Shift Handover Form: Initiative Details (As Per Production Schedule)

This shift handover form contains information to be transferred between production shifts. It includes details about the running job like product and quantity produced, any machine breakdowns during the shift, planned vs actual production quantities, and instructions for tasks to be handed over to the next shift. Signatures are included to acknowledge the handover of responsibilities between supervisors.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
5K views

Shift Handover Form: Initiative Details (As Per Production Schedule)

This shift handover form contains information to be transferred between production shifts. It includes details about the running job like product and quantity produced, any machine breakdowns during the shift, planned vs actual production quantities, and instructions for tasks to be handed over to the next shift. Signatures are included to acknowledge the handover of responsibilities between supervisors.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Format No.

: Form / Doc # Form / Doc Date


Rev. No. :
SHIFT HANDOVER FORM Rev. Date :
Unit Name Production Line Assembling Code Location Shift Handover Shift handover by

□ 1St to 2nd

□ 2nd to 1st
Shift handover Time Running Job # Running Job Product Job Qty Inserted Remarks ( About Job)

Total manpower # of Electrical # Machine Breakdown Reasons for Breakdown Identified / Not Identified at General Condition of Shift
Used & Available Breakdown Noted Noted

Initiative details (As per production Schedule )

Scheduled ( As per Production Planning)


Job Order
# Product General Processes
# Qty Actual Qty
Time Machine # Product Specification Remarks
Planned Produced

Handover running job to shift


# Job Order # Required Processes Product Qty Instructions

List of Isolated Machine / Equipments Identified High Risk Supervisor Note:


.
M/C Name Short Description .

Shift Hand over to – sign.


Shift Handover by– Sign.
.
.
.
.
.
.
.
.