New Hot Bitumen Storage Tank Construction Guidelines: Purpose
New Hot Bitumen Storage Tank Construction Guidelines: Purpose
CONSTRUCTION GUIDELINES
The information and recommendations in these guidelines are given in good faith and
belief in their accuracy at the time of publication, but do not imply any legal liability or
responsibility by the Association.
The Health and Safety at Work Act 1974 requires employers to provide safe systems of
work to ensure the safety of their employees and the public. Health and Safety Law
imposes duties on both the supplier and the customer to provide safe systems of work.
These guidelines are intended to help both parties comply with their respective
responsibilities during the transfer, handling, and storing of hot bitumen at hot mix
asphalt manufacturing plants, and are not intended to vary the legal responsibility of
either party.
PURPOSE:
These guidelines provide hot mix asphalt manufacturing plant Owners/Operators
information to aid in designing, fabricating, and erecting new hot bitumen storage tanks
at their facilities.
SCOPE:
These guidelines are applicable to above-ground atmospheric-pressure bitumen
storage tanks that have a maximum design temperature of 260°C (500°F) - hot bitumen
storage tanks.
Stored product is heated petroleum-derived bitumen products with Open Cup Flash
Points above 163°C (325°F), such as straight-run paving penetration grades, oxidized
grades, and polymer modified bitumen. These guidelines are not applicable for other
bitumen products with lower Open Cup Flash Points, such as emulsions and cutbacks.
Transferring, handling, and storing hot bitumen expose plant operators and hauliers to
inherent hazards:
• Thermal burns
• Froth-overs and boil-overs due to contamination by water or
lower boiling point hydrocarbons
• Formation and release of hydrogen sulfide
• Formation and release of hydrocarbon fumes
• Formation of flammable vapors
• Creation of ignition sources - pyrophoric deposits, hot
surfaces, sparks, and open flames
• Falls from elevated work surfaces
1
Due to these inherent hazards and the complexities involved with designing and
constructing hot bitumen storage tanks, Owners/Operators should consult and hire
qualified engineering firms when initiating a new tank project. A qualified engineering
firm will be knowledgeable in the design/construction process of hot bitumen storage
tanks, including all applicable specifications, codes, and regulatory requirements. A
qualified engineering firm will develop a tank design that meets these requirements and
mitigates the risks of these inherent hazards.
REFERENCES:
API Recommended Practice 2023, "Guide for Safe Storage and Handling of Heated
Petroleum-Derived Asphalt Products and Crude-Oil Residua", August 2001.
API Standard 650, "Welded Tanks for Oil Storage", June 2007.
API Standard 2000, "Venting Atmospheric and Low-Pressure Storage Tanks", April
1998.
Asphalt Institute Manual Series No. 4 (MS-4), The Asphalt Handbook, 7th edition, 2007.
"Code of Practice for the Safe Delivery of Bitumen Products", Refined Bitumen
Association Ltd.
"Guidance for Safe Bitumen Tank Management", Refined Bitumen Association Ltd./
Quarry Products Association
"RBA Position Paper on the use of Ground-Based Pumps for Bitumen Discharge at
Customer Sites", Refined Bitumen Association Ltd.
2
DEFINITIONS:
Bitumen Discharge Area: Area within the plant specifically designed to safely offload
and receive vehicle deliveries of hot bitumen. The bitumen is pumped from the bitumen
discharge area to the hot bitumen storage tank.
Boil-over: Fiery tank overflow caused by hot residue from a surface fire in a bitumen
tank becoming denser and sinking in the tank to form a hot layer that causes a violent
eruption of burning bitumen when the sinking hot layer comes in contact with a water or
lower boiling point hydrocarbon layer.
Froth-over: Tank overflow caused by hot bitumen being placed over a layer of water or
lower boiling point hydrocarbons, causing the water/hydrocarbons to boil and vaporize,
pass through the upper layer of bitumen, and overflow the tank coated with hot bitumen.
Hot Bitumen: Heated petroleum-based bitumen products with Open Cup Flash Points
above 163°C (325°F), and typically stored in the range of 130° - 168°C (265° - 335°F).
Open Cup Flash Point: Minimum Cleveland Open Cup Flash temperature as
determined by AASHTO T48 and ASTM D 92.
Pyrophoric Deposits: Pyrophoric carbonaceous deposits are formed on the roof and
walls of tanks due to the condensation of bitumen vapors, which can become a potential
ignition source at temperatures between 177°- 190°C (350° - 375°F) due to oxidation
when exposed to an influx of air. Pyrophoric iron sulfide deposits are formed due to
hydrogen sulfide reacting with the iron in the tank's roof and walls in the presence of
moisture, which can also become a potential ignition source due to oxidation when
exposed to air.
GENERAL GUIDELINES:
A. Site layout considerations
1. Traffic patterns for bitumen delivery vehicles, other vehicles, and personnel on
foot within the plant, to include optimizing one-way traffic flows and minimizing
reversing of vehicles.
2. Proximity of bitumen storage tank and bitumen discharge area to other plant
operations and traffic patterns of other vehicles - local codes may require
minimum safety distances and Personal Protective Equipment requirements
within designated areas. The location of the discharge point must avoid
surrounding or adjacent operations which could impair safe delivery.
3
3. Sufficient work space around the tank and equipment.
a) Sufficient area to meet future maintenance and testing requirements, such
as removing the heating device from the tank for inspection, maintenance,
and replacement.
b) Reduce the potential risk for trips and falls.
4. In addition to meeting spacing requirements, it may be advantageous to
minimize pipe runs between the proposed tank, bitumen discharge area, and
plant mixer, due to construction costs and future maintenance and energy costs
related to pipe heat tracing and insulation needs.
5. Vent / overflow pipework location - exposure to personnel and vehicles should
hot bitumen, bitumen fumes, or hydrogen sulfide be released to the
atmosphere.
6. Lines of sight between plant personnel (plant control room) and haulier; haulier
and tank (vent); and plant personnel (plant control room) and tank.
7. Tank and equipment spill containment.
8. Elevation differential between bitumen discharge area and tank - if the head
pressure differential and line friction losses are too great for the delivery
vehicle's pump, a ground-based pump may be needed. An added benefit to the
installation of a ground-based pump may be the elimination of bitumen
deliveries via compressed air discharge systems and their associated hazards.
(See "RBA Position Paper on the use of Ground-Based Pumps for Bitumen
Discharge at Customer Sites", Refined Bitumen Association, Ltd for additional
guidance on ground-based pumps.)
9. Terrain contour of site
a) Level working surfaces in key site locations, such as bitumen discharge
area, areas around tank, pump areas, and any work area with an
increased likelihood of trips and falls occurring. Depending on delivery
vehicle design, a gently inclined bitumen discharge area may help
promote complete drainage of delivery vehicles.
b) Drainage patterns around key site locations, such as bitumen discharge
area; areas around tank, sampling port location, pump area, and other
areas to minimize
1) Potential water contact with hot bitumen.
2) Corrosion.
3) Moisture buildup in tank insulation.
4) Potential slips and falls.
c) Potential access to public sewers, waterways, or adjoining properties may
dictate the need for emergency drainage systems with traps or separators.
4
10. Emergency equipment and plans, such as locating emergency shower(s) and
eye wash stand(s), emergency shut-off switch(es), fire extinguishers, tank vent,
and alarm display(s) and horn(s); identifying evacuation route(s); and insuring
required accessibility for fire fighting.
11. Lighting for key work areas.
B. Tank size design considerations (See "Guidance for Safe Bitumen Tank
Management", Refined Bitumen Association, Ltd for additional information regarding
tank dimensions and defined capacities.)
1. Safe Working Tank Capacity (m3) - Owner/Operator to determine how much
volume is needed in the tank to store bitumen that will be available for draw off
for use in plant manufacturing requirements. The intent is to prevent unplanned
run outs, and its capacity is usually determined based upon
a) Bitumen hauling capacity of local delivery vehicles and the projected
bitumen availability from suppliers, to include potential delays during
periods of peak supply demand (rate in).
b) Peak production rate requirements at Owner/Operator's plant (rate out).
c) The maximum potential temperature differential, between the minimum
temperature of the delivered bitumen and the maximum bitumen storage
temperature, should be considered. (See Volumetric To Mass Conversion
Factor below in GENERAL GUIDELINES, paragraph B.6.)
2. Available Tank Capacity (m3) - Design Engineer to calculate by applying a
safety factor to the Owner/Operator's desired Safe Working Tank Capacity
(safety factor should be endorsed by Owner/Operator). This safety factor is
established to allow sufficient time to safely shut down tank filling operations to
avoid overfilling the tank, and is based on maximum potential tank filling rates.
The Available Tank Capacity comprises the internal volume from the draw off
nozzle to the tank vent / overfill pipework.
3. Unavailable Tank Capacity (m3) - Determined by the Design Engineer and
consisting of both the
a) Internal volume from the floor of the tank to the normal draw-off nozzle
(undrawable or heel capacity). This is where the tank's internal heating
device is located and normally this capacity of stored bitumen is
unavailable for use.
b) Internal volume above the Available Tank Capacity from the tank vent /
overfill pipework to the roof of the tank.
4. Nominal Tank Capacity (m3) - Total internal volume of the tank from the floor to
its roof. This capacity is greater than and should not be confused with the Safe
Working Tank Capacity when discussing the tank's available capacity.
5. The Design Engineer may propose changes to the tank design capacities to
optimize or economize the tank fabrication process.
5
6. Volumetric (m3) To Mass (tonnes) Conversion Factor - Owner/Operator to
provide the Design Engineer a conservative conversion factor (based on
anticipated lowest bitumen density), or the maximum bitumen storage
temperature for each bitumen grade that may be stored in the tank (generally
lighter grades are less dense/viscous and stored at lower temperatures). A
given mass of bitumen will occupy its largest volume when at its highest storage
temperature. This conversion factor will allow the Owner/Operator and Design
Engineer to convert Safe Working Tank Capacity into tonnes similar to the
delivery vehicles, and later aid the plant operators and hauliers determine
whether the tank can safely receive a delivery of bitumen of known weight
(tonnes) without overfilling the tank.
C. Tank load design considerations unique to Owner/Operator's locale and local code
requirements
1. Seismic loads
2. Snow loads
3. Wind loads
a) Both magnitude and prevailing direction
b) Uplift pressure on the roof
4. Flood loads
6
3. Elevated tank temperatures may evaporate moisture in the supporting soil over
time, especially if there is a high water table or a high level of moisture content
in the soil, and cause either uneven settling or excessive settling of the tank.
4. Anchoring considerations - A tank operating at elevated temperatures may tend
to move over time and create stresses on the tank fittings and attachments.
7
g) Gauge hatch or manhole cover that lifts under abnormal internal tank
pressure, or roof-to-shell frangible joint for emergency venting, such as
during vent plugging or froth-over situations.
h) Vent / overflow pipework accessibility for inspection and cleaning to
prevent plugging.
8
f) Clear labeling of individual readout displays may help to promote system
understanding and avoid potentially unsafe overfilling or draw-down
conditions. Clear labeling may also help avoid confusion when multiple
tanks are present.
9
G. Tank and related pipework heating system considerations
1. Heating system type (such as hot oil, fired heaters, electric, and steam) may
depend on available utilities and facilities, economic, and safety considerations;
tank heating systems may be implemented via devices internal or external to
the tank.
2. Unsafe situations, such as a potential ignition source due to inadvertent
temperatures above specified temperature limits (including insufficient bitumen
coverage of internal heating devices), may be reduced by incorporating
automatic shutoff systems.
3. If bitumen is periodically allowed to cool inside the tank, incorporating a vertical
hairpin loop as part of an internal heating coil may help allow adequate
expansion of remelted bitumen trapped beneath a solid layer of product in the
tank.
10
6. Drain valve to safely empty heel capacity for tank cleaning and maintenance.
7. Bitumen sampling valve on tank or dedicated piping.
8. Ladders, stairs and platforms, including handrails.
9. Roof gauging hatches and manways.
10. Anchor bolts and straps.
M. Maintain "as built" detailed site and fabrication drawings after project completion
1. Interior tank data.
2. All specifications and dimensions.
3. Testing result reports.
4. Handling and rigging requirements for shop-built tanks.
11