quantities. - Other items mentioned are reinforced blockwork, solid blockwork, etc. but quantities are only provided for the 2nd levelling floor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

JOB NO.

CUSTOMER DATE 23-Dec-2009


PREPARED BY Vijay
DESCRIPTION Summary of Quantity
CHECKED BY Suman

Description Quantity Unit

1 Reinforced Cement Concrete = 623.34 m3

2 nd Levelling Floor = 168.79 m3
1 st Levelling Floor = 166.37 m3
Ground Floor = 154.10 m3
First Floor = 91.37 m3
Staircase Room = 13.03 m3
Add 5 % = 29.68 m3

2 Reinforcement = 73.04 Tonn

2 d L lli Fl
2 nd Levelling Floor = 18 37
18.37 ttonn
1 st Levelling Floor = 17.95 tonn
Ground Floor = 18.82 tonn
First Floor = 12.32 tonn
Staircase Room = 2.10 tonn
Add 5 % = 3.48 tonn

3 Reinforced Blockwork = 62.54 m3

2 nd Levelling Floor = 28.48 m3
1 st Levelling Floor = 19.54 m3
Ground Floor = 11.54 m3
Add 5 %
Add 5 % = 2 98
2.98 m3

4 Solid Blockwork = 407.03 m3

2 nd Levelling Floor = 59.10 m3
1 st Levelling Floor = 59.62 m3
Ground Floor
Ground Floor = 115 68
115.68 m3
First Floor = 129.98 m3
Staircase Room = 23.28 m3
Add 5 % = 19.38 m3
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY suman
Vijay
DESCRIPTION 2nd Levelling Floor
CHECKED BY Suman

Length 
Length RCC Quantity
RCC Quantity  Reinforcement 
Reinforcement
No cm Width cm Height cm m3 tonn

1 Concrete Works 168.79 18.37

i Foundation 83.34 7.29


F 4 1 300.00 260.00 65.00 5.07 0.21
F 2 1 230.00 200.00 50.00 2.30 0.10
CF 4 1 550.00 280.00 70.00 10.78 0.85
CF 6 Part 1 1 1400.00 320.00 70.00 31.36 2.89
Part 2 1 440.00 320.00 70.00 9.86 0.92
Part 3 1 320.00 170.00 70.00 3.81 0.36
Part 4 1 510.00 240.00 70.00 8.57 0.80
Part 5 1 250.00 160.00 70.00 2.80 0.27
Part 6 1 1610.00 70.00 40.00 4.51 0.42
Part 7 1 2450.00 70.00 25.00 4.29 0.47

ii Strap 4.70 0.45


Part 1 1 1610.00 20.00 70.00 2.25 0.30
Part 2 1 2450.00 20.00 50.00 2.45 0.15

iii Column 8.70 1.18


Up to Plinth
C 5  4 80.00 30.00 155.00 1.49 0.17
C 2  2 50.00 30.00 155.00 0.47 0.06
C 3 2 60.00 30.00 155.00 0.56 0.07
C 4  2 70.00 30.00 155.00 0.65 0.08
C 8 1 50.00 50.00 155.00 0.39 0.07
Above Plinth
C 5  4 80.00 20.00 320.00 2.05 0.27
C 2  2 50.00 20.00 320.00 0.64 0.09
C 3 2 60.00 20.00 320.00 0.77 0.11
C 4  2 70.00 20.00 320.00 0.90 0.13
C 8 1 50.00 50.00 320.00 0.80 0.13
JOB NO.
CUSTOMER DATE 23-Dec-2009

DESCRIPTION 2nd Levelling Floor


PREPARED BY suman
Vijay
CHECKED BY Suman

Length 
Length RCC Quantity
RCC Quantity  Reinforcement 
Reinforcement
No cm Width cm Height cm m3 tonn
iv RCC Wall 31.35 3.10
1 2640.00 25.00 475.00 31.35 3.10

v Plinth Beam 6.51 0.63


P1
P 1 1 990
990.00
00 20
20.00
00 40
40.00
00 0
0.79
79 0
0.08
08
P 2 1 2300.00 20.00 50.00 2.30 0.23
P 3 1 370.00 20.00 50.00 0.37 0.05
P 5 1 2180.00 20.00 70.00 3.05 0.28

vi Stair Case 5.00 0.88


Waist Slab 2 420.00 150.00 20.00 2.52 0.44
Landing 2 310.00 200.00 20.00 2.48 0.44

vii Beam 10.53 1.44


B 2 1 420.00 20.00 60.00 0.50 0.05
B3
B 3 1 370
370.00
00 20
20.00
00 60
60.00
00 0
0.44
44 0
0.05
05
B 4 1 1880.00 20.00 60.00 2.26 0.23
B 5 1 1050.00 20.00 60.00 1.26 0.16
B 10 1 700.00 20.00 70.00 0.98 0.11
B 11 1 700.00 20.00 70.00 0.98 0.13
B 14 1 780.00 20.00 75.00 1.17 0.30
HB 6 1 700.00 42.00 100.00 2.94 0.40

viii Slab 18.65 2.58


S 1 2 420.00 190.00 13.00 2.07 0.29
S 2 1 370.00 310.00 15.00 1.72 0.21
S4
S 4 1 520
520.00
00 420
420.00
00 18
18.00
00 3
3.93
93 0
0.43
43
S 5 1 780.00 700.00 20.00 10.92 1.65

2 RCC Block Work 28.48 0.83


Part 1 1 1000.00 20.00 505.00 10.10 0.29
Part 2 1 1190.00 20.00 505.00 12.02 0.35
Part 3 1 360.00 20.00 505.00 3.64 0.11
Part 4 1 270.00 20.00 505.00 2.73 0.08
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY suman
Vijay
DESCRIPTION 2nd Levelling Floor
CHECKED BY Suman

Length 
Length RCC Quantity
RCC Quantity  Reinforcement 
Reinforcement
No cm Width cm Height cm m3 tonn

3 Total Quantito of Solid Block Work 59.10
Block Work 64.00
Compound Wall 1 2450.00 20.00 290.00 14.21
Al
Along Grid 1,3,6 &8
G id 1 3 6 &8 4 700
700.00
00 20
20.00
00 505
505.00
00 28
28.28
28
Along Grid A 1 780.00 20.00 505.00 7.88
Along Grid A 1 620.00 20.00 505.00 6.26
Along Grid C 1 730.00 20.00 505.00 7.37

Reduction For Openings 4.90
D 2 1 220.00 20.00 150.00 0.66
D 3 1 220.00 20.00 110.00 0.48
D 4 1 220.00 20.00 100.00 0.44
D 5 1 220.00 20.00 80.00 0.35
W 1 1 740.00 20.00 160.00 2.37
W2
W 2 1 300
300.00
00 20
20.00
00 100
100.00
00 0
0.60
60
JOB NO.
CUSTOMER DATE 23-Dec-2009
St PREPARED BY Vijay
DESCRIPTION 1 Levelling Floor
CHECKED BY Suman

Length  Height  RCC Quantity  Reinforcement 


No cm Width cm cm m3 tonn
1 Concrete Works 166.37 17.95

i Foundation 69.14 5.12


F 4 1 300.00 260.00 65.00 5.07 0.21
F 3 1 250.00 220.00 55.00 3.03 0.12
CF 3 1 420.00 280.00 70.00 8.23 0.65
CF 5 Part 1 1 600.00 200.00 70.00 8.40 0.67
Part 2 1 550.00 260.00 70.00 10.01 0.79
Part 3 1 1380.00 280.00 70.00 27.05 2.10
Part 4 1 350.00 300.00 70.00 7.35 0.58

ii Strap 1.93 0.32


Part 1 2 690.00 20.00 70.00 1.93 0.32

iii Column 10.45 1.52


Up to Plinth
C 5  3 80.00 30.00 50.00 0.36 0.05
C 3 1 60.00 30.00 50.00 0.09 0.02
C 4  4 70.00 30.00 50.00 0.42 0.07
C 7 1 90.00 30.00 50.00 0.14 0.02
Above Plinth
C 5  7 80.00 20.00 320.00 3.58 0.47
C 2  2 50.00 20.00 320.00 0.64 0.09
C 3 3 60.00 20.00 320.00 1.15 0.17
C 4  6 70.00 20.00 320.00 2.69 0.40
C 7 1 90.00 20.00 320.00 0.58 0.10
C 8 1 50.00 50.00 320.00 0.80 0.13

iv RCC Wall 24.42 2.52


1 2640.00 25.00 370.00 24.42 2.52
JOB NO.
CUSTOMER DATE 23-Dec-2009
St PREPARED BY Vijay
DESCRIPTION 1 Levelling Floor
CHECKED BY Suman

Length  Height  RCC Quantity  Reinforcement 


No cm Width cm cm m3 tonn
v Plinth Beam 7.01 0.90
P 1 1 620.00 20.00 40.00 0.50 0.05
P 2 1 2520.00 20.00 50.00 2.52 0.25
P 3 1 980.00 20.00 50.00 0.98 0.12
P 4 1 2270.00 20.00 50.00 2.27 0.41
P 5 1 620.00 20.00 60.00 0.74 0.08

vi Stair Case 5.00 0.88


Waist Slab 2 420.00 150.00 20.00 2.52 0.44
Landing 2 310.00 200.00 20.00 2.48 0.44

vii Beam 22.71 3.31


B 1 1 580.00 20.00 50.00 0.58 0.04
B 2 1 420.00 20.00 60.00 0.50 0.05
B 3 1 370.00 20.00 60.00 0.44 0.05
B 4 1 3540.00 20.00 60.00 4.25 0.43
B 5 1 370.00 20.00 60.00 0.44 0.06
B 6 1 360.00 20.00 60.00 0.43 0.08
B 7 1 1880.00 20.00 70.00 2.63 0.51
B 8 1 780.00 20.00 80.00 1.25 0.31
B 9 1 310.00 20.00 90.00 0.56 0.10
HB 6 1 780.00 42.00 100.00 3.28 0.45
CR B 2 1 780.00 20.00 60.00 0.94 0.15
Ribbed Beam 13 760.00 25.00 30.00 7.41 1.08

viii Slab 25.71 2.78


S 1 1 730.00 370.00 13.00 3.51 0.47
S 4 1 780.00 460.00 18.00 6.46 0.71
S 4 1 620.00 420.00 18.00 4.69 0.52
S 6 1 730.00 270.00 20.00 3.94 0.43
Ribbed Slab 1 780.00 760.00 12.00 7.11 0.65

2 RCC Block Work 19.54 0.60


Part 1 1 2640.00 20.00 370.00 19.54 0.60
JOB NO.
CUSTOMER DATE 23-Dec-2009
St PREPARED BY Vijay
DESCRIPTION 1 Levelling Floor
CHECKED BY Suman

Length  Height  RCC Quantity  Reinforcement 


No cm Width cm cm m3 tonn

3 Total Quantito of Solid Block Work 59.62
Block Work 68.45
Part 1 2 1185.00 20.00 370.00 17.54
Part 2 2 1530.00 20.00 370.00 22.64
Part 3 1 420.00 20.00 370.00 3.11
Part 4 1 1210.00 20.00 370.00 8.95
Part 5 3 490.00 20.00 370.00 10.88
Part 6 1 540.00 20.00 370.00 4.00
Part 7 1 180.00 20.00 370.00 1.33

Reduction For Openings 8.83
D 3 4 220.00 20.00 110.00 1.94
D 5 4 220.00 20.00 80.00 1.41
W 1 1 740.00 20.00 160.00 2.37
W 3 2 200.00 20.00 100.00 0.80
W 5 1 250.00 20.00 200.00 1.00
SD 2 1 300.00 20.00 220.00 1.32
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY Vijay
DESCRIPTION Ground Floor
CHECKED BY Suman

RCC Quantity  Reinforcement 
No Length cm Width cm Height cm m3 tonn
1 Concrete Works 154.10 18.82

i Foundation 28.51 2.09


F 1 1 200.00 180.00 45.00 1.62 0.07
F 3 1 250.00 220.00 55.00 3.03 0.12
CF 1 1 440.00 220.00 55.00 5.32 0.41
CF 2 1 400.00 240.00 60.00 5.76 0.49
CF 8 1 420.00 380.00 55.00 8.78 0.67
NF 1 1 200.00 180.00 50.00 1.80 0.15
NF 2 1 294.00 150.00 50.00 2.21 0.18

ii Strap 2.10 0.34


Part 1 2 750.00 20.00 70.00 2.10 0.34

iii Column 17.81 2.39


Up to Plinth
C 1 4 40.00 30.00 150.00 0.72 0.12
C 3 2 60.00 30.00 150.00 0.54 0.07
C 4  2 70.00 30.00 150.00 0.63 0.08
C 6 4 70.00 30.00 150.00 1.26 0.16
Above Plinth
C 1 4 40.00 20.00 375.00 1.20 0.16
C 5  7 80.00 20.00 375.00 4.20 0.54
C 2  2 50.00 20.00 375.00 0.75 0.10
C 3 3 60.00 20.00 375.00 1.35 0.19
C 4  6 70.00 20.00 375.00 3.15 0.46
C 6 4 40.00 40.00 375.00 2.40 0.24
C 7 1 90.00 20.00 375.00 0.68 0.11
C 8 1 50.00 50.00 375.00 0.94 0.15

iv Plinth Beam 6.50 0.78


P 2 1 2780.00 20.00 50.00 2.78 0.27
P 3 1 1740.00 20.00 50.00 1.74 0.21
P 4 1 1240.00 20.00 50.00 1.24 0.22
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY Vijay
DESCRIPTION Ground Floor
CHECKED BY Suman

RCC Quantity  Reinforcement 
No Length cm Width cm Height cm m3 tonn
P 5 1 620.00 20.00 60.00 0.74 0.08

v Stair Case 5.00 0.88


Waist Slab 2 420.00 150.00 20.00 2.52 0.44
Landing 2 310.00 200.00 20.00 2.48 0.44

vi Beam 47.08 6.44


B 1 1 450.00 20.00 50.00 0.45 0.03
B 3 1 1565.00 20.00 60.00 1.88 0.19
B 4 1 1240.00 20.00 60.00 1.49 0.15
B 5 1 1150.00 20.00 60.00 1.38 0.18
B 7 1 2820.00 20.00 70.00 3.95 0.76
B 10 1 5670.00 20.00 70.00 7.94 1.08
B 11 1 270.00 20.00 70.00 0.38 0.06
B 12 1 270.00 20.00 60.00 0.32 0.04
B 13 1 1600.00 20.00 70.00 2.24 0.25
B 15 1 780.00 30.00 90.00 2.11 0.35
B 17 1 450.00 20.00 70.00 0.63 0.09
HB 1 1 1510.00 40.00 80.00 4.83 0.58
HB 2 1 620.00 40.00 100.00 2.48 0.30
HB 3 1 460.00 42.00 60.00 1.16 0.14
HB 4 1 500.00 42.00 80.00 1.68 0.19
HB 5 1 780.00 42.00 120.00 3.93 0.53
CR B 2 1 780.00 20.00 60.00 0.94 0.15
Ribbed Beam 20 620.00 25.00 30.00 9.30 1.36

vii Slab 47.09 5.53


S 1 1 620.00 370.00 13.00 2.98 0.40
S 2 1 1530.00 150.00 15.00 3.44 0.41
S 3 1 620.00 200.00 15.00 1.86 0.22
S 5 1 890.00 460.00 20.00 8.19 1.25
S 4 1 870.00 270.00 18.00 4.23 0.47
S 4 1 600.00 500.00 18.00 5.40 0.59
S 4 1 500.00 200.00 18.00 1.80 0.21
S 4 1 620.00 420.00 18.00 4.69 0.52
S 6 1 620.00 520.00 20.00 6.45 0.69
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY Vijay
DESCRIPTION Ground Floor
CHECKED BY Suman

RCC Quantity  Reinforcement 
No Length cm Width cm Height cm m3 tonn
Ribbed Slab 1 1 720.00 620.00 12.00 5.36 0.49
Ribbed Slab 2 1 500.00 450.00 12.00 2.70 0.28

2 RCC Block Work 11.54 0.36


Part 1 2 780.00 20.00 370.00 11.54 0.36

3 Total Quantito of Solid Block Work 115.68
Block Works 130.17
Compound Wall 1 2450.00 20.00 290.00 14.21
Part 1 2 2200.00 20.00 370.00 32.56
Part 2 1 870.00 20.00 370.00 6.44
Part 3 1 1140.00 20.00 370.00 8.44
Part 4 1 700.00 20.00 370.00 5.18
Part 5 2 1530.00 20.00 370.00 22.64
Part 6 1 420.00 20.00 370.00 3.11
Part 7 1 730.00 20.00 370.00 5.40
Part 8 1 620.00 20.00 370.00 4.59
Part 9 1 890.00 20.00 370.00 6.59
Part 10 2 620.00 20.00 370.00 9.18
Part 11 1 600.00 20.00 370.00 4.44
Part 12 2 500.00 20.00 370.00 7.40
Reduction For Openings 14.49
D 1 1 220.00 20.00 150.00 0.66
D 3 4 220.00 20.00 110.00 1.94
D 4 3 220.00 20.00 100.00 1.32
D 5 4 220.00 20.00 80.00 1.41
W 1 1 740.00 20.00 160.00 2.37
W 2 2 300.00 20.00 100.00 1.20
W 3 2 200.00 20.00 100.00 0.80
W 4 2 400.00 20.00 120.00 1.92
W 5 1 250.00 20.00 200.00 1.00
W 6 2 120.00 20.00 80.00 0.38
W 7 2 220.00 20.00 20.00 0.18
SD 2 1 300.00 20.00 220.00 1.32
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY Vijay
DESCRIPTION First Floor
CHECKED BY Suman

Length  Height  RCC Quantity  Reinforcement 


No cm Width cm cm m3 tonn
1 Concrete Works 91.37 12.32

i Column 14.66 2.00


C 1 4 40.00 20.00 375.00 1.20 0.16
C 5  7 80.00 20.00 375.00 4.20 0.54
C 2  2 50.00 20.00 375.00 0.75 0.10
C 3 3 60.00 20.00 375.00 1.35 0.23
C 4  6 70.00 20.00 375.00 3.15 0.46
C 6 4 40.00 40.00 375.00 2.40 0.24
C 7 1 90.00 20.00 375.00 0.68 0.11
C 8 1 50.00 50.00 375.00 0.94 0.15

ii Stair Case 5.00 0.88


Waist Slab 2 420.00 150.00 20.00 2.52 0.44
Landing 2 310.00 200.00 20.00 2.48 0.44
iii Beam 26.73 3.73
B 1 1 580.00 20.00 50.00 0.58 0.04
B 3 1 840.00 20.00 60.00 1.01 0.10
B 4 1 4360.00 20.00 60.00 5.23 0.53
B 5 1 1100.00 20.00 60.00 1.32 0.17
B 7 1 1710.00 20.00 70.00 2.39 0.46
B 10 1 1680.00 20.00 70.00 2.35 0.32
B 11 1 1320.00 20.00 70.00 1.85 0.30
B 13 1 1090.00 20.00 70.00 1.53 0.17
B 14 1 780.00 20.00 75.00 1.17 0.21
B 15 1 720.00 30.00 90.00 1.94 0.32
B 16 1 320.00 20.00 60.00 0.38 0.07
Ribbed Beam 15 620.00 25.00 30.00 6.98 1.02

iv Slab 44.97 5.71


S 1 1 470.00 200.00 13.00 1.22 0.17
S 1 1 470.00 370.00 13.00 2.26 0.31
S 2 1 620.00 320.00 15.00 2.98 0.35
S 2 1 520.00 420.00 15.00 3.28 0.38
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY Vijay
DESCRIPTION First Floor
CHECKED BY Suman

Length  Height  RCC Quantity  Reinforcement 


No cm Width cm cm m3 tonn
S 3 1 270.00 200.00 15.00 0.81 0.10
S 3 1 550.00 420.00 15.00 3.47 0.40
S 5 1 780.00 700.00 20.00 10.92 1.65
S 5 1 620.00 460.00 20.00 5.70 0.87
S 4 1 470.00 420.00 18.00 3.55 0.40
S 4 1 620.00 420.00 18.00 4.69 0.52
Ribbed Slab 1 1 820.00 620.00 12.00 6.10 0.56

2 Total Quantito of Solid Block Work 129.98
Block Work 143.95
Part 1 2 2200.00 20.00 370.00 32.56
Part 2 1 1500.00 20.00 370.00 11.10
Part 3 1 700.00 20.00 370.00 5.18
Part 4 1 1880.00 20.00 370.00 13.91
Part 5 1 320.00 20.00 370.00 2.37
Part 6 1 360.00 20.00 370.00 2.66
Part 7 4 1530.00 20.00 370.00 45.29
Part 8 1 420.00 20.00 370.00 3.11
Part 9 1 620.00 20.00 370.00 4.59
Parapet 2 1530.00 20.00 120.00 7.34
Parapet 2 2200.00 20.00 120.00 10.56
Parapet Car Park 1 2200.00 20.00 120.00 5.28
Reduction For Openings 13.98
D 3 4 220.00 20.00 110.00 1.94
D 5 4 220.00 20.00 80.00 1.41
D 6 1 220.00 20.00 120.00 0.53
D 7 1 220.00 20.00 90.00 0.40
W 1 1 740.00 20.00 160.00 2.37
W 3 3 200.00 20.00 100.00 1.20
W 4 1 400.00 20.00 120.00 0.96
W 5 1 250.00 20.00 200.00 1.00
SD 1 400.00 20.00 220.00 1.76
SD 1 1 250.00 20.00 220.00 1.10
SD 2 1 300.00 20.00 220.00 1.32
JOB NO.
CUSTOMER DATE 23-Dec-2009
PREPARED BY Vijay
DESCRIPTION Staircase Room
CHECKED BY Suman
Length  Height  RCC Quantity  Reinforcement 
3
No cm Width cm cm m tonn
1 Concrete Works 13.03 2.10

i Column 1.89 0.51


C 5  1 80.00 20.00 375.00 0.60 0.09
C 2  1 50.00 20.00 375.00 0.38 0.05
C 3 1 60.00 20.00 375.00 0.45 0.06
Column 2 25.00 25.00 375.00 0.47 0.30

ii Beam 2.57 0.30


B 1 1 330.00 20.00 50.00 0.33 0.02
B 4 1 520.00 20.00 60.00 0.62 0.06
B 5 1 510.00 20.00 60.00 0.61 0.08
B 10 1 720.00 20.00 70.00 1.01 0.14

iii Slab 3.56 0.41


S 3 1 720.00 330.00 15.00 3.56 0.41

iv Stair Case 5.00 0.88


Waist Slab 2 420.00 150.00 20.00 2.52 0.44
Landing 2 310.00 200.00 20.00 2.48 0.44

2 Total Quantito of Solid Block Work 23.28
Block Work 23.76
Part 1 2 720.00 20.00 320.00 9.22
Part 2 2 330.00 20.00 320.00 4.22
Parapet 2 720.00 20.00 120.00 3.46
Parapet 2 330.00 20.00 120.00 1.58
Parapet Car Park 1 2200.00 20.00 120.00 5.28

Reduction For Openings 0.48
D 3 1 220.00 20.00 110.00 0.48