Monthly Check List For Electrical Panel

This monthly checklist provides instructions for inspecting an electrical panel. It includes checking that the panel earthing is properly connected, motor circuits are set correctly, the panel interior is clean and dust-free, wiring connections are tight, contact springs operate smoothly, auxiliary contactors function properly per the logic, timers are set correctly, power and control cables are securely fastened, isolator units and selector switches operate as intended, cable entry holes are sealed, indicator lamps illuminate appropriately, the lighting control station is clean and dust-free, the ELCB condition is noted, and lighting circuits inside and outside the station work properly. Signoff is required from the inspector and approver after review.

Uploaded by

qamar sayed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
274 views1 page

Monthly Check List For Electrical Panel

This monthly checklist provides instructions for inspecting an electrical panel. It includes checking that the panel earthing is properly connected, motor circuits are set correctly, the panel interior is clean and dust-free, wiring connections are tight, contact springs operate smoothly, auxiliary contactors function properly per the logic, timers are set correctly, power and control cables are securely fastened, isolator units and selector switches operate as intended, cable entry holes are sealed, indicator lamps illuminate appropriately, the lighting control station is clean and dust-free, the ELCB condition is noted, and lighting circuits inside and outside the station work properly. Signoff is required from the inspector and approver after review.

Uploaded by

qamar sayed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Monthly Check List For Electrical Panel

Date Inspected by name Sign

Panel location Panel name

Sl.No CHECKING Inspection Specification Actual value Remarks


AREA

Ensure the panel earthing Connectivity


OLR Setting as per the motor rating As per motor rated current
Motor RYB Phase current Equal
Open the panel clean and remove the dust NO dust
Control wiring tightness No loose connections
Check the contact spring tension Smooth operation
Check the auxiliary contactors for correct operation As per logic
1 PANEL Ensure the timers for correct setting/operation As per logic
Check the power cable tightness Perfect connection
Check the function of isolator units Proper operation
Check the selector switch,push buttons are in proper
working order Proper operation
Free holes/opening on the cable entry No holes/openings
All indication lamps condition Should glow based on logic
LCS panel clean and remove the dust and cable No loose connections
tightness
ELCB Conndition Good/Bad
Check the lighting circuits inside and out side the
station Glowing
Auto change over function check As per logic
Remarks

Approved by: Reviewed by:


Checked by: