Comments: Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB)
Comments: Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB)
2. Same sign used for side road left / right. Also sign
should interchanged for up/down direction.
Overtaking restricted sections to be identified and provided
signs for overtaking restriction.
11 ALL 3. Please provide design details of rigid pavement.
12 ALL Plan and profile shown upto 45+000. Please clearly mark the
end chainage of the project.
13 ALL Bid Documents
Schedule A
1. Page 301 Site - Please correct the end chainage
2. Page 301 Table 2.1. Details start from 22+646 to
44+900. Please clearly state the chainage given as
existing / design chainage. Also ensure the details for
the full length of project road. Please ensure this for all
other tables.
3. Page 307 1 Carriageway: Please check the subsection
numbering. Please correct subsection number for the
remaining sections also
Schedule B
4. Development of the project highway. Add the following
at the end the section.
“The alignment plans of the Project Highway are
specified in Annex-III of Schedule A shall be deemed to
be part of this Schedule B. The proposed profile of the
project highway as indicated in the Annex- III of
Schedule A shall be followed by the contractor with
minimum FRL as indicated in the alignment plan. Based
on site/design requirement, the Contractor may,
however, improve/upgrade upon the alignment plans
and profiles as indicated in Annexure - III of Schedule A
and raise the finished roadway level (FRL) with
approval from the Department within the available
Right of Way.
5. Please restart the sub section numbering from 1.
6. Page 318 Two laning - Change the heading to
Rehabilitation and augmentation. Also add the start and
end chainage to describe the project section.
7. Page 319 Annex I Description of the Project
8. Please add the following note
9. “[Note: Description of the Project Highway shall be
given by the Authority in detail together with
explanatory drawings (where necessary) to explain the
Authority’s requirements precisely in order to avoid
subsequent changes in the Scope of the Project. The
particulars that must be specified in this Schedule-B are
listed below as per the requirements of the Manual of
Specifications and Standards for Two Laning of
Highways (IRC:SP:73)], referred to as the “Manual”. If
any standards, specifications or details are not given in
the Manual, the minimum design/construction
requirements shall be specified in this Schedule. In
addition to these particulars, all other essential project
Schedule C
18. Table 2.1 Bus Shelter / Bus bay: 6 bus shelter with bus
bays provided. Please mark the busbays on the plan
and ensure that the ROW is available for the provision
of bus bays.
19. Page 413 Toilet Block - Please provide the drawing as
mentioned in the schedule C.
Schedule D
Provide details of all codes forms part of the design
requirement.
Note : Only schedule A to D of bid document reviewed.