Material Tracking and Controlling Flow Chart
Material Tracking and Controlling Flow Chart
ENGINEERING
VENDORS
STORE
MANAGEMENT
STORE
MANAGEMENT &
CONSTRUCTION
SUB-CONTRACTORS &
CONSTRUCTION
MATERIAL TRACKING AND CONTRO
WORKFLOW
RAISE PURCHASE
REQUISITIONS NEW PR
(TYPES /REVISIONS)
RAISE PURCHASE
ORDERS PO AMMENDMENT
EXPIDITING No
RESTRATEGIZE
ORDER
Yes
INPECTION RELEASE
NOTE
STORE MATERIAL
RECEIPT
INVENTORY /
STORAGE
Yes
MATERIAL ISSUANCE
NOTE
MATERIAL REPORTS
(SHORT FALL / SURPLUS)
MATERIAL REQUEST
NOTE
MATERIAL
RECONCILATION
SUB-CONTRACTORS
AND CONTROLLING FLOW CHART
INEERING
EGIZE
MINOR RAISE AD
MATERIA
ENGINEERING DRAWING
(ISOMETRIC DRAWINGS)
IF COVERED IN PO
IF NOT COVERED IN PO
CONSTRUCTION
ERIAL REQUEST IN CASE OF DAMAGED MATE
NOTE RE-ROUTING OF PIPING
ANY CHANGE AT SITE WHICH
REPORTS
Yes
SHORT FALL
No
FABRICATION &
ERECTION
M
AJ
OR
OR
RAISE ADDITIONAL
MATERIAL INDENT
OVERED IN PO