WHITE WASHING (3 COATS) COST
MATERIAL REQUIREMENT ANALYSIS FOR 100M2 AREA
for 1 COAT LIME REQUIRED 10.00 kg
LIME FOR 3 COATS 30.00 kg
RATE ANAL
ITEM NAME : 12mm THICK CEMENT PLASTERING IN C
(B) Material Cost Analysis
SR.NO MATERIAL QUANTITY
1 LIME POWDER 30.00 kg
2 FEVICOL LUMSUM
3 INDIGO LUMSUM
4 SUNDRIES LUMSUM
5
6
7
8
9
(A) Labour Cost Analysis
SR.NO LABOUR NUMBERS
1 WHITE WASHER 2.00
2 LABOUR 2
3 SUNDRIES -
4
5
6
(B) Equipment Cost Analysis
SR.NO Equipment Name
1
2 -
3 -
TOTAL COST
NOTES
- Material, Labour,and Equipment price is change as per location and time
- Material and equiment requirement is as per your uses.
- This is most common Rate Analysis Sheet which is majorly used
construction.
SHING (3 COATS) COST ANALYSIS
EA
RATE ANALYSIS SHEET
HICK CEMENT PLASTERING IN CEMENT MORTAR (1;3), QUANTITY (100 SQURE METER)
RATE PER AMOUNT
RS/- RS/-
5 kg 150
- - 50
- - 25
- - 10
TOTAL COST RS/- 235
RATE PER AMOUNT
RS/- RS/-
200 DAY 400
200 DAY 400
- - 10
Total Cost 810
(A) MATERIAL COST 235
HIRE CHARGES (B) LABOUR COST 810
RS/- Ps. (C)EQUIPMENT COST 0
0 0
0 0 TOTAL COST OF LABOUR & EQUIPMENT
0 0 1 A+B+C 1045
TOTAL COST 0 2 1.5% WATER CHARGE 15.675
3 10% CONTRACTOR'S PROFIT 104.5
TOTAL COST RS/- 1165.175
s per location and time FOR 100 SQUARE METER RS/- 1165.175
r uses. FOR 1 SQUARE METER RS/- 11.65175