PM CM Issued Permits
Mechanical 150 120 270
Electrical 235 150 385
Instrument 200 101 301
HVAC 450 13 12 25
385
400
350
Work Permits
301
300 270
235
250 200
200 150
PM
150
150 120 101
100
CM
50 13 12 25
0
Mechanical Electrical Instrument HVAC Issued Permits
Department
Ministry of Electricity & Energy ء وا وزارة ا
Public Electricity Corporation ء ا ا
MARIB Gas Power Generation Station رب ا ز
! "# ادارة ا
"و ت دول ا
ا ا
د ن /م ا ر /م
ما
راري ؤاد *دا !ز ز ا% /م
ظت
ء وا وزارة ا
Work Permits 1st Half Year Statistics ء ا ا
From 01-January-2019 To 30-June-2019 رب ا ز
! "# ادارة ا
PM Works CM Works Issued Works
Mechanical 3 9 12
Electrical 53 18 71
Instrument 51 20 71
HVAC 45 5 50
80 71 71
Work Permits
70
60 53 51 50
50 45 PM Works
40
30 18 20 CM Works
20 12
9 5
10 3
0 Issued Works
Mechanical Electrical Instrument HVAC
Department
ء وا وزارة ا
2019_1st Half Year Preventive Maintenance Chart ء ا ا
رب ا ز
! "# ادارة ا
Issued PM Works Closed PM Works Pinding PM Works
Mechanical 3 1 2
Electrical 53 26 27
Instrument 51 26 25
HVAC 45 35 10
60 53 51
Work Permits
50 45
40 35 Issued PM Works
26 27
30 26 25
20 Closed PM Works
10
10 3 2
1 Pinding PM Works
0
Mechanical Electrical Instrument HVAC
Department
ء وا وزارة ا
2019_1st Half Year Corrective Maintenance Chart ء ا ا
رب ا ز
! "# ادارة ا
Issued CM Works Closed CM Works Pinding CM Works
Mechanical 9 5 4
Electrical 18 9 9
Instrument 20 10 10
HVAC 5 4 1
25
Work Permits
20
20 18
Issued CM Works
15
9 10 10
9 9
10 Closed CM Works
5 4 5 4
5
1
0 Pinding CM Works
Mechanical Electrical Instrument HVAC
Department
ء وا وزارة ا
Work Permits 2nd Half Year Statistics ء ا ا
From 01-July-2019 To 31-December-2019 رب ا ز
! "# ادارة ا
PM Works CM Works Issued Works
Mechanical 37 19 56
Electrical 6 18 24
Instrument 2 10 12
HVAC 24 12 36
60 56
Work Permits
50
37
40 36 PM Works
30 24 24
18
20 19
12 12
CM Works
10
10 6
2
0 Issued Works
Mechanical Electrical Instrument HVAC
Department
ء وا وزارة ا
2019_2nd Half Year Preventive Maintenance Chart ء ا ا
رب ا ز
! "# ادارة ا
Issued PM Works Closed PM Works Pinding PM Works Previous Closed PM Permits
Mechanical 37 15 22 1
Electrical 6 3 3 10
Instrument 2 1 1 4
HVAC 24 20 4 10
40 37
Work Permits
35 Issued PM Works
30
24
25 22
20 Closed PM Works
20 15
15 10 10 Pinding PM Works
10 6
3 4 4
3
5 1 2 1 1
Previous Closed PM Permits
0
1 2 3 4
Department
ء وا وزارة ا
ء ا ا
2019_2nd Half Year Corrective Maintenance Chart رب ا ز
! "# ادارة ا
Issued CM Works Closed CM Works Pinding CM Works Previous Closed CM Works
Mechanical 19 7 12 2
Electrical 18 5 13 2
Instrument 10 3 7 2
HVAC 12 10 2 0
19
20 18
Work Permits
18 Issued CM Works
16 13
14 12 12
12 10 10 Closed CM Works
10 7
8 7
5 Pinding CM Works
6 3
4 2 2 2 2
2 0 Previous Closed CM Works
0
1 2 3 4
Department
ء وا وزارة ا
2019_Issued Works Final Statistics&Chart ء ا ا
رب ا ز
! "# ادارة ا
PM Works CM Works Issued Works
Mechanical 40 28 68
Electrical 59 36 95
Instrument 53 30 83
HVAC 69 17 86
100 95
83 86
Work Permits
90
80 68 69
70 59 PM Works
60 53
50 40 36
40 28
30 CM Works
30 17
20
10
0 Issued Works
Mechanical Electrical Instrument HVAC
Department
Work Planned Feed Back
No. Frequency Job Code System KKS Unit Remark
Permit # Date Date
25 PM-MECH-25/19 Quarterly MECH-MOTOR-Q GT #11 LUBE OIL MAIN PUMP 11MBV21AP001 11 04/Sep/19
26 PM-MECH-26/19 Quarterly MECH-MOTOR-Q GT #11 LUBE OIL AUXILIARY PUMP 11MBV21AP002 11 04/Sep/19
27 PM-MECH-29/19 Quarterly MECH-MOTOR-Q GT #11 LUBE OIL LIFTING PUMP 11MBV21AP003 11 04/Sep/19
32 PM-MECH-32/19 Half Yearly MECH-MBL-H GT #11 AIR INTAKE SYSTEM 11MBL 11 04/Sep/19
11BTA10A/B
5 PM-ELEC-05/19 Monthly ELEC-BATTERY-M GT #11 BATTERY 220 V DC 11 29/Jan/19
12BTA10A/B
6 PM-ELEC-06/19 Monthly ELEC-BATTERY-M GT #12 BATTERY 220 V DC 12 29/Jan/19
13BTA10A/B
7 PM-ELEC-07/19 Monthly ELEC-BATTERY-M GT #13 BATTERY 220 V DC 13 29/Jan/19
00BTA10
8 PM-ELEC-08/19 Monthly ELEC-BATTERY-M SWITCHGEAR BATTERIES ROOM 10 29/Jan/19
00SAA30GH001
15 PM-ELEC-15/19 Half Yearly INST-PANEL-H BSDG #1 & 2_400V HVAC MCC PANEL 10 23/Jun/19
00BRT01/02
17 PM-ELEC-17/19 Half Yearly ELEC-PANEL-H BY PASS PANEL #1 & 2 (LV ROOM) 10 23/Jun/19
00BTL20
18 PM-ELEC-18/19 Half Yearly ELEC-PANEL-H DC REGULATOR #1 & 2 (LV ROOM) 10 23/Jun/19
00BRU01/02
23 PM-ELEC-23/19 Half Yearly ELEC-PANEL-H INVERTER PANEL #1 &2 (LV ROOM) 10 23/Jun/19
00BZL55
25 PM-ELEC-25/19 Half Yearly ELEC-PANEL-H OUTDOOR LIGHTING PANEL 10 23/Jun/19
00CPU10
26 PM-ELEC-26/19 Half Yearly ELEC-PANEL-H PANEL FOR BATTERIES (LV ROOM) 10 23/Jun/19
11BAB11
27 PM-ELEC-27/19 Half Yearly ELEC-PANEL-H PCC #11 220 V DC /24V DC CONVERTER 11 23/Jun/19
13MBV21AP001-01
45 PM-ELEC-45/19 26 Weeks E CH-02 GT #13 MAIN LUBE OIL PUMP MOTOR 13 23/Jun/19
00XKA04
59 PM-ELEC-59/19 Yearly ELEC-XKA04-1Y CUMMINS GENERATOR _B.S.D.G#4 0 20/Aug/19
Work Planned Feed Back
No. Frequency Job Code System KKS Unit Remark
Permit # Date Date
27 PM-INST-27/19 Half Yearly INST-PANEL-H PCC #11 CONTROL PANEL ET200 11CPA01/02 11 07/Mar/19
28 PM-INST-28/19 Half Yearly INST-PANEL-H GT #11 AUTOMATION (PCC #11) 11CJP01/41 11 07/Mar/19
30 PM-INST-30/19 Half Yearly INST-PANEL-H PCC #12 CONTROL PANEL ET200 12CPA01/02 12 07/Mar/19
31 PM-INST-31/19 Half Yearly INST-PANEL-H PCC #13 CONTROL PANEL ET200 13CPA01/02 13 07/Mar/19
32 PM-INST-32/19 Half Yearly INST-PANEL-H GT #11 AUTOMATION (PCC #12) 12CJP01/41 12 07/Mar/19
36 PM-INST-36/19 Half Yearly INST-PANEL-H ELECTRONIC ROOM ELECTRICAL PANEL 00CJC01 10 07/Mar/19
39 PM-INST-39/19 Half Yearly INST-PANEL-H DRAIN OIL LOCAL CONTROL PANEL 10GMA20GH001 10 07/Mar/19
44 PM-INST-44/19 Half Yearly INST-PANEL-H FIRE FIGHTING CONTROL PANEL 10SAK17GH001 10 07/Mar/19
46 PM-INST-46/19 Half Yearly INST-PANEL-H FOAM STATION CONTROL PANEL #1 & 2 10 07/Mar/19
1 PM-HVAC-01/19 Monthly HVAC-SAC-M PCC #11 HVAC PACKAGED UNITS 11SAC02AH81E81/2/3/4 11 06/February/2019
2 PM-HVAC-02/19 Monthly HVAC-SAC-M PCC #12 HVAC PACKAGED UNITS 12SAC02AH81E81/2/3/4 12 06/February/2019
3 PM-HVAC-03/19 Monthly HVAC-SAC-M PCC #13 HVAC PACKAGED UNITS 13SAC02AH81E81/2/3/4 13 06/February/2019
6 PM-HVAC-06/19 2 Months HVAC-2M GT #11 CEMS SPLIT UNIT (1 PCS) 11MBR20 11 06/February/2019
7 PM-HVAC-07/19 2 Months HVAC-2M GT #12 CEMS SPLIT UNIT (1 PCS) 12MBR20 12 06/February/2019
8 PM-HVAC-08/19 2 Months HVAC-2M GT #13 CEMS SPLIT UNIT (1 PCS) 13MBR20 13 06/February/2019
15 PM-HVAC-15/19 2 Months HVAC-2M FUEL OIL GAS PLC SPLIT UNIT (2 PCS) 10 06/February/2019
16 PM-HVAC-16/19 2 Months HVAC-2M FUEL GAS PLC SPLIT UNIT (2 PCS) 10 06/February/2019
19 PM-HVAC-19/19 2 Months HVAC-2M SHIFT IN CHARGE ROOM SPLIT UNIT (1 PCS) 10 06/February/2019
23 PM-HVAC-23/19 Monthly HVAC-SAC-M PCC #11 HVAC PACKAGED UNITS 11SAC02AH81E81/2/3/4 11 14/May/2019
24 PM-HVAC-24/19 Monthly HVAC-SAC-M PCC #12 HVAC PACKAGED UNITS 12SAC02AH81E81/2/3/4 12 14/May/2019
25 PM-HVAC-25/19 Monthly HVAC-SAC-M PCC #13 HVAC PACKAGED UNITS 13SAC02AH81E81/2/3/4 13 14/May/2019
28 PM-HVAC-28/19 2 Months HVAC-2M GT #11 CEMS SPLIT UNIT (1 PCS) 11MBR20 11 14/May/2019
29 PM-HVAC-29/19 2 Months HVAC-2M GT #12 CEMS SPLIT UNIT (1 PCS) 12MBR20 12 14/May/2019
30 PM-HVAC-30/19 2 Months HVAC-2M GT #13 CEMS SPLIT UNIT (1 PCS) 13MBR20 13 14/May/2019
37 PM-HVAC-37/19 2 Months HVAC-2M FUEL OIL GAS PLC SPLIT UNIT (2 PCS) 10 14/May/2019
Work Planned Feed Back
No. Frequency Job Code System KKS Unit Remark
Permit # Date Date
38 PM-HVAC-38/19 2 Months HVAC-2M FUEL GAS PLC SPLIT UNIT (2 PCS) 10 14/May/2019
41 PM-HVAC-41/19 2 Months HVAC-2M SHIFT IN CHARGE ROOM SPLIT UNIT (1 PCS) 10 14/May/2019
47 PM-HVAC-47/19 Monthly HVAC-SAC-M PCC #11 HVAC PACKAGED UNITS 11SAC02AH81E81/2/3/4 11 17/December/2019
48 PM-HVAC-48/19 Monthly HVAC-SAC-M PCC #12 HVAC PACKAGED UNITS 12SAC02AH81E81/2/3/4 12 17/December/2019
49 PM-HVAC-49/19 Monthly HVAC-SAC-M PCC #13 HVAC PACKAGED UNITS 13SAC02AH81E81/2/3/4 13 17/December/2019
52 PM-HVAC-52/19 2 Months HVAC-2M GT #11 CEMS SPLIT UNIT (1 PCS) 11MBR20 11 17/December/2019
53 PM-HVAC-53/19 2 Months HVAC-2M GT #12 CEMS SPLIT UNIT (1 PCS) 12MBR20 12 17/December/2019
54 PM-HVAC-54/19 2 Months HVAC-2M GT #13 CEMS SPLIT UNIT (1 PCS) 13MBR20 13 17/December/2019
61 PM-HVAC-61/19 2 Months HVAC-2M FUEL OIL GAS PLC SPLIT UNIT (2 PCS) 10 17/December/2019
62 PM-HVAC-62/19 2 Months HVAC-2M FUEL GAS PLC SPLIT UNIT (2 PCS) 10 17/December/2019
65 PM-HVAC-65/19 2 Months HVAC-2M SHIFT IN CHARGE ROOM SPLIT UNIT (1 PCS) 10 17/December/2019
00XKA01,00XKA
15 CM-MECH-15/19 WR-62/19 B.S.D.G#1/#2 COOLANT SYS 0 7-Oct-19
02
00XKA01,00XKA
17 CM-MECH-17/19 WR-64/19 B.S.D.G#1/#2 _GEAR BOX 0 7-Oct-19
02
11MKJ17AA001,,1
26 CM-MECH-26/19 WR-82/19 GEN_INLET/OUTLET DAMPERS 11 8-Dec-19
1MKJ15AA001
12MKJ17AA001,,1
27 CM-MECH-26/19 WR-82/19 GEN_INLET/OUTLET DAMPERS 12 8-Dec-19
2MKJ15AA001
13MKJ17AA001,,1
28 CM-MECH-28/19 WR-82/19 GEN_INLET/OUTLET DAMPERS 13 8-Dec-19
3MKJ15AA001
Page 2 of 6
2019 List of Electrical CM Permits
00BCB10GS021/X032,,,0
13 CM-ELEC-13/19 WR-42/19 INCOMING BUS BAR_33KV SWG 10 16/Jun/19
0BCB10GS021/X034
19 CM-ELEC-19/19 WR-48/19 FIRE FIGHTING DIESEL PUMP CONTROL PANEL 10SGY 10 03/Jul/19
Page 3 of 6
2019 List of Electrical CM Permits
Page 4 of 6
2019 List of Instrument CM Permits
Page 5 of 6
2019 List of HVAC CM Permits
Page 6 of 6