EF-005 Business-Engineering Change Notice

This Engineering Change Notice proposes changes to a part or process. It identifies the supplier, part number, change description, and reason for the change. It also addresses the disposition of current stock and validation plans. Managers from quality assurance, engineering, manufacturing, and the plant must approve the change. Attachments include a marked up drawing showing the changes and an interface diagram.

Uploaded by

Juan C Gramillo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
439 views3 pages

EF-005 Business-Engineering Change Notice

This Engineering Change Notice proposes changes to a part or process. It identifies the supplier, part number, change description, and reason for the change. It also addresses the disposition of current stock and validation plans. Managers from quality assurance, engineering, manufacturing, and the plant must approve the change. Attachments include a marked up drawing showing the changes and an interface diagram.

Uploaded by

Juan C Gramillo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

ENGINEERING CHANGE NOTICE (ENGINEERING CHANGE REQUEST)

Supplier : ECN Number:

Supplier Code: Initiated by: Approved

Manufacturing Location: Reviewed by: Rejected

Date of Request: Effective Date:

# Description of Request:
Part Number / Process id Proposed Change - identify any affect on interfacing components/systems Reason for the request

Disposition of Current Stock Exhaust Stock: Scrap: Other (specify):

Product/Process Validation Plan:


Quality Assurance Manager

Engineering Manager

Manufacturing Manager
Note: if making changes to the drawing, attach a marked up print -
clearly identify the changes; also include an interface/boundary
diagram Plant Manager compliments of: thequalityportal.com
TEAM FEASIBILITY COMMITMENT

Customer Date

Part #/Rev Part Name

Feasibility Considerations

Our product quality planning team has considered the following questions, not intended to be all-inclusive in
performing a feasibility evaluation. The drawings and/or specifications provided have been used as a
basis for analyzing the ability to meet all specified requirements. All "no" answers are supported with
attached comments identifying our concerns and/or proposed changes to enable us to meet the
specified requirements.

YES NO N/A CONSIDERATION


Is product adequately defined (application requirements, etc.) to enable feasibility
evaluation?
Can Engineering Performance Specifications be met as written?
Can product be manufactured to tolerances specified on drawing?
Can product be manufactured with Cpk's that meet requirements?
Are there special characteristics that need to be identified on CP?
Is there adequate capacity to produce product?
Does the design allow the use of efficient material handling techniques?
Can the product be manufactured without incurring any unusual:
Costs for capital equipment?
Costs for tooling?
Alternative manufacturing methods?
Is statistical process control required on product?
Is statistical process control presently used on similar products?
Where statistical process control is used on similar products:
Are the processes in control and stable?
Are Cpk's greater than 1.33?

Conclusion

Feasible Product can be produced as specified with no revisions.


Feasible Changes recommended (see attached).
Not Feasible Design revision required to produce product within the specified requirements.

EF-005, Rev 2 08/2014 Page 2 of 3


Does this change effect:
Yes /
Quality Control No
Comments Actual Comp Date

Control Plan
FMEA
Process Flow
Special Characteristics
Work Instructions
PPAP
Dimensional Layout
Procedure
Gages
Test Equipment
Customer Specific Requirements
Training
Engineering
Material Specifications
Engineering Specifications
Program Management
Training
Production
Manpower
Plant Layout
Training
Maintenance
Tooling
PM Schedule
Specialized Tools
Training
Purchasing / Sales
Bill of Materials
Sale Price
Purchasing Price
Suppliers
Training
Training
Staffing
Training
IT
Software
Hardware
Training
Materials
Labeling
Packaging
Storage
Inventory
4th Shift
Running Change
FIFO
Delivery / Service
Training

EF-005, Rev 2 08/2014 Page 3 of 3