RAB Pembangunan Pintu Gerbang Kota Lama

This document provides a cost estimate for a construction project to build a new gate and entrance for an old city area in Bandung, Indonesia. It includes schedules of labor rates based on local standards, schedules of material and equipment costs, and lists tasks and quantities needed for the project. The document was prepared by a student at the Politeknik Negeri Bandung to fulfill a course requirement for their construction engineering study.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views72 pages

RAB Pembangunan Pintu Gerbang Kota Lama

This document provides a cost estimate for a construction project to build a new gate and entrance for an old city area in Bandung, Indonesia. It includes schedules of labor rates based on local standards, schedules of material and equipment costs, and lists tasks and quantities needed for the project. The document was prepared by a student at the Politeknik Negeri Bandung to fulfill a course requirement for their construction engineering study.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

RAB DAN RAP PROYEK PEMBANGUNAN PINTU GERBANG

KOTA LAMA JALAN WASTUKENCANA - JALAN PERINTIS KEMERDEKAAN

disusun untuk memenuhi salah satu syarat mata kuliah Estimasi Biaya
Semester 4 Tahun Ajaran 2017/2018

disusun oleh :

IRMA HALIMATUS SA'DIYAH (NIM 161111016)

Kelas 2A
Teknik Konstruksi Gedung

POLBAN

PROGRAM STUDI DIPLOMA-III TEKNIK KONSTRUKSI GEDUNG


JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANDUNG
2018
HARGA SATUAN UPAH TENAGA KERJA (RAB)

NO URAIAN KODE SATUAN JUMLAH SUMBER DATA

1 Pekerja L.01 hari 99,000.00 Standar Satuan Harga PEMKOT BANDUNG 2017

2 Tukang L.02 hari 136,297.67 Standar Satuan Harga PEMKOT BANDUNG 2017

3 Kepala Tukang L.03 hari 152,963.13 Standar Satuan Harga PEMKOT BANDUNG 2017

4 Mandor L.04 hari 159,000.00 Standar Satuan Harga PEMKOT BANDUNG 2017

5 Sopir L10 bulan 3,050,000.00 Standar Satuan Harga PEMKOT BANDUNG 2017

6 Sopir L10 hari 101,666.67 Standar Satuan Harga PEMKOT BANDUNG 2017
HARGA SATUAN MATERIAL / BAHAN
NO KODE URAIAN PEKERJAAN SAT HARGA

A BAHAN ALAM
1 A.01 Batu Pecah 2/3 cm m3 200,630.00
2 A.02 Batu Belah Pondasi m3 124,890.00
3 A.03 Tanah Urug m3 106,420.00
4 A.04 Pasir Urug m3 110,500.00
5 A.05 Pasir Pasang m3 149,480.00
6 A.06 Pasir Beton m3 232,640.00
7 A.07 Abu Batu m3 173,310.00
8 A.08 Kerikil beton m3 206,300.00
B SEMEN
9 B.01 Semen PC zak 76,816.67
10 B.02 Semen Warna kg 11,710.00
C BATUAN
11 C.01 Bata Merah Bakar Kelas I bh 880.00
12 C.02 Kerb bh 90,525.00
13 C.03 Paving Block Cisangkan t=8 cm m2 110,238.00
14 C.04 Kansteen Paving Block m1 29,610.00
15 C.05 Tali air Batu Sikat 10 cm m2 113,380.79
16 C.06 Lantai Batu Sikat m2 113,380.79
17 C.07 Dinding Batu Sikat m2 113,380.79
D KAYU
18 D.01 Kayu Balok Klas II Lokal / rasamala/ kruing, papan m3 2,655,860.00
19 D.02 Kayu Balok Klas II Lokal / papan kamper samarinda m3 9,163,760.00
20 D.03 Kayu Albasia m3 1,884,020.00
21 D.04 Kayu Dolken dia 8-10/400 cm btg 32,700.00
22 D.05 Multiplek tebal 9 mm lbr 151,930.00
23 D.06 Multiplek tebal 12 mm lbr 194,480.00
24 D.07 Plywood 9 mm, uk. 1,20 x 2,40 lbr 151,930.00
25 D.08 Kayu Terentang m3 2,206,130.00
26 D.09 Kayu kelas III m3 1,960,750.00
27 D.10 Kayu 5/7 m3 2,785,714.00
28 D.11 Kayu papan 2/20 m3 3,350,000.00
E BESI
29 E.01 Besi Beton U 24 kg 13,090.00
30 E.02 Besi Beton U. 32 kg 13,090.00
31 E.03 IWF Ex DN SII kg 16,550.00
32 E.04 Plat Besi 8mm kg 16,300.00
33 E.05 Kawat Beton kg 20,000.00
34 E.06 Paku kg 19,010.00
35 E.07 Sekrup kg 12,250.00
36 E.08 Besi beton polos kg 8,250.00
37 E.09 Bore pile dia. 40 cm m1 180,000.00
38 E.10 Besi 8 Dia. 16 kg 16,000.00
39 E.11 Sengkang Ø 8 kg 15,600.00
40 E.12 Besi D 10 - 150 kg 66,550.00
41 E.13 Besi D 16-150 kg 66,550.00
42 E.14 Baud Angkur 4 m16 (panjang 15 cm) bh 22,500.00
43 E.15 Siku metal furing m 47,883.00
44 E.16 Canal C metal furing m 81,967.00
45 E.17 Paku Ramset + missiu m 8,125.00
F PELUMAS
46 F.01 Minyak Bekisting ltr 18,230.00
47 F.02 Solar ltr 7,000.00
48 F.03 Minyak Pelumas ltr 35,000.00
49 F.04 Steger ls 1,000.00
G PENGECATAN
50 G.01 Cat Tembok ex. ICI CATYLAC (INTERIOR) kg 56,156.00
51 G.02 Cat Tembok ex. ICI CATYLAC (EKTERIOR) kg 56,156.00
52 G.03 Water Profing Emulsion kg 110,240.00
53 G.04 Plamir tembok SANLEX kg 16,570.00
54 G.05 Amplas lbr 4,900.00
55 G.06 Kwas 3 " bh 18,500.00
H BETON
56 H.01 Beton K-350 m3 1,134,151.00
57 H.02 Beton K-100 m3 933,813,00
I PIPA
58 I.01 Pipa medium 2" Galvanis btg 475,000.00
59 I.02 Pipa medium 1" Galvanis btg 225,000.00
J ORNAMEN
60 J.01 Kaca Patri (Kuningan) Tebal 3mm m2 1,823,250.00
61 J.02 Sealent kg 27,620.00
62 J.03 Panel GRC ( tebal 9 mm ) m2 140,800.00
63 J.04 Panel GRC ( tebal 10 mm ) m2 140,800.00
64 J.05 Panel GRC ( tebal 12 mm ) m2 140,800.00
65 J.06 Profil GRC m1 40,920.00
66 J.07 Granit m2 1,669,120.00
67 J.08 Patung Maung Bandung (Bahan Resin) unit 1,000,000.00
68 J.09 Ornamen Sate unit 150,000.00
69 J.10 Plakat Granit Hitam Bintik Emas (Galaxy) bh 200,000.00
70 J.11 Cincin Kolom (Bahan Resin) bh 80,000.00
71 J.12 Joint taep @ 75 m roll 12,100.00
72 J.13 Jointing coumpond kg 177,000.00
73 J.14 Jam diameter 50cm unit 80,000.00
K PEKERJAAN TAMAN DAN LAIN-LAIN
74 K.01 Urugan tanah m3 41,555.00
75 K.02 Tanah gembur m3 113,135.00
76 K.03 Pupuk kompos 5kg 9,100.00
77 K.04 Pupuk kompos 1 kg 1,820.00
78 K.05 Gebalan rumput m2 21,266.00
79 K.06 Administrasi dan Dokumentasi (laporan,Foto Proyek) ls 500,000.00
80 K.07 Papan Nama Proyek (bahan spanduk outdoor) m2 350,000.00
81 K.08 Kawat las listrik kg 60,000.00
82 K.09 Pengelasan 10 cm 45,836.00
83 K.10 Pengelasan 1 cm 4,583.60
84 K.11 Baligho m2 28,000.00
85 K.12 Pengerolan Pipa bh 2,500.00
86 K.13 LED Strip mtr 10,000.00
87 K.14 Sewa Alat jam 55,000.00

HARGA SATUAN MATERIAL / BAHAN ELEKTRIKAL


NO URAIAN PEKERJAAN SAT HARGA
1 M.01 NYY 3x2.5 mm2 Prima m 27,225.00
2 M.02 NYFGBY 2 x 4 m 2,574.00
3 M.03 Lasdop bh 300.00
4 M.04 Pipa Conduit 20 mm2 m 8,000.00
5 M.05 Sock Conduit 20 mm2 bh 650.00
6 M.06 Klem Conduit 20 mm2 bh 650.00
7 M.07 Fisher + cung 6 mm bh 8,000.00
8 M.08 Isolasi roll 10,000.00
9 M.09 Floodlight 40 W bh 350,000.00
10 M.10 Floodlight 20 W bh 236,000.00
11 M.11 Spotlight LED 12 W bh 120,000.00
12 M.12 Spotlight LED 9 W bh 95,000.00
13 M.13 Spotlight LED 6 W bh 65,000.00
14 M.14 Spotlight LED 3 W bh 45,000.00
15 M.15 Bohlam LED 23 W bh 70,000.00
16 M.16 Bohlam LED 9 W bh 30,000.00
17 M.17 Fitting lampu bh 10,000.00
18 M.18 MCB 4A bh 44,000.00
19 M.19 MCB 2A bh 44,000.00
20 M.20 Panel 40x30x15 cm bh 270,000.00
21 M.21 Kabel BC 4 mm2 mtr 7,500.00
22 M.22 Kabel BC 50 mm2 mtr 40,500.00
23 M.23 Penangkal Petir Splitzen 30 cm bh 170,000.00
24 M.24 Penangkal Petir Splitzen 50 cm bh 260,000.00
25 M.25 Batang grounding GIP 1" mtr 197,000.00
26 M.26 Boring batang grounding ttk 1,225,000.00
27 M.27 KWH Meter bh 1,320,000.00
28 M.28 Fotosel 3 A bh 79,000.00
29 M.29 Instalasi Sambungan 900 VA lot 3,277,500.00
32 M.30 Biaya SLO lot 70,000.00
33 M.31 Surge Arester 40 KA bh 1,100,000.00
34 M.32 Pembuatan Bak Kontrol bh 543,493.00
35 M.33 Box Panel 30 x40 x15 cm bh 170,000.00
36 M.34 Pipa Galvanis 2" mtr 105,000.00
37 M.35 Tralis Lampu bh
38 M.36 kap lampu kaca patri bh

39 M.37 Alat bantu ls 40,110.00


KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA

NO. URAIAN PEKERJAAN KODE HARGA SATUAN JUMLAH

I PEKERJAAN PERSIAPAN
1 1 M2 Membersihkan lapangan dan perataan (SNI 2013)
Tenaga 0.1 oh Pekerja L.01 Rp 99,000.00 9,900.00
0.05 oh Mandor L.04 Rp 159,000.00 7,950.00
Jumlah 17,850.00
Jasa pelaksanaan maks. 10 % (overhead dan profit) 1,785.00
Jumlah dibulatkan 19,600.00
2 1 M1 Pengukuran dan Pemasangan Bouwplank (SNI 2013)
Bahan 0.012 M3 Kayu 5/7 D.10 Rp 2,785,714.00 33,428.57
0.02 kg Paku biasa 2" - 5" E.06 Rp 19,010.00 380.20
0.007 M3 Kayu Papan 2/20 D.11 Rp 3,350,000.00 23,450.00
Tenaga 0.1 oh Tukang L.02 Rp 136,297.67 13,629.77
0.1 oh Pekerja L.01 Rp 99,000.00 9,900.00
0.01 oh Kepala Tukang L.03 Rp 152,963.13 1,529.63
0.005 oh Mandor L.04 Rp 159,000.00 795.00
Jumlah 83,113.17
Jasa pelaksanaan maks. 10 % (overhead dan profit) 8,311.32
Jumlah dibulatkan 91,400.00
3 1 M1 Pembuatan Pagar Pembuatan Pagar Sementara dari Baligho Tinggi 2 meter
Bahan 1.25 btg Kayu Dolken dia 8-10/400 D.04 Rp 32,700.00 40,875.00
cm
2 m2 Baligho K.11 Rp 28,000.00 56,000.00
0.02 m³ Kayu Albasia 5/7 (ikat) D.03 Rp 1,884,020.00 37,680.40
0.06 kg Paku Biasa 2" - 5" E.06 Rp 19,010.00 1,140.60
Tenaga 0.4 oh Pekerja L.01 Rp 99,000.00 39,600.00
0.2 oh Tukang Kayu L.02 Rp 136,297.67 27,259.53
0.02 oh Kepala Tukang L.03 Rp 152,963.13 3,059.26
0.02 oh Mandor L.04 Rp 159,000.00 3,180.00
Jumlah 208,794.80
Jasa pelaksanaan maks. 10 % (overhead 20,879.48
dan profit)
Jumlah 229,600.00
dibulatk
II PEKERJAAN BONGKARAN
an
4 1 M2 Bongkaran Lantai Keramik
Tenaga 0.05 oh Pekerja L.01 Rp 99,000.00 4,950.00
0.01 oh Mandor L.04 Rp 159,000.00 1,590.00
Jumlah 6,540.00
Jasa pelaksanaan maks. 10 % (overhead 654.00
dan profit)
Jumlah dibulatkan 7,100.00
5 1 M2 Bongkaran Keramik Dinding
Tenaga 0.05 oh Pekerja L.01 Rp 99,000.00 4,950.00
0.025 oh Mandor L.04 Rp 159,000.00 3,975.00
Jumlah 8,925.00
Jasa pelaksanaan maks. 10 % (overhead 892.50
dan profit)
Jumlah dibulatkan 9,800.00
6 1 M1 Bongkaran Kerb
Tenaga 0.17 oh Pekerja L.01 Rp 99,000.00 16,830.00
0.015 oh Tukang L.02 Rp 136,297.67 2,044.47
Jumlah 18,874.47
Jasa pelaksanaan maks. 10 % 1,887.45
Jumlah dibulatkan 20,700.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

III PEKERJAAN TANAH DAN PASIR


7 1 M3 Galian tanah biasa sedalam 1 m (SNI 2013)
Tenaga 0.75 oh Pekerja L.01 Rp 99,000.00 74,250.00
0.025 oh Mandor L.04 Rp 159,000.00 3,975.00
Jumlah 78,225.00
Jasa pelaksanaan maks. 10 % 7,822.50
Jumlah dibulatkan 86,000.00
8 1 M3 Galian tanah biasa sedalam 2 m (SNI 2013)
Tenaga 0.9 oh Pekerja L.01 Rp 99,000.00 89,100.00
0.045 oh Mandor L.04 Rp 159,000.00 7,155.00
Jumlah 96,255.00
Jasa pelaksanaan maks. 10 % 9,625.50
Jumlah dibulatkan 105,800.00
9 1 M3 Pembuangan tanah sejauh 30 meter (SNI 2013)
Tenaga 0.33 oh Pekerja L.01 Rp 99,000.00 32,670.00
0.01 oh Mandor L.04 Rp 159,000.00 1,590.00
Jumlah 34,260.00
Jasa pelaksanaan maks. 10 % 3,426.00
Jumlah dibulatkan 37,600.00
10 1 M3 Pengurugan kembali galian tanah (SNI 2013)
Tenaga 0.5 oh Pekerja L.01 Rp 99,000.00 49,500.00
0.05 oh Mandor L.04 Rp 159,000.00 7,950.00
Jumlah 57,450.00
Jasa pelaksanaan maks. 10 % 5,745.00
Jumlah dibulatkan 63,100.00
11 1 M3 Pengurugan dengan pasir urug (SNI 2013)
Bahan 1.2 M3 Pasir urug A.04 Rp 110,500.00 132,600.00
Tenaga 0.3 oh Pekerja L.01 Rp 99,000.00 29,700.00
0.01 oh Mandor L.04 Rp 159,000.00 1,590.00
Jumlah 163,890.00
Jasa pelaksanaan maks. 10 % 16,389.00
Jumlah dibulatkan 180,200.00
12 1 M3 Urugan Tanah (SNI 2013)
Bahan 1 M3 Tanah Urug Rp 106,420.00 106,420.00
Tenaga 0.5 oh Pekerja L.01 Rp 99,000.00 49,500.00
0.05 oh Mandor L.04 Rp 159,000.00 7,950.00
Jumlah 163,870.00
Jasa pelaksanaan maks. 10 % 16,387.00
Jumlah dibulatkan 180,200.00
IV HARGA SATUAN PEKERJAAN BETON
13 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 +2) cm, w/c = 0,87 (SNI 2013)
Bahan 4.94 Zak Semen B.01 Rp 76,816.67 379,474.33
0.6207 M3 Pasir beton A.06 Rp 232,640.00 144,399.65
0.55 M3 Batu pecah 2/3 A.01 Rp 200,630.00 110,346.50
Tenaga 1.65 oh Pekerja L.01 Rp 99,000.00 163,350.00
0.275 oh Tukang Batu L.02 Rp 136,297.67 37,481.86
0.028 oh Kepala Tukang L.03 Rp 152,963.13 4,282.97
0.083 oh Mandor L.04 Rp 159,000.00 13,197.00
Jumlah 852,532.31
Jasa pelaksanaan maks. 10 % 85,253.23
Jumlah dibulatkan 937,700.00
14 1 m3 beton mutu f’c = 29,05 MPa (K 350), slump (12 +2) cm, w/c = 0,48 (SNI 2013)
Bahan 8.26 Zak Semen B.01 Rp 76,816.67 634,505.67
0.4764 M3 Pasir beton A.06 Rp 232,640.00 110,829.70
0.556 M3 Batu pecah 2/3 A.01 Rp 200,630.00 111,550.28
Tenaga 1.65 oh Pekerja L.01 Rp 99,000.00 163,350.00
0.0275 oh Tukang Batu L.02 Rp 136,297.67 3,748.19
0.028 oh Kepala Tukang L.03 Rp 152,963.13 4,282.97
0.083 oh Mandor L.04 Rp 159,000.00 13,197.00
Jumlah 1,041,463.80
Jasa pelaksanaan maks. 10 % 104,146.38
Jumlah dibulatkan 1,145,600.00
NO.
URAIAN PEKERJAAN HARGA SATUAN JUMLAH
KODE
15 1 KG Pembesian dengan besi polos U 24 (SNI 2013)
Bahan 1.05 kg Besi Beton U 24 E.01 Rp 13,090.00 13,744.50
0.015 kg Kawat beton E.05 Rp 20,000.00 300.00
Tenaga 0.007 oh Pekerja L.01 Rp 99,000.00 693.00
0.007 oh Tukang Batu L.02 Rp 136,297.67 954.08
0.0007 oh Kepala Tukang L.03 Rp 152,963.13 107.07
0.0004 oh Mandor L.04 Rp 159,000.00 63.60
Jumlah 15,862.26
Jasa pelaksanaan maks. 10 % 1,586.23
Jumlah dibulatkan 17,400.00
16 1 KG Pembesian dengan besi U 32 (SNI 2013)
Bahan 1.05 kg Besi Beton U 32 E.01 Rp 13,090.00 13,744.50
0.015 kg Kawat beton E.05 Rp 20,000.00 300.00
Tenaga 0.007 oh Pekerja L.01 Rp 99,000.00 693.00
0.007 oh Tukang Batu L.02 Rp 136,297.67 954.08
0.0007 oh Kepala Tukang L.03 Rp 152,963.13 107.07
0.0004 oh Mandor L.04 Rp 159,000.00 63.60
Jumlah 15,862.26
Jasa pelaksanaan maks. 10 % 1,586.23
Jumlah dibulatkan 17,400.00
17 1 M2 Membuat Bekisting Pondasi (2X Pemakaian) (SNI 2013)
Bahan 0.04 M3 Kayu terentang D.08 Rp 2,206,130.00 88,245.20
0.3 kg Paku biasa E.06 Rp 19,010.00 5,703.00
0.1 lt Minyak Bekisting F.01 Rp 18,230.00 1,823.00
Tenaga 0.52 oh Pekerja L.01 Rp 99,000.00 51,480.00
0.26 oh Tukang Kayu L.02 Rp 136,297.67 35,437.39
0.026 oh Kepala Tukang L.03 Rp 152,963.13 3,977.04
0.026 oh Mandor L.04 Rp 159,000.00 4,134.00
Jumlah 190,799.64
Jasa pelaksanaan maks. 10 % 19,079.96
Jumlah dibulatkan 2 x Pakai 209,800.00
18 1 M2 Membuat Bekisting Sloof (2X Pemakaian) (SNI 2013)
Bahan 0.045 M3 Kayu papan terentang D.08 Rp 2,206,130.00 99,275.85
0.3 kg Paku biasa E.06 Rp 19,010.00 5,703.00
18

0.1 lt Minyak Bekisting F.01 Rp 18,230.00 1,823.00


Tenaga 0.52 oh Pekerja L.01 Rp 99,000.00 51,480.00
0.26 oh Tukang Kayu L.02 Rp 136,297.67 35,437.39
0.026 oh Kepala Tukang L.03 Rp 152,963.13 3,977.04
0.026 oh Mandor L.04 Rp 159,000.00 4,134.00
Jumlah 201,830.29
Jasa pelaksanaan maks. 10 % 20,183.03
Jumlah dibulatkan 2 x Pakai 222,000.00
19 1 M2 Membuat Bekisting Kolom (2X Pemakaian) (SNI 2013)
Bahan 0.04 M3 Kayu papan terentang D.08 Rp 2,206,130.00 88,245.20
0.4 kg Paku biasa E.06 Rp 19,010.00 7,604.00
0.2 lt Minyak Bekisting F.01 Rp 18,230.00 3,646.00
0.015 m3 Balok Kayu Kelas III D.09 Rp 1,960,750.00 29,411.25
0.35 lbr Playwood tebal 9 mm D.05 Rp 151,930.00 53,175.50
2 Btg Dolken kayu dia 8-10/400 cm D.04 Rp 32,700.00 65,400.00
Tenaga 0.66 oh Pekerja L.01 Rp 99,000.00 65,340.00
0.33 oh Tukang Kayu L.02 Rp 136,297.67 44,978.23
0.033 oh Kepala Tukang L.03 Rp 152,963.13 5,047.78
0.033 oh Mandor L.04 Rp 159,000.00 5,247.00
Jumlah 368,094.96
Jasa pelaksanaan maks. 10 % 36,809.50
Jumlah dibulatkan 2 x Pakai 404,900.00
20 1 M2 Membuat Bekisting Balok (2X Pemakaian) (SNI 2013)
Bahan 0.04 M3 Kayu papan terentang D.08 Rp 2,206,130.00 88,245.20
0.4 kg Paku biasa E.06 Rp 19,010.00 7,604.00
0.2 lt Minyak Bekisting F.01 Rp 18,230.00 3,646.00
0.018 m3 Balok Kayu Kelas III D.09 Rp 1,960,750.00 35,293.50
0.35 lbr Playwood tebal 9 mm D.05 Rp 151,930.00 53,175.50
1 ls alat steger F.04 Rp 1,000.00 1,000.00
Tenaga 0.66 oh Pekerja L.01 Rp 99,000.00 65,340.00
0.33 oh Tukang Kayu L.02 Rp 136,297.67 44,978.23
0.033 oh Kepala Tukang L.03 Rp 152,963.13 5,047.78
0.033 oh Mandor L.04 Rp 159,000.00 5,247.00
Jumlah 309,577.21
Jasa pelaksanaan maks. 10 % 30,957.72
Jumlah dibulatkan 2 x Pakai 340,500.00
21 1 M2 Membuat Bekisting Untuk Lantai (2X Pemakaian) (SNI 2013)

Bahan 0.04 M3 Kayu papan terentang D.08 Rp 2,206,130.00 88,245.20


0.4 kg Paku biasa E.06 Rp 19,010.00 7,604.00
0.2 lt Minyak Bekisting F.01 Rp 18,230.00 3,646.00
0.015 m3 Balok Kayu Kelas III D.09 Rp 1,960,750.00 29,411.25
0.35 lbr Playwood tebal 9 mm D.05 Rp 151,930.00 53,175.50
1 ls alat steger F.04 Rp 1,000.00 1,000.00
Tenaga 0.66 oh Pekerja L.01 Rp 99,000.00 65,340.00
0.33 oh Tukang Kayu L.02 Rp 136,297.67 44,978.23
0.033 oh Kepala Tukang L.03 Rp 152,963.13 5,047.78
0.033 oh Mandor L.04 Rp 159,000.00 5,247.00
Jumlah 303,694.96
Jasa pelaksanaan maks. 10 % 30,369.50
Jumlah dibulatkan 2 x Pakai 334,000.00
22 1 M2 Membuat Bekisting Untuk Dinding (2X Pemakaian) (SNI 2013)
Bahan 0.0133 M3 Kayu papan terentang D.08 Rp 2,206,130.00 29,341.53
22

0.4 kg Paku biasa E.06 Rp 19,010.00 7,604.00


0.2 lt Minyak Bekisting F.01 Rp 18,230.00 3,646.00
0.005 m3 Balok Kayu Kelas III D.09 Rp 1,960,750.00 9,803.75
0.1167 lbr Playwood tebal 12 mm D.05 Rp 151,930.00 17,730.23
1 ls alat steger F.04 Rp 1,000.00 1,000.00
Tenaga 0.66 oh Pekerja L.01 Rp 99,000.00 65,340.00
0.33 oh Tukang Kayu L.02 Rp 136,297.67 44,978.23
0.033 oh Kepala Tukang L.03 Rp 152,963.13 5,047.78
0.033 oh Mandor L.04 Rp 159,000.00 5,247.00
Jumlah 189,738.52
Jasa pelaksanaan maks. 10 % 18,973.85
Jumlah dibulatkan 2 x Pakai 208,700.00
23 1 M1 Membuat Ring Balok beton bertulang (10x15 cm) (SNI 2013)
Bahan 0.003 M3 Kayu Kelas III D.09 Rp 1,960,750.00 5,882.25
0.02 kg Paku biasa E.06 Rp 19,010.00 380.20
3.6 kg Besi Beton Polos E.08 Rp 8,250.00 29,700.00
0.05 kg Kawat Beton E.05 Rp 20,000.00 1,000.00
0.11 zak Semen Portland B.01 Rp 76,816.67 8,449.83
0.009 M3 Pasir Beton A.06 Rp 232,640.00 2,093.76
0.015 M3 Kerikil Beton A.08 Rp 206,300.00 3,094.50
Tenaga 0.297 oh Pekerja L.01 Rp 99,000.00 29,403.00
0.033 oh Tukang Batu L.02 Rp 136,297.67 4,497.82
0.033 oh Tukang Kayu L.02 Rp 136,297.67 4,497.82
0.033 oh Tukang Besi L.02 Rp 136,297.67 4,497.82
0.01 oh Kepala Tukang L.02 Rp 136,297.67 1,362.98
0.015 oh Mandor L.04 Rp 159,000.00 2,385.00
Jumlah 97,244.99
Jasa pelaksanaan maks. 10 % 9,724.50
Jumlah dibulatkan 106,900.00
24 1 M1 Membuat Kolom Praktis Beton Bertulang (11x11 cm) (SNI 2013)
Bahan 0.003 M3 Kayu Kelas III D.09 Rp 1,960,750.00 5,882.25
0.02 kg Paku biasa E.06 Rp 19,010.00 380.20
3.6 kg Besi Beton Polos E.08 Rp 8,250.00 29,700.00
0.05 kg Kawat Beton E.05 Rp 20,000.00 1,000.00
0.11 zak Semen Portland B.01 Rp 76,816.67 8,449.83
0.009 M3 Pasir Beton A.06 Rp 232,640.00 2,093.76
0.015 M3 Kerikil Beton A.08 Rp 206,300.00 3,094.50
Tenaga 0.18 oh Pekerja L.01 Rp 99,000.00 17,820.00
0.02 oh Tukang Batu L.02 Rp 136,297.67 2,725.95
0.02 oh Tukang Kayu L.02 Rp 136,297.67 2,725.95
0.02 oh Tukang Besi L.02 Rp 136,297.67 2,725.95
0.006 oh Kepala Tukang L.02 Rp 136,297.67 817.79
0.009 oh Mandor L.04 Rp 159,000.00 1,431.00
Jumlah 78,847.19
Jasa pelaksanaan maks. 10 % 7,884.72
Jumlah dibulatkan 86,700.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

V PEKERJAAN PASANGAN
25 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps (SNI 2013)
Bahan 70 Bh Batu bata merah ( lokal ) C.01 Rp 880.00 61,600.00
0.1936 zak Semen B.01 Rp 76,816.67 14,871.71
0.045 M3 Pasir pasang A.05 Rp 149,480.00 6,726.60
25

Tenaga 0.3 oh Pekerja L.01 Rp 99,000.00 29,700.00


0.1 oh Tukang batu L.02 Rp 136,297.67 13,629.77
0.01 oh Kepala Tukang L.02 Rp 136,297.67 1,362.98
0.015 oh Mandor L.04 Rp 159,000.00 2,385.00
Jumlah 130,276.05
Jasa pelaksanaan maks. 10 % 13,027.61
Jumlah dibulatkan 143,300.00
26 1 M3 Pasangan Batu Belah 1Pc : 5 Ps (SNI 2013)
Bahan 1.2 m3 Batu Belah Pondasi A.02 Rp 124,890.00 149,868.00
2.72 zak Semen PC 50kg B.01 Rp 76,816.67 208,941.33
0.544 m3 Pasir Pasang A.05 Rp 149,480.00 81,317.12
Tenaga 1.5 oh Pekerja L.01 Rp 99,000.00 148,500.00
0.75 oh Tukang batu L.02 Rp 136,297.67 102,223.25
0.075 oh Kepala Tukang L.03 Rp 152,963.13 11,472.23
0.075 oh Mandor L.04 Rp 159,000.00 11,925.00
Jumlah 714,246.94
Jasa pelaksanaan maks. 10 % 71,424.69
Jumlah dibulatkan 785,600.00
27 1 M3 Pasangan Batu Kosong (Anstamping) (SNI 2013)
Bahan 1.2 m3 Batu Belah Pondasi A.02 Rp 124,890.00 149,868.00
0.432 m3 Pasir Urug A.04 Rp 110,500.00 47,736.00
Tenaga 1.5 oh Pekerja L.01 Rp 99,000.00 148,500.00
0.75 oh Tukang batu L.02 Rp 136,297.67 102,223.25
0.075 oh Kepala Tukang L.03 Rp 152,963.13 11,472.23
0.075 oh Mandor L.04 Rp 159,000.00 11,925.00
Jumlah 471,724.49
Jasa pelaksanaan maks. 10 % 47,172.45
Jumlah dibulatkan 518,800.00
VI PEKERJAAN PLESTERAN
28 1 M2 Pemasangan Acian (SNI 2013)
Bahan 0.065 zak Semen B.01 Rp 76,816.67 4,993.08
Tenaga 0.2 oh Pekerja L.01 Rp 99,000.00 19,800.00
0.1 oh Tukang batu L.02 Rp 136,297.67 13,629.77
0.01 oh Kepala Tukang L.03 Rp 152,963.13 1,529.63
0.01 oh Mandor L.04 Rp 159,000.00 1,590.00
Jumlah 41,542.48
Jasa pelaksanaan maks. 10 % 4,154.25
Jumlah dibulatkan 45,600.00
29 1 M2 Pemasangan Plesteran 1 PC : 3 PP tebal 15 mm (SNI 2013)

Bahan 0.1555 zak Semen B.01 Rp 76,816.67 11,944.99


0.023 M3 Pasir pasang A.05 Rp 149,480.00 3,438.04
Tenaga 0.3 oh Pekerja L.01 Rp 99,000.00 29,700.00
0.15 oh Tukang batu L.02 Rp 136,297.67 20,444.65
0.015 oh Kepala Tukang L.03 Rp 152,963.13 2,294.45
0.015 oh Mandor L.04 Rp 159,000.00 2,385.00
Jumlah 70,207.13
Jasa pelaksanaan maks. 10 % 7,020.71
Jumlah dibulatkan 77,200.00
30 1 M2 Pemasangan Plesteran 1 PC : 5 PP tebal 15 mm (SNI 2013)

Bahan 0.1037 zak Semen B.01 Rp 76,816.67 7,965.89


0.026 M3 Pasir pasang A.05 Rp 149,480.00 3,886.48
Tenaga 0.3 oh Pekerja L.01 Rp 99,000.00 29,700.00
30

0.15 oh Tukang batu L.02 Rp 136,297.67 20,444.65


0.015 oh Kepala Tukang L.03 Rp 152,963.13 2,294.45
0.015 oh Mandor L.04 Rp 159,000.00 2,385.00
Jumlah 66,676.47
Jasa pelaksanaan maks. 10 % 6,667.65
Jumlah dibulatkan 73,300.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

VII PEKERJAAN PENGECATAN


31 1 M2 Pengecatan tembok baru ex. ICI (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) EKSTERIOR (SNI
Bahan 0.36 kg Cat tembok ex. ICI G.01 Rp 56,156.00 20,216.16
CATYLAC
0.1 kg Plamir G.04 Rp 16,570.00 1,657.00
Tenaga 0.02 oh Pekerja L.01 Rp 99,000.00 1,980.00
0.063 oh Tukang Cat L.02 Rp 136,297.67 8,586.75
0.0063 oh Kepala Tukang L.03 Rp 152,963.13 963.67
0.003 oh Mandor L.04 Rp 159,000.00 477.00
Jumlah 33,880.58
Jasa pelaksanaan maks. 10 % 3,388.06
Jumlah dibulatkan 37,200.00
I PEKERJAAN BESI
X
32 1 M1 Pemasangan Pipa Galvanis 2"
Bahan 0.1667 btg Pipa GI Medium Class dia 1" I.02 Rp 225,000.00 37,507.50
1 ls Accessories (35% x bahan) Rp 13,127.63 13,127.63
Tenaga 0.135 oh Pekerja L.01 Rp 99,000.00 13,365.00
0.225 oh Tukang L.02 Rp 136,297.67 30,666.98
0.023 oh Kepala Tukang L.03 Rp 152,963.13 3,518.15
0.007 oh Mandor L.04 Rp 159,000.00 1,113.00
Jumlah 99,298.25
Jasa pelaksanaan maks. 10 % 9,929.83
Jumlah dibulatkan 109,200.00
33 1 M1 Pemasangan Pipa Galvanis 1"
Bahan 0.1667 btg Pipa GI Medium Class dia 1" I.02 Rp 225,000.00 37,507.50
1 ls Accessories (35% x bahan) Rp 13,127.63 13,127.63
Tenaga 0.135 oh Pekerja L.01 Rp 99,000.00 13,365.00
0.225 oh Tukang L.02 Rp 136,297.67 30,666.98
0.023 oh Kepala Tukang L.03 Rp 152,963.13 3,518.15
0.007 oh Mandor L.04 Rp 159,000.00 1,113.00
Jumlah 99,298.25
Jasa pelaksanaan maks. 10 % 9,929.83
Jumlah dibulatkan 109,200.00
34 1 cm1 Pengelasan
Bahan 0.04 kg Kawat Las Listrik K.08 Rp 60,000.00 2,400.00
0.03 liter Solar F.02 Rp 7,000.00 210.00
0.004 liter Pelumas F.03 Rp 35,000.00 140.00
Tenaga 0.004 oh Pekerja L.01 Rp 99,000.00 396.00
0.002 oh Tukang L.02 Rp 136,297.67 272.60
0.0002 oh Kepala Tukang L.03 Rp 152,963.13 30.59
0.0002 oh Mandor L.04 Rp 159,000.00 31.80
Jumlah 3,480.99
Jasa pelaksanaan maks. 10 % 348.10
Jumlah dibulatkan 3,800.00
35 1 KG Pemasangan Besi WF
Bahan 1.05 kg IWF Ex. DN SII E.03 Rp 16,550.00 17,377.50
35

Tenaga 0.06 oh Pekerja L.01 Rp 99,000.00 5,940.00


0.06 oh Tukang L.02 Rp 136,297.67 8,177.86
0.006 oh Kepala Tukang L.03 Rp 152,963.13 917.78
0.003 oh Mandor L.04 Rp 159,000.00 477.00
Jumlah 32,890.14
Jasa pelaksanaan maks. 10 % 3,289.01
Jumlah dibulatkan 36,100.00
36 1 KG Pemasangan Plat Bes
Bahan 1.05 kg Plat Besi 8 mm E.04 Rp 16,300.00 17,115.00
Tenaga 0.06 oh Pekerja L.01 Rp 99,000.00 5,940.00
0.06 oh Tukang L.02 Rp 136,297.67 8,177.86
0.006 oh Kepala Tukang L.03 Rp 152,963.13 917.78
0.003 oh Mandor L.04 Rp 159,000.00 477.00
Jumlah 32,627.64
Jasa pelaksanaan maks. 10 % 3,262.76
Jumlah dibulatkan 35,800.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

37 100 kg Pekerjaan Perakitan Baja (SNI 2013)


Bahan 1 ltr Solar F.02 Rp 7,000.00 7,000.00
0.1 ltr Minyak Pelumas F.03 Rp 35,000.00 3,500.00
0.8 jam Sewa Alat K.14 Rp 55,000.00 44,000.00
Tenaga 0.1 oh Pekerja L.01 Rp 99,000.00 9,900.00
0.01 oh Tukang Besi L.02 Rp 136,297.67 1,362.98
0.001 oh Kepala Tukang Besi L.03 Rp 152,963.13 152.96
0.005 oh Mandor L.04 Rp 159,000.00 795.00
Jumlah 56,210.94
Jasa pelaksanaan maks. 10 % 5,621.09
Jumlah dibulatkan 61,800.00
X PEKERJAAN LAIN-LAIN
38 1 M2 Pemasangan Panel GRC 9mm
Bahan 1.1 m2 Panel GRC 9mm J.03 Rp 140,800.00 154,880.00
4 m Siku metal furing E.15 Rp 47,883.00 191,532.00
2 m Canal C metal furing E.16 Rp 81,967.00 163,934.00
4 bh Paku ramset+misiu E.17 Rp 8,125.00 32,500.00
0.1429 roll Joint Tape @75 m J.12 Rp 12,100.00 1,729.09
8 bh Skrup E.07 Rp 12,250.00 98,000.00
0.5 kg Jointing coumpond J.13 Rp 177,000.00 88,500.00
Tenaga 0.5 oh Pekerja L.01 Rp 99,000.00 49,500.00
0.5 oh Tukang L.02 Rp 136,297.67 68,148.84
0.05 oh Kepala Tukang L.03 Rp 152,963.13 7,648.16
0.025 oh Mandor L.04 Rp 159,000.00 3,975.00
Jumlah 860,347.08
Jasa pelaksanaan maks. 10 % 86,034.71
Jumlah dibulatkan 946,300.00
39 1 M2 Pemasangan Panel GRC 10mm
Bahan 1.1 m2 Panel GRC 10mm J.03 Rp 140,800.00 154,880.00
4 m Siku metal furing E.15 Rp 47,883.00 191,532.00
2 m Canal C metal furing E.16 Rp 81,967.00 163,934.00
4 bh Paku ramset+misiu E.17 Rp 8,125.00 32,500.00
0.1429 roll Joint Tape @75 m J.12 Rp 12,100.00 1,729.09
8 bh Skrup E.07 Rp 12,250.00 98,000.00
0.5 kg Jointing coumpond J.13 Rp 177,000.00 88,500.00
Tenaga 0.5 oh Pekerja L.01 Rp 99,000.00 49,500.00
0.5 oh Tukang L.02 Rp 136,297.67 68,148.84
0.05 oh Kepala Tukang L.03 Rp 152,963.13 7,648.16
0.025 oh Mandor L.04 Rp 159,000.00 3,975.00
Jumlah 860,347.08
Jasa pelaksanaan maks. 10 % 86,034.71
Jumlah dibulatkan 946,300.00
40 1 M2 Pemasangan Panel GRC 12mm
Bahan 1.1 m2 Panel GRC 12mm J.03 Rp 140,800.00 154,880.00
4 m Siku metal furing E.15 Rp 47,883.00 191,532.00
2 m Canal C metal furing E.16 Rp 81,967.00 163,934.00
4 bh Paku ramset+misiu E.17 Rp 8,125.00 32,500.00
0.1429 roll Joint Tape @75 m J.12 Rp 12,100.00 1,729.09
8 bh Skrup E.07 Rp 12,250.00 98,000.00
0.5 kg Jointing coumpond J.13 Rp 177,000.00 88,500.00
Tenaga 0.5 oh Pekerja L.01 Rp 99,000.00 49,500.00
0.5 oh Tukang L.02 Rp 136,297.67 68,148.84
0.05 oh Kepala Tukang L.03 Rp 152,963.13 7,648.16
0.025 oh Mandor L.04 Rp 159,000.00 3,975.00
Jumlah 860,347.08
Jasa pelaksanaan maks. 10 % 86,034.71
Jumlah dibulatkan 946,300.00
41 1 M1 Pemasangan Profil GRC (SNI 2008)
Bahan 1.05 m1 Profil GRC J.06 Rp 40,920.00 42,966.00
Tenaga 0.06 oh Pekerja L.01 Rp 99,000.00 5,940.00
0.06 oh Tukang L.02 Rp 136,297.67 8,177.86
0.006 oh Kepala Tukang L.03 Rp 152,963.13 917.78
0.003 oh Mandor L.04 Rp 159,000.00 477.00
Jumlah 58,478.64
Jasa pelaksanaan maks. 10 % 5,847.86
Jumlah dibulatkan 64,300.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

42 1 M2 Pemasangan Kaca Patri Tebal 3mm (SNI 2013)


Bahan 1.1 m2 Kaca Patri Tebal 3mm J.01 Rp 1,823,250.00 2,005,575.00
0.05 kg Sealent J.02 Rp 27,620.00 1,381.00
Tenaga 0.075 oh Pekerja L.01 Rp 99,000.00 7,425.00
0.15 oh Tukang L.02 Rp 136,297.67 20,444.65
0.015 oh Kepala Tukang L.03 Rp 152,963.13 2,294.45
0.004 oh Mandor L.04 Rp 159,000.00 636.00
Jumlah 2,037,756.10
Jasa pelaksanaan maks. 10 % 203,775.61
Jumlah dibulatkan 2,241,500.00
43 1 Unit Lampu Kaca Patri Taman
Bahan 0.51 kg Plat besi E.04 Rp 16,300.00 8,313.00
51 cm Pengelasan K.10 Rp 4,583.60 233,763.60
0.7 m2 Kaca patri J.01 Rp 1,823,250.00 1,276,275.00
Jumlah 1,518,351.60
Jumlah dibulatkan 1,518,300.00
44 1 Unit Lampu Kaca Patri Gerbang
Bahan 0.82 kg Plat besi E.04 Rp 16,300.00 13,366.00
82 cm Pengelasan K.10 Rp 4,583.60 375,855.20
0.56 m2 Kaca patri J.01 Rp 1,823,250.00 1,021,020.00
44

Jumlah 1,410,241.20
Jumlah dibulatkan 1,410,200.00
45 1 M1 Pemasangan Batu Pinggir Beton/Kerb Uk. 60x15x30
Bahan 1.6667 bh Batu Pinggir Beton 15x35x60 C.02 Rp 90,525.00 150,878.02
(K - 225)
Tenaga 0.25 oh Pekerja L.01 Rp 99,000.00 24,750.00
0.5 oh Tukang L.02 Rp 136,297.67 68,148.84
0.025 oh Kepala Tukang L.03 Rp 152,963.13 3,824.08
0.003 oh Mandor L.04 Rp 159,000.00 477.00
Jumlah 248,077.93
Jasa pelaksanaan maks. 10 % 24,807.79
Jumlah dibulatkan 272,800.00
46 1 M1 Pemasangan Kanstein kecil 10x20x35 cm
Bahan 2.8571 m' Kaanstein Paving Block C.04 Rp 29,610.00 84,598.73
0.02 m3 Abu Batu A.07 Rp 173,310.00 3,466.20
Tenaga 0.015 oh Pekerja L.01 Rp 99,000.00 1,485.00
0.15 oh Tukang L.02 Rp 136,297.67 20,444.65
0.005 oh Kepala Tukang L.03 Rp 152,963.13 764.82
0.005 oh Mandor L.04 Rp 159,000.00 795.00
Jumlah 111,554.40
Jasa pelaksanaan maks. 10 % 11,155.44
Jumlah dibulatkan 122,700.00
47 1 M2 Pemasangan Granit
Bahan 1.1 m2 Granit J.07 Rp 1,669,120.00 1,836,032.00
9.8 kg Semen abu B.01 Rp 1,536.33 15,056.07
1.3 kg Semen Warna B.02 Rp 11,710.00 15,223.00
0.045 m3 Pasir Pasang A.05 Rp 149,480.00 6,726.60
Tenaga 0.25 oh Pekerja L.01 Rp 99,000.00 24,750.00
0.125 oh Tukang L.02 Rp 136,297.67 17,037.21
0.013 oh Kepala Tukang L.03 Rp 152,963.13 1,988.52
0.013 oh Mandor L.04 Rp 159,000.00 2,067.00
Jumlah 1,918,880.40
Jasa pelaksanaan maks. 10 % 191,888.04
Jumlah dibulatkan 2,110,800.00
48 1 M3 Pembentukan Tanah & Pembentukan Kontur
Bahan 0.2 m3 Tanah Gembur K.02 Rp 113,135.00 22,627.00
0.8 m3 Urugan Tanah (Tanah A.03 Rp 106,420.00 85,136.00
Setempat)
2 kg. Pupuk Kompos K.04 Rp 1,820.00 3,640.00
Tenaga 0.1 oh Pekerja L.01 Rp 99,000.00 9,900.00
0.01 oh Mandor L.04 Rp 159,000.00 1,590.00
Jumlah 122,893.00
Jasa pelaksanaan maks. 10 % 12,289.30
Jumlah dibulatkan 135,200.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

49 1 M2 Penanaman Rumput Gajah mini tandur


Bahan 1 m2 Gebalan Rumput K.05 Rp 21,266.00 21,266.00
0.5 kg Pupuk Kompos K.04 Rp 1,820.00 910.00
Tenaga 0.04 oh Pekerja L.01 Rp 99,000.00 3,960.00
0.01 oh Mandor L.04 Rp 159,000.00 1,590.00
Jumlah 27,726.00
Jasa pelaksanaan maks. 10 % 2,772.60
Jumlah dibulatkan 30,500.00
50 1 M1 Tanaman Jenis Teh tehan
50
Bahan 6 m2 Gebalan Rumput K.05 Rp 21,266.00 127,596.00
0.248 kg Pupuk Kompos K.04 Rp 1,820.00 451.36
Tenaga 0.102 oh Pekerja L.01 Rp 99,000.00 10,098.00
0.01 oh Mandor L.04 Rp 159,000.00 1,590.00
Jumlah 170,235.36
Jasa pelaksanaan maks. 10 % 17,023.54
Jumlah dibulatkan 187,300.00
KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

ANALISA HARGA BETON

HARGA TOTAL
URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
RUPIAH RUPIAH
1 2 3 4 5

1 m3 sloof 15/15 cm K-225


Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 266.67 kg 17,400.00 4,640,058.00
Bekisting dengan Papan 13.33 m2 222,000.00 2,959,260.00
Jumlah 8,744,918.00
Dibulatkan 8,744,900.00
1 m3 K1 30/30 cm K-350
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 183 kg 17,400.00 3,184,200.00
Bekisting dengan Multiplek 12 20 m2 404,900.00 8,098,000.00
mm Jumlah 12,427,800.00
Dibulatkan 12,427,800.00
1 m3 K 20/30 cm K-350
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 183 kg 17,400.00 3,184,200.00
Bekisting dengan Multiplek 12 23.53 m2 404,900.00 9,527,297.00
mm Jumlah 13,857,097.00
Dibulatkan 13,857,000.00
1 m3 K 10/35 cm K-350
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 76.81 kg 17,400.00 1,336,494.00
Bekisting dengan Multiplek 12 25.71 m2 404,900.00 10,409,979.00
mm Jumlah 12,892,073.00
Dibulatkan 12,892,000.00
1 m3 Kolom K2 Ø 17 cm K-350
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 337.01 kg 17,400.00 5,863,974.00
Bekisting dengan Multiplek 12 23.53 m2 404,900.00 9,527,297.00
mm Jumlah 16,536,871.00
Dibulatkan 16,536,800.00
1 m3 Plat Lantai t= 20 cm K-350
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 208.32 kg 17,400.00 3,624,768.00
Bekisting dengan Multiplek 12 8.33 m2 334,000.00 2,782,220.00
mm Jumlah 7,552,588.00
Dibulatkan 7,552,500.00
1 m3 Kolom Pedestal 35/35 cm
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 225.41 kg 17,400.00 3,922,134.00
Bekisting dengan Multiplek 12 11.43 m2 404,900.00 4,628,007.00
mm Jumlah 9,695,741.00
Dibulatkan 9,695,700.00
1 m3 Kolom Pedestal 17.5/25 cm
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 219.37 kg 17,400.00 3,817,038.00
Bekisting dengan Multiplek 12 19.43 m2 404,900.00 7,867,207.00
mm
Jumlah 12,829,845.00
Dibulatkan 12,829,800.00

HARGA TOTAL
URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
RUPIAH RUPIAH
1 2 3 4 5
1 m3 Balok Beton 20/40 cm
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 215.25 kg 17,400.00 3,745,350.00
Bekisting dengan Multiplek 12 12.5 m2 340,500.00 4,256,250.00
mm Jumlah 9,147,200.00
Dibulatkan 9,147,200.00
1 m3 Balok Beton 15/45 cm
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 131.85 kg 17,400.00 2,294,190.00
Bekisting dengan Multiplek 12 15.56 m2 340,500.00 5,298,180.00
mm Jumlah 8,737,970.00
Dibulatkan 8,737,900.00
1 m3 Balok Beton 20/20 cm
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 163.25 kg 17,400.00 2,840,550.00
Bekisting dengan Multiplek 12 15 m2 340,500.00 5,107,500.00
mm Jumlah 9,093,650.00
Dibulatkan 9,093,600.00
1 m3 Dinding Beton Tebal 15 cm
Beton K-350 1 m3 1,145,600.00 1,145,600.00
Besi beton 126.76 kg 17,400.00 2,205,624.00
Bekisting dengan Multiplek 12 13.33 m2 106,900.00 1,424,977.00
mm Jumlah 4,776,201.00
Dibulatkan 4,776,200.00
KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL

HARGA
NO URAIAN PEKERJAAN SAT TOTAL
MATERIAL UPAH
I. INSTALASI LISTRIK

1 Unit Pasang titik Lampu Sorot (Kabel NYY) titik


Rincian Material : 565,361.25
NYY 3x2.5 mm2 = 16 mx 27,225.00 = 435,600.00
Pipa Conduit 20 mm = 16 mx 8,000.00 = 128,000.00
Perlengkapan instalasi = 5 %x 35,225.00 = 1,761.25

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
612,171.45

1 Unit Pasang titik Lampu Sorot (Kabel NYFGbY) titik


Rincian Material : 169,712.70
NYFGBY 2 x 4 = 16 mx 2,574.00 = 41,184.00
Pipa Conduit 20 mm = 16 mx 8,000.00 = 128,000.00
Perlengkapan instalasi = 5 %x 10,574.00 = 528.70

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
216,522.90

1 Unit Pasang Floodlight 40 Watt bh


Rincian Material : 367,500.00
Floodlight 40 Watt = 1 bh x 350,000.00 = 350,000.00
Perlengkapan instalasi = 5 %x 350,000.00 = 17,500.00

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
414,310.20

1 Unit Pasang Floodlight 20 Watt bh


Rincian Material : 247,800.00
Floodlight 20 Watt = 1 bh x 236,000.00 = 236,000.00
Perlengkapan instalasi = 5 %x 236,000.00 = 11,800.00

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
294,610.20

HARGA
NO URAIAN PEKERJAAN SAT TOTAL
MATERIAL UPAH
1 Unit Pasang Bohlam 23 Watt bh
Rincian Material : 73,500.00
Bohlam LED 23 W = 1 bh x 70,000.00 = 70,000.00
Perlengkapan instalasi = 5 %x 70,000.00 = 3,500.00

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
120,310.20

1 Unit Pasang Bohlam 9 Watt bh


Rincian Material : 31,500.00
Bohlam LED 9 W = 1 bh x 30,000.00 = 30,000.00
Perlengkapan instalasi = 5 %x 30,000.00 = 1,500.00

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
78,310.20

1 Unit Pasang Spotlite 12 Watt bh


Rincian Material : 126,000.00
Spotlight LED 12 W = 1 bh x 120,000.00 = 120,000.00
Perlengkapan instalasi = 5 %x 120,000.00 = 6,000.00

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
172,810.20

1 Unit Pasang Spotlite 9 Watt bh


Rincian Material : 99,750.00
Spotlight LED 9 W = 1 bh x 95,000.00 = 95,000.00
Perlengkapan instalasi = 5 %x 95,000.00 = 4,750.00

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
146,560.20

1 Unit Pasang Spotlite 6 Watt bh


Rincian Material : 68,250.00
Spotlight LED 6 W = 1 bh x 65,000.00 = 65,000.00
Perlengkapan instalasi = 5 %x 65,000.00 = 3,250.00

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
115,060.20

HARGA
NO URAIAN PEKERJAAN SAT TOTAL
MATERIAL UPAH
1 Unit Pasang Spotlite 3 Watt bh
Rincian Material : 47,250.00
Spotlight LED 3 W = 1 bh x 45,000.00 = 45,000.00
Perlengkapan instalasi = 5 %x 45,000.00 = 2,250.00

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
94,060.20

1 Unit Pasang Titik Fotosel (Kabel NYY) titik


Rincian Material : 565,361.25
NYY 3x2.5 mm2 = 16 mx 27,225.00 = 435,600.00
Pipa Conduit 20 mm = 16 mx 8,000.00 = 128,000.00
Perlengkapan instalasi = 5 %x 35,225.00 = 1,761.25

Tenaga : 86,678.01
Pekerja = 0.15 oh x 99,000.00 = 14,850.00
Tukang Listrik = 0.15 oh x 136,297.67 = 20,444.65
Kepala Tukang Listrik = 0.18 oh x 152,963.13 = 27,533.36
Mandor = 0.15 oh x 159,000.00 = 23,850.00
652,039.26

1 Unit Pasang Titik Saklar fotosel (Kabel NYFGbY) titik


Rincian Material : 169,712.70
NYFGBY 2 x 4 = 16 mx 2,574.00 = 41,184.00
Pipa Conduit 20 mm = 16 mx 8,000.00 = 128,000.00
Perlengkapan instalasi = 5 %x 10,574.00 = 528.70

Tenaga : 86,678.01
Pekerja = 0.15 oh x 99,000.00 = 14,850.00
Tukang Listrik = 0.15 oh x 136,297.67 = 20,444.65
Kepala Tukang Listrik = 0.18 oh x 152,963.13 = 27,533.36
Mandor = 0.15 oh x 159,000.00 = 23,850.00
256,390.71

1 Unit Pasang Fotosel 3A bh


Rincian Material : 82,950.00
Fotosel 3 A = 1 bh x 79,000.00 = 79,000.00
Perlengkapan instalasi = 5 %x 79,000.00 = 3,950.00

Tenaga : 10,708.81
Pekerja = 0.025 oh x 99,000.00 = 2,475.00
Tukang Listrik = 0.025 oh x 136,297.67 = 3,407.44
Kepala Tukang Listrik = 0.017 oh x 152,963.13 = 2,600.37
Mandor = 0.014 oh x 159,000.00 = 2,226.00
93,658.81

1 Unit instalasi Sambungan 900 VA VA


Rincian Material 3,441,375
Instalasi Sambungan = 1 VA x 3,277,500 = 3,277,500
900 VA
Perlengkapan instalasi = 5 %x 3,277,500 = 163,875

Tenaga : 35,152.92
Pekerja = 0.1 oh x 99,000.00 = 9,900.00
Tukang Listrik = 0.1 oh x 136,297.67 = 13,629.77
Kepala Tukang Listrik = 0.05 oh x 152,963.13 = 7,648.16
Mandor = 0.025 oh x 159,000.00 = 3,975.00
3,476,527.9235

HARGA
NO URAIAN PEKERJAAN SAT TOTAL
MATERIAL UPAH

Biaya boring kabel 5 mtr


1 mtr
Rincian Material 603,169.00
Alat bantu = 1 ls x 40,110.00 = 40,110.00
Alat pengebor tanah = 7 jam x 55,000.00 = 385,000.00
Mobil pick up = 7 jam x 25,437.00 = 178,059.00

Tenaga : 797,166.04
Pekerja = 3.5 oh x 99,000.00 = 346,500.00
Tukang = 1.7 oh x 136,297.67 = 231,706.04
Sopir = 0.84 oh x 101,666.67 = 85,400.00
Mandor = 0.84 oh x 159,000.00 = 133,560.00
1,400,335.04

Biaya galian tanah 4 m3


1 m3
Rincian Material 40,110.00
Alat bantu = 1 ls x 40,110 = 40,110

Tenaga : 555,000.00
Pekerja = 4 oh x 99,000.00 = 396,000.00
Mandor = 1 oh x 159,000.00 = 159,000.00
595,110.00

Biaya SLO VA
Rincian Material 70,000.00
Biaya SLO = 1 VA x 70,000.00 = 70,000.00

Tenaga : 35,152.92
Pekerja = 0.1 oh x 99,000.00 = 9,900.00
Tukang Listrik = 0.1 oh x 136,297.67 = 13,629.77
Kepala Tukang Listrik = 0.05 oh x 152,963.13 = 7,648.16
Mandor = 0.025 oh x 159,000.00 = 3,975.00
105,152.92

1 Unit Pasang Box Panel bh


Rincian Material : 16,112,000.00
Box Panel 30 x40 x15 cm = 1 bh x 170,000.00 = 170,000.00
1 Unit Pasang MCB 2 A = 2 bh x 44,000.00 = 88,000.00

1 Unit Pasang MCB 4 A = 1 bh x 44,000.00 = 44,000.00

Surge Arester 40 KA = 1 bh x 1,100,000.00 = 1,100,000.00


kWh meter = 1 bh x 1,320,000.00 = 1,320,000.00
Perlengkapan instalasi = 5 %x 2,678,000 = 13,390,000.00

Tenaga : 35,152.92
Pekerja = 0.1 oh x 99,000.00 = 9,900.00
Tukang Listrik = 0.1 oh x 136,297.67 = 13,629.77
Kepala Tukang Listrik = 0.05 oh x 152,963.13 = 7,648.16
Mandor = 0.025 oh x 159,000.00 = 3,975.00
16,147,152.92

1 Unit Pasang Pipa Galvanis medium 2" mtr


Rincian Material : 206,850.00
Batang grounding GIP 1" = 1 mx 197,000.00 = 197,000.00

Perlengkapan instalasi = 5 %x 197,000.00 = 9,850.00


23,282.46
Pekerja = 0.054 oh x 99,000.00 = 5,346.00
Tukang = 0.09 oh x 136,297.67 = 12,266.79
Kepala Tukang = 0.009 oh x 152,963.13 = 1,376.67
Mandor = 0.027 oh x 159,000.00 = 4,293.00
230,132.46

HARGA
NO URAIAN PEKERJAAN SAT TOTAL
MATERIAL UPAH
1 Unit Pasang kabel power NYFGbY 2 x 4 mm2 mtr
Rincian Material : 2,702.70
NYFGBY 2 x 4 = 1 mx 2,574.00 = 2,574.00
Perlengkapan instalasi = 5 %x 2,574.00 = 128.70
12,591.20
Pekerja = 0.033 oh x 99,000.00 = 3,267.00
Tukang Listrik = 0.033 oh x 136,297.67 = 4,497.82
Kepala Tukang Listrik = 0.017 oh x 152,963.13 = 2,600.37
Mandor = 0.014 oh x 159,000.00 = 2,226.00
15,293.90

1 Unit Pasang Kabel BC 4 mm2 mtr


Rincian Material : 7,875.00
Kabel BC 4 mm2 = 1 mtr x 7,500.00 = 7,500.00
Perlengkapan instalasi = 5 %x 7,500.00 = 375.00

Tenaga : 12,591.20
Pekerja = 0.033 oh x 99,000.00 = 3,267.00
Tukang Listrik = 0.033 oh x 136,297.67 = 4,497.82
Kepala Tukang Listrik = 0.017 oh x 152,963.13 = 2,600.37
Mandor = 0.014 oh x 159,000.00 = 2,226.00
20,466.20

1 Unit Pasang Kabel BC 50 mm2 mtr


Rincian Material : 7,875.00
Kabel BC 50 mm = 1 mtr x 7,500.00 = 7,500.00
Perlengkapan instalasi = 5 %x 7,500.00 = 375.00

Tenaga : 12,591.20
Pekerja = 0.033 oh x 99,000.00 = 3,267.00
Tukang Listrik = 0.033 oh x 136,297.67 = 4,497.82
Kepala Tukang Listrik = 0.017 oh x 152,963.13 = 2,600.37
Mandor = 0.014 oh x 159,000.00 = 2,226.00
20,466.20

1 Unit Pasang Penangkal Petir 30 cm bh


Rincian Material : 273,000.00
Penangkal Petir = 1 bh x 260,000.00 = 260,000.00
Splitzen 30 cm
Perlengkapan instalasi = 5 %x 260,000.00 = 13,000.00

Tenaga : 35,152.92
Pekerja = 0.1 oh x 99,000.00 = 9,900.00
Tukang Listrik = 0.1 oh x 136,297.67 = 13,629.77
Kepala Tukang Listrik = 0.05 oh x 152,963.13 = 7,648.16
Mandor = 0.025 oh x 159,000.00 = 3,975.00
308,152.92
1 Unit Pasang Penangkal Petir 50 cm bh
Rincian Material : 178,500.00
Penangkal Petir = 1 bh x 170,000.00 = 170,000.00
Splitzen 50 cm
Perlengkapan instalasi = 5 %x 170,000.00 = 8,500.00

Tenaga : 35,152.92
Pekerja = 0.1 oh x 99,000.00 = 9,900.00
Tukang Listrik = 0.1 oh x 136,297.67 = 13,629.77
Kepala Tukang Listrik = 0.05 oh x 152,963.13 = 7,648.16
Mandor = 0.025 oh x 159,000.00 = 3,975.00
213,652.92

HARGA
NO URAIAN PEKERJAAN SAT TOTAL
MATERIAL UPAH
1 Unit Pembuatan Bak Kontrol bh
Rincian Material 570,667.65
Pembuatan Bak = 1 bh x 543,493.00 = 543,493.00
Kontrol
Perlengkapan instalasi = 5 %x 543,493.00 = 27,174.65

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
617,477.85

1 unit Pengeboran batang grounding ttk


Rincian Material 3,675,000
Pengeboran tanah = 3 hr x 1,225,000 = 3,675,000
gorunding

Tenaga : 108,090.00
Pekerja = 0.61 oh x 99,000.00 = 60,390.00
Mandor = 0.3 oh x 159,000.00 = 47,700.00
3,783,090.00

1 Unit Pasang Batang Grounding GIP 1" bh


Rincian Material 206,850.00
Batang grounding GIP = 1 bh x 197,000.00 = 197,000.00
1"
Perlengkapan instalasi = 5 %x 197,000.00 = 9,850.00

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.00 = 16,434.00
Tukang Listrik = 0.166 oh x 136,297.67 = 22,625.41
Kepala Tukang Listrik = 0.033 oh x 152,963.13 = 5,047.78
Mandor = 0.017 oh x 159,000.00 = 2,703.00
253,660.20

1 Unit Pasang Tralis Lampu bh


Rincian Material 110,250.00
Pipa Galvanis 2" = 1 bh x 105,000.0 = 105,000.00
Perlengkapan instalasi = 5 %x 105,000.0 = 5,250.00

Tenaga : 46,810.20
Pekerja = 0.166 oh x 99,000.0 = 16,434.00
Tukang = 0.166 oh x 136,297.7 = 22,625.41
Kepala Tukang = 0.033 oh x 152,963.1 = 5,047.78
Mandor = 0.017 oh x 159,000.0 = 2,703.00
157,060.20
KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

REKAPITULASI ANALISA HARGA SATUAN

NO Item Pekerjaan Satuan Harga


PEKERJAAN PERSIAPAN
1 1 M2 Membersihkan lapangan dan perataan (SNI 2013) m² 19,600.00
2 1 M1 Pengukuran dan Pemasangan Bouwplank (SNI 2013) m 91,400.00
3 1 M1 Pembuatan Pagar Pembuatan Pagar Sementara dari Baligho m
Tinggi 2 meter 229,600.00
4 1 M2 Bongkaran Lantai Keramik m² 7,100.00
5 1 M2 Bongkaran Keramik Dinding m² 9,800.00
6 1 M1 Bongkaran Kerb m 20,700.00
PEKERJAAN TANAH DAN PASIR
7 1 M3 Galian tanah biasa sedalam 1 m (SNI 2013) m³ 86,000.00
8 1 M3 Galian tanah biasa sedalam 2 m (SNI 2013) m³ 105,800.00
9 1 M3 Pembuangan tanah sejauh 30 meter (SNI 2013) m³ 37,600.00
10 1 M3 Pengurugan kembali galian tanah (SNI 2013) m³ 63,100.00
11 1 M3 Pengurugan dengan pasir urug (SNI 2013) m³ 180,200.00
12 1 M3 Urugan Tanah (SNI 2013) m³ 180,200.00
HARGA SATUAN PEKERJAAN BETON
13 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 +2) cm, w/c = 0,87 m³
(SNI 2013) 937,700.00
14 1 m3 beton mutu f’c = 29,05 MPa (K 350), slump (12 +2) cm, w/c = m³
0,48 (SNI 2013) 1,145,600.00
15 1 KG Pembesian dengan besi polos U 24 (SNI 2013) kg 17,400.00
16 1 KG Pembesian dengan besi U 32 (SNI 2013) kg 17,400.00
17 1 M2 Membuat Bekisting Pondasi (2X Pemakaian) (SNI 2013) m² 209,800.00
18 1 M2 Membuat Bekisting Sloof (2X Pemakaian) (SNI 2013) m² 222,000.00
19 1 M2 Membuat Bekisting Kolom (2X Pemakaian) (SNI 2013) m² 404,900.00
20 1 M2 Membuat Bekisting Balok (2X Pemakaian) (SNI 2013) m² 340,500.00
21 m²
1 M2 Membuat Bekisting Untuk Lantai (2X Pemakaian) (SNI 2013) 334,000.00
22 m²
1 M2 Membuat Bekisting Untuk Dinding (2X Pemakaian) (SNI 2013) 208,700.00
23 1 M1 Membuat Ring Balok beton bertulang (10x15 cm) (SNI 2013) m 106,900.00
24 m
1 M1 Membuat Kolom Praktis Beton Bertulang (11x11 cm) (SNI 2013) 86,700.00
PEKERJAAN PASANGAN
25 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps (SNI 2013) m² 143,300.00
26 1 M3 Pasangan Batu Belah 1Pc : 5 Ps (SNI 2013) m³ 785,600.00
27 1 M3 Pasangan Batu Kosong (Anstamping) (SNI 2013) m³ 518,800.00
PEKERJAAN PLESTERAN
28 1 M2 Pemasangan Acian (SNI 2013) m² 45,600.00
29 1 M2 Pemasangan Plesteran 1 PC : 3 PP tebal 15 mm (SNI 2013) m² 77,200.00
30 1 M2 Pemasangan Plesteran 1 PC : 5 PP tebal 15 mm (SNI 2013) m² 73,300.00
PEKERJAAN PENGECATAN
31 1 M2 Pengecatan tembok baru ex. ICI (1 lapis plamir, 1 lapis cat dasar, m²
2 lapis cat penutup) EKSTERIOR (SNI 37,200.00
PEKERJAAN BESI
32 1 M1 Pemasangan Pipa Galvanis 2" m 109,200.00
33 1 M1 Pemasangan Pipa Galvanis 1" m 109,200.00
34 1 cm1 Pengelasan cm 3,800.00
35 1 KG Pemasangan Besi WF kg 36,100.00
36 1 KG Pemasangan Plat Bes kg 35,800.00
37 100 kg Pekerjaan Perakitan Baja (SNI 2013) kg 61,800.00
PEKERJAAN LAIN-LAIN
38 1 M2 Pemasangan Panel GRC 9mm m² 946,300.00
39 1 M2 Pemasangan Panel GRC 10mm m² 946,300.00
40 1 M2 Pemasangan Panel GRC 12mm m² 946,300.00
41 1 M1 Pemasangan Profil GRC (SNI 2008) m 946,300.00
42 1 M2 Pemasangan Kaca Patri Tebal 3mm (SNI 2013) m² 2,241,500.00
43 1 Unit Lampu Kaca Patri Taman unit 1,518,300.00
44 1 Unit Lampu Kaca Patri Gerbang unit 1,410,200.00
45 1 M1 Pemasangan Batu Pinggir Beton/Kerb Uk. 60x15x30 m 272,800.00
46 1 M1 Pemasangan Kanstein kecil 10x20x35 cm m 122,700.00
47 1 M2 Pemasangan Granit m² 122,700.00
48 1 M3 Pembentukan Tanah & Pembentukan Kontur m³ 2,110,800.00
49 1 M2 Penanaman Rumput Gajah mini tandur m² 30,500.00
50 1 M1 Tanaman Jenis Teh tehan m 187,300.00

HARGA BETON
51 1 m3 sloof 15/15 cm K-225 m³ 8,744,900.00
52 1 m3 K1 30/30 cm K-350 m³ 12,427,800.00
53 1 m3 K 20/30 cm K-350 m³ 13,857,000.00
54 1 m3 K 10/35 cm K-350 m³ 12,892,000.00
55 1 m3 Kolom K2 Ø 17 cm K-350 m³ 16,536,800.00
56 1 m3 Plat Lantai t= 20 cm K-350 m³ 7,552,500.00
57 1 m3 Kolom Pedestal 35/35 cm m³ 9,695,700.00
58 1 m3 Kolom Pedestal 17.5/25 cm m³ 12,829,800.00
59 1 m3 Balok Beton 20/40 cm m³ 9,147,200.00
60 1 m3 Balok Beton 15/45 cm m³ 8,737,900.00
61 1 m3 Balok Beton 20/20 cm m³ 9,093,600.00
62 1 m3 Dinding Beton Tebal 15 cm m³ 4,776,200.00

ANALISA HARGA SATUAN ELEKTRIKAL


INSTALASI LISTRIK
63 1 Unit Pasang titik Lampu Sorot (Kabel NYY) titik 612,171.45
64 1 Unit Pasang titik Lampu Sorot (Kabel NYFGbY) titik 216,522.90
65 1 Unit Pasang Floodlight 40 Watt bh 414,310.20
66 1 Unit Pasang Floodlight 20 Watt bh 294,610.20
67 1 Unit Pasang Bohlam 23 Watt bh 120,310.20
68 1 Unit Pasang Bohlam 9 Watt bh 78,310.20
69 1 Unit Pasang Spotlite 12 Watt bh 172,810.20
70 1 Unit Pasang Spotlite 9 Watt bh 146,560.20
71 1 Unit Pasang Spotlite 6 Watt bh 115,060.20
72 1 Unit Pasang Spotlite 3 Watt bh 94,060.20
73 1 Unit Pasang Titik Fotosel (Kabel NYY) titik 652,039.26
74 1 Unit Pasang Titik Saklar fotosel (Kabel NYFGbY) titik 256,390.71
75 1 Unit Pasang Fotosel 3A bh 93,658.81
76 1 Unit instalasi Sambungan 900 VA VA 3476527.9235
77 Biaya boring kabel mtr 1,400,335.04
78 Biaya galian tanah mtr 595,110.00
79 Biaya SLO VA 105,152.92
80 1 Unit Pasang Box Panel bh 16,147,152.92
81 1 Unit Pasang Pipa Galvanis medium 2" mtr 230,132.46
82 1 Unit Pasang kabel power NYFGbY 2 x 4 mm2 mtr 15,293.90
83 1 Unit Pasang Kabel BC 4 mm2 mtr 20,466.20
84 1 Unit Pasang Kabel BC 50 mm2 mtr 20,466.20
85 1 Unit Pasang Penangkal Petir 30 cm bh 308,152.92
86 1 Unit Pasang Penangkal Petir 50 cm bh 213,652.92
87 1 Unit Pembuatan Bak Kontrol bh 617,477.85
88 1 unit Pengeboran batang grounding titik 3,783,090.00
89 1 Unit Pasang Batang Grounding GIP 1" bh 253,660.20
90 1 Unit Pasang Tralis Lampu bh 157,060.20
KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

JUMLAH HARGA
HARGA SATUAN
NO. URAIAN SATUAN VOLUME KONTRAKTOR
(Rp.) (Rp.)
1 2 3 4 5 6
B GERBANG ISLAND JL. WASTUKENCANA - JL. PERINTIS
1 KEMERDEKAAN
SIPIL
I PEKERJAAN PERSIAPAN
1 Pembersihan lahan m2 56.75 19,600.00 1,112,300.00
2 Pengukuran dan pemasangan bouwplank m1 26.7 91,400.00 2,440,380.00
3 Administrasi dan Dokumentasi (laporan,Foto Proyek) ls 1 500,000.00 500,000.00
4 Papan Nama Proyek (bahan spanduk outdoor) m2 2 350,000.00 700,000.00
5 Pagar pengaman Proyek Bahan Baligho tinggi 2 m m1 34.56 229,600.00 7,934,976.00
6 Mobilisasi dan demobilisasi alat bore file ls 1 650,000.00 650,000.00
JUMLAH I PEKERJAAN PERSIAPAN 13,337,656.00

II PEKERJAAN BONGKARAN DAN PERBAIKAN SITE


1 Bongkaran Taman dan buang tanah bekas bongkaran m3 56.75 160,000.00 9,080,000.00
2 Bongkaran Kerb/Kansteen m1 26.71 20,700.00 552,897.00
3 Perbaikan Utilitas sekitar eksisting ls 1 5,000,000.00 5,000,000.00
JUMLAH II PEKERJAAN BONGKARAN DAN PERBAIKAN SITE 14,632,897.00

III PEKERJAAN TANAH DAN PASIR


1 Galian Tanah Pondasi Bore pile 4 titik dia. 40 cm m3 3.02 86,000.00 259,369.89
2 Galian Tanah Poer ukuran m3 5.40 86,000.00 464,400.00
3 Urugan Kembali Ex. Galian m3 0.72 63,100.00 45,432.00
4 Buangan Ex Galian m3 7.70 37,600.00 289,366.93
5 Pasir urug di bawah sloof dan poer m3 0.45 180,200.00 81,090.00
JUMLAH III PEKERJAAN TANAH DAN PASIR 1,139,658.82

IV PEKERJAAN PONDASI
1 Pondasi Bore pile Dia. 40 cm
- Bore pile dia. 40 cm m1 24 180,000.00 4,320,000.00
- Besi 8 Dia. 16 kg 304 16,000.00 4,864,000.00
- Sengkang Ø 8 kg 65 15,600.00 1,014,000.00
- Cor Beton K-350 m3 3 1,134,151.00 3,402,453.00
2 Pekerjaan Poer -
Besi D 10 - 150 kg 103.6 66,550.00 6,894,580.00
Besi D 16-150 kg 247 66,550.00 16,437,850.00
Bekisting m2 7.2 151,930.00 1,093,896.00
Cor Beton K-350 m3 5.4 1,134,151.00 6,124,415.40
3 Lantai Kerja di bawah pondasi dan sloof m3 0.9 937,700.00 843,930.00
JUMLAH IV PEKERJAAN PONDASI 44,995,124.40

V PEKERJAAN STRUKTUR
1 Sloop 15/15 cm K-225 m3 0.00 8,744,900.00 -
2 Dinding Beton Tebal 15 cm m3 0.00 4,776,200.00 -
3 Kolom Praktis Beton (11/11 cm) m1 16 86,700.00 1,387,200.00
4 Balok Praktis 10/15 m1 0.00 8,737,900.00 -
5 Kolom K1 30/30 cm k-350 m3 0.79 12,427,800.00 9,842,817.60
6 Kolom 20x20 cm m3 0.58 9,093,600.00 5,237,913.60
7 Kolom 10x35 cm m3 0.90 12,892,000.00 11,551,232.00
8 Kolom K3 Ø 17 cm k-350 m3 0.36 16,536,800.00 5,953,248.00
9 Balok B1 20x40 cm m3 0.16 9,147,200.00 1,436,110.40
10 Balok B2 15x40 cm m3 0.19 8,737,900.00 1,642,725.20
11 Balok B3 (20x20 cm) m3 0.11 9,093,600.00 1,000,296.00
12 Plat Lantai elev. +2.000 (K-350) m3 0.60 7,552,500.00 4,531,500.00
13 Plat Lantai elev. +5.270 (K-350) m3 0.43 7,552,500.00 3,247,575.00
14 Plat Lantai elev. +6.800 (K-350) m3 0.22 7,552,500.00 1,661,550.00
Struktur atap -
1 Pipa besi Ø 2 " Medium galvanis m1 25.5 109,200.00 2,784,609.53
2 Pipa besi Ø 1 " Medium Galvanis m1 9.6 109,200.00 1,048,320.00
3 Base Plate 8mm kg 50.24 35,800.00 1,798,592.00
4 Baud Angkur 4 m16 (panjang 15 cm) bh 32 22,500.00 720,000.00
5 Pengerolan Pipa bh 6 2,500.00 15,000.00
6 Pengelasan cm1 320 3,800.00 1,216,000.00
7 Panel GRC (tebal 12 cm) m2 10.2 946,300.00 9,607,485.80
JUMLAH V PEKERJAAN STRUKTUR 64,682,175.13

VI PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan dinding 1/2 bata 1 : 5 m2 36.00 143300.00 5,158,800.00
2 Plesteran dinding 1 : 5 m2 72.00 77200.00 5,558,400.00
3 Acian (dinding) m2 72.00 45600.00 3,283,200.00
4 Plesteran beton 1 : 3 m2 28.50 77200.00 2,200,200.00
5 Acian (beton) m2 28.50 45600.00 1,299,600.00
6 Acian Profil elevasi 0+1.36 m1 9.20 45600.00 419,520.00
7 Acian Profil elevasi 0+2.61 m1 9.20 45600.00 419,520.00
8 Acian Profil elevasi 0+5.93 m1 6.60 45600.00 300,960.00
9 Acian Profil Lantai 0+7.54 m1 7.30 45600.00 332,880.00
10 Acian Tali Air Dinding m1 30.40 45600.00 1,386,240.00
JUMLAH VI PEKERJAAN PASANGAN DAN PLESTERAN 20,359,320.00

VII PEKERJAAN FINISHING / PENGECATAN


1 Cat Dasar Dulux m2 296.17 37200.00 11,017,520.61
2 Pengecatan dinding tembok Wheathershield m2 296.17 37200.00 11,017,520.61
JUMLAH VII PEKERJAAN FINISHING / PENGECATAN 22,035,041.21

VIII PEKERJAAN PULAU JALAN ( ISLAND)


Teras Tugu
A. Pekerjaan Galian
- Galian Tanah m3 0.30 86000.00 25,800.00
- Urugan Tanah Kembali m3 9.61 63100.00 606,517.20
-
B. Pasangan Pondasi -
- Pasangan pasir Urug m3 2.18 180200.00 392,385.50
-
C Pekerjaan Beton -
- Lantai kerja (K-100) m3 4.36 937700.00 4,083,683.50
-
D Pekerjaan Pasangan -
- Pasangan dinding 1/2 bata 1 : 5 m2 12.05 143,300.00 1,726,765.00
- Plesteran m2 12.05 73,300.00 883,265.00
- Acian m2 12.05 45600.0000 549,480.00
- Pasangan Dinding Marmer Travertime m2 3.15 122,700.00 386,505.00
- Pasangan Lantai Granit m2 31.075 2,110,800.00 65,593,110.00
- Pasangan Kerb m1 24 272,800.00 6,547,200.00
- Tali air Batu Sikat 10 cm m2 1.93 113380.79 218,258.02
- Lantai Batu Sikat m2 10.55 113380.79 1,196,167.33
- Dinding Batu Sikat m2 4.065 113380.79 460,892.91

JUMLAH VIII PEKERJAAN TAMAN 82,670,029.47

X PEKERJAAN ASESORIS
1 Jam + kaca Patri
- Jam diameter 50cm unit 4 80,000.00 320,000.00
- Kaca Patri (Kuningan) Tebal 3mm m2 3.712 2,241,500.00 8,320,448.00
2 Patung Maung Bandung (Bahan Resin) unit 4 1,000,000 4,000,000.00
3 Ornamen Sate unit 1 150,000 150,000.00
4 Plakat Granit Hitam Bintik Emas (Galaxy) bh 1 200,000 200,000.00
5 Cincin Kolom (Bahan Resin) bh 16 80,000 1,280,000.00
JUMLAH X PEKERJAAN ASESORIS 14270446
JUMLAH X PEKERJAAN ARSITEKTUR, SIPIL
KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

HARGA
NO. URAIAN SATUAN VOLUME JUMLAH HARGA
SATUAN
(Rp.) (Rp.)
1 2 3 4 5 6
B PEKERJAAN ELEKTRIKAL
I Pekerjaan Panel
(Pengadaan dan pemasangan panel termasuk pentanahan panel sesuai dengan gambar rencana dan
gambar rencana dan spesifikasi spesifikasi
teknis) teknis Komponen Panel sesuai
1 Penyambungan daya PLN 900 VA lot 1 3,476,527.92 3,476,527.92
2 Panel penerangan bh 1 16,147,152.92 16,147,152.92
- Box panel 40x30x15
- KWH Meter
- MCB 4A
- MCB 2A
3 Instalasi kabel power panel penerangan NYFGbY 2 mtr 50 15,293.90 15,293.90
x 4 mm2
4 Instalasi pipa galvanis medium 2'' mtr 15 230,132.46 3,451,986.88
5 Instalasi grounding panel kabel BC 4 mm2 mtr 8 20,466.20 163,729.57
6 Biaya Boring tanah horizontal mtr 15 595,110.00 8,926,650.00
7 Biaya Galian tanah ttk 2 595,110.00 1,190,220.00
8 Biaya SLO lot 1 105,152.92 105,152.92
33,476,714.11
II Pekerjaan Penerangan
1 Floodlight LED 40 W bh 5 414,310.20 2,071,550.98
2 LED Strip mtr 7 10,000.00 70,000.00
3 Spotlight LED 9 W bh 1 146,560.20 146,560.20
4 Instalasi titik Penerangan
- Instalasi penerangan Kabel NYY ttk 3 612,171.45 1,836,514.34
- Instalasi penerangan kabel NYFGbY ttk 4 216,522.90 866,091.59
5 Fotosel 3A bh 2 93,658.81 187,317.63
6 Instalasi fotosel
- Instalasi fotosel kabel NYY ttk 1 652,039.26 652,039.26
- Instalasi fotosel kabel NYFGbY ttk 1 256,390.71 256,390.71
7 Tralis Lampu 35X35X40 bh 4 157,060.20 628,240.79
6,714,705.50
C Pekerjaan Penangkal Petir
1 Penangkal Petir Splitzen 30 cm bh 1 213,652.92 213,652.92
2 Instalasi kabel BC 50 mm2 mtr 20 20,466.20 409,323.93
3 Batang grounding GIP 1' mtr 4 253,660.20 1,014,640.79
4 Pembuatan bak kontrol bh 1 617,477.85 617,477.85
5 Pengeboran batang grounding ttk 1 3,783,090.00 3,783,090.00
6,038,185.48
JUMLAH PEKERJAAN ELEKTRIKAL 46,229,605.10
REKAPITULASI DAFTAR KUANTITAS HARGA
BILL OF QUANTITY (BOQ)
RAB
KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

NO URAIAN PEKERJAAN JUMLAH HARGA BOBOT

A PEKERJAAN SIPIL DAN ARSITEKTUR


I Pekerjaan Persiapan 13,337,656.00 4.11
II Pekerjaan Bongkaran dan Perbaikan Site 14,632,897.00 4.51
III Pekerjaan Tanah dan Pasir 1,139,658.82 0.35
IV Pekerjaan Pondasi 44,995,124.40 13.87
V Pekerjaan Strukture 64,682,175.13 19.94
VI Pekerjaan Pasangan Plesteran dan Acian 20,359,320.00 6.28
VII Pekerjaan Pengecatan 22,035,041.21 6.79
VIII Pekerjaan Taman 82,670,029.47 25.49
IX Pekerjaan Aksesories 14,270,446.00 4.40

B PEKERJAAN ELEKTRIKAL
I Pekerjaan Panel 33,476,714.11 10.32
II Pekerjaan Penerangan 6,714,705.50 2.07

III Pekerjaan Penangkal Petir 6,038,185.48 1.86

JUMLAH A+B 324,351,953.12 100.00


JUMLAH TOTAL 324,351,953.12
Dibula 324,351,000.00
tkan
PPN 32,435,100.00
ke
10%
TOT 356,787,000.00
bawah
Terbilang tiga ratus lima puluh enam juta tujuh ratus delapan puluh(Adala
L ribu rupiah
tujuh
m
ribuan
)
KURVA S (RAB)

KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA


PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)

1 2 3 4 5 6 7 8 9 10
NO. URAIAN PEKERJAAN Jumlah Harga Bobot (%)
(31 MEI) JUNI 2018 JULI 2018
A PEKERJAAN SIPIL DAN ARSITEKTUR
I Pekerjaan Persiapan 13,337,656.00 4.112 2.056 2.056
II Pekerjaan Bongkaran dan Perbaikan Site 14,632,897.00 4.511 2.256 2.256
III Pekerjaan Tanah dan Pasir 1,139,658.82 0.351 0.35
IV Pekerjaan Pondasi 44,995,124.40 13.872 6.936 6.936
V Pekerjaan Strukture 64,682,175.13 19.942 6.647 6.647 6.647
VI Pekerjaan Pasangan Plesteran dan Acian 20,359,320.00 6.277 6.277
VII Pekerjaan Pengecatan 22,035,041.21 6.794 6.794
VIII Pekerjaan Taman 82,670,029.47 25.488 8.496 8.496 8.496
IX Pekerjaan Aksesories 14,270,446.00 4.400 2.200 2.200

B PEKERJAAN ELEKTRIKAL
X Pekerjaan Panel 33,476,714.11 10.32 5.161 5.161
XI Pekerjaan Penerangan 6,714,705.50 2.07 1.035 1.035
XII Pekerjaan Penangkal Petir 6,038,185.48 1.86 0.931 0.931

BOBOT PRESTASI MINGGUAN 324,351,953.12 100.000 2.056 4.312 2.607 6.936 13.583 11.808 12.843 15.808 18.420 11.627
KUMULATIF 324,351,953.12 2.056 6.368 8.975 15.911 29.495 41.302 54.145 69.953 88.373 100.000
MODAL/JML UANG YANG HARUS DISEDIAKAN 324,351,900.00 7,335,707.75 15,383,797.75 9,301,714.18 24,747,308.12 48,464,095.80 42,128,972.78 45,822,059.27 56,400,660.70 65,720,609.45 41,482,074.20
MODAL KUMULATIF 32,435,190.00 7,335,707.75 22,719,505.50 32,021,219.68 56,768,527.80 105,232,623.61 147,361,596.39 193,183,655.66 249,584,316.36 315,304,925.80 356,787,000.00

*7
KEGIATAN KEGIATAN YANG MENDAHULUI WAKTU (PEKAN) BIAYA NORMAL BIAYA CRASH WAKTU NORMAL (MINGWAKTU CRASH (MINGBIAYA RELATIF (Rp./Ming)
I Pekerjaan Persiapan - 2 13,337,656.00 14671421.600.00 2 1.8 6668828.000.00000
II Pekerjaan Bongkaran dan Perbaikan Site I 2 14,632,897.00 17559476.400.00 2 1.6 7316448.500.00000
KURVA S (RAB)

KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA


PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)

1 2 3 4 5 6 7 8 9 10
NO. URAIAN PEKERJAAN Jumlah Harga Bobot (%)
(31 MEI) JUNI 2018 JULI 2018
A PEKERJAAN SIPIL DAN ARSITEKTUR
I Pekerjaan Persiapan 13,337,656.00 4.112 2.056 2.056
II Pekerjaan Bongkaran dan Perbaikan Site 14,632,897.00 4.511 2.256 2.256
III Pekerjaan Tanah dan Pasir 1,139,658.82 0.351 0.35
IV Pekerjaan Pondasi 44,995,124.40 13.872 6.936 6.936
V Pekerjaan Strukture 64,682,175.13 19.942 6.647 6.647 6.647
VI Pekerjaan Pasangan Plesteran dan Acian 20,359,320.00 6.277 6.277
VII Pekerjaan Pengecatan 22,035,041.21 6.794 6.794
VIII Pekerjaan Taman 82,670,029.47 25.488 8.496 8.496 8.496
IX Pekerjaan Aksesories 14,270,446.00 4.400 2.200 2.200

B PEKERJAAN ELEKTRIKAL
X Pekerjaan Panel 33,476,714.11 10.32 5.161 5.161
XI Pekerjaan Penerangan 6,714,705.50 2.07 1.035 1.035
XII Pekerjaan Penangkal Petir 6,038,185.48 1.86 0.931 0.931

BOBOT PRESTASI MINGGUAN 324,351,953.12 100.000 2.056 4.312 2.607 6.936 13.583 11.808 12.843 15.808 18.420 11.627
KUMULATIF 324,351,953.12 2.056 6.368 8.975 15.911 29.495 41.302 54.145 69.953 88.373 100.000
MODAL/JML UANG YANG HARUS DISEDIAKAN 324,351,900.00 7,335,707.75 15,383,797.75 9,301,714.18 24,747,308.12 48,464,095.80 42,128,972.78 45,822,059.27 56,400,660.70 65,720,609.45 41,482,074.20
MODAL KUMULATIF 32,435,190.00 7,335,707.75 22,719,505.50 32,021,219.68 56,768,527.80 105,232,623.61 147,361,596.39 193,183,655.66 249,584,316.36 315,304,925.80 356,787,000.00

*7
KEGIATAN KEGIATAN YANG MENDAHULUI WAKTU (PEKAN) BIAYA NORMAL BIAYA CRASH WAKTU NORMAL (MINGWAKTU CRASH (MINGBIAYA RELATIF (Rp./Ming)
I Pekerjaan Persiapan - 2 13,337,656.00 14671421.600.00 2 1.8 6668828.000.00000
II Pekerjaan Bongkaran dan Perbaikan Site I 2 14,632,897.00 17559476.400.00 2 1.6 7316448.500.00000
HARGA SATUAN UPAH TENAGA KERJA

NO URAIAN KODE SATUAN JUMLAH SUMBER DATA

1 Pekerja L.01 hari 91,550.00 Internet

2 Tukang L.02 hari 111,550.00 Internet

3 Kepala Tukang L.03 hari 136,550.00 Internet

4 Mandor L.04 hari 151,550.00 Internet

5 Sopir L10 bulan 3,000,000.00 Internet

6 Sopir L10 hari 100,000.00 Internet


HARGA SATUAN MATERIAL / BAHAN
NO KODE Uraian Pekerjaan SAT HARGA
A BAHAN ALAM
1 A.01 Batu Pecah 2/3 cm m3 140,000.00
2 A.02 Batu Belah Pondasi m3 120,000.00
3 A.03 Tanah Urug m3 71,747.00
4 A.04 Pasir Urug m3 170,000.00
5 A.05 Pasir Pasang m3 135,800.00
6 A.06 Pasir Beton m3 215,000.00
7 A.07 Abu Batu m3 112,500.00
8 A.08 Kerikil beton m3 205,000.00
B SEMEN
9 B.01 Semen PC zak 60,000.00
10 B.02 Semen Warna kg 6,240.00
C BATUAN
11 C.01 Bata Merah Bakar Kelas I bh 900.00
12 C.02 Kerb bh 90,525.00
13 C.03 Paving Block Cisangkan t=8 cm m2 137,500.00
14 C.04 Kansteen Paving Block m1 27,000.00
15 C.05 Tali air Batu Sikat 10 cm m2 113,380.79
16 C.06 Lantai Batu Sikat m2 113,380.79
17 C.07 Dinding Batu Sikat m2 113,380.79
D KAYU
Kayu Balok Klas II Lokal / rasamala/ kruing, m3 2,000,000.00
18 D.01 papan
Kayu Balok Klas II Lokal / papan kamper m3 8,000,000.00
19 D.02 samarinda

20 D.03 Kayu Albasia m3 1,850,750.00


21 D.04 Kayu Dolken dia 8-10/400 cm btg 29,000.00
22 D.05 Multiplek tebal 9 mm lbr 124,000.00
23 D.06 Multiplek tebal 12 mm lbr 155,000.00
24 D.07 Plywood 9 mm, uk. 1,20 x 2,40 lbr 150,750.00
25 D.08 Kayu Terentang m3 2,206,130.00
26 D.09 Kayu kelas III m3 1,960,750.00
27 D.10 Kayu 5/7 m3 2,785,714.00
28 D.11 Kayu papan 2/20 m3 3,350,000.00
E BESI
29 E.01 Besi Beton U. 24 kg 10,135.00
30 E.02 Besi Beton U. 32 kg 10,135.00
31 E.03 IWF Ex DN SII kg 10,660.00
32 E.04 Plat Besi 8mm kg 16,200.00
33 E.05 Kawat Beton kg 20,000.00
34 E.06 Paku kg 21,000.00
35 E.07 Sekrup kg 15,550.00
36 E.08 Besi beton polos kg 13,090.00
37 E.09 Bore pile dia. 40 cm m1 180,000.00
38 E.10 Besi 8 Dia. 16 kg 16,000.00
39 E.11 Sengkang Ø 8 kg 15,600.00
40 E.12 Besi D 10 - 150 kg 66,550.00
41 E.13 Besi D 16-150 kg 66,550.00
42 E.14 Baud Angkur 4 m16 (panjang 15 cm) bh 22,500.00
43 E.15 Siku metal furing m 47,883.00
44 E.16 Canal C metal furing m 81,967.00
45 E.17 Paku Ramset + missiu m 8,125.00
F PELUMAS
46 F.01 Minyak Bekisting ltr 20,000.00
47 F.02 Solar ltr 7,500.00
48 F.03 Minyak Pelumas ltr 33,000.00
49 F.04 Steger ls 1,000.00
G PENGECATAN
50 G.01 Cat Tembok ex. ICI CATYLAC (INTERIOR) kg 23,800.00
51 G.02 Cat Tembok ex. ICI CATYLAC (EKTERIOR) kg 23,800.00
52 G.03 Water Profing Emulsion kg 52,000.00
53 G.04 Plamir tembok SANLEX kg 21,200.00
54 G.05 Amplas lbr 4,500.00
55 G.06 Kwas 3 " bh 11,000.00
H BETON
56 H.01 Beton K-350 m3 900,000.00
57 H.02 Lantai kerja beton K - 100 m3 830,500.00
I PIPA
58 I.01 Pipa medium 2" Galvanis btg 475,000.00
59 I.02 Pipa medium 1" Galvanis btg 225,000.00
J ORNAMEN
60 J.01 Kaca Patri (Kuningan) Tebal 3mm m2 1,750,000.00
61 J.02 Sealent kg 26,500.00
62 J.03 Panel GRC ( tebal 9 mm ) m2 140,800.00
63 J.04 Panel GRC ( tebal 10 mm ) m2 140,800.00
64 J.05 Panel GRC ( tebal 12 mm ) m2 140,800.00
65 J.06 Profil GRC m1 40,920.00
66 J.07 Granit m2 1,500,000.00
67 J.08 Patung Maung Bandung (Bahan Resin) unit 875,000.00
68 J.09 Ornamen Sate unit 110,000.00
69 J.10 Plakat Granit Hitam Bintik Emas (Galaxy) bh 180,000.00
70 J.11 Cincin Kolom (Bahan Resin) bh 80,000.00
71 J.12 Joint taep @ 75 m roll 11,000.00
72 J.13 Jointing coumpond kg 175,000.00
73 J.14 Jam diameter 50cm unit 65,000.00
K PEKERJAAN TAMAN DAN LAIN-LAIN
74 K.01 Urugan tanah m3 41,555.00
75 K.02 Tanah gembur m3 113,135.00
76 K.03 Pupuk kompos 5kg 9,100.00
77 K.04 Pupuk kompos 1 kg 1,820.00
78 K.05 Gebalan rumput m2 21,266.00
Administrasi dan Dokumentasi (laporan,Foto
79 K.06 ls
Proyek) 500,000.00
80 K.07 Papan Nama Proyek (bahan spanduk outdoor) m2 350,000.00
81 K.08 Kawat las listrik kg 61,000.00
82 K.09 Pengelasan 10 cm 45,836.00
83 K.10 Pengelasan 1 cm 4,583.60
84 K.11 Baligho m2 28,000.00
85 K.12 Pengerolan Pipa bh 2,500.00
86 K.13 LED Strip mtr 10,000.00
87 K.14 Sewa Alat Untuk Perakitan jam 50,000.00

HARGA SATUAN MATERIAL / BAHAN ELEKTRIKAL


NO KODE URAIAN PEKERJAAN SAT HARGA
1 M.01 NYY 3x2.5 mm2 Prima m 26,500.00
2 M.02 NYFGBY 2 x 4 m 2,574.00
3 M.03 Lasdop bh 300.00
4 M.04 Pipa Conduit 20 mm2 m 7,500.00
5 M.05 Sock Conduit 20 mm2 bh 650.00
6 M.06 Klem Conduit 20 mm2 bh 650.00
7 M.07 Fisher + cung 6 mm bh 8,000.00
8 M.08 Isolasi roll 9,500.00
9 M.09 Floodlight 40 W bh 340,000.00
10 M.10 Floodlight 20 W bh 236,000.00
11 M.11 Spotlight LED 12 W bh 120,000.00
12 M.12 Spotlight LED 9 W bh 90,000.00
13 M.13 Spotlight LED 6 W bh 60,000.00
14 M.14 Spotlight LED 3 W bh 40,000.00
15 M.15 Bohlam LED 23 W bh 70,000.00
16 M.16 Bohlam LED 9 W bh 30,000.00
17 M.17 Fitting lampu bh 8,000.00
18 M.18 MCB 4A bh 44,000.00
19 M.19 MCB 2A bh 44,000.00
20 M.20 Panel 40x30x15 cm bh 270,000.00
21 M.21 Kabel BC 4 mm2 mtr 7,500.00
22 M.22 Kabel BC 50 mm2 mtr 40,500.00
23 M.23 Penangkal Petir Splitzen 30 cm bh 170,000.00
24 M.24 Penangkal Petir Splitzen 50 cm bh 260,000.00
25 M.25 Batang grounding GIP 1" mtr 185,000.00
26 M.26 Boring batang grounding ttk 1,050,000.00
27 M.27 KWH Meter bh 1,200,000.00
28 M.28 Fotosel 3 A bh 79,000.00
29 M.29 Instalasi Sambungan 900 VA lot 3,050,000.00
32 M.30 Biaya SLO lot 70,000.00
33 M.31 Surge Arester 40 KA bh 105,000.00
34 M.32 Pembuatan Bak Kontrol bh 475,000.00
35 M.33 Box Panel 30 x40 x15 cm bh 170,000.00
36 M.34 Pipa Galvanis 2" mtr 107,500.00
37 M.35 Tralis Lampu bh
38 M.36 kap lampu kaca patri bh
39 M.37 Alat bantu ls 40,110.00
KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

I PEKERJAAN PERSIAPAN
1 1 M2 Membersihkan lapangan dan perataan (SNI 2013)
Tenaga 0.1 oh Pekerja Rp 91,550.00 9,155.00
0.05 oh Mandor Rp 151,550.00 7,577.50
Jumlah 16,732.50
Jasa pelaksanaan maks. 10 % (overhead dan 1,673.25
profit)
Jumlah dibulatkan 18,400.00
2 1 M1 Pengukuran dan Pemasangan Bouwplank (SNI 2013)
Bahan 0.012 M3 Kayu 5/7 Rp 2,785,714.00 33,428.57
0.02 kg Paku biasa 2" - 5" Rp 21,000.00 420.00
0.007 M3 Kayu Papan 2/20 Rp 3,350,000.00 23,450.00
Tenaga 0.1 oh Tukang Kayu Rp 111,550.00 11,155.00
0.1 oh Pekerja Rp 91,550.00 9,155.00
0.01 oh Kepala Tukang Rp 136,550.00 1,365.50
0.005 oh Mandor Rp 151,550.00 757.75
Jumlah 79,731.82
Jasa pelaksanaan maks. 10 % (overhead dan 7,973.18
profit)
Jumlah dibulatkan 87,700.00
3 1 M1 Pembuatan Pagar Pembuatan Pagar Sementara dari Baligho Tinggi 2 meter
Bahan 1.25 btg Kayu Dolken dia 8-10/400 cm Rp 29,000.00 36,250.00
2 m2 Baligho Rp 28,000.00 56,000.00
0.02 m³ Kayu Albasia 5/7 (ikat) Rp 2,785,714.00 55,714.28
0.06 kg Paku Biasa 2" - 5" Rp 21,000.00 1,260.00
Tenaga 0.4 oh Pekerja Rp 91,550.00 36,620.00
0.2 oh Tukang Kayu Rp 111,550.00 22,310.00
0.02 oh Kepala Tukang Rp 136,550.00 2,731.00
0.02 oh Mandor Rp 151,550.00 3,031.00
Jumlah 213,916.28
Jasa pelaksanaan maks. 10 % (overhead dan 21,391.63
profit)
Jumlah dibulatkan 235,300.00
II PEKERJAAN BONGKARAN
4 1 M2 Bongkaran Lantai Keramik
Tenaga 0.05 oh Pekerja Rp 91,550.00 4,577.50
0.01 oh Mandor Rp 151,550.00 1,515.50
Jumlah 6,093.00
Jasa pelaksanaan maks. 10 % (overhead dan 609.30
profit)
Jumlah dibulatkan 6,700.00
5 1 M2 Bongkaran Keramik Dinding
Tenaga 0.05 oh Pekerja Rp 91,550.00 4,577.50
0.025 oh Mandor Rp 151,550.00 3,788.75
5

Jumlah 8,366.25
Jasa pelaksanaan maks. 10 % (overhead dan 836.63
profit)
Jumlah dibulatkan 9,200.00
6 1 M1 Bongkaran Kerb
Tenaga 0.17 oh Pekerja Rp 91,550.00 15,563.50
0.015 oh Tukang Rp 111,550.00 1,673.25
Jumlah 17,236.75
Jasa pelaksanaan maks. 10 % 1,723.68
Jumlah dibulatkan 18,900.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

III PEKERJAAN TANAH DAN PASIR


7 1 M3 Galian tanah biasa sedalam 1 m (SNI 2013)
Tenaga 0.75 oh Pekerja Rp 91,550.00 68,662.50
0.025 oh Mandor Rp 151,550.00 3,788.75
Jumlah 72,451.25
Jasa pelaksanaan maks. 10 % 7,245.13
Jumlah dibulatkan 79,600.00
8 1 M3 Galian tanah biasa sedalam 2 m (SNI 2013)
Tenaga 0.9 oh Pekerja Rp 91,550.00 82,395.00
0.045 oh Mandor Rp 151,550.00 6,819.75
Jumlah 89,214.75
Jasa pelaksanaan maks. 10 % 8,921.48
Jumlah dibulatkan 98,100.00
9 1 M3 Pembuangan tanah sejauh 30 meter (SNI 2013)
Tenaga 0.33 oh Pekerja Rp 91,550.00 30,211.50
0.01 oh Mandor Rp 151,550.00 1,515.50
Jumlah 31,727.00
Jasa pelaksanaan maks. 10 % 3,172.70
Jumlah dibulatkan 34,800.00
10 1 M3 Pengurugan kembali galian tanah (SNI 2013)
Tenaga 0.5 oh Pekerja Rp 91,550.00 45,775.00
0.05 oh Mandor Rp 151,550.00 7,577.50
Jumlah 53,352.50
Jasa pelaksanaan maks. 10 % 5,335.25
Jumlah dibulatkan 58,600.00
11 1 M3 Pengurugan dengan pasir urug (SNI 2013)
Bahan 1.2 M3 Pasir urug Rp 110,500.00 132,600.00
Tenaga 0.3 oh Pekerja Rp 99,000.00 29,700.00
0.01 oh Mandor Rp 159,000.00 1,590.00
Jumlah 163,890.00
Jasa pelaksanaan maks. 10 % 16,389.00
Jumlah dibulatkan 180,200.00
12 1 M3 Urugan Tanah (SNI 2013)
Bahan 1 M3 Tanah Urug Rp -
Tenaga 0.5 oh Pekerja Rp 91,550.00 45,775.00
0.05 oh Mandor Rp 151,550.00 7,577.50
Jumlah 53,352.50
Jasa pelaksanaan maks. 10 % 5,335.25
Jumlah dibulatkan 58,600.00
IV HARGA SATUAN PEKERJAAN BETON
13 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 +2) cm, w/c = 0,87 (SNI 2013)
Bahan 4.94 Zak Semen Rp 60,000.00 296,400.00
0.6207 M3 Pasir beton Rp 215,000.00 133,450.50
0.55 M3 Batu pecah 2/3 Rp 140,000.00 77,000.00
Tenaga 1.65 oh Pekerja Rp 91,550.00 151,057.50
0.275 oh Tukang Batu Rp 111,550.00 30,676.25
0.028 oh Kepala Tukang Rp 136,550.00 3,823.40
0.083 oh Mandor Rp 151,550.00 12,578.65
Jumlah 704,986.30
Jasa pelaksanaan maks. 10 % 70,498.63
Jumlah dibulatkan 775,400.00
14 1 m3 beton mutu f’c = 29,05 MPa (K 350), slump (12 +2) cm, w/c = 0,48 (SNI 2013)
Bahan 8.26 Zak Semen Rp 60,000.00 495,600.00
0.4764 M3 Pasir beton Rp 215,000.00 102,426.00
0.556 M3 Batu pecah 2/3 Rp 140,000.00 77,840.00
Tenaga 1.65 oh Pekerja Rp 99,000.00 163,350.00
0.0275 oh Tukang Batu Rp 136,297.67 3,748.19
0.028 oh Kepala Tukang Rp 152,963.13 4,282.97
0.083 oh Mandor Rp 159,000.00 13,197.00
Jumlah 860,444.15
Jasa pelaksanaan maks. 10 % 86,044.42
Jumlah dibulatkan 946,400.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

15 1 KG Pembesian dengan besi polos U 24 (SNI 2013)


Bahan 1.05 kg Besi Beton U 24 Rp 10,135.00 10,641.75
0.015 kg Kawat beton Rp 20,000.00 300.00
Tenaga 0.007 oh Pekerja Rp 91,550.00 640.85
0.007 oh Tukang Batu Rp 111,550.00 780.85
0.0007 oh Kepala Tukang Rp 136,550.00 95.59
0.0004 oh Mandor Rp 151,550.00 60.62
Jumlah 12,519.66
Jasa pelaksanaan maks. 10 % 1,251.97
Jumlah dibulatkan 13,700.00
16 1 KG Pembesian dengan besi U 32 (SNI 2013)
Bahan 1.05 kg Besi Beton U 32 Rp 10,135.00 10,641.75
0.015 kg Kawat beton Rp 20,000.00 300.00
Tenaga 0.007 oh Pekerja Rp 91,550.00 640.85
0.007 oh Tukang Batu Rp 111,550.00 780.85
0.0007 oh Kepala Tukang Rp 136,550.00 95.59
0.0004 oh Mandor Rp 151,550.00 60.62
Jumlah 12,519.66
Jasa pelaksanaan maks. 10 % 1,251.97
Jumlah dibulatkan 13,700.00
17 1 M2 Membuat Bekisting Pondasi (2X Pemakaian) (SNI 2013)
Bahan 0.04 M3 Kayu papan terentang Rp 2,206,130.00 88,245.20
0.3 kg Paku biasa Rp 21,000.00 6,300.00
0.1 lt Minyak Bekisting Rp 20,000.00 2,000.00
Tenaga 0.52 oh Pekerja Rp 91,550.00 47,606.00
0.26 oh Tukang Kayu Rp 111,550.00 29,003.00
0.026 oh Kepala Tukang Rp 136,550.00 3,550.30
0.026 oh Mandor Rp 151,550.00 3,940.30
Jumlah 180,644.80
Jasa pelaksanaan maks. 10 % 18,064.48
Jumlah dibulatkan 2 x Pakai 198,700.00
18 1 M2 Membuat Bekisting Sloof (2X Pemakaian) (SNI 2013)
Bahan 0.045 M3 Kayu papan terentang Rp 2,206,130.00 99,275.85
0.3 kg Paku biasa Rp 21,000.00 6,300.00
0.1 lt Minyak Bekisting Rp 20,000.00 2,000.00
Tenaga 0.52 oh Pekerja Rp 91,550.00 47,606.00
0.26 oh Tukang Kayu Rp 111,550.00 29,003.00
0.026 oh Kepala Tukang Rp 136,550.00 3,550.30
0.026 oh Mandor Rp 151,550.00 3,940.30
Jumlah 191,675.45
Jasa pelaksanaan maks. 10 % 19,167.55
Jumlah dibulatkan 2 x Pakai 210,800.00
19 1 M2 Membuat Bekisting Kolom (2X Pemakaian) (SNI 2013)
Bahan 0.04 M3 Kayu papan terentang Rp 2,206,130.00 88,245.20
0.4 kg Paku biasa Rp 21,000.00 8,400.00
0.2 lt Minyak Bekisting Rp 20,000.00 4,000.00
0.015 m3 Balok Kayu Kelas III Rp 1,960,750.00 29,411.25
0.35 lbr Playwood tebal 9 mm Rp 150,750.00 52,762.50
2 Btg Dolken kayu dia 8-10/400 cm Rp 29,000.00 58,000.00
Tenaga 0.66 oh Pekerja Rp 91,550.00 60,423.00
0.33 oh Tukang Kayu Rp 111,550.00 36,811.50
0.033 oh Kepala Tukang Rp 136,550.00 4,506.15
0.033 oh Mandor Rp 151,550.00 5,001.15
Jumlah 347,560.75
Jasa pelaksanaan maks. 10 % 34,756.08
Jumlah dibulatkan 2 x Pakai 382,300.00
20 1 M2 Membuat Bekisting Balok (2X Pemakaian) (SNI 2013)
Bahan 0.04 M3 Kayu papan terentang Rp 2,206,130.00 88,245.20
0.4 kg Paku biasa Rp 21,000.00 8,400.00
0.2 lt Minyak Bekisting Rp 20,000.00 4,000.00
0.018 m3 Balok Kayu Kelas III Rp 1,960,750.00 35,293.50
0.35 lbr Playwood tebal 9 mm Rp 150,750.00 52,762.50
1 ls alat steger Rp 1,000.00 1,000.00
Tenaga 0.66 oh Pekerja Rp 91,550.00 60,423.00
0.33 oh Tukang Kayu Rp 111,550.00 36,811.50
0.033 oh Kepala Tukang Rp 136,550.00 4,506.15
0.033 oh Mandor Rp 151,550.00 5,001.15
Jumlah 296,443.00
Jasa pelaksanaan maks. 10 % 29,644.30
Jumlah dibulatkan 2 x Pakai 326,000.00
21 1 M2 Membuat Bekisting Untuk Lantai (2X Pemakaian) (SNI 2013)
Bahan 0.04 M3 Kayu papan terentang Rp 2,206,130.00 88,245.20
0.4 kg Paku biasa Rp 21,000.00 8,400.00
0.2 lt Minyak Bekisting Rp 20,000.00 4,000.00
0.015 m3 Balok Kayu Kelas III Rp 1,960,750.00 29,411.25
0.35 lbr Playwood tebal 9 mm Rp 150,750.00 52,762.50
1 ls alat steger Rp 1,000.00 1,000.00
Tenaga 0.66 oh Pekerja Rp 91,550.00 60,423.00
0.33 oh Tukang Kayu Rp 111,550.00 36,811.50
0.033 oh Kepala Tukang Rp 136,550.00 4,506.15
0.033 oh Mandor Rp 151,550.00 5,001.15
Jumlah 290,560.75
Jasa pelaksanaan maks. 10 % 29,056.08
Jumlah dibulatkan 2 x Pakai 319,600.00
22 1 M2 Membuat Bekisting Untuk Dinding (2X Pemakaian) (SNI 2013)
Bahan 0.0133 M3 Kayu papan terentang Rp 2,206,130.00 29,341.53
0.4 kg Paku biasa Rp 21,000.00 8,400.00
0.2 lt Minyak Bekisting Rp 20,000.00 4,000.00
0.005 m3 Balok Kayu Kelas III Rp 1,960,750.00 9,803.75
0.1167 lbr Playwood tebal 12 mm Rp 155,000.00 18,088.50
1 ls alat steger Rp 1,000.00 1,000.00
Tenaga 0.66 oh Pekerja Rp 91,550.00 60,423.00
0.33 oh Tukang Kayu Rp 111,550.00 36,811.50
0.033 oh Kepala Tukang Rp 136,550.00 4,506.15
0.033 oh Mandor Rp 151,550.00 5,001.15
Jumlah 177,375.58
Jasa pelaksanaan maks. 10 % 17,737.56
Jumlah dibulatkan 2 x Pakai 195,100.00
23 1 M1 Membuat Ring Balok beton bertulang (10x15 cm) (SNI 2013)
Bahan 0.003 M3 Kayu Kelas III Rp 1,960,750.00 5,882.25
0.02 kg Paku biasa Rp 21,000.00 420.00
3.6 kg Besi Beton Polos Rp 13,090.00 47,124.00
0.05 kg Kawat Beton Rp 20,000.00 1,000.00
0.11 zak Semen Portland Rp 60,000.00 6,600.00
0.009 M3 Pasir Beton Rp 215,000.00 1,935.00
0.015 M3 Kerikil Beton Rp 205,000.00 3,075.00
Tenaga 0.297 oh Pekerja Rp 91,550.00 27,190.35
0.033 oh Tukang Batu Rp 111,550.00 3,681.15
0.033 oh Tukang Kayu Rp 111,550.00 3,681.15
0.033 oh Tukang Besi Rp 111,550.00 3,681.15
0.01 oh Kepala Tukang Rp 136,550.00 1,365.50
0.015 oh Mandor Rp 151,550.00 2,273.25
Jumlah 107,908.80
Jasa pelaksanaan maks. 10 % 10,790.88
Jumlah dibulatkan 118,600.00
24 1 M1 Membuat Kolom Praktis Beton Bertulang (11x11 cm) (SNI 2013)
Bahan 0.003 M3 Kayu Kelas III Rp 1,960,750.00 5,882.25
0.02 kg Paku biasa Rp 21,000.00 420.00
3.6 kg Besi Beton Polos Rp 13,090.00 47,124.00
0.05 kg Kawat Beton Rp 20,000.00 1,000.00
0.11 zak Semen Portland Rp 60,000.00 6,600.00
0.009 M3 Pasir Beton Rp 215,000.00 1,935.00
0.015 M3 Kerikil Beton Rp 205,000.00 3,075.00
Tenaga 0.18 oh Pekerja Rp 91,550.00 16,479.00
0.02 oh Tukang Batu Rp 111,550.00 2,231.00
0.02 oh Tukang Kayu Rp 111,550.00 2,231.00
0.02 oh Tukang Besi Rp 111,550.00 2,231.00
0.006 oh Kepala Tukang Rp 136,550.00 819.30
0.009 oh Mandor Rp 151,550.00 1,363.95
Jumlah 91,391.50
Jasa pelaksanaan maks. 10 % 9,139.15
Jumlah dibulatkan 100,500.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

V PEKERJAAN PASANGAN
25 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps (SNI 2013)
Bahan 70 Bh Batu bata merah ( lokal ) Rp 900.00 63,000.00
0.1936 zak Semen Rp 60,000.00 11,616.00
0.045 M3 Pasir pasang Rp 135,800.00 6,111.00
Tenaga 0.3 oh Pekerja Rp 91,550.00 27,465.00
0.1 oh Tukang batu Rp 111,550.00 11,155.00
0.01 oh Kepala Tukang Rp 136,550.00 1,365.50
0.015 oh Mandor Rp 151,550.00 2,273.25
Jumlah 122,985.75
Jasa pelaksanaan maks. 10 % 12,298.58
Jumlah dibulatkan 135,200.00
26 1 M3 Pasangan Batu Belah 1Pc : 5 Ps (SNI 2013)
Bahan 1.2 m3 Batu Belah Pondasi Rp 120,000.00 144,000.00
2.72 zak Semen PC 50kg Rp 60,000.00 163,200.00
0.544 m3 Pasir Pasang Rp 135,800.00 73,875.20
Tenaga 1.5 oh Pekerja Rp 91,550.00 137,325.00
0.75 oh Tukang batu Rp 111,550.00 83,662.50
0.075 oh Kepala Tukang Rp 136,550.00 10,241.25
0.075 oh Mandor Rp 151,550.00 11,366.25
Jumlah 623,670.20
Jasa pelaksanaan maks. 10 % 62,367.02
Jumlah dibulatkan 686,000.00
27 1 M3 Pasangan Batu Kosong (Anstamping) (SNI 2013)
Bahan 1.2 m3 Batu Belah Pondasi Rp 120,000.00 144,000.00
0.432 m3 Pasir Urug Rp 170,000.00 73,440.00
Tenaga 1.5 oh Pekerja Rp 91,550.00 137,325.00
0.75 oh Tukang batu Rp 111,550.00 83,662.50
0.075 oh Kepala Tukang Rp 136,550.00 10,241.25
0.075 oh Mandor Rp 151,550.00 11,366.25
Jumlah 460,035.00
Jasa pelaksanaan maks. 10 % 46,003.50
Jumlah dibulatkan 506,000.00
VPEKERJAAN PLESTERAN
28 I 1 M2 Pemasangan Acian (SNI 2013)
Bahan 0.065 zak Semen Rp 60,000.00 3,900.00
Tenaga 0.2 oh Pekerja Rp 91,550.00 18,310.00
0.1 oh Tukang batu Rp 111,550.00 11,155.00
0.01 oh Kepala Tukang Rp 136,550.00 1,365.50
0.01 oh Mandor Rp 151,550.00 1,515.50
Jumlah 36,246.00
Jasa pelaksanaan maks. 10 % 3,624.60
Jumlah dibulatkan 39,800.00
29 1 M2 Pemasangan Plesteran 1 PC : 3 PP tebal 15 mm (SNI 2013)
Bahan 0.1555 zak Semen Rp 60,000.00 9,330.00
0.023 M3 Pasir pasang Rp 135,800.00 3,123.40
29

Tenaga 0.3 oh Pekerja Rp 91,550.00 27,465.00


0.15 oh Tukang batu Rp 111,550.00 16,732.50
0.015 oh Kepala Tukang Rp 136,550.00 2,048.25
0.015 oh Mandor Rp 151,550.00 2,273.25
Jumlah 60,972.40
Jasa pelaksanaan maks. 10 % 6,097.24
Jumlah dibulatkan 67,000.00
30 1 M2 Pemasangan Plesteran 1 PC : 5 PP tebal 15 mm (SNI 2013)
Bahan 0.1037 zak Semen Rp 60,000.00 6,222.00
0.026 M3 Pasir pasang Rp 135,800.00 3,530.80
Tenaga 0.3 oh Pekerja Rp 91,550.00 27,465.00
0.15 oh Tukang batu Rp 111,550.00 16,732.50
0.015 oh Kepala Tukang Rp 136,550.00 2,048.25
0.015 oh Mandor Rp 151,550.00 2,273.25
Jumlah 58,271.80
Jasa pelaksanaan maks. 10 % 5,827.18
Jumlah dibulatkan 64,000.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

VII PEKERJAAN PENGECATAN


31 1 M2 Pengecatan tembok baru ex. ICI (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) EKSTERIOR (SNI
Bahan 0.36 kg Cat tembok ex. ICI CATYLAC Rp 23,800.00 8,568.00
0.1 kg Plamir Rp 21,200.00 2,120.00
Tenaga 0.02 oh Pekerja Rp 91,550.00 1,831.00
0.063 oh Tukang Cat Rp 111,550.00 7,027.65
0.0063 oh Kepala Tukang Rp 136,550.00 860.27
0.003 oh Mandor Rp 151,550.00 454.65
Jumlah 20,861.57
Jasa pelaksanaan maks. 10 % 2,086.16
Jumlah dibulatkan 22,900.00
I PEKERJAAN BESI
32 X1 M1 Pemasangan Pipa Galvanis 2"
Bahan 0.1667 btg Pipa GI Medium Class dia 1" Rp 225,000.00 37,507.50
1 ls Accessories (35% x bahan) Rp 78,750.00 78,750.00
Tenaga 0.135 oh Pekerja Rp 91,550.00 12,359.25
0.225 oh Tukang Rp 111,550.00 25,098.75
0.023 oh Kepala Tukang Rp 136,550.00 3,140.65
0.007 oh Mandor Rp 151,550.00 1,060.85
Jumlah 157,917.00
Jasa pelaksanaan maks. 10 % 15,791.70
Jumlah dibulatkan 173,700.00
33 1 M1 Pemasangan Pipa Galvanis 1"
Bahan 0.1667 btg Pipa GI Medium Class dia 1" Rp 225,000.00 37,507.50
1 ls Accessories (35% x bahan) Rp 78,750.00 78,750.00
Tenaga 0.135 oh Pekerja Rp 91,550.00 12,359.25
0.225 oh Tukang Rp 111,550.00 25,098.75
0.023 oh Kepala Tukang Rp 136,550.00 3,140.65
0.007 oh Mandor Rp 151,550.00 1,060.85
Jumlah 157,917.00
Jasa pelaksanaan maks. 10 % 15,791.70
Jumlah dibulatkan 173,700.00
34 1 cm1 Pengelasan
Bahan 0.04 kg Kawat Las Listrik Rp 61,000.00 2,440.00
0.03 liter Solar Rp 7,500.00 225.00
0.004 liter Pelumas Rp 33,000.00 132.00
Tenaga 0.004 oh Pekerja Rp 91,550.00 366.20
0.002 oh Tukang Rp 111,550.00 223.10
0.0002 oh Kepala Tukang Rp 136,550.00 27.31
0.0002 oh Mandor Rp 151,550.00 30.31
Jumlah 3,443.92
Jasa pelaksanaan maks. 10 % 344.39
Jumlah dibulatkan 3,700.00
35 1 KG Pemasangan Besi WF
Bahan 1.05 kg IWF Ex. DN SII Rp 10,660.00 11,193.00
Tenaga 0.06 oh Pekerja Rp 91,550.00 5,493.00
0.06 oh Tukang Rp 111,550.00 6,693.00
0.006 oh Kepala Tukang Rp 151,550.00 909.30
0.003 oh Mandor Rp 151,550.00 454.65
Jumlah 24,742.95
Jasa pelaksanaan maks. 10 % 2,474.30
Jumlah dibulatkan 27,200.00
36 1 KG Pemasangan Plat Bes
Bahan 1.05 kg Plat Besi 8 mm Rp 16,200.00 17,010.00
Tenaga 0.06 oh Pekerja Rp 91,550.00 5,493.00
0.06 oh Tukang Rp 111,550.00 6,693.00
0.006 oh Kepala Tukang Rp 136,550.00 819.30
0.003 oh Mandor Rp 151,550.00 454.65
Jumlah 30,469.95
Jasa pelaksanaan maks. 10 % 3,047.00
Jumlah dibulatkan 33,500.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

37 100 kg Pekerjaan Perakitan Baja (SNI 2013)


Bahan 1 ltr Solar Rp 7,500.00 7,500.00
0.1 ltr Minyak Pelumas Rp 33,000.00 3,300.00
0.8 jam Sewa Alat Rp 55,000.00 44,000.00
Tenaga 0.1 oh Pekerja Rp 91,550.00 9,155.00
0.01 oh Tukang Besi Rp 111,550.00 1,115.50
0.001 oh Kepala Tukang Besi Rp 136,550.00 136.55
0.005 oh Mandor Rp 151,550.00 757.75
Jumlah 55,164.80
Jasa pelaksanaan maks. 10 % 5,516.48
Jumlah dibulatkan 60,600.00
XPEKERJAAN LAIN-LAIN
38 1 M2 Pemasangan Panel GRC 9mm
Bahan 1.1 m2 Panel GRC 9mm Rp 140,800.00 154,880.00
4 m Siku metal furing Rp 47,883.00 191,532.00
2 m Canal C metal furing Rp 81,967.00 163,934.00
4 bh Paku ramset+misiu Rp 8,125.00 32,500.00
0.1429 roll Joint Tape @75 m Rp 11,000.00 1,571.90
8 bh Skrup Rp 15,550.00 124,400.00
0.5 kg Jointing coumpond Rp 175,000.00 87,500.00
Tenaga 0.5 oh Pekerja Rp 91,550.00 45,775.00
0.5 oh Tukang Rp 111,550.00 55,775.00
0.05 oh Kepala Tukang Rp 136,550.00 6,827.50
0.025 oh Mandor Rp 151,550.00 3,788.75
Jumlah 868,484.15
Jasa pelaksanaan maks. 10 % 86,848.42
Jumlah dibulatkan 955,300.00
39 1 M2 Pemasangan Panel GRC 10mm
Bahan 1.1 m2 Panel GRC 10mm Rp 140,800.00 154,880.00
4 m Siku metal furing Rp 47,883.00 191,532.00
2 m Canal C metal furing Rp 81,967.00 163,934.00
4 bh Paku ramset+misiu Rp 8,125.00 32,500.00
0.1429 roll Joint Tape @75 m Rp 11,000.00 1,571.90
8 bh Skrup Rp 15,550.00 124,400.00
0.5 kg Jointing coumpond Rp 175,000.00 87,500.00
Tenaga 0.5 oh Pekerja Rp 91,550.00 45,775.00
0.5 oh Tukang Rp 111,550.00 55,775.00
0.05 oh Kepala Tukang Rp 136,550.00 6,827.50
0.025 oh Mandor Rp 151,550.00 3,788.75
Jumlah 868,484.15
Jasa pelaksanaan maks. 10 % 86,848.42
Jumlah dibulatkan 955,300.00
40 1 M2 Pemasangan Panel GRC 12mm
Bahan 1.1 m2 Panel GRC 12mm Rp 140,800.00 154,880.00
4 m Siku metal furing Rp 47,883.00 191,532.00
2 m Canal C metal furing Rp 81,967.00 163,934.00
4 bh Paku ramset+misiu Rp 8,125.00 32,500.00
0.1429 roll Joint Tape @75 m Rp 11,000.00 1,571.90
8 bh Skrup Rp 15,550.00 124,400.00
0.5 kg Jointing coumpond Rp 175,000.00 87,500.00
Tenaga 0.5 oh Pekerja Rp 99,000.00 49,500.00
0.5 oh Tukang Rp 136,297.67 68,148.84
0.05 oh Kepala Tukang Rp 152,963.13 7,648.16
0.025 oh Mandor Rp 159,000.00 3,975.00
Jumlah 885,589.89
Jasa pelaksanaan maks. 10 % 88,558.99
Jumlah dibulatkan 974,100.00
41 1 M1 Pemasangan Profil GRC (SNI 2008)
Bahan 1.05 m1 Profil GRC Rp 40,920.00 42,966.00
Tenaga 0.06 oh Pekerja Rp 91,550.00 5,493.00
0.06 oh Tukang Rp 111,550.00 6,693.00
0.006 oh Kepala Tukang Rp 136,550.00 819.30
0.003 oh Mandor Rp 151,550.00 454.65
Jumlah 56,425.95
Jasa pelaksanaan maks. 10 % 5,642.60
Jumlah dibulatkan 62,000.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

42 1 M2 Pemasangan Kaca Patri Tebal 3mm (SNI 2013)


Bahan 1.1 m2 Kaca Patri Tebal 3mm Rp 1,750,000.00 1,925,000.00
0.05 kg Sealent Rp 26,500.00 1,325.00
42

Tenaga 0.075 oh Pekerja Rp 91,550.00 6,866.25


0.15 oh Tukang Rp 111,550.00 16,732.50
0.015 oh Kepala Tukang Rp 136,550.00 2,048.25
0.004 oh Mandor Rp 151,550.00 606.20
Jumlah 1,952,578.20
Jasa pelaksanaan maks. 10 % 195,257.82
Jumlah dibulatkan 2,147,800.00
43 1 Unit Lampu Kaca Patri Taman
Bahan 0.51 kg Plat besi Rp 16,200.00 8,262.00
51 cm Pengelasan Rp 4,583.60 233,763.60
0.7 m2 Kaca patri Rp 1,750,000.00 1,225,000.00
Jumlah 1,467,025.60
Jumlah dibulatkan 1,467,000.00
44 1 Unit Lampu Kaca Patri Gerbang
Bahan 0.82 kg Plat besi Rp 16,200.00 13,284.00
82 cm Pengelasan Rp 4,583.60 375,855.20
0.56 m2 Kaca patri Rp 1,750,000.00 980,000.00
Jumlah 1,369,139.20
Jumlah dibulatkan 1,369,100.00
45 1 M1 Pemasangan Batu Pinggir Beton/Kerb Uk. 60x15x30
Bahan 1.6667 bh Batu Pinggir Beton 15x35x60 (K Rp 90,525.00 150,878.02
Tenaga 0.25 oh -Pekerja
225) Rp 91,550.00 22,887.50
0.5 oh Tukang Rp 111,550.00 55,775.00
0.025 oh Kepala Tukang Rp 136,550.00 3,413.75
0.003 oh Mandor Rp 151,550.00 454.65
Jumlah 233,408.92
Jasa pelaksanaan maks. 10 % 23,340.89
Jumlah dibulatkan 256,700.00
46 1 M1 Pemasangan Kanstein kecil 10x20x35 cm
Bahan 2.8571 m' Kaanstein Paving Block Rp 27,000.00 77,141.70
0.02 m3 Abu Batu Rp 112,500.00 2,250.00
Tenaga 0.015 oh Pekerja Rp 91,550.00 1,373.25
0.15 oh Tukang Rp 111,550.00 16,732.50
0.005 oh Kepala Tukang Rp 136,550.00 682.75
0.005 oh Mandor Rp 151,550.00 757.75
Jumlah 98,937.95
Jasa pelaksanaan maks. 10 % 9,893.80
Jumlah dibulatkan 108,800.00
47 1 M2 Pemasangan Granit
Bahan 1.1 m2 Granit Rp 1,500,000.00 1,650,000.00
9.8 kg Semen abu Rp 1,360.00 13,328.00
1.3 kg Semen Warna Rp 6,240.00 8,112.00
0.045 m3 Pasir Pasang Rp 135,800.00 6,111.00
Tenaga 0.25 oh Pekerja Rp 99,000.00 24,750.00
0.125 oh Tukang Rp 136,297.67 17,037.21
0.013 oh Kepala Tukang Rp 152,963.13 1,988.52
0.013 oh Mandor Rp 159,000.00 2,067.00
Jumlah 1,723,393.73
Jasa pelaksanaan maks. 10 % 172,339.37
Jumlah dibulatkan 1,895,800.00
48 1 M3 Pembentukan Tanah & Pembentukan Kontur
48
Bahan 0.2 m3 Tanah Gembur Rp 113,135.00 22,627.00
0.8 m3 Urugan Tanah (Tanah Rp 41,555.00 33,244.00
2 kg. Setempat)
Pupuk Kompos Rp 1,820.00 3,640.00
Tenaga 0.1 oh Pekerja Rp 91,550.00 9,155.00
0.01 oh Mandor Rp 151,550.00 1,515.50
Jumlah 70,181.50
Jasa pelaksanaan maks. 10 % 7,018.15
Jumlah dibulatkan 77,200.00

NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

49 1 M2 Penanaman Rumput Gajah mini tandur


Bahan 1 m2 Gebalan Rumput Rp 21,266.00 21,266.00
0.5 kg Pupuk Kompos Rp 1,820.00 910.00
Tenaga 0.04 oh Pekerja Rp 91,550.00 3,662.00
0.01 oh Mandor Rp 151,550.00 1,515.50
Jumlah 27,353.50
Jasa pelaksanaan maks. 10 % 2,735.35
Jumlah dibulatkan 30,100.00
50 1 M1 Tanaman Jenis Teh tehan
Bahan 6 m2 Gebalan Rumput Rp 21,266.00 127,596.00
0.248 kg Pupuk Kompos Rp 1,820.00 451.36
Tenaga 0.102 oh Pekerja Rp 91,550.00 9,338.10
0.01 oh Mandor Rp 151,550.00 1,515.50
Jumlah 169,000.96
Jasa pelaksanaan maks. 10 % 16,900.10
Jumlah dibulatkan 186,000.00
KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

ANALISA HARGA BETON

HARGA SATUAN TOTAL HARGA


URAIAN PEKERJAAN VOLUME SATUAN
RUPIAH RUPIAH

1 2 3 4 5

1 m3 sloof 15/15 cm K-225


Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 266.67 kg 13,700.00 3,653,379.00
Bekisting dengan Papan 13.33 m2 210,800.00 2,809,964.00
Jumlah 7,409,743.00
Dibulatkan 7,409,700.00
1 m3 K1 30/30 cm K-350
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 183 kg 13,700.00 2,507,100.00
Bekisting dengan Multiplek 12 20 m2 382,300.00 7,646,000.00
mm Jumlah 11,099,500.00
Dibulatkan 11,099,500.00
1 m3 K 20/30 cm K-350
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 183 kg 13,700.00 2,507,100.00
Bekisting dengan Multiplek 12 23.53 m2 382,300.00 8,995,519.00
mm Jumlah 12,449,019.00
Dibulatkan 12,449,000.00
1 m3 K 10/35 cm K-350
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 76.81 kg 13,700.00 1,052,297.00
Bekisting dengan Multiplek 12 25.71 m2 382,300.00 9,828,933.00
mm Jumlah 11,827,630.00
Dibulatkan 11,827,600.00
1 m3 Kolom K2 Ø 17 cm K-
350
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 337.01 kg 13,700.00 4,617,037.00
Bekisting dengan Multiplek 12 23.53 m2 382,300.00 8,995,519.00
mm Jumlah 14,558,956.00
Dibulatkan 14,558,900.00
1 m3 Plat Lantai t= 20 cm K-
350
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 208.32 kg 13,700.00 2,853,984.00
Bekisting dengan Multiplek 12 8.33 m2 319,600.00 2,662,268.00
mm Jumlah 6,462,652.00
Dibulatkan 6,462,600.00
1 m3 Kolom Pedestal 35/35 cm
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 225.41 kg 13,700.00 3,088,117.00
Bekisting dengan Multiplek 12 11.43 m2 382,300.00 4,369,689.00
mm Jumlah 8,404,206.00
Dibulatkan 8,404,200.00
1 m3 Kolom Pedestal 17.5/25
cm
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 219.37 kg 13,700.00 3,005,369.00
Bekisting dengan Multiplek 12 19.43 m2 382,300.00 7,428,089.00
mm Jumlah 11,379,858.00
Dibulatkan 11,379,800.00

HARGA TOTAL
URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
RUPIAH RUPIAH
1 2 3 4 5
1 m3 Balok Beton 20/40 cm
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 215.25 kg 13,700.00 2,948,925.00
Bekisting dengan Multiplek 12 12.5 m2 326,000.00 4,075,000.00
mm Jumlah 7,970,325.00
Dibulatkan 7,970,300.00
1 m3 Balok Beton 15/45 cm
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 131.85 kg 13,700.00 1,806,345.00
Bekisting dengan Multiplek 12 15.56 m2 326,000.00 5,072,560.00
mm Jumlah 7,825,305.00
Dibulatkan 7,825,300.00
1 m3 Balok Beton 20/20 cm
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 163.25 kg 13,700.00 2,236,525.00
Bekisting dengan Multiplek 12 15 m2 326,000.00 4,890,000.00
mm Jumlah 8,072,925.00
Dibulatkan 8,072,900.00
1 m3 Dinding Beton Tebal 15
cm
Beton K-350 1 m3 946,400.00 946,400.00
Besi beton 126.76 kg 13,700.00 1,736,612.00
Bekisting dengan Multiplek 12 13.33 m2 195,100.00 2,600,683.00
mm Jumlah 5,283,695.00
Dibulatkan 5,283,600.00
KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL

HARGA
NO URAIAN PEKERJAAN SAT TOTAL
MATERIAL UPAH
I. INSTALASI LISTRIK

1 Unit Pasang titik Lampu Sorot (Kabel NYY) titik


Rincian Material : 571,200.00
NYY 3x2.5 mm2 = 16 mx 26,500.00 = 424,000.00
Pipa Conduit 20 mm = 16 mx 7,500.00 = 120,000.00
Perlengkapan = 5 %x 544,000.00 = 27,200.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
611,997.10

1 Unit Pasang titik Lampu Sorot (Kabel NYFGbY) titik


Rincian Material : 169,243.20
NYFGBY 2 x 4 = 16 mx 2,574.00 = 41,184.00
Pipa Conduit 20 mm = 16 mx 7,500.00 = 120,000.00
Perlengkapan = 5 %x 161,184.00 = 8,059.20
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
210,040.30

1 Unit Pasang Floodlight 40 Watt bh


Rincian Material : 357,000.00
Floodlight 40 Watt = 1 bh x 340,000.00 = 340,000.00
Perlengkapan = 5 %x 340,000.00 = 17,000.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
397,797.10

1 Unit Pasang Floodlight 20 Watt bh


Rincian Material : 247,800.00
Floodlight 20 Watt = 1 bh x 236,000.00 = 236,000.00
Perlengkapan = 5 %x 236,000.00 = 11,800.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
288,597.10

HARGA
NO URAIAN PEKERJAAN SAT TOTAL
MATERIAL UPAH
1 Unit Pasang Bohlam 23 Watt bh
Rincian Material : 73,500.00
Bohlam LED 23 W = 1 bh x 70,000.00 = 70,000.00
Perlengkapan = 5 %x 70,000.00 = 3,500.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
114,297.10

1 Unit Pasang Bohlam 9 Watt bh


Rincian Material : 31,500.00
Bohlam LED 9 W = 1 bh x 30,000.00 = 30,000.00
Perlengkapan = 5 %x 30,000.00 = 1,500.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
72,297.10

1 Unit Pasang Spotlite 12 Watt bh


Rincian Material : 126,000.00
Spotlight LED 12 W = 1 bh x 120,000.00 = 120,000.00
Perlengkapan = 5 %x 120,000.00 = 6,000.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
166,797.10

1 Unit Pasang Spotlite 9 Watt bh


Rincian Material : 94,500.00
Spotlight LED 9 W = 1 bh x 90,000.00 = 90,000.00
Perlengkapan = 5 %x 90,000.00 = 4,500.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
135,297.10

1 Unit Pasang Spotlite 6 Watt bh


Rincian Material : 63,000.00
Spotlight LED 6 W = 1 bh x 60,000.00 = 60,000.00
Perlengkapan = 5 %x 60,000.00 = 3,000.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
103,797.10

HARGA
NO URAIAN PEKERJAAN SAT TOTAL
MATERIAL UPAH
1 Unit Pasang Spotlite 3 Watt bh
Rincian Material : 0.00
Spotlight LED 3 W = 1 bh x = 0.00
Perlengkapan = 5 %x = 0.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
40,797.10

1 Unit Pasang Titik Fotosel (Kabel NYY) titik


Rincian Material : 571,200.00
NYY 3x2.5 mm2 = 16 mx 26,500.00 = 424,000.00
Pipa Conduit 20 mm = 16 mx 7,500.00 = 120,000.00
Perlengkapan = 5 %x 544,000.00 = 27,200.00
instalasi
Tenaga : 77,776.50
Pekerja = 0.15 oh x 91,550.00 = 13,732.50
Tukang Listrik = 0.15 oh x 111,550.00 = 16,732.50
Kepala Tukang = 0.18 oh x 136,550.00 = 24,579.00
Listrik
Mandor = 0.15 oh x 151,550.00 = 22,732.50
648,976.50

1 Unit Pasang Titik Saklar fotosel (Kabel NYFGbY) titik


Rincian Material : 169,243.20
NYFGBY 2 x 4 = 16 mx 2,574.00 = 41,184.00
Pipa Conduit 20 mm = 16 mx 7,500.00 = 120,000.00
Perlengkapan = 5 %x 161,184.00 = 8,059.20
instalasi
Tenaga : 77,776.50
Pekerja = 0.15 oh x 91,550.00 = 13,732.50
Tukang Listrik = 0.15 oh x 111,550.00 = 16,732.50
Kepala Tukang = 0.18 oh x 136,550.00 = 24,579.00
Listrik
Mandor = 0.15 oh x 151,550.00 = 22,732.50
247,019.70

1 Unit Pasang Fotosel 3A bh


Rincian Material : 82,950.00
Fotosel 3 A = 1 bh x 79,000.00 = 79,000.00
Perlengkapan = 5 %x 79,000.00 = 3,950.00
instalasi
Tenaga : 9,520.55
Pekerja = 0.025 oh x 91,550.00 = 2,288.75
Tukang Listrik = 0.025 oh x 111,550.00 = 2,788.75
Kepala Tukang = 0.017 oh x 136,550.00 = 2,321.35
Listrik
Mandor = 0.014 oh x 151,550.00 = 2,121.70
92,470.55
1 Unit instalasi Sambungan 900 VA VA
Rincian Material 3,202,500
Instalasi Sambungan = 1 VA x 3,050,000 = 3,050,000
900 VA
Perlengkapan = 5 %x 3,050,000 = 152,500
instalasi
Tenaga : 30,926.25
Pekerja = 0.1 oh x 91,550.00 = 9,155.00
Tukang Listrik = 0.1 oh x 111,550.00 = 11,155.00
Kepala Tukang = 0.05 oh x 136,550.00 = 6,827.50
Listrik
Mandor = 0.025 oh x 151,550.00 = 3,788.75
3,233,426.2500

HARGA
NO URAIAN PEKERJAAN SAT TOTAL
MATERIAL UPAH

Biaya boring kabel 5 mtr


1 mtr
Rincian Material 607,110.00
Alat bantu = 1 lx 40,110.00 = 40,110.00
Alat pengebor tanah = 7 jams x 55,000.00 = 385,000.00
Mobil pick up = 7 jam x 26,000.00 = 182,000.00

Tenaga : 752,064.00
Pekerja = 3.5 oh x 91,550.00 = 320,425.00
Tukang = 1.7 oh x 111,550.00 = 189,635.00
Sopir = 0.84 oh x 136,550.00 = 114,702.00
Mandor = 0.84 oh x 151,550.00 = 127,302.00
1,359,174.00

Biaya galian tanah 4 m3


1 m3
Rincian Material 40,110.00
Alat bantu = 1 lx 40,110 = 40,110
s
Tenaga : 517,750.00
Pekerja = 4 oh x 91,550.00 = 366,200.00
Mandor = 1 oh x 151,550.00 = 151,550.00
557,860.00

Biaya SLO VA
Rincian Material 70,000.00
Biaya SLO = 1 VA x 70,000.00 = 70,000.00

Tenaga : 30,926.25
Pekerja = 0.1 oh x 91,550.00 = 9,155.00
Tukang Listrik = 0.1 oh x 111,550.00 = 11,155.00
Kepala Tukang = 0.05 oh x 136,550.00 = 6,827.50
Listrik
Mandor = 0.025 oh x 151,550.00 = 3,788.75
100,926.25

1 Unit Pasang Box Panel bh


Rincian Material : 9,642,000.00
Box Panel 30 x40 x15 = 1 bh x 170,000.00 = 170,000.00
1 Unit Pasang MCBcm 2 = 2 bh x 44,000.00 = 88,000.00
1 Unit Pasang MCBA 4 = 1 bh x 44,000.00 = 44,000.00
Surge Arester 40 A = 1 bh x 105,000.00 = 105,000.00
KA
kWh meter = 1 bh x 1,200,000.00 = 1,200,000.00
Perlengkapan = 5 %x 1,607,000 = 8,035,000.00
instalasi
Tenaga : 30,926.25
Pekerja = 0.1 oh x 91,550.00 = 9,155.00
Tukang Listrik = 0.1 oh x 111,550.00 = 11,155.00
Kepala Tukang = 0.05 oh x 136,550.00 = 6,827.50
Listrik
Mandor = 0.025 oh x 151,550.00 = 3,788.75
9,672,926.25

1 Unit Pasang Pipa Galvanis medium 2" mtr


Rincian Material : 194,250.00
Batang grounding GIP = 1 mx 185,000.00 = 185,000.00
Perlengkapan 1" = 5 %x 185,000.00 = 9,250.00
instalasi 20,304.00
Pekerja = 0.054 oh x 91,550.00 = 4,943.70
Tukang = 0.09 oh x 111,550.00 = 10,039.50
Kepala Tukang = 0.009 oh x 136,550.00 = 1,228.95
Mandor = 0.027 oh x 151,550.00 = 4,091.85
214,554.00

HARGA
NO URAIAN PEKERJAAN SAT MATERIAL UPAH TOTAL
1 Unit Pasang kabel power NYFGbY 2 x 4 mm2 mtr
Rincian Material : 2,702.70
NYFGBY 2 x 4 = 1 mx 2,574.00 = 2,574.00
Perlengkapan = 5 %x 2,574.00 = 128.70
instalasi 11,145.35
Pekerja = 0.033 oh x 91,550.00 = 3,021.15
Tukang Listrik = 0.033 oh x 111,550.00 = 3,681.15
Kepala Tukang = 0.017 oh x 136,550.00 = 2,321.35
Listrik
Mandor = 0.014 oh x 151,550.00 = 2,121.70
13,848.05

1 Unit Pasang Kabel BC 4 mm2 mtr


Rincian Material : 7,875.00
Kabel BC 4 mm2 = 1 mtr x 7,500.00 = 7,500.00
Perlengkapan = 5 %x 7,500.00 = 375.00
instalasi
Tenaga : 11,145.35
Pekerja = 0.033 oh x 91,550.00 = 3,021.15
Tukang Listrik = 0.033 oh x 111,550.00 = 3,681.15
Kepala Tukang = 0.017 oh x 136,550.00 = 2,321.35
Listrik
Mandor = 0.014 oh x 151,550.00 = 2,121.70
19,020.35

1 Unit Pasang Kabel BC 50 mm2 mtr


Rincian Material : 42,525.00
Kabel BC 50 mm = 1 mtr x 40,500.00 = 40,500.00
Perlengkapan = 5 %x 40,500.00 = 2,025.00
instalasi
Tenaga : 11,145.35
Pekerja = 0.033 oh x 91,550.00 = 3,021.15
Tukang Listrik = 0.033 oh x 111,550.00 = 3,681.15
Kepala Tukang = 0.017 oh x 136,550.00 = 2,321.35
Listrik
Mandor = 0.014 oh x 151,550.00 = 2,121.70
53,670.35

1 Unit Pasang Penangkal Petir 30 cm bh


Rincian Material : 178,500.00
Penangkal Petir = 1 bh x 170,000.00 = 170,000.00
Splitzen 30 cm
Perlengkapan = 5 %x 170,000.00 = 8,500.00
instalasi
Tenaga : 30,926.25
Pekerja = 0.1 oh x 91,550.00 = 9,155.00
Tukang Listrik = 0.1 oh x 111,550.00 = 11,155.00
Kepala Tukang = 0.05 oh x 136,550.00 = 6,827.50
Listrik
Mandor = 0.025 oh x 151,550.00 = 3,788.75
209,426.25

1 Unit Pasang Penangkal Petir 50 cm bh


Rincian Material : 273,000.00
Penangkal Petir = 1 bh x 260,000.00 = 260,000.00
Splitzen 50 cm
Perlengkapan = 5 %x 260,000.00 = 13,000.00
instalasi
Tenaga : 30,926.25
Pekerja = 0.1 oh x 91,550.00 = 9,155.00
Tukang Listrik = 0.1 oh x 111,550.00 = 11,155.00
Kepala Tukang = 0.05 oh x 136,550.00 = 6,827.50
Listrik
Mandor = 0.025 oh x 151,550.00 = 3,788.75
303,926.25

HARGA
NO URAIAN PEKERJAAN SAT MATERIAL UPAH TOTAL
1 Unit Pembuatan Bak Kontrol bh
Rincian Material 0.00
Pembuatan Bak = 1 bh x = 0.00
Kontrol
Perlengkapan = 5 %x = 0.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
40,797.10

1 unit Pengeboran batang grounding ttk


Rincian Material 3,150,000
Pengeboran tanah = 3 hr x 1,050,000 = 3,150,000
gorunding
Tenaga : 101,310.50
Pekerja = 0.61 oh x 91,550.00 = 55,845.50
Mandor = 0.3 oh x 151,550.00 = 45,465.00
3,251,310.50

1 Unit Pasang Batang Grounding GIP 1" bh


Rincian Material 194,250.00
Batang grounding = 1 bh x 185,000.00 = 185,000.00
GIP 1"
Perlengkapan = 5 %x 185,000.00 = 9,250.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.00 = 15,197.30
Tukang Listrik = 0.166 oh x 111,550.00 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.00 = 4,506.15
Listrik
Mandor = 0.017 oh x 151,550.00 = 2,576.35
235,047.10

1 Unit Pasang Tralis Lampu bh


Rincian Material 112,875.00
Pipa Galvanis 2" = 1 bh x 107,500.0 = 107,500.00
Perlengkapan = 5 %x 107,500.0 = 5,375.00
instalasi
Tenaga : 40,797.10
Pekerja = 0.166 oh x 91,550.0 = 15,197.30
Tukang = 0.166 oh x 111,550.0 = 18,517.30
Kepala Tukang = 0.033 oh x 136,550.0 = 4,506.15
Mandor = 0.017 oh x 151,550.0 = 2,576.35
153,672.10
KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

REKAPITULASI ANALISA HARGA SATUAN

NO ITEM PEKERJAAN SATUAN HARGA


PEK
ERJ
1 1 M2 Membersihkan lapangan dan perataan (SNI 2013) m² 18,400.00
AA
N2 1 M1 Pengukuran dan Pemasangan Bouwplank (SNI 2013) m 87,700.00
PER 1 M1 Pembuatan Pagar Pembuatan Pagar Sementara dari Baligho
3
SIA m
Tinggi 2 meter 235,300.00
PAN
4 1 M2 Bongkaran Lantai Keramik m² 6,700.00
5 1 M2 Bongkaran Keramik Dinding m² 9,200.00
6 1 M1 Bongkaran Kerb m 18,900.00
PEKERJAAN TANAH DAN PASIR
7 1 M3 Galian tanah biasa sedalam 1 m (SNI 2013) m³ 79,600.00
8 1 M3 Galian tanah biasa sedalam 2 m (SNI 2013) m³ 98,100.00
9 1 M3 Pembuangan tanah sejauh 30 meter (SNI 2013) m³ 34,800.00
10 1 M3 Pengurugan kembali galian tanah (SNI 2013) m³ 58,600.00
11 1 M3 Pengurugan dengan pasir urug (SNI 2013) m³ 180,200.00
12 1 M3 Urugan Tanah (SNI 2013) m³ 58,600.00
HARGA SATUAN PEKERJAAN BETON

13 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 +2) cm, w/c = m³
0,87 (SNI 2013) 775,400.00
1 m3 beton mutu f’c = 29,05 MPa (K 350), slump (12 +2) cm, w/c
14 = 0,48 (SNI 2013) m³
946,400.00
15 1 KG Pembesian dengan besi polos U 24 (SNI 2013) kg 13,700.00
16 1 KG Pembesian dengan besi U 32 (SNI 2013) kg 13,700.00
17 1 M2 Membuat Bekisting Pondasi (2X Pemakaian) (SNI 2013) m² 198,700.00
18 1 M2 Membuat Bekisting Sloof (2X Pemakaian) (SNI 2013) m² 210,800.00
19 1 M2 Membuat Bekisting Kolom (2X Pemakaian) (SNI 2013) m² 382,300.00
20 1 M2 Membuat Bekisting Balok (2X Pemakaian) (SNI 2013) m² 326,000.00

21 1 M2 Membuat Bekisting Untuk Lantai (2X Pemakaian) (SNI m²


2013) 319,600.00

22 1 M2 Membuat Bekisting Untuk Dinding (2X Pemakaian) (SNI m²


2013) 195,100.00

23 1 M1 Membuat Ring Balok beton bertulang (10x15 cm) (SNI m


2013) 118,600.00

24 1 M1 Membuat Kolom Praktis Beton Bertulang (11x11 cm) (SNI m


2013) 100,500.00
PEKERJAAN PASANGAN
1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps (SNI 2013)
25 m²
135,200.00
26 1 M3 Pasangan Batu Belah 1Pc : 5 Ps (SNI 2013) m³ 686,000.00
27 1 M3 Pasangan Batu Kosong (Anstamping) (SNI 2013) m³ 506,000.00
PEKERJAAN PLESTERAN
28 1 M2 Pemasangan Acian (SNI 2013) m² 39,800.00
29 m²
1 M2 Pemasangan Plesteran 1 PC : 3 PP tebal 15 mm (SNI 2013) 67,000.00

30 m²
1 M2 Pemasangan Plesteran 1 PC : 5 PP tebal 15 mm (SNI 2013) 64,000.00
PEKERJAAN PENGECATAN

31 1 M2 Pengecatan tembok baru ex. ICI (1 lapis plamir, 1 lapis cat m²


dasar, 2 lapis cat penutup) EKSTERIOR (SNI 22,900.00
PEKERJAAN BESI
32 1 M1 Pemasangan Pipa Galvanis 2" m 173,700.00
33 1 M1 Pemasangan Pipa Galvanis 1" m 173,700.00
34 1 cm1 Pengelasan cm 3,700.00
35 1 KG Pemasangan Besi WF kg 27,200.00
36 1 KG Pemasangan Plat Besi kg 33,500.00
37 100 kg Pekerjaan Perakitan Baja (SNI 2013) kg 60,600.00
PEKERJAAN LAIN-LAIN
38 1 M2 Pemasangan Panel GRC 9mm m² 955,300.00
39 1 M2 Pemasangan Panel GRC 10mm m² 955,300.00
40 1 M2 Pemasangan Panel GRC 12mm m² 974,100.00
41 1 M1 Pemasangan Profil GRC (SNI 2008) m 62,000.00
42 1 M2 Pemasangan Kaca Patri Tebal 3mm (SNI 2013) m² 2,147,800.00
43 1 Unit Lampu Kaca Patri Taman unit 1,467,000.00
44 1 Unit Lampu Kaca Patri Gerbang unit 1,369,100.00
45 1 M1 Pemasangan Batu Pinggir Beton/Kerb Uk. 60x15x30 m 256,700.00
46 1 M1 Pemasangan Kanstein kecil 10x20x35 cm m 108,800.00
47 1 M2 Pemasangan Granit m² 1,895,800.00
48 1 M3 Pembentukan Tanah & Pembentukan Kontur m³ 77,200.00
49 1 M2 Penanaman Rumput Gajah mini tandur m² 30,100.00
50 1 M1 Tanaman Jenis Teh tehan m 186,000.00

HARGA BETON
51 1 m3 sloof 15/15 cm K-225 m³ 7,409,700.00
52 1 m3 K1 30/30 cm K-350 m³ 11,099,500.00
53 1 m3 K 20/30 cm K-350 m³ 12,449,000.00
54 1 m3 K 10/35 cm K-350 m³ 11,827,600.00
55 1 m3 Kolom K2 Ø 17 cm K-350 m³ 14,558,900.00
56 1 m3 Plat Lantai t= 20 cm K-350 m³ 6,462,600.00
57 1 m3 Kolom Pedestal 35/35 cm m³ 8,404,200.00
58 1 m3 Kolom Pedestal 17.5/25 cm m³ 11,379,800.00
59 1 m3 Balok Beton 20/40 cm m³ 7,970,300.00
60 1 m3 Balok Beton 15/45 cm m³ 7,825,300.00
61 1 m3 Balok Beton 20/20 cm m³ 8,072,900.00
62 1 m3 Dinding Beton Tebal 15 cm m³ 5,283,600.00

ANALISA HARGA SATUAN ELEKTRIKAL


INSTALASI LISTRIK
63 1 Unit Pasang titik Lampu Sorot (Kabel NYY) titik 611,997.10
64 1 Unit Pasang titik Lampu Sorot (Kabel NYFGbY) titik 210,040.30
65 1 Unit Pasang Floodlight 40 Watt bh 397,797.10
66 1 Unit Pasang Floodlight 20 Watt bh 288,597.10
67 1 Unit Pasang Bohlam 23 Watt bh 114,297.10
68 1 Unit Pasang Bohlam 9 Watt bh 72,297.10
69 1 Unit Pasang Spotlite 12 Watt bh 166,797.10
70 1 Unit Pasang Spotlite 9 Watt bh 135,297.10
71 1 Unit Pasang Spotlite 6 Watt bh 103,797.10
72 1 Unit Pasang Spotlite 3 Watt bh 40,797.10
73 1 Unit Pasang Titik Fotosel (Kabel NYY) titik 648,976.50
74 1 Unit Pasang Titik Saklar fotosel (Kabel NYFGbY) titik 247,019.70
75 1 Unit Pasang Fotosel 3A bh 92,470.55
76 1 Unit instalasi Sambungan 900 VA VA 3233426.25
77 Biaya boring kabel mtr 1,359,174.00
78 Biaya galian tanah mtr 557,860.00
79 Biaya SLO VA 100,926.25
80 1 Unit Pasang Box Panel bh 9,672,926.25
81 1 Unit Pasang Pipa Galvanis medium 2" mtr 214,554.00
82 1 Unit Pasang kabel power NYFGbY 2 x 4 mm2 mtr 13,848.05
83 1 Unit Pasang Kabel BC 4 mm2 mtr 19,020.35
84 1 Unit Pasang Kabel BC 50 mm2 mtr 53,670.35
85 1 Unit Pasang Penangkal Petir 30 cm bh 209,426.25
86 1 Unit Pasang Penangkal Petir 50 cm bh 303,926.25
87 1 Unit Pembuatan Bak Kontrol bh 40,797.10
88 1 unit Pengeboran batang grounding titik 3,251,310.50
89 1 Unit Pasang Batang Grounding GIP 1" bh 235,047.10
90 1 Unit Pasang Tralis Lampu bh 153,672.10
HARGA JUMLAH HARGA
NO. URAIAN SATUAN VOLUME SATUAN KONTRAKTOR

(Rp.) (Rp.)
1 2 3 4 5 6
B GERBANG ISLAND JL. WASTUKENCANA - JL.
PERINTIS KEMERDEKAAN
1 SIPIL
I PEKERJAAN PERSIAPAN
1 Pembersihan lahan m2 56.75 18,400.00 1,044,200.00
2 Pengukuran dan pemasangan bouwplank m1 26.7 87,700.00 2,341,590.00
3 Administrasi dan Dokumentasi (laporan,Foto Proyek) ls 1 500,000.00 500,000.00
4 Papan Nama Proyek (bahan spanduk outdoor) m2 2 350,000.00 700,000.00
5 Pagar pengaman Proyek Bahan Baligho tinggi 2 m m1 34.56 235,300.00 8,131,968.00
6 Mobilisasi dan demobilisasi alat bore file ls 1 600,000.00 600,000.00
JUMLAH I PEKERJAAN PERSIAPAN 13,317,758.00

II PEKERJAAN BONGKARAN DAN PERBAIKAN SITE


1 Bongkaran Taman dan buang tanah bekas bongkaran m3 56.75 160,000.00 9,080,000.00
2 Bongkaran Kerb/Kansteen m1 26.71 18,900.00 504,819.00
3 Perbaikan Utilitas sekitar bekisting ls 1 5,000,000.00 5,000,000.00
JUMLAH II PEKERJAAN BONGKARAN DAN 14,584,819.00
PERBAIKAN SITE
III PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi Bore pile 4 titik dia. 40 cm m3 3.02 79,600.00 240,067.94
2 Galian Tanah Poer ukuran m3 5.40 98,100.00 529,740.00
3 Urugan Kembali Ex. Galian m3 0.72 58,600.00 42,192.00
4 Buangan Ex Galian m3 7.70 34,800.00 267,818.33
5 Pasir urug di bawah sloof dan poer m3 0.45 170,000.00 76,500.00
JUMLAH III PEKERJAAN TANAH DAN PASIR 1,156,318.27

IV PEKERJAAN PONDASI
1 Pondasi Bore pile Dia. 40 cm
- Bore pile dia. 40 cm m1 24 180,000.00 4,320,000.00
- Besi 8 Dia. 16 kg 304 16,000.00 4,864,000.00
- Sengkang Ø 8 kg 65 15,600.00 1,014,000.00
- Cor Beton K-350 m3 3 900,000.00 2,700,000.00
2 Pekerjaan Poer -
Besi D 10 - 150 kg 103.6 66,550.00 6,894,580.00
Besi D 16-150 kg 247 66,550.00 16,437,850.00
Bekisting m2 7.2 198,700.00 1,430,640.00
Cor Beton K-350 m3 5.4 900,000.00 4,860,000.00
3 Lantai Kerja di bawah pondasi dan sloof m3 0.9 830,500.00 747,450.00
JUMLAH IV PEKERJAAN PONDASI 43,268,520.00

V PEKERJAAN STRUKTUR
1 Sloop 15/15 cm K-225 m3 0.00 7,409,700.00 -
2 Dinding Beton Tebal 15 cm m3 0.00 5,283,600.00 -
3 Kolom Praktis Beton (11/11 cm) m1 16 100,500.00 1,608,000.00
4 Balok Praktis 10/15 m1 0.00 118,600.00 -
5 Kolom K1 30/30 cm k-350 m3 0.79 11,099,500.00 8,790,804.00
6 Kolom 20x20 cm m3 0.58 12,449,000.00 7,170,624.00
7 Kolom 10x35 cm m3 0.90 11,827,600.00 10,597,529.60
8 Kolom K3 Ø 17 cm k-350 m3 0.36 14,558,900.00 5,241,204.00
9 Balok B1 20x40 cm m3 0.16 7,970,300.00 1,251,337.10
10 Balok B2 15x40 cm m3 0.19 7,825,300.00 1,471,156.40
11 Balok B3 (20x20 cm) m3 0.11 8,072,900.00 888,019.00
12 Plat Lantai elev. +2.000 (K-350) m3 0.60 6,462,600.00 3,877,560.00
13 Plat Lantai elev. +5.270 (K-350) m3 0.43 6,462,600.00 2,778,918.00
14 Plat Lantai elev. +6.800 (K-350) m3 0.22 6,462,600.00 1,421,772.00
Struktur atap -
1 Pipa besi Ø 2 " Medium galvanis m1 25.5 475,000.00 12,112,541.47
2 Pipa besi Ø 1 " Medium Galvanis m1 9.6 225,000.00 2,160,000.00
3 Base Plate 8mm kg 50.24 16,200.00 813,888.00
4 Baud Angkur 4 m16 (panjang 15 cm) bh 32 22,500.00 720,000.00
5 Pengerolan Pipa bh 6 2,500.00 15,000.00
6 Pengelasan cm1 320 4,583.60 1,466,752.00
7 Panel GRC (tebal 12 cm) m2 10.2 140,800.00 1,429,498.04
JUMLAH V PEKERJAAN STRUKTUR 63,814,603.62

VI PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan dinding 1/2 bata 1 : 5 m2 36.00 135200.00 4,867,200.00
2 Plesteran dinding 1 : 5 m2 72.00 64000.00 4,608,000.00
3 Acian (dinding) m2 72.00 39800.00 2,865,600.00
4 Plesteran beton 1 : 3 m2 28.50 67000.00 1,909,500.00
5 Acian (beton) m2 28.50 39800.00 1,134,300.00
6 Acian Profil elevasi 0+1.36 m1 9.20 39800.00 366,160.00
7 Acian Profil elevasi 0+2.61 m1 9.20 39800.00 366,160.00
8 Acian Profil elevasi 0+5.93 m1 6.60 39800.00 262,680.00
9 Acian Profil Lantai 0+7.54 m1 7.30 39800.00 290,540.00
10 Acian Tali Air Dinding m1 30.40 39800.00 1,209,920.00
JUMLAH VI PEKERJAAN PASANGAN DAN PLESTERAN 17,880,060.00

V PEKERJAAN FINISHING / PENGECATAN


II 1 Cat Dasar Dulux m2 296.17 23800.00 7,048,843.83
2 Pengecatan dinding tembok Wheathershield m2 296.17 22900.00 6,782,290.91
JUMLAH VII PEKERJAAN FINISHING / PENGECATAN 13,831,134.74

V PEKERJAAN PULAU JALAN ( ISLAND)


II Teras Tugu
I
A. Pekerjaan Galian
- Galian Tanah m3 0.30 79600.00 23,880.00
- Urugan Tanah Kembali m3 9.61 58600.00 563,263.20
-
B. Pasangan Pondasi -
- Pasangan pasir Urug m3 2.18 180200.00 392,385.50
-
C Pekerjaan Beton -
- Lantai kerja (K-100) m3 4.36 830500.00 3,616,827.50
-
D Pekerjaan Pasangan -
- Pasangan dinding 1/2 bata 1 : 5 m2 12.05 135,200.00 1,629,160.00
- Plesteran m2 12.05 64,000.00 771,200.00
- Acian m2 12.05 39800.0000 479,590.00
- Pasangan Dinding Marmer Travertime m2 3.15 108,800.00 342,720.00
- Pasangan Lantai Granit m2 31.075 1,895,800.00 58,911,985.00
- Pasangan Kerb m1 24 256,700.00 6,160,800.00
- Tali air Batu Sikat 10 cm m2 1.93 113380.79 218,258.02
- Lantai Batu Sikat m2 10.55 113380.79 1,196,167.33
- Dinding Batu Sikat m2 4.065 113380.79 460,892.91

JUMLAH VIII PEKERJAAN TAMAN 74,767,129.47

X PEKERJAAN ASESORIS
1 Jam + kaca Patri
- Jam diameter 50cm unit 4 65,000.00 260,000.00
- Kaca Patri (Kuningan) Tebal 3mm m2 3.712 1,750,000.00 6,496,000.00
2 Patung Maung Bandung (Bahan Resin) unit 4 875,000 3,500,000.00
3 Ornamen Sate unit 1 110,000 110,000.00
4 Plakat Granit Hitam Bintik Emas (Galaxy) bh 1 180,000 180,000.00
5 Cincin Kolom (Bahan Resin) bh 16 80,000 1,280,000.00
JUMLAH X PEKERJAAN ASESORIS 11825998
JUMLAH X PEKERJAAN ARSITEKTUR, SIPIL
HARGA JUMLAH
NO. URAIAN SATUAN VOLUME
SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
B PEKERJAAN ELEKTRIKAL
I Pekerjaan Panel
(Pengadaan dan pemasangan panel termasuk pentanahan panel sesuai dengan gambar rencana dan
spesifikasi
gambar rencana dan spesifikasi teknis) teknis Komponen Panel sesuai
1 Penyambungan daya PLN 900 VA lot 1 3,233,426.25 3,233,426.25
2 Panel penerangan bh 1 9,672,926.25 9,672,926.25
- Box panel 40x30x15
- KWH Meter
- MCB 4A
- MCB 2A
3 Instalasi kabel power panel penerangan mtr 50 13,848.05 13,848.05
NYFGbY 2 x 4 mm2
4 Instalasi pipa galvanis medium 2'' mtr 15 214,554.00 3,218,310.00
5 Instalasi grounding panel kabel BC 4 mm2 mtr 8 19,020.35 152,162.80
6 Biaya Boring tanah horizontal mtr 15 557,860.00 8,367,900.00
7 Biaya Galian tanah ttk 2 557,860.00 1,115,720.00
8 Biaya SLO lot 1 100,926.25 100,926.25
25,875,219.60
II Pekerjaan Penerangan
1 Floodlight LED 40 W bh 5 340,000.00 1,700,000.00
2 LED Strip mtr 7 10,000.00 70,000.00
3 Spotlight LED 9 W bh 1 90,000.00 90,000.00
4 Instalasi titik Penerangan
- Instalasi penerangan Kabel NYY ttk 3 611,997.10 1,835,991.30
- Instalasi penerangan kabel NYFGbY ttk 4 210,040.30 840,161.20
5 Fotosel 3A bh 2 79,000.00 158,000.00
6 Instalasi fotosel
- Instalasi fotosel kabel NYY ttk 1 648,976.50 648,976.50
- Instalasi fotosel kabel NYFGbY ttk 1 247,019.70 247,019.70
7 Tralis Lampu 35X35X40 bh 4 - -
5,590,148.70
C Pekerjaan Penangkal Petir
1 Penangkal Petir Splitzen 30 cm bh 1 260,000.00 260,000.00
2 Instalasi kabel BC 50 mm2 mtr 20 53,670.35 1,073,407.00
3 Batang grounding GIP 1' mtr 4 235,047.10 940,188.40
4 Pembuatan bak kontrol bh 1 40,797.10 40,797.10
5 Pengeboran batang grounding ttk 1 3,251,310.50 3,251,310.50
5,565,703.00
JUMLAH PEKERJAAN ELEKTRIKAL 37,031,071.30
REKAPITULASI DAFTAR KUANTITAS HARGA
BILL OF QUANTITY (BOQ)

KEGIATAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA


PEKERJAAN : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKASI : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)
TAHUN : 2018

NO URAIAN PEKERJAAN JUMLAH HARGA BOBOT

A PEKERJAAN SIPIL DAN ARSITEKTUR


I Pekerjaan Persiapan 13,317,758.00 4.57
II Pekerjaan Bongkaran dan Perbaikan Site 14,584,819.00 5.00
III Pekerjaan Tanah dan Pasir 1,156,318.27 0.40
IV Pekerjaan Pondasi 43,268,520.00 14.84
V Pekerjaan Strukture 63,814,603.62 21.89
VI Pekerjaan Pasangan Plesteran dan Acian 17,880,060.00 6.13
VII Pekerjaan Pengecatan 13,831,134.74 4.75
VIII Pekerjaan Taman 74,767,129.47 25.65
IX Pekerjaan Aksesories 11,825,998.00 4.06

B PEKERJAAN ELEKTRIKAL
I Pekerjaan Panel 25,875,219.60 8.88
II Pekerjaan Penerangan 5,590,148.70 1.92
III Pekerjaan Penangkal Petir 5,565,703.00 1.91

JUMLAH A+B 291,477,412.39 100.00


JUMLAH TOTAL 291,477,412.39
Dibulatkan ke bawah ( dalam ribuan ) 291,477,000.00
PPN 32,435,100.00
10%
TOTA 323,913,000.00
L ribu rupiah
Terbilang : tiga ratus dua puluh tiga juta sembilan ratus tiga belas

Keuntungan = RAB - RAP = 32,874,000.00


KEGI : PEMBANGUNAN PINTU GERBANG KOTA LAMA
PEKE : PEMBANGUNAN PINTU GERBANG KOTA LAMA
LOKA : JALAN WASKTUKENCANA - JALAN PERINTIS KEMERDEKAAN (BALAI KOTA)

1 2 3 4 5 6 7 8 9 10
NO. URAIAN PEKERJAAN BOBOT (%)
(31 MEI) JUNI 2018 JULI 2018
A PEKERJAAN SIPIL DAN ARSITEKTUR
I Pekerjaan Persiapan 4.57 2.285 2.285
II Pekerjaan Bongkaran dan Perbaikan Site 5.00 2.502 2.502
III Pekerjaan Tanah dan Pasir 0.40 0.40
IV Pekerjaan Pondasi 14.84 7.422 7.422
V Pekerjaan Strukture 21.89 7.298 7.298 7.298
VI Pekerjaan Pasangan Plesteran dan Acian 6.13 6.134
VII Pekerjaan Pengecatan 4.75 4.75
VIII Pekerjaan Taman 25.65 8.550 8.550 8.550
IX Pekerjaan Aksesories 4.06 2.029 2.029

B PEKERJAAN ELEKTRIKAL
I Pekerjaan Panel 8.88 4.439 4.439
II Pekerjaan Penerangan 1.92 0.959 0.959
III Pekerjaan Penangkal Petir 1.91 0.955 0.955

BOBOT PRESTASI MINGGUAN 100 2.28 4.79 2.90 7.42 14.72 11.74 12.70 15.64 16.28 11.53
KUMULATIF 2.28 7.07 9.97 17.39 32.11 43.85 56.54 72.19 88.47 100.00
JUMLAH/JML UANG YANG HARUS DISEDIAKAN 7,399,878.62 15,503,786.98 9,388,901.65 24,041,719.05 47,680,348.58 38,015,935.71 41,122,045.75 50,671,598.90 52,729,523.63 37,359,261.11
MODAL KUMULATIF 7,399,878.62 22,903,665.61 32,292,567.26 56,334,286.31 104,014,634.89 142,030,570.60 183,152,616.35 233,824,215.25 286,553,738.89 323,913,000.00