Palad: Wrong Answer Summary
Palad: Wrong Answer Summary
D
LA
Question asked (61):
What is meant by the term 'lapping in' in relation to diesel engine cylinder cover valves?
Selected answer (score 0):
Don't know
Correct answer:
PA
Grinding the valve against the valve seat, usually manually, to obtain a uniform sealing
surface across the seat.
What is the normal maximum oil content permitted for machinery space bilge overboard
discharge via OWS equipment?
Selected answer (score 0):
Don't know
AR
Correct answer:
15 ppm
cylinders is hotter than normal. What is the likely cause of this problem?
Selected answer (score 0):
Don't know
Correct answer:
The air start valve for the cylinder is leaking or stuck open.
Page 1/11
Wrong answer summary
D
To avoid accidental intake of water into the engine room in case of valve or pipeline
failure.
LA
Question asked (2817):
When the boiler safety valves operate due to the boiler pressure being too high the
excess steam is discharged to _______
Selected answer (score 0):
Don't know
Correct answer:
the atmosphere via the atmospheric line
How can water hammer be avoided when operating the valves and pumps in a cooling
water system?
Selected answer (score 0):
Don't know
AR
Correct answer:
Operate valves slowly
Page 2/11
Wrong answer summary
D
A hydraulic hand pump is usually used to tighten G-nuts
LA
What should the Fitter be asked to do?
Selected answer (score 0):
Don't know
Correct answer:
The Fitter should be asked to check the level of hydraulic oil in the header tank
What kind of safety equipment should be used when operating a grinding wheel?
Selected answer (score 0):
Don't know
Correct answer:
AR
Don't know
Correct answer:
Legs bent, back straight, using leg muscles to lift
Page 3/11
Wrong answer summary
D
Class A
LA
Question asked (3801):
Simple gauge glasses for indicating the boiler water level, such as the one shown here,
are often fitted to low pressure boilers. What would be a reasonable schedule for blowing
through the gauge glasses to make sure they are reading correctly?
Selected answer (score 0):
Don't know
Correct answer:
At least once a day
In the event of the water level disappearing out of the boiler water level gauge glass; what
should be the first action to be taken?
Selected answer (score 0):
Don't know
AR
Correct answer:
Secure all of the burners
board ships. Precaution has to be taken to avoid this risk. Which of the following safety
rules may be regarded as the most important?
Selected answer (score 0):
Don't know
Correct answer:
The welder shall have been instructed in the use of the ship's welding plant
Page 4/11
Wrong answer summary
D
The minimum temperature at which a combustible gives off vapours that may burn in
contact with oxygen in air, and at which combustion persists once the source of ignition
has been removed
LA
Question asked (10264):
What are the main basic components of a portable extinguisher?
Selected answer (score 0):
Don't know
Correct answer:
The container, the extinguishing agent, the impulsion system
1200 litres
Liferaft
Page 5/11
Wrong answer summary
D
An immersion suit or an anti-exposure suit
LA
Question asked (20307):
You have abandoned ship in a liferaft. In most cases, which of the following actions
should you generally take?
Selected answer (score 0):
Don't know
Correct answer:
anchor
When a fire breaks out in the engine room, who is in charge of the fire fighting
operations?
G
Selected answer (score 0):
Don't know
Correct answer:
N
What method shall be used when hauling survivors out of the sea (state of survivors is
critical)?
Selected answer (score 0):
Don't know
AR
Correct answer:
Using nets
Page 6/11
Wrong answer summary
D
Confirm with their search partner that the object found is suspicious.
LA
Question asked (32163):
Hot work is to be carried out close to a smoke detector in the engine room. What
precautions should be taken?
Selected answer (score 0):
Don't know
Correct answer:
PA
Notify Deck Officer and Engineer Officer in charge. The loop for the smoke detector
should be isolated while work is done and normal precautions for hot work taken including
permit to work.
Correct answer:
Use cleaning wires starting with a small gauge and gradually work up to the full size of
the nozzle hole.
IA
stores. The task will take about half an hour. What should the rating do?
Selected answer (score 0):
Don't know
Correct answer:
Contact the engine officer on watch for permission to assist and to arrange a relief for the
duration of the store taking.
M
Page 7/11
Wrong answer summary
While on boiler watch on an automatically controlled steam boiler the rating notices that
the burner has failed to light following a drop in steam pressure. What action should be
taken?
Selected answer (score 0):
Don't know
Correct answer:
Call the duty engineer immediately using the engineers call alarm.
D
Question asked (32519):
While on watch, an engine room rating notices a leak from the gland of a running
LA
seawater pump. What action should be taken?
Selected answer (score 0):
Don't know
Correct answer:
Inform the engineer officer of the watch so that the pump can be changed over and the
gland can be repacked.
happened.
An engine room rating is given the task of retightening the flanges of a pipe that has been
replaced in the engine room. Which of the following tightening procedures should be
followed?
Selected answer (score 0):
AR
Don't know
Correct answer:
Gradually tighten all of the bolts working diagonally across and around the flange.
Which of the following tools can be safely sharpened using a pedestal grinder?
Selected answer (score 0):
Don't know
Correct answer:
Steel drill bit
Page 8/11
Wrong answer summary
Correct answer:
Inform the watchkeeper so that the pump can be stopped and a new bolt can be fitted to
permanently fix the guard in place.
D
pump?
Selected answer (score 0):
Don't know
LA
Correct answer:
Make a new gasket from old chart paper or other similar material of the same thickness
as the original gasket.
Check the bolts are correctly tightened before informing the engineer so that the flange
faces can be cleaned and re-jointed if necessary.
G
Question asked (32614):
An engine room rating is assisting in the maintenance of some of the valves on the low
N
pressure steam range. Which packing material, from the options given, would be the best
choice for repacking the gland of a low pressure steam valve?
Selected answer (score 0):
IA
Don't know
Correct answer:
Graphite fibre packing.
AR
Correct answer:
Inform the engineer in case it has been left inside the compressor when it was closed up.
Page 9/11
Wrong answer summary
D
Correct answer:
Clean the strainer more frequently and clean out the bilge well at the first opportunity.
LA
Question asked (32625):
A seawater pipe is holed due to corrosion causing frequent bilge alarms. Which of the
given temporary repair methods would be the preferred option to remedy the problem
until the pipe can be replaced?
Selected answer (score 0):
Don't know
Correct answer:
PA
Cover all of the affected area with fibre glass tape and resin/fibre glass mixture.
Page 10/11
Wrong answer summary
Correct answer:
A deck crane using grabs.
D
Don't know
Correct answer:
The people are hosing down the cargo hold to clean it.
LA
Question asked (33758):
What do you understand by: Let go the port anchor?
Selected answer (score 0):
Don't know
Correct answer:
Let go the port anchor means: open the port windlass brake
Page 11/11