Ba Test Com Panel TM

The document is a testing and commissioning report for a hotel project in Jogjakarta, Indonesia. It details inspections of electrical, plumbing, and fire suppression systems across multiple floors and rooms. Measurement parameters were within standards and test results were approved. Signatures from contractors and consultants indicate joint verification of the inspections and results.

Uploaded by

Ahmad Gofur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
237 views

Ba Test Com Panel TM

The document is a testing and commissioning report for a hotel project in Jogjakarta, Indonesia. It details inspections of electrical, plumbing, and fire suppression systems across multiple floors and rooms. Measurement parameters were within standards and test results were approved. Signatures from contractors and consultants indicate joint verification of the inspections and results.

Uploaded by

Ahmad Gofur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

KONTRAKTOR KONSULTAN MK

PENGETESAN & NATURAL DISAIN PT.


PENGUJIAN CIPTALARAS
PT. CIPTA GRAHA KANAKA DEVELOPMENT & ENGINEERING CONSULTANT

NOMOR : ….…./BA-ME/CGK/EL/2020 PROYEK : HOTEL PATRA MALIOBORO

TANGGAL: ………/………………/2020 LOKASI : JL. SOSROWIJAYAN - JOGJAKARTA

PEKERJAAN :
VAC PLUMBING √ ELEKTRIKAL

ELEKTRONIK PEMADAM KEBAKARAN …………………….

LOKASI : ……………………………………………………………………

LANTAI : ……………………………………………………………………

POSISI/KAMAR NO : ……………………………………………………………………

JENIS PENGETESAN : ……………………………………………………………………

OBYEK PENGETESAN : ……………………………………………………………………

PARAMETER : STANDART………………… HASIL PENGUKURAN : BAIK ………..

HASIL PENGETESAN : SESUAI TIDAK SESUAI

STATUS PENGETESAN : DITERIMA DITOLAK

CATATAN
……………………………………………………………………………………………………………….
……………………………………………………………………………………………………………….
……………………………………………………………………………………………………………….
……………………………………………………………………………………………………………….
……………………………………………………………………………………………………………….
……………………………………………………………………………………………………………….

KONTRAKTOR KONSULTAN MK
PT. CIPTA GRAHA KANAKA PT. NATURAL DISAIN CIPTALARAS
DILAKSANAKAN PENGETESAN DAN DISAKSIKAN BERSAMA :
NAMA : AGUS NAMA : BAHZANDI
JABATAN : PELAKSANA MEP JABATAN : PENGAWAS MK
TANDA TANGAN TANDA TANGAN

MENGETAHUI & MENYETUJUI :


NAMA : SUBUH EKO P NAMA : ANDREAS SURJAKA
JABATAN : QUALITY CONTROL JABATAN :MEP
TANDA TANGAN TANDA TANGAN
TESTING AND COMMISIONING
PANEL TM
TANGGAL : ………………………..
LOKASI : …………………………

FUNCTION INCOMING OUTGOING


TYPE IM QM
CI-2020-1030-5- CI-2020-1011-3-
SERIAL NO.
0009 0037

NO CHECKING ITEMS IM QM KETERANGAN

A. Characteristics
1 Brand Schneider Schneider
2 Range SM6 SM6
3 Rated Voltage - Um (kV) 24 kV 24 kV
4 Rated Operation Voltage - Us (kV) 20 kV 20 kV
5 Rated Current - In (A) 630A 630A
6 Breaking Capacity - Isc (kA) 16 kA/ Is 16 kA/ Is

B. Civil & Mechanical


1 Panel level Adjustment
2 Panel Grounding Fixing
3 Panel Aligning & Fixing
4 Conformity of Busbar Intallation
5 Busbar Tightening Torque ( 28 Nm )
6 MV Cable Tightening Torque (50 Nm)
7 Conformity of Earthing Circuit Intalation
8 Earthing Bar Tightening
9 Interupter Condition of DS/LBS
10 Condition of Pole Circuit Breaker (CB)
11 Condition of Lower Circuit Point CB
12 Condition of Upper Circuit Point CB
13 Condition of Fixed Contact on CT
14 Condition of Fixed Contact on Lower DS
15 Separator Condition, if any
16 Condition of Lower Grounding Device
17 Condition of Grounding Cluster/Clip CB

C. Operating Mechnism
1 Intallation Mode ( draw out / in )
2 Mechanical Switch Close/Open
3 Mechanical Earthing Switch Close/Open
4 Mechanical Circuit Breaker Close/Open
5 Circuit Breaker - rack in and rack out
6 Rollarc Contactor Close Open,CRM

D. Visual Inspection and Labeling


1 Cleanlines of Cubiccle/Panel
2 Paintwork in good condition
3 "Safety labels" symbols marked
4 Blown fuse indicator for QM/CRM
5 Conformity of Equipment
E. Electrical & Accessories
1 Manual electrical switch close/open
2 Breaker On/Off indication
3 Auxillary Tripping
4 Heater Function
5 Capicitive Voltage Devider
6 Voltage Phase indicator lamp

F. Mechanical and Electrical Interlock


1 Mechanical Interlock
2 Electrical Interlock

G. MV Fuses
1 Brand
2 Rating
3 Striker
4 Rated Voltage - Un (kV)
5 Breaking Capacity (kA)

H. Simulation Test
1 Individual test
2 Interlocking Test

NOTE :

Dilaksanakan Oleh : Disaksikan Oleh :


PT. CIPTA GRAHA KANAKA PT. NATURAL DESAIN CIPTALARAS

( SUBUH ) ( AGUS ) ( BAHZANDI )


QC SPV Pengawas MK
TESTING AND COMMISIONING
TRAFO
TANGGAL : …………………..
LOKASI : …………………..

DATA TEKNIS TRAFO :


Merk : ………………….. HV : ………………….. Tahun : …………………..
Kapasitas : ………………….. LV : ………………….. Frekuensi : …………………..
No. Seri : ………………….. Vector Group : …………………..
TRANSFORMATOR TYPE OIL
1. Transformator type : …………………..
2. Proteksi trafo : …………………..
3. Kondisi & Type Bushing
- HV Bushing PIB/Keramik
Type : ………………….. Merk : ………………….. Torsi : …………………..
- LV Bushing
Type : ………………….. Merk : ………………….. Torsi : …………………..
4. Tap Changer
Type : ………………….. Merk : …………………..
5. Setting Proteksi
Oil temperatur Alarm : …………………
Oil temperatur Trip : …………………
Winding temperatur Alarm : …………………
Winding temperatur Trip : …………………
Pressure : …………………

ITEM PENGECEKAN
1. Insulation resistance test Alat Yang digunakan :
- Primer - Ground : ……………………..
- Sekunder - Ground : ……………………..
- Primer - Sekunder : ……………………..

2. Periksa Sistem Grounding Transformator


- Grounding Body : ……………………..
- Grounding Neutral : ……………………..

3. Periksa keadaan Fisik & Ruangan Transformator


- Kondisi Fisik : ……………………..
- Pagar Proteksi Traffo : ……………………..
- Support penahan roda : ……………………..
- Sirkulasi udara/Exhaust fan : ……………………..
- Suhu Ruangan / ambient : ……………………..

4. Pemeriksaan sistem koneksi kabel ke/dari traffo ( TR/TM)


- Potensi kabel membebani bushing terminal TM/TR : ……………………..
- Kabel TM/TR sudah terkoneksi : ……………………..
- Kabel Proteksi Trafo DGPT
ENERGIZED TRAFO ( COMMISIONING TEST )
1. Hasil Pengukuran Tegangan
a. Tegaangan Input : ……………………..
b. Tegangan Output
2U-2V : …………………….. 2N-2U : ……………………..
2V-2W : …………………….. 2N-2V : ……………………..
2W-2U : …………………….. 2N-2W : ……………………..
c. Posisi Tab changer saat energized : ……………………..
d. Putaran phase : ……………………..

NOTE :
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………

Dilaksanakan Oleh : Disaksikan Oleh :


PT. CIPTA GRAHA KANAKA PT. NATURAL DESAIN CIPTALARAS

( SUBUH ) ( AGUS ) ( BAHZANDI )


QC SPV Pengawas MK
FOTO DOKUMENTASI TEST COMMISIONING
COLD WATER & HOT WATER