IFC Yangon
IFC Yangon
StevenLeach
Partners in creative solutions
FOR CONSTRUCTION
08 OCTOBER 2020
StevenLeach
IFC YANGON
Email : [email protected]
COVER SHEET NORTH
GENERAL
I-0.01.01 DRAWING LIST & SYMBOL LEGEND
www.sla-group.com
I-0.02.01 FINISHES SCHEDULE A
I-0.04.01 DOOR SCHEDULE, DOOR TYPE &DOOR HARDWARE SCHEDULE 1
1
I-5.01.01
Interior:
A
I-3.01.01
Drawing not to be used for construction,
D B Do not scale drawing,
Use figured dimension only.
I-3.04.01 I-3.02.01
- - -
C - - -
I-3.03.01 - - -
- - -
- - -
- - -
1
PLAN I-3.01.01
-
-
-
-
-
-
- - -
I-2.01.00 EXISTING PLAN - - -
- - -
I-2.01.01 PARTITION PLAN A
- - -
- - -
I-2.02.01 REFLECTED CEILING PLAN
- - -
REVISION
I-7.01.01 DOOR PLAN & ELEVATION
I-7.02.01 DOOR HORIZONTAL SECTION
I-7.03.01 DOOR VERTICAL SECTION
ELECTRICAL PLAN
1
1
Aa
W1
w1
PROJECT : 2020-D-07
1
DETAIL
1 IFC YANGON
I-8.03.01 CEILING DETAIL
F1 YANGON
MYANMAR
1000 DRAWING TITLE :
DRAWING LIST
1000 & SYMBOL LEGEND
1000
Date: 2020/07/27 Drawing Number :
Design By:
Drawn By:
YW., ST.
MM.
I-0.01.01
Check By : YW. Scale: NTS.
Y1a Y2 Y3 Y4 Y5
StevenLeach
STEVEN J. LEACH, JR. & ASSOCIATES LIMITED
Partners in creative solutions
PRINTER PRINTER
COFFEE CORNER
Email : [email protected]
WR+SH
WHITE BOARD
www.sla-group.com
PS (S) FA
(SSL)
DATA
FA ELEC TEL
(FCU)
XB HR
Interior:
Drawing not to be used for construction,
Do not scale drawing,
Use figured dimension only.
- - -
MICROWAVE - - -
- - -
PRINTER - - -
- - -
- - -
- - -
REF.
- - -
TV. - - -
PRINTER
RECEPTION - - -
- - -
- - -
COFFEE CORNER - - -
PED - - -
- - -
- - -
AUTO - - -
DOOR - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
TV. 2020-10-08 - FOR CONSTRUCTION
CM
MOVABLE TV.
XA
EXISTING PLAN
1
PROJECT : 2020-D-07
IFC YANGON
YANGON
MYANMAR
DRAWING TITLE :
EXISTING PLAN
Email : [email protected]
www.sla-group.com
30 900 30 EQ 30 EQ 30 30 900 30 270 30
3500 1260
Interior:
PLAN PLAN
1 3
Drawing not to be used for construction,
Do not scale drawing,
Use figured dimension only.
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
1 2 1 2 -
-
-
-
-
-
I-7.02.01 I-7.02.01 I-7.02.01 I-7.02.01 - - -
- - -
- - -
30
30
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
1 2 - - -
2500 ( TO MATCH EXISTING)
1000
PROJECT : 2020-D-07
IFC YANGON
30 900 30 EQ 30 EQ 30 30 900 30 270 30
YANGON
3500 1260
MYANMAR
DRAWING TITLE :
Drawn By:
YW., ST.
MM.
I-7.01.01
Check By : YW. Scale: 1 : 25
StevenLeach
STEVEN J. LEACH, JR. & ASSOCIATES LIMITED
Partners in creative solutions
Email : [email protected]
PILC
www.sla-group.com
Interior:
Drawing not to be used for construction,
Do not scale drawing,
Use figured dimension only.
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
G01 - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
2020-10-08 - FOR CONSTRUCTION
REVISION
PROJECT : 2020-D-07
IFC YANGON
YANGON
MYANMAR
DRAWING TITLE :
Email : [email protected]
G01
L01
www.sla-group.com
L01
G01
Interior:
Drawing not to be used for construction,
Do not scale drawing,
Use figured dimension only.
- - -
HORIZONTAL SECTION - - -
1 -
-
-
-
-
-
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
G01
- - -
L01
- - -
- - -
- - -
- - -
- - -
- - -
L01
- - -
G01
- - -
- - -
- - -
2020-10-08 - FOR CONSTRUCTION
REVISION
HORIZONTAL SECTION
2
PROJECT : 2020-D-07
IFC YANGON
YANGON
MYANMAR
DRAWING TITLE :
DOOR DETAIL
HORIZONTAL SECTION
Email : [email protected]
www.sla-group.com
Interior:
Drawing not to be used for construction,
Do not scale drawing,
Use figured dimension only.
- - -
- - -
- - -
- - -
- - -
(C.O.S.)
- - -
- - -
- - -
- - -
AIR DUCT - - -
FCU - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
2020-10-08 - FOR CONSTRUCTION
(C.O.S.)
CEILING DETAIL
1 PROJECT : 2020-D-07
IFC YANGON
YANGON
MYANMAR
DRAWING TITLE :
CEILING DETAILS