Bill of Materials Building Name: WTP Section Main Building SL No Item Description Qty. Unit Unit Price Total Price

The bill of materials lists items and quantities required for constructing the main building of the WTP Section. It includes 4.31 metric tons of built-up members, 1.98 metric tons of galvanized steel plates, and 0.54 metric tons of MS pipes. Roofing and wall materials include 204 square meters and 252 square meters of sheet metal respectively. Additional items include anchor bolts, nuts and bolts, cable bracing, insulation, doors, and canopies. The total cost of materials and installation is calculated at the end.

Uploaded by

FoisulAlam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views2 pages

Bill of Materials Building Name: WTP Section Main Building SL No Item Description Qty. Unit Unit Price Total Price

The bill of materials lists items and quantities required for constructing the main building of the WTP Section. It includes 4.31 metric tons of built-up members, 1.98 metric tons of galvanized steel plates, and 0.54 metric tons of MS pipes. Roofing and wall materials include 204 square meters and 252 square meters of sheet metal respectively. Additional items include anchor bolts, nuts and bolts, cable bracing, insulation, doors, and canopies. The total cost of materials and installation is calculated at the end.

Uploaded by

FoisulAlam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

BILL OF MATERIALS

Building Name: WTP Section


Main Building

Sl Qty. Unit Total


Item Description Unit
No Price Price

1 Built-up member (Column & Rafter with connection 4.31 MT 115


plate) ASTM A572 Gr. 50, Fy = 34.5 kN/cm2
Purlin, Girt & Sheeting Angle
2 Galvanized steel plate, ASTM A653, 1.98 MT 120
Fy = 27.6 kN/cm2
MS pipe confirming to ASTM A36 or equivalent,
3 0.54 MT 100
Fy = 24.8 kN/cm2
Roof Sheet (0.5mm thick)
204 SQM
4 ASTM A792M Grade 345 Class 1 Coating AZ150, 900
Fy = 34.5 kN/cm2 0.87 MT
Wall Sheet (0.5mm thick) 252 SQM 900
5 ASTM A792M Grade 345 Class 1 Coating AZ150,
1.07 MT 185000
Fy = 34.5 kN/cm2
Sheeting Accessories (Gutter, Eave trim, Corner
capping, Ridge capping, Drip trim, Gable capping,
6 Down spouts, etc.) 0.60 MT 200000
ASTM A792M Grade 345 Class 1 Coating AZ150,
Fy = 34.5 kN/cm2
Anchor Bolts confirming to ASTM A36 or
7 0.10 MT 120
equivalent, Fy = 24.8 kN/cm2
Hot Dip Galvanized Nut- Bolt,
8 0.20 MT 190
Bolt Class-8.8, Nut Class-8, Fu= 80 kN/cm2
High Strength Cable Bracing with hillside washer,
9 0.18 MT 200000
eye bolt & wire clamp, Fu= 119.7 kN/cm2
10 Screw for Roof, Wall & Sheeting accessories 4,478 PCS 5

Double Bubble Insulation with Both Side Aluminum


11 230 SQM 22
Faced Heat Shield Foil. Thickness (mm): 5.0-4.5

Sub Total 9.85 MT


Accessories
12 Double Sliding Door, 4m X 4m 01 Nos 75000
13 2.5m Projected Curve Canopy with Soffit 01 Nos
14 Skylight 15 SQM 120000
Sub Total

15 Transportation
16 Erection
17 Two coat enamel paint
Sub Total

Total Cost