This document provides an overview of the systems development life cycle (SDLC), which includes preliminary investigation, systems analysis, and systems design stages. In the preliminary investigation stage, the feasibility of a new system is analyzed. In systems analysis, the current system is documented and requirements for a new system are identified. Finally, in systems design, how the new system will work is determined through a detailed specification. The goal is to translate user needs into a system that meets requirements through this structured development process.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views

Module 5 - Reading1 - SystemDevelopment

This document provides an overview of the systems development life cycle (SDLC), which includes preliminary investigation, systems analysis, and systems design stages. In the preliminary investigation stage, the feasibility of a new system is analyzed. In systems analysis, the current system is documented and requirements for a new system are identified. Finally, in systems design, how the new system will work is determined through a detailed specification. The goal is to translate user needs into a system that meets requirements through this structured development process.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 26

Reading: System Development

Introduction

This chapter will provide you with an overview of the


systems development process. First we describe in detail the
traditional Systems Development Life Cycle (SDLC),
encompassing the stages through which each system should
pass, from the initial survey to hand-over of the completed
system.
Pressure for rapid development and future maintainability of
systems has resulted in a number of alternative approaches
to systems development, ranging from development by end-
users, to the incorporation of formal methods to improve the
quality and efficiency of the development process.
Systems Development Life Cycle (SDLC)
Systems development could be seen as the simple process
of writing programs to solve the needs of the user.
Unfortunately the user knows what he wants but has no
technical expertise while the programmer understands the
computer but not the user environment. This communication
gap between the customer and the service provider must be
handled by an intermediary, the systems analyst. Broadly
speaking therefore the systems analyst translates user’s
needs into detailed specifications for implementation by the
programmer.
Over the years the software manufacturing process has
become more formalized:
The basic idea of the systems development life cycle is
that there is a well defined process by which an application
is conceived, developed and implemented. The life cycle
gives structure to a creative process. In order to manage
and control the development effort, it is necessary to know
what should have been done, what has been done, and
what has yet to be accomplished. The phases in the
systems development life cycle provide a basis for
management and control because they define segments of
the workflow which can be identified for managerial
purposes and specify the documents or other deliverables
to be produced in each phase.
—Davis and Olson, 1985.
The number of stages and names to describe those stages
differ slightly between organizations; but the SDLC normally
covers the activities shown in figure 1, each with a primary
purpose.
Preliminary Investigation
The preliminary investigation is carried out to determine the
scope and objectives of the new system and to investigate
whether there is a feasible solution. New applications
normally originate from end-user requests and are weighed
against the other requests for IS resources before approval
to develop the system is granted. At this stage an analyst or
small project team is authorized to investigate the real
potential of the new application. During this brief study the
analyst must investigate the problem and the existing system
sufficiently to be able to identify the true extent and purpose
of the new application.
In order to ensure that the new system would be of greater
benefit to the organization than other competing requests for
proposals, a feasibility study must be performed covering the
following three major areas:
• Economic feasibility to measure the costs and benefits of
the new system.
• Technical feasibility to ensure that the organization has
sufficient hardware, software and personnel resources
to develop and support the proposed system.
• Operational feasibility, the willingness and ability of
management, users and Information Systems staff in
the organization to build and use the proposed system
Figure 1: Systems Development Process
Issues such as the size and complexity of the new system
and the skills and availability of user and IS staff, will
determine the level of potential risk to the organization in
developing the system.
The output from this preliminary investigation is a statement
of scope and objectives (often termed the project charter)
together with a feasibility report. This document is submitted
to management where a decision is made as to whether or
not the development project should continue.
Systems Analysis
In this stage the analyst investigates the needs of the user
and develops a conceptual solution to the problem. One
human failing we all tend to exhibit is to rush into proposing
solutions before we fully understand the problem we are
trying to solve. It is therefore important for the analyst to
develop a broad, conceptual solution to the problem (what
needs to be done) prior to launching into the detailed
physical design where we specify how the system will work.
In the past analysis tended to be very much a pragmatic
affair with success more dependent on the experience and
capabilities of the analyst than on any formalized approach.
The analysis phase should include the following discrete
steps:
• Understand how the existing system operates. This
information can be obtained by observing people at
work, interviewing users, and studying procedure
manuals and other supporting documentation,
questionnaires and visits to other organizations.
• Document the current physical system. A major problem in
the past was how to record all the detail about the
system. Most of it could be found only in the analyst’s
head or draft notes. Here the basic tools of structured
systems analysis such as the data flow diagram (DFD),
the entity relationship diagram (ERD) and data
dictionary (DD) can be used to represent graphically
and record the data and procedures. We will discuss
these later in the chapter.
• Define the problem areas. These may include such issues
as poor response times in the existing system, poor
presentation of current information, high costs or weak
controls in the current system, waste and sometimes
duplication.
• Identify new requirements. The analyst must attempt to
identify new user requirements and look for new and
improved procedures that can be incorporated into the
system.
• Identify possible solutions. Having derived objectives for
the new system from the previous stage, the analyst
now develops a conceptual model of the new system in
conjunction with the user. This may involve the
investigation of alternative physical designs, such as
whether to remain with the existing manual system, or
to choose a centralized or decentralized approach to
the application.
• The culmination of the analysis stage is the preparation of
the formal user requirement specification (URS) that
incorporates a logical model of a system that will meet
the user’s requirements. A large proportion of the
functional description and data specifications is best
communicated from the analysis stage to the design
stage through the graphic and electronic output from
the structured tools used in the analysis process (data
flow diagrams, entity relationship models, decision trees
and the data dictionary).
• Again management is required to review the status of the
project and to make its go/no-go decision.
Systems Design
The analysis stage of the SDLC has clearly identified what
must be done in order to meet the user’s requirements. One
important decision that must be taken at this point is whether
to “make or buy” the new software application. In the past,
most large organizations developed their own applications
as no two organizations were exactly alike, and they could
afford the investment in systems developed around their
user’s needs.
Today the picture is changing as custom-built software is
becoming very expensive to develop and even more so to
maintain. Computer applications are large, complex and
integrated and many businesses have become non-
competitive because of their inability to develop systems that
adequately support their business activities.
On the reverse side, packages (pre-written software
applications) are becoming more common and can be
customized to meet the needs of each organization. With
major benefits in terms of speed of installation, cost, low
maintenance and low risk, more and more companies are
switching to packaged applications software. It is at this
stage in the SDLC that the “make or buy” decision must be
taken. We have analyzed our user’s requirements and can
use these as selection criteria in searching for an
appropriate package to purchase and install. Where there is
no suitable package available we can still look to other
innovative ways of obtaining the software, such as hiring
contract staff or appointing a software house to build the
system for us. Purchasing pre-written software will obviously
mean the detailed systems design, coding and testing
phases of the project are bypassed, depending on the need
for customization of the final system. In later courses we will
look at the package selection process in more detail.
The objective of the design stage is to determine exactly
how the new system will work, and to communicate this
information in a document referred to as the detailed
systems specification. If we take the analogy of an architect
building a house, in the analysis stage he has determined
the feasibility of the project and identified the owner’s
requirements in terms of the positioning of the house on the
plot, size and architectural style, number of rooms and so
on. The architect may even have built a small model to
demonstrate the look and feel of the new dwelling. Once the
owner is happy that the proposed house meets his
requirements, the architect must communicate the detailed
design to the builders. This would entail the drawing of a
detailed plan of the house, specifying exactly how every part
of the building is constructed and defining dimensions,
materials, construction techniques etc.
We need to go through the same process when designing
computer systems. This includes the design of:
• the technical platform on which the software will run. The
new application may need new hardware, operating
systems software and network connections
• output reports and enquiry screens
• input forms and data capture procedures
• physical file and database layouts
• description of the workings of each program module
• new clerical processes and procedures that will be required
to interface with the new system.
Whereas in the analysis stage the emphasis was on
identifying the user’s needs with little concern for the way the
computer would be used, the design stage also requires
user involvement for the approval of detailed design, but the
physical constraints imposed by the computer are also of
major importance. Gane and Sarson [1979] define the
objectives of structured design as follows:
The most important objective of design, of course, is to
deliver the functions required by the user. If the logical
model calls for the production of pay cheques and the
design does not produce pay cheques, or does not
produce them correctly, then the design is a failure. But
given that many correct designs are possible, there are
three main objectives which the designer has to bear in
mind while evolving and evaluating a design:
• Performance. How fast the design will be able to do the
user’s work given a particular hardware resource.
• Control. The extent to which the design is secure against
human errors, machine malfunction, or deliberate
mischief.
• Changeability. The ease with which the design allows the
system to be changed to, for example, meet the user’s
needs to have different transaction types processed.
The output from systems design is a detailed design
specification incorporating technical, input, output, data and
process specifications. In the past, much of the information
was communicated in written form which was difficult to
understand and often ambiguous. Imagine the builder having
to construct a house from a written description. Like the
output from analysis we have a number of innovative tools to
help users and developers understand and communicate the
workings of the system. These include data models and data
dictionaries, screen and report layouts, structure charts and
pseudo-code. We will look at most of these later in this
chapter.
Systems Build
In this stage we program the new system. If the system has
been purchased “off-the shelf, this phase would consist of
the customization of the system. The success of the
implementation stage is heavily reliant on the previous
stages. If the analysis stage was poorly enacted, the system
may not be what the user requires. Poor design will make it
difficult for the programmer to construct the system, and it
may be inefficient and difficult to maintain.
However, if the required effort and expertise is invested in
analysis and design, there will be a precise specification of
what to build available to the IS programmers and technical
staff.
Unlike the previous stages, the programming stage can be
undertaken as a number of separate tasks, performed in
parallel. Programmers can code, data base administrators
set up the database, hardware suppliers install and test
networks and equipment, and we can begin to train the end-
users to prepare them for the implementation phase. With so
much happening, and with the need for some tasks to be
completed before others begin, the analyst must develop a
detailed project implementation plan to ensure tasks are
scheduled and delays are quickly identified and addressed.
Programming includes the following steps:
• database construction
• program coding and testing
• systems testing to check the system can handle expected
loads and meets physical performance criteria
• finalise manual procedures
Systems Implementation
This entails the transition of the completed system into the
operational environment, and includes the following tasks
(some of which will already have been started in earlier
phases):
• installation and testing of any new hardware, systems
software and network infrastructure
• train users and operations staff
• transfer data (data conversion)from the manual or old
system to the new database where necessary
• perform acceptance testing. This requires careful planning
to ensure all data flows, error procedures, interfaces,
controls and manual procedures are tested
• complete project documentation
The change over carries some risk, as failure of the new
system may result in the organization being unable to do
business, There are a number of approaches to converting
from the old system to the new. The least risky is to run the
new system in parallel with the old until the new system is
stable. There is obviously a cost to running both systems.
Another approach is to convert one part of the organization
at a time (for example one branch office at a time). This
method (known as the pilot method) reduces risk and allows
the development team to focus on one area. This approach
can cause some integration problems as part of the
organization is running on the old system and part on the
new. A similar approach is the phased implementation
method where organizations convert to a large system one
step at a time. For example they may start with the stock
system, then implement debtors and finally the order entry
system. Some organizations use the big bang approach and
just switch over from the old to the new system. This option
is obviously high risk as there is no system to fall back on in
an emergency.
When the new system has been in operation for a few
months, a post-implementation audit should be carried out.
This audit must ascertain whether the project has achieved
the initial objectives specified in terms of:
• meeting initial scope and objectives
• anticipated costs and benefits to the organization
• user satisfaction with the new system
• performance (response/turnaround time, reliability)
• adherence to standards
• quality of final product
• project performance in terms of cost and time.
This exercise will help to highlight problems that require
maintenance of the new system and provide valuable
feedback to IS management and project teams to assist in
future development exercises.
Maintenance
Finally resources will be required to maintain and enhance
the system over its operational life which can vary between 4
and 10 years. There is normally a formal hand-over of the
system from the project team to the maintenance team. This
will ensure that there is a defined time when the project is
completed and that all the required documentation is
produced. There are many systems in existence that are still
supported by the original developer; and all knowledge of the
system exists only in that individual’s head. The problem is
that when this person leaves (or worse gets run over by a
bus), there is no one with any knowledge of the system and
the organization is at risk.
Research has shown that this is the most expensive stage of
the life cycle as program bugs (as a result of poor design or
bad coding and testing) or enhancements (poor analysis of
user’s requirements or changes to the business) require
continual analysis and programming effort.
The following table summarizes the important tasks in the six
stages of the SDLC and highlights the main deliverables
from each task.
Figure 2: SDLC Tasks

Stage Tasks

Preliminary Problem Definition Scope and Objectives Data Gathering Risk Assessmen
Investigation Feasibility Analysis

Systems
Data Gathering Systems Modeling User Requirements Definition
Analysis

Systems Design Make or Buy Decision Physical Systems Design Technical Design

Systems Build Programming and testing Platform Implementation

Systems User Training Data Conversion Systems Conversion Post-Implementation


Implementation Review

Systems
Fix system “bugs” System enhancement
Maintenance

Development of Structured Methodologies

New and innovative systems development techniques are


frequently proposed by researchers and practitioners and,
over time, these formal methods have replaced the
traditional pragmatic approach to developing computer
systems.
Structured Programming
In the 1960’s, the major concern in IS development
environments was the efficient utilization of expensive
computer hardware. Programs were written in low level
languages with little or no support documentation and, over
time, the code became almost impossible for maintenance
programmers to understand and fix. So arose the need to
introduce a set of standard rules and procedures for writing
programs, often referred to as structured programming.
Some of the key techniques in the structured programming
approach include:
• a limited set of simple control structures (to control
branching and looping)
• standard naming conventions for data and procedures
• self documenting programs.
Structured programming techniques ensured that programs
were easier to write and test and much easier to maintain.
Structured Design
In the mid 1970s the focus in systems development moved
from program coding to systems design. Computer
applications were becoming more complex with the
introduction of large on-line, integrated systems.
IS researchers, and in particular Larry Constantine, studied
the problems of program size and complexity, and
determined that, as a problem grew in size, so there was a
more than proportional growth in the complexity of the
problem and therefore in programming time. He advocated
that all systems should be made up of small modules each
no longer than fifty lines of program code.
Fragmenting a problem into a number of modules can be
done in many ways; and he urged that the best technique
would be to segment the program by function (task) with
each module being as functionally independent of other
modules as possible. This would ensure that changes to one
program module were unlikely to affect other modules.
This technique was known as structured design; and a
graphical representation of the modules and their
relationships known as a structure chart, was developed to
assist in the process.
Structured Analysis
In the late 1970s the focus in systems development moved
again, this time to the analysis stage. IS professionals had
formalized the design and coding of computer software but
had neglected the most important development issue – what
are the user’s real requirements. Written specifications were
the main source of communication throughout the project. In
the same way that architects would never attempt to
describe a building in a letter, so analysts needed tools and
techniques which could be used to define and communicate
the user’s requirements to the systems design stage. These
structured tools and techniques included:
• Data Flow Diagrams (DFD). These diagrams are used to
show how data flows between the various processes in
the system. DFD’s are an excellent communication tool
as they are simple enough for users to understand and
yet detailed enough to form the basis for the systems
design process. A number of DFD techniques has been
developed since the original work was published by
Tom De Marco in 1978. However, they all basically
perform the same task. Data flow diagrams are one of
the most used and popular IS charting techniques.
• Entity Relationship Diagrams (ERD). Entity relationship
diagrams identify the major objects about which data is
stored and chart their interrelationship. Like most formal
techniques, its major value is that it forces the analyst
into a structured and detailed investigation of all the
data used in the system.
• Decision Trees and Pseudo-code. These tools enable the
analyst to express process logic clearly and
unambiguously. In the detailed analysis of an
information system, the analyst often has to describe a
logical process that the future system will have to
perform. Examples of these could be the way that a
personnel system calculates pension benefits for
employees or a sales system calculates sales
commissions. Decision trees are diagrammatic
representations of the process logic, showing the
conditions that need to be tested and the resulting
activities in a simple tree-like structure. Pseudo-code
can be described as “structured English”. It permits the
analyst to define process logic using English language
couched in the logical structures inherent in program
code. In reality it eliminates the verbosity and ambiguity
from the English narrative.
• Project Dictionary. This tool enables the analyst to capture
and catalogue the entire system specification on
computer with the obvious advantages in reporting,
cross-referencing and updating. In a database
environment, data is no longer the property of each
individual application but managed centrally as a
corporate resource. Vast amounts of information about
this data needs to be maintained, for example field
names, types and lengths, validation rules, data
structures and relationships. As systems move from the
development to production environment, this data about
data is transferred from the project dictionary into a
production data dictionary to enable the database
administrator (DBA) to build and maintain the corporate
database.
As we will discuss later, most of the new computer assisted
software engineering (CASE) tools are now built up round a
project dictionary.
Alternative approaches to developing systems
Over the past 40 years, efforts have been made to improve
the quality of new systems and to reduce the time and effort
expended in their development. The following section
provides an overview of some of the significant tools and
techniques developed for this purpose.
Prototyping
One technique that has been incorporated successfully into
the SDLC is prototyping. As the name suggests a prototype
is a mock-up or model of a system for review purposes.
Looking at the traditional SDLC, one of the major problems
is that the user is asked to provide detailed requirements
prior to the system being built. Once a system is
implemented he may find flaws in his original requirements
or may see the possibilities of a new and improved
approach.
For applications such as general ledger and payroll, the
requirements are normally well understood (and usually
standardized enough to suggest the use of packages) but
many other areas such as personnel are unstructured and
would benefit from the prototyping stage.
The two main approaches to the use of prototypes in the
SDLC are:
• discovery prototyping where the analyst builds a skeleton
of the final product in the analysis stage of the project in
order that the user may better understand the workings
of the final system. This prototype is normally built with
a fourth generation language and while it is likely to
include mock-ups of screens and reports, it is seldom a
fully working model. The building and refining of the
prototype is an iterative process between analyst and
user and stimulates discussion on the functionality of
the final product. Once the analyst and user are happy
that the system’s requirements have been identified,
detailed requirement specifications are developed and
the prototype is no longer required. In some instances
the prototype may serve as the specification.
• evolutionary prototyping where a working model is built
with the intention of later refining it into the operational
system. While this technique would appear to have
great advantages in terms of productivity, the original
prototype is often thrown together and not properly
designed.
Prototyping can offer IS developers many advantages in that
it assists in clarifying user’s requirements, improves user
communication and commitment, should improve the
functionality and quality of the user interface and will assist
in identifying problems earlier in the development life cycle.
Where prototyping can be problematic is that it raises the
user’s expectations that systems are quick to build and
changes are easy. In addition there is a lack of experienced
prototypers and quality prototyping tools.
Joint Application Development (JAD)
One major problem in systems development projects is the
lack of real communication, understanding and consensus
between users, management and the development team.
Instead of the traditional one on one interviews spread over
weeks and often months, the JAD approach involves a
series of highly structured workshops where stakeholders
focus on any one of the planning, analysis, design and
implementation stages of the life cycle. One obvious
advantage of this approach is a reduction in the time it takes
to develop systems. However the real benefits of JAD come
from better user requirements through improved
communication and conflict resolution. Successful JAD
sessions often depend on the competence of the session
leader (termed the facilitator), the scribe (who is responsible
for documenting the output from the sessions), strong top
management support and a mix of participants with expertise
and responsibility for the area under discussion.
Computer Assisted Software Engineering (CASE)
There is a famous saying, “The cobblers children have no
shoes.” and this is very relevant to IS. Here we have a
classic example of a group of IS professionals, dedicated to
computerizing the organization in which they work, while
developing these computer systems via manual means.
CASE environments attempt to address this problem by
offering a set of integrated electronic tools for use in the
SDLC. During the first phase of system development, CASE
products provide the analyst with computerized tools to
complete and document the analysis and detailed design
stages of the development project by graphically modeling
the data requirements and the business process flows that
the intended application has to address. These models
attempt to give a visual representation of a part of the
business operations, following one of many modeling
standards. The resultant application model is then used as a
blueprint for the actual implementation in computer code.
The tools that are geared specifically for this modeling phase
are referred to as upper-CASE or JJ-CASE tools.
Lower-CASE tools specialize in the second phase of system
development: the actual generation of executable
applications or advanced prototypes. This is typically
achieved through the use of a generic application generator,
although CASE tools tend to be independent of any specific
database management system.
Integrated or I-CASE aims to automate both phases i.e. a
combination of upper and lower-CASE tools in one single
package.
Most CASE environments use an electronic project
dictionary as a repository and can include:
• graphic tools for charting diagrams such as DFD’s, ERD’s
and Structure charts
• 4th generation languages or application generators to
assist with prototyping
• data dictionary facilities to record and maintain data about
data, processes and other system details
• quality control facilities to check specifications and code for
correctness
• code generators to reduce programming effort
• spreadsheet models to assist with cost/benefit analysis
• project management tools to plan, monitor and control the
development cycle.
• When CASE environments were originally developed in the
mid 1980s, IS managers viewed them as a possible
“silver bullet” to resolve the growing demand for
computer systems. The promise of CASE was better
quality systems, reduced development time, enforced
standards and improved documentation.
As yet CASE tools have failed to make a major impact.
CASE environments are complex, the cost of implementing
CASE is high (both in terms of the CASE software and
analyst training) and many organizations are looking to other
solutions (packages and object orientation) to resolve their
applications backlog.
Object Oriented Development (OOD)
Using the traditional development approach where the
analyst designs procedures focused on the user’s
requirements can result in systems that are costly to develop
and inflexible in nature. The object oriented approach
attempts to build components (objects) that model the
behavior of persons, places, things or concepts that exist in
the real world and then to build systems from these
components. We do not design and build unique systems for
motor cars or televisions; they are mostly built up from a set
of common, interchangeable components. Even when
components are unique they are very similar to other
components. In the same way we can construct computer
systems from building blocks reusing objects from other
systems, making modifications to similar objects or obtaining
objects from commercial component libraries.
The OOD paradigm is only now gaining momentum in the
market place and most programming languages and
methodologies do not support 00 development. One
exception is Small Talk, the language credited with
pioneering the OOP (object oriented programming) concept.
Today many of the popular programming languages are
appearing with 00 versions (for example Pascal, C++, Visual
Basic and even COBOL).
Other development tools
The above-mentioned new programming approaches were
not the only attempts to improve developer productivity. The
following presents some other development tools and
approaches. Note that, since distinctions between the
categories cannot always be perfect, some tools could be
classified in more than one category.
• Visual programming tools. The power of graphical user
interfaces and object-orientation has spawned a
number of high-level front-ends or shells to enable non-
programmers to generate their own straightforward
applications. These visual programming tools allow for
the construction of applications by selecting,
connecting, copying and arranging programming
objects. For simple applications, there is no need for
any code to be written at all since all required objects
can be copied from a large library with all commonly
used, pre-configured objects and their associated
standard methods.
• Report generators are generally associated with database
management systems and allow users to create ad-
hoc, customized reports using the data in the database
by specifying the various selection criteria and the
desired report layout.
• Application generators consist of standard building blocks
that can be combined or customized to create the
required systems. The user specifies the inputs, the
output requirements and the various data validations
and transformations. Screen and report painters allow
on-line, visual layout of input and output modules.
Generally, these generators are supported by a
comprehensive database management system that
integrates the data dictionary, graphics and reporting
modules as well as other utilities such as data and
process modeling, security facilities, decision support
modules and query-by-example (QBE) languages.
• Logic programming for knowledge based systems.
Programmers quickly discovered that conventional
programming languages were inadequate to develop
advanced knowledge-based applications, such as
expert systems and other artificial intelligence systems.
These systems require reasoning capabilities and have
knowledge representation requirements that are difficult
to implement using procedural languages. This led to
the development of logic programming languages such
as LISP and Prolog. The use of these languages is
generally confined to researchers and scientists. Today,
a number of shells has been developed that allow the
automatic generation of straight-forward knowledge-
based systems.
• End-user applications. Today’s end-user productivity
applications have extensive programming capabilities
and allow for customization by means of macros (pre-
recorded sequences of commands, keystrokes) and
formulae. A spreadsheet is essentially a model
developed by an end-user whereby the equations (or
data transformations) have been programmed by
means of formulae. Many of these formulae look similar
to the statements in programming languages. The
following statement would calculate someone’s weekly
wages taking into account an overtime rate of 50%,
using Microsoft Excel or Access.
– IF ( hours > 42 , hours * wage , 42 * wage + ( 1.5 * wage )
* ( hours – 42 ))
Critical success factors

Regardless of the development approach that may be used,


a number of factors have been identified that are critical to
ensuring the success of a systems development project:
• well-defined system objectives
• careful test of feasibility
• top management support
• user involvement to ensure strong commitment
• rigorous analysis to ensure detailed, unambiguous user
requirements
• sound detailed design to ensure an efficient, quality,
maintainable system
• project management to ensure the development team is
managed and controlled.
South African Perspective
Research by a group of Scandinavian computer scientists
has suggested that prototyping is better suited than the
traditional SDLC to systems development projects
undertaken in developing countries. Although the SDLC
provides a rigorous development methodology intended to
generate clearly defined system requirements, it does not
take into account problems resulting from social and cultural
factors. These include the uncertain availability of technical
skills, user anxiety about technology, and the need for
adaptability of the final product to differing local conditions. A
further dimension to this approach is the need to train users
in basic computer literacy skills and to inform them about the
business role of IS before any attempt is made to elicit
system requirements. Once workers have been empowered
in this way, they are able to provide more valuable
participation in the development of a system. Developers
must also see the project as a mutual learning experience,
since they need to understand how future changes in the
business environment may affect system requirements.
Beyond the Basics
Web pages can contain multimedia effects and interactive
capabilities, and the development of web pages involves
using a variety of special components. Among the jargon
and acronyms that you may encounter are the following:
• Hypertext Markup Language (HTML) is not actually a
programming language, but has specific rules for
defining the formatting of text, graphics, video and
audio on a web page. Tags are used to indicate how a
page should be displayed on your screen, and the
details underlying links to other web pages.
• Interactive elements such as scrolling messages, pop-up
windows and animated graphics are controlled by small
programs, generally scripts, applets or ActiveX controls.
Basically, a script is an interpreted program that runs on
the client computer, as opposed to an applet, which is a
compiled program running on the client computer.
ActiveX controls are object-oriented technologies that
allow components on a network to communicate with
one another.
• Information is sent and received between your computer
and a web server via the common gateway interface
(CGI), which is the communications standard that
defines how a web server communicates with outside
sources such as a database. CGI programs are
frequently written using scripting languages such as
JavaScript, which is simpler to use than the full Java
language.
• Web pages created using dynamic HTML can
automatically update their content on the client’s
machine, without having to access the web server,
making them more responsive to user interaction.
Extensible HTML (XHTML) uses XML technology to
display web pages on different types of display devices,
while wireless markup language (WML) supports
browsing on PDAs and cellular telephones. Finally
wireless application protocol (WAP) specifies how
wireless devices such as cellular telephones
communicate with the Web.
Exercises
Stages of the SDLC
Read the following article, and then briefly explain, for each
stage of the SDLC, which of the standard activities appear to
have been omitted or not completed when developing the
system, and what effect this had on the quality of the final
product.
From: Machlis, S. “U.S. Agency Puts $71m System on Ice”,
Computerworld, 12 May 1997.
The U.S Agency for International Development (AID) last
week confirmed that it suspended overseas use of a new
computer system plagued by integration snafus, data
transmission bottlenecks, and response times so slow that
employee efficiency suffered. For now, 39 field sites will go
back to using the agency’s old system for core accounting
services and procurement contracts while problems with the
Washington-based computers are ironed out. “We need to
get the core functionality established”, said Richard McCall,
AID’s chief of staff.
The New Management System (NMS), budgeted at $71
million, has been under fire since it was deployed in October
of 1997. The AID inspector general’s office criticized NMS
for data errors and slow performance. In some cases, users
had to spend days trying to process a single transaction.
The new system can’t handle the large amount of data that
passes among AID offices, McCall said. The agency must
decide whether to boost expensive satellite network
bandwidth to handle real time transactions or move to some
batch processing. “I don’t think people understood the
amount of data that would be transmitted over the system”,
he said.
Designers also initially failed to gasp the difficulty of
integrating legacy accounting systems. “We thought we had
three primary accounting systems,” McCall said. But
numerous infield alterations to basic systems over the years
meant the agency had closer to 80 different accounting
systems. Some of the resulting data didn’t import correctly
into the new system.
In addition, McCall said, system designers should have
stayed focused on core requirements instead of trying to
immediately add features that users requested after early
tests. For example, some overseas employees wanted to be
able to call up data from any foreign site. Although that is an
attractive feature, he said, “that taxes the system. You don’t
really need that now.”
Systems conversion
Four different methods have been described for the
conversion to a new system: the parallel, pilot, phased or
“big bang” approach. Compare these four alternatives in
terms of the likely time frame involved, level of risk incurred,
and user “buy-in” to the new system.

You might also like