CRP Instance Status As On 10-Nov-2010 S.No. Activity Responsibility

The document outlines the status of a CRP instance cloning project as of November 10, 2010. It lists 10 activities required for the project including installing Oracle applications, taking backups, patching, and cloning instances. It notes that installation, backups, and patching have been completed. Setup on the initial CRP instance is in progress, with cloning scheduled for the following Monday. The project aims to create 3 live instances, with one already developed for testing and the other two pending cloning and setup.

Uploaded by

pankaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views

CRP Instance Status As On 10-Nov-2010 S.No. Activity Responsibility

The document outlines the status of a CRP instance cloning project as of November 10, 2010. It lists 10 activities required for the project including installing Oracle applications, taking backups, patching, and cloning instances. It notes that installation, backups, and patching have been completed. Setup on the initial CRP instance is in progress, with cloning scheduled for the following Monday. The project aims to create 3 live instances, with one already developed for testing and the other two pending cloning and setup.

Uploaded by

pankaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

CRP Instance Status as on 10-Nov-2010

S.No. Activity Responsibility


1 Oracle Application Installation Apps DBA
2 Backup of Application Apps DBA
3 Patch Application Apps DBA
4 Post patch backup of application Apps DBA

5 Verification of Backup Apps DBA


6 Setup on CRP instance Apps Functional Team

7 Post Setup Backup of CRP instance Apps DBA


8 Verification of Post Setup Backup of CRP instance Apps DBA

9 Cloning of CRP instance Apps DBA


10 Cloned CRP instance Apps DBA

Total no. of instance required (live) 3


Development Instance
CRP1 Instance

Clone of CRP1 instance


as on 10-Nov-2010
Status Remarks
Completed
Completed
Completed
Completed
Backup level 3 is taken and backup size is verified
In Progress with source size.
Completed
Will be done immediate after cloning which is
In Progress scheduled on Monday.
Pending ** same as above **
Cloning of CRP instance is scheduled on Monday
In Progress morning with Rajeev(apps DBA).
Pending ** same as above **

Purpose
Required for business process development
Developed process mapping and testing
Successfully tested process mapping with master data only (no
transactional Data)