0% found this document useful (0 votes)
31 views

For Op-1 Time For Per Pcs Production (T) 60/120 .5min

This document provides information from an activity sampling analysis and production summary sheet to calculate the standard minute value (SMV) of various operations. It gives the percentage of time spent on different activities for 8 operations. It also provides the hourly production and time taken per piece for each operation. The SMV is then calculated for the first two operations as the sum of the basic time value, mental/attention time value, and rest/avoidance time value. The individual target rate is calculated by dividing the time period by the SMV.

Uploaded by

shpon
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

For Op-1 Time For Per Pcs Production (T) 60/120 .5min

This document provides information from an activity sampling analysis and production summary sheet to calculate the standard minute value (SMV) of various operations. It gives the percentage of time spent on different activities for 8 operations. It also provides the hourly production and time taken per piece for each operation. The SMV is then calculated for the first two operations as the sum of the basic time value, mental/attention time value, and rest/avoidance time value. The individual target rate is calculated by dividing the time period by the SMV.

Uploaded by

shpon
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Activity sampling:-

An analysis sheet & a production summary sheet are given below-


On the basis of those sheets calculate smv of all respective
operation:-
activi operati Op- Op- Op- Op- Op- Op- Op- Op-
ty on 1% 2% 3% 4% 5% 6% 7% 8%
Op 41.4 43.4 44.6 40.2 37.8 35.8 41.8 43.8
3 2 2 3 4 5 3 2
Ma 17.9 16.3 20.7 18.7 19.5 20 19.1 18.3
2 4 1 2 2 2 2
A 16.7 15.5 18.3 18 15.5 19.1 15.1 15.5
3 4 2 3 2 3 3
I 13.9 16 12 14 15.5 12 11.1 10.3
4 3 5 5
Od 9.9 8.77 4.38 9.16 11.1 13.1 12.7 12
6 5 4 4
total 100 100 100 100 100 100 100 100
% % % % % % % %

Table(production summary)
0p-1 Op- Op- Op- Op- Op- Op- Op-
2 3 4 5 6 7 8
Hourly 120pcs 110 130 80 70 90 85 95
production pcs pcs pcs pcs pcs pcs pcs
Time for per .5min .54 .46 .75 .85 .67 .70 .63
pcs
production(t)

For op-1 time for per pcs production(T)=60/120=.5min


Op-2=.54,op-3=.46,op-4=.75,op-5=.85,op-6=.67,op-7=.70,op-8=.63

For op-1---------------
Op=104/251*100=41.43%
Ma=45/251*100=17.92%
A=42/251*100=16.73%
I=35/251*100=13.94%

Od=25/251*100=9.96%
For op-2----------
Op=43.42%
Ma=16.34%
A=15.54%
I=16%
Od=8.77%

Now smv calculation--------------


SMV=BT+M/A+R/A

Op-1:-----------------------------------
BT=OP*T
=41.43%*.5=.207
M/A=MA*T=17.92%*.5=.089
R/A=RA*T=16.73%*.5=.08
SMV=.207+.089+.08
=.37min

individual target=60/individual smv=60/.37=162.16=162pcs/hr

op-2----------------------
BT=.23
M/A=.089
R/A=.08
Smv=.39
Individual=60/.39=153.84=154