(B) Material Cost Analysis Material

The document provides a rate analysis for white washing a 100 sqm area with 3 coats of lime. It estimates that 30 kg of lime will be needed for the 3 coats. The labor cost analysis estimates it will require 2 white washers and 2 laborers at a rate of Rs. 200 per day. The total material cost is Rs. 235 and total labor and equipment cost is Rs. 1,045, bringing the total cost to Rs. 1,165.175 for white washing a 100 sqm area with 3 coats of lime.

Uploaded by

Kutty Maran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
965 views4 pages

(B) Material Cost Analysis Material

The document provides a rate analysis for white washing a 100 sqm area with 3 coats of lime. It estimates that 30 kg of lime will be needed for the 3 coats. The labor cost analysis estimates it will require 2 white washers and 2 laborers at a rate of Rs. 200 per day. The total material cost is Rs. 235 and total labor and equipment cost is Rs. 1,045, bringing the total cost to Rs. 1,165.175 for white washing a 100 sqm area with 3 coats of lime.

Uploaded by

Kutty Maran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

WHITE WASHING (3 COATS) COST

MATERIAL REQUIREMENT ANALYSIS FOR 100M2 AREA


for 1 COAT LIME REQUIRED 10.00 kg
LIME FOR 3 COATS 30.00 kg

RATE ANAL
ITEM NAME : 12mm THICK CEMENT PLASTERING IN C
(B) Material Cost Analysis
SR.NO MATERIAL QUANTITY

1 LIME POWDER 30.00 kg


2 FEVICOL LUMSUM
3 INDIGO LUMSUM
4 SUNDRIES LUMSUM
5
6
7
8
9

(A) Labour Cost Analysis


SR.NO LABOUR NUMBERS

1 WHITE WASHER 2.00


2 LABOUR 2
3 SUNDRIES -
4
5
6

(B) Equipment Cost Analysis


SR.NO Equipment Name

1
2 -
3 -
TOTAL COST
NOTES
- Material, Labour,and Equipment price is change as per location and time
- Material and equiment requirement is as per your uses.
- This is most common Rate Analysis Sheet which is majorly used
construction.
SHING (3 COATS) COST ANALYSIS

EA

RATE ANALYSIS SHEET


HICK CEMENT PLASTERING IN CEMENT MORTAR (1;3), QUANTITY (100 SQURE METER)

RATE PER AMOUNT


RS/- RS/-
5 kg 150
- - 50
- - 25
- - 10

TOTAL COST RS/- 235

RATE PER AMOUNT


RS/- RS/-
200 DAY 400
200 DAY 400
- - 10

Total Cost 810

(A) MATERIAL COST 235


HIRE CHARGES (B) LABOUR COST 810
RS/- Ps. (C)EQUIPMENT COST 0
0 0
0 0 TOTAL COST OF LABOUR & EQUIPMENT
0 0 1 A+B+C 1045
TOTAL COST 0 2 1.5% WATER CHARGE 15.675
3 10% CONTRACTOR'S PROFIT 104.5
TOTAL COST RS/- 1165.175
s per location and time FOR 100 SQUARE METER RS/- 1165.175
r uses. FOR 1 SQUARE METER RS/- 11.65175