PROJECT
MANAGEMENT
[Document subtitle]
Table of Contents
Introduction................................................................................................................................ 2
Project Background and Objectives...................................................................................2
Project Background.............................................................................................................. 2
Project Objectives................................................................................................................. 3
Project Team Members and their key roles....................................................................3
Project Stages and Key Deliverables................................................................................ 4
Project Time Management.................................................................................................... 7
Work Breakdown Structure............................................................................................... 7
Gantt chart............................................................................................................................13
Network Diagram............................................................................................................... 18
Critical Path.......................................................................................................................... 19
Project Budget.........................................................................................................................20
Project Quality Plan............................................................................................................... 23
Project Quality Responsibilities.....................................................................................23
Quality Criteria.................................................................................................................... 23
Quality Methods.................................................................................................................. 24
Project Risk Register............................................................................................................. 26
Conclusion................................................................................................................................ 27
References........................................................................ Error! Bookmark not defined.
1
Introduction
This project is about "House construction" project management plan. The
project management plan covers different aspects of house development
project. The first thing discloses in the paper is project background and
objectives. It will serve as a guide for the readers to understand the scenario
of the whole project. Moreover, it also covers the role of its key deliverables
and stakeholders. The roles and responsibilities of project team members are
discussed in respect of project key deliverables. Moreover, the paper also
covers an important part of project management plan which is project time
management. The main motive behind the discussion of project time
management is to understand project work breakdown structure, Gantt chart,
network diagram and critical path as well. At last, the project covers the
budget and quality plan for the project. All these aspects are studied under
the study of previous research sources. Moreover, the project time
management and project budget are prepared through the use of advanced
software which is MS project and MS Excel. Both of these tools are an
important source of the plan the overall schedule of a particular project.
Project Background and Objectives
Project Background
The project is about the preparation of a complete house at Oman City. The
premises shall be handed over to the owner no later than 1st August 2019.
The contract price for the project will remain OMR 130,000. Generally, the
2
house will prepare as per the requirements of the owner. It will include a
ground floor with four different rooms, one kitchen, and one washroom set.
Apart from this, it will also include construction of the first floor with 3
different rooms and one set of the kitchen as well as washrooms. The house
will properly cover with latest tiles and appropriate design and structure. It
will involve the ground works, materials, structure, project management,
interior, services, signoff, and exterior systems. Moreover, it also has a pool
and garden for the entertainment of family members.
Project Objectives
The project objective is to prepare a well-organized house Design
Complete the project on 30th July 2019.
Accomplish the project within the budget of OMR 130,000.
Project Team Members and their key roles
The project involves a large number of project team members. It is because
the home needs to construct within the one year from its initial starting date.
The key project team member involved in the project is following:
Owner: The owner is the person who responsible for the whole management
and evaluation of his or her house. The owner will sponsor the Housing
construction team members to build his or her house (Alwan, 2017). He or
she will remain responsible for providing necessary funds.
3
Design-Builder: These are the team members who will remain responsible
for the overall structural design of the project and will oversee the activities
done by the labor and another person.
Architect: The architect will prepare the effective blueprint of the owner
house so that he or she can live effectively with all facilities.
Civil Engineer: These are the individual who directly responsible for the
evaluation of construction work. They will guide the team members in
performing their tasks and responsibilities (Banihashemi, 2017). This group
involves electrical, structural, project manager, mechanics, and various other
people.
Landscape: The landscaping team is responsible for landscaping task. It
involves the construction of yard, garden and pool which will perform by plan
mechanics, and other labors (Clevenger, 2017).
Project Stages and Key Deliverables
The project stages and its key deliverables can understand with the help of
the 4D model of project management. It is an exciting and appropriate
concept for the management of housing and other complex projects
(Burtonshaw-Gunn, 2017).
4
(Kerzner, 2017)
Define
The "Housing Construction" project is conducted with a sole aim of prepares
an attractive and best design house with the presence of a garden, pool, and
two different floors. It will start on the 1st of May 2018 and finish on 30th July
2019. It will consume the construction process of one year and three months.
In order to accomplish the project as per predetermined timeline, the project
management team will keep strict towards their goals and deadline as well.
Design
The design of the house will be unique and different from other nearby
houses. The project will integrate with following design:
Spacious kitchen with plenty of storage
5
Creation of keeping rooms
Master bath
Bedroom on both floors (Mubarak, 2015)
Covers entrance
Attractive design pool with best tiles
Garden with plenty of plants
Development
The project development will perform as per the below-mentioned procedure:
6
From the above-mentioned figure, it can clarify that the implementation
process of the house will proceed accordingly. The contractor will remain
responsible for the continuous evaluation of Groundworks, materials,
structure, and project management procedure of the project so that any
delay can avoid effectively (Marsh, 2015).
Deliver
The project delivery will perform by sharing the project quality and progress
report (Merschbrock, 2015). It will give surety to the client about the project
specifications. At this stage, the owner takes the responsibility of his or her
home and makes necessary payments if anything left.
Project Time Management
Work Breakdown Structure
Mubarak (2015) said that the work breakdown structure represents the
overall activity involved in the accomplishment of a project. The work
breakdown structure for "Housing Construction" project is prepared through
the use of advanced software known as MS Project. It is an important method
of preparing work breakdown structure with required specifications
(Merschbrock, 2015). The work breakdown structure for housing construction
project can understand with a below-mentioned table:
Task Duratio Predecess Resource
Task Name Start Finish
Mode n ors Names
7
Auto House
310 Tue Mon
Schedu Construction at
days 5/1/18 7/8/19
led Oman
Auto
Conduct 100 Tue Mon
Schedu
Ground Work days 5/1/18 9/17/18
led
Auto
Concrete Tue Mon
Schedul 55 days Laborer
works 5/1/18 7/16/18
ed
Auto
45 Tue Mon
Schedu Excavation
days 7/17/18 9/17/18
led
Auto Plant
Tue Mon
Schedul Pool 15 days 3 Mechanic,
7/17/18 8/6/18
ed Site Joiner
Auto
Tue Mon
Schedul Foundation 30 days 5 Client
8/7/18 9/17/18
ed
Auto
Perform 90 Tue Mon
Schedu
Landscaping days 9/18/18 1/21/19
led
Auto Pool 40 days Tue Mon 5,6 Laborer
8
Schedul 9/18/18 11/12/1
ed 8
Auto Tue Mon
Plant
Schedul Yard 20 days 11/13/1 12/10/1 8
Mechanic
ed 8 8
Auto Tue
Mon Plant
Schedul Gardens 30 days 12/11/1 8,9
1/21/19 Mechanic
ed 8
Auto Tue
Arrange 80 Mon
Schedu 12/11/1
Materials days 4/1/19
led 8
Auto Tue
Project Mon
Schedul 25 days 12/11/1 9 Laborer
Management 1/14/19
ed 8
Auto
Tue Mon Plant
Schedul Storage 40 days 10
1/22/19 3/18/19 Mechanic
ed
Auto
Tue Mon
Schedul Delivery 10 days 12,13 Site Joiner
3/19/19 4/1/19
ed
Auto Give 86 Tue Tue
Schedu Structure days 9/18/18 1/15/19
9
led
Auto Fri
Tue Steel
Schedul Timber 44 days 11/16/1 6
9/18/18 structural
ed 8
Auto Mon Tue
Schedul Masonry 22 days 11/19/1 12/18/1 16 Site Joiner
ed 8 8
Auto Wed
Tue Steel
Schedul Steel 20 days 12/19/1 17
1/15/19 structural
ed 8
Auto
Design House 61 Wed Wed
Schedu
Interior days 1/16/19 4/10/19
led
Auto
Wed Wed Painter and
Schedul Lining 26 days 18
1/16/19 2/20/19 Decorator
ed
Auto
Thu Wed
Schedul 10 days 20 Laborer
Kitchen/Bathroom 2/21/19 3/6/19
ed
Auto
Thu Wed
Schedul Storage 10 days 21 Roofer
3/7/19 3/20/19
ed
10
Auto
Thu Wed Painter and
Schedul Decorating 15 days 22
3/21/19 4/10/19 Decorator
ed
Auto
Arrange 48 Thu Mon
Schedu
Services days 2/21/19 4/29/19
led
Auto
Thu Wed
Schedul Plumbing 5 days 23 Laborer
4/11/19 4/17/19
ed
Auto
Thu Mon
Schedul Electrical 8 days 25 Electrician
4/18/19 4/29/19
ed
Auto
Thu Tue
Schedul Data 4 days 20 Site Joiner
2/21/19 2/26/19
ed
Auto
Wed Mon
Schedul 9 days 27 Site Joiner
Entertainment 2/27/19 3/11/19
ed
Auto
Tue Wed
Schedul Security 12 days 28 Client
3/12/19 3/27/19
ed
Auto Pool 17 days Thu Fri 29 Roofer
11
Schedul 3/28/19 4/19/19
ed
Auto
Perform 56 Mon Mon
Schedu
Cladding days 4/22/19 7/8/19
led
Auto
39 Mon Thu
Schedu Roofing
days 4/22/19 6/13/19
led
Auto
Mon Thu
Schedul Tiling 19 days 30 Roofer
4/22/19 5/16/19
ed
Auto
Fri Thu
Schedul Insulation 20 days 33 Roofer
5/17/19 6/13/19
ed
Auto
56 Mon Mon
Schedu Walls
days 4/22/19 7/8/19
led
Auto
Mon Thu Plant
Schedul Exterior 24 days 30
4/22/19 5/23/19 Mechanic
ed
Auto Fri Mon
Insulation 32 days 36 Electrician
Schedul 5/24/19 7/8/19
12
ed
Auto
Mon Thu
Schedul Joinery 14 days 30 Client
4/22/19 5/9/19
ed
Auto
Fri Thu Painter and
Schedul Paint 15 days 38
5/10/19 5/30/19 Decorator
ed
Auto
Thu Thu
Schedul Project closure 0 days 39 Client
5/30/19 5/30/19
ed
Activity list
WBSID Activity Predecesso Duration in Resource
Task Name
rs Weeks Type
House
Construction at
Oman
Conduct 1
Ground Work
1.1 Complete
Concrete
foundation
works
s
13
1.2 Complete
Excavation Excavatio
ns
Pool 1.2.1
Foundation 1.2.2
2 Complete
Perform landscapi
Landscaping ng
package
Pool 2.1
Yard 2.2
Gardens 2.3
3 Perform
effective
Arrange
material
Materials
managem
ents
3.1 Perform
Project project
Management manageme
nt
Storage 3.2
14
Delivery 3.3
Give 4 Complete
Structure structure
Timber 4.1
Masonry 4.2
Steel 4.3
5 Effective
completio
Design House
n of
Interior
house
interior
Lining 5.1
5.2
Kitchen/Bathroom
Storage 5.3
Decorating 5.4
6 Get best
Arrange
house
Services
services
Plumbing 6.1
Electrical 6.2
Data 6.3
15
Entertainment 6.4
Security 6.5
Pool 6.6
7 Exterior
cladding
Perform systems
Cladding and
decoratio
Roofing 7.1
Tiling 7.2
Insulation 7.3
8 Ensure
effective
Walls
design of
walls
Exterior 8.1
Insulation 8.2
Joinery 8.3
Paint 8.4
9 Perform
Project closure
project
16
closing
facilities
Gantt chart
The below-mentioned figures represent the Gantt chart for the “Housing
construction” Project. It is also prepared through the effective use of MS
project management software.
Figure 1
Figure 2
17
Figure 3
Network Diagram
The Network Diagram for the “Housing Construction project” can understand
through the below-mentioned figures:
Figure 1
18
Critical Path
The Critical Path for the “Housing Construction project” can understand
through the below-mentioned figures:
Figure 1
19
Figure 2
Figure 3
Project Budget
The project budget can understand through the below-mentioned table
prepared by using the MS Excel:
Budget
Task Name
(OMR) Total (OMR)
House Construction at 128600
20
Oman
Conduct Ground
Work
Concrete works 49600 49600
Excavation
Pool 23200
Foundation 23200 46400
Perform Landscaping
Pool 54400
Yard 17400
Gardens 18000 89800
Arrange Materials
Project Management 3000
Storage 5000
Delivery 2000 10000
Give Structure
Timber 124000
Masonry 60000
Steel 41000 225000
Design House
Interior
Lining 29600
21
Kitchen/Bathroom 42200
Storage 9900
Decorating 54000 135700
Arrange Services
Plumbing 5000
Electrical 6000
Data 7000
Entertainment 9000
Security 7500
Pool 14000 48500
Perform Cladding
Roofing
Tiling 38600
Insulation 14900 53500
Walls
Exterior 47200
Insulation 14800
Joinery 33600
Paint 27000 122600
Project closure 6000 6000
22
On the basis of the above-mentioned project schedule, it can clearly
understand that the project can finish within the predetermined budget. It
will consume the total cost of OMR128, 600.
Project Quality Plan
Project Quality Responsibilities
The project owner delegated the project quality responsibility to
management levels of the project. In order to construct a good house, the
project contractor, supervisory team, and engineering manager will remain
responsible. The project contractor will ensure that the project outcomes
effectively represent the owner specifications (Kerzner, 2018). On the other
hand, the project manager will oversee the speed, efficiency, and economical
completion of the overall project to avoid any unnecessary delay. Moreover,
the engineering manager will ensure the project quality by continuous
evaluation of project execution plan, construction process, and engineering
codes and standards (Nicholas, 2017).
Quality Criteria
The quality of new house will judge on the basis of below-mentioned aspects:
Quality assurance Criteria Key aspects
In General Age of the building
Building layout
Building size and type
23
The condition of Structure
Interior (Oakland, 2017)
Structure Structural span
Construction Technology
Common Areas Building Entrance
Corridor, and Stairs
Building Lot Pool
Garden
Parking space
Presence and quality of
common areas like washroom,
kitchen, and bedroom (Sears,
2015)
Other Utilities (Public Water supply,
Garbage disposal, heating,
electricity, sewage, and
streets)
Fire Escape and Protection
Quality Methods
In order to evaluate the quality of the project, the two important methods
will follow here. These methods are following:
24
Process Checklists: At this stage, a list of critical tasks will prepare to
evaluate it against the predetermined work breakdown structure. This
will give information about any tendency in project accomplishment
and breakdown schedule (Tedla, 2018).
Comparison of project outcomes against standard Criteria: Here, the
project outcomes will compare the above-mentioned standard criteria
to find any problem.
Project Quality Register
QUALITY REGISTER FORM
Ref: Ve
Programme Name: Project Name: House Constru
Project Management
Quality Identifier: Product Identifier:
1 1.1
Product Title: Quality Method:
Ground works Quality review
Roles/Responsibilities: Result:
Quality reviews and Project audit team members Pass
Quality Records: DATES
Continuous Evaluation Planned
Quality 1st July
25
Activity
Sign-Off 30th July
Project Risk Register
The project is covered with a large number of risk factors. It can understand
through the below-mentioned risk register:
RISK REGISTER FORM
Ref: Vers
Programme Name: Project Name: House Construct
Project Management
Risk Identifier: Risk Description:
001 Failure to identify the project dependency on other team
members
Probability: Impact: Expected Value:
3 High High
Risk Response Category:
Reduce
Risk Response:
Outline dependency to avoid any confusion
Date Registered: Risk Author: Risk Owner: Risk Action:
16th August Project Management Project Project
Team Management Management Tea
Team
26
Conclusion
On the basis of the above-mentioned analysis, it can be concluded that the
success chances of the project are high than its failure. It is because the
owner needs not to hire a big team for its management. Moreover, the
project schedule and budget structure should effectively follow by the team
to avoid any unnecessary delay and cost overrun problem. This will enhance
the quality of generated project outcomes.
27