Before you receive your Ceramill system in several days, there may still be some preparation required
so that everything can run smoothly on the day of installation.
We would like you to read the following pages carefully – all important information is clearly
summarised. If you should still have any questions, however, you can contact our Helpdesk.
Telefonnummern:
DE: +49 7231 957-300 | AT: +43 5523 62333-300 | Int.: +43 5523 62333-300
Contents
1. Technical Data.....................................................................................................................................................................3
PC...........................................................................................................................................................................................5
2. Workstation requirements................................................................................................................................................5
2.2 Ceramill Motion 2 (4X and 5X), Ceramill Mikro, Ceramill Airstream & Ceramill Coolstream............................5
Internet connection......................................................................................................................................................... 10
3. Delivery information........................................................................................................................................................ 12
2
AmannGirrbach
1. TECHNICAL DATA
Measurements
390 x 360 x 310 415 x 407 x 535 588 x 516 x 755 588 x 516 x 755 410 x 410 x 540
D/W/H [mm]
Weight [kg] 31 31 75 78 50
Suction Power
Torque (Ncm) 4 4 4
Axes 2 2 4 5 4
Degree of protection
Recommended Table, no direct Table, no direct Table, no direct Table, no direct Table, no direct
installation site sunlight sunlight sunlight sunlight sunlight
Permitted
18 - 30 °C 15 - 30 °C 18 - 30 °C 18 - 30 °C 18 - 30 °C
temperature range
USB/Ethernet/
USB/Ethernet/SD/RS232; USB/Ethernet/SD/RS232;
SD/RS232;
Interfaces connection PC to Motion: connection PC to Motion:
connection PC to Mikro:
USB or network cable 5m USB or network cable 5m
USB or network cable 5m
subject to modifications
3
3
AmannGirrbach AmannGirrbach
Measurements
406 x 280 x 423 656 x 518 x 651 500 x 461 x 480 500x461x480
D/W/H [mm]
Weight [kg] 16 36 30 32
230 / 50 Hz;
Hertz [Hz] 50 / 60 50/60 50/60
110-120 / 60
Dry, clean
compressed air;
Compressed air
extraction capac.
connection
during run:
6 bar, 100l/min
Torque (Ncm)
Accuracy
Axes
Degree of protection IP 20 IP 20
Interfaces
subject to modifications
4
AmannGirrbach
COMPUTER
Screen [inch] 22
For information: Technical specifications may change depending on the development status
2. WORKSTATION REQUIREMENTS
General recommendations:
_ The units should not be exposed to large fluctuations in temperature (< 15°C) or direct sunlight
_ Recommended temperature range 15°C – 30°C
_ All units must be free standing; otherwise the fans cannot operate correctly and it could result
in overheating
_ All units are connected to the mains using a round Schuko plug (in Germany)
_We recommend positioning the scanner near the computer (easier operation).
_Place the scanner on a stable, level base (sturdy table, worktop, etc.)
2.2 CERAMILL MOTION 2 (4X AND 5X), CERAMILL MIKRO CERAMILL AIRSTREAM &
CERAMILL COOLSTREAM
We recommend positioning the milling machine near the computer. If this is not possible, see Section 2
“Ceramill milling machines connection options”
Please check:
_ There must be sufficient space to allow the option of placing the Ceramill Motion 2 directly on the Ceramill
Coolstream. See the following pages (tower version and bench version).
5
AmannGirrbach AmannGirrbach
_ A permanent supply of compressed air at adequate pressure must be guaranteed during operation of the
milling machines. It must be ensured that:
- The compressed air connection continuously delivers 6 bar (87 psi) to the milling machine.
- The required minimum air consumption of the machine of 50 L/min (1.77 CFM) is supplied continually.
- The pressure does not fluctuate due to additionally connected machines.
When planning and purchasing the compressor provide for sufficient volume flow reserve.
The recommended air volume of > 100L/min. (3.54 CFM) applies for calculation of the compressor
consumption for each individual milling machine.
If other machines are connected to the compressor, they must also be included (with sufficient reserves)
in the calculation of the consumption volume.
_ Requirements on air purity:
a) Solid contaminants: Class 3; 5 µm or less for solids
b) Water content: Class 4; max. pressure dew point +3°C
c) Total oil content: Class 2; max. oil content 0.1 mg/m3
_ Remark: The higher the capacity of the compressors, which are in continuous use, the better.
_ Can the “Ceramill Airstream” extraction be set up near the Ceramill milling machine (hose length is 1.8 m)?
When using Ceramill Motion 2 there is the option of installing and connecting the Airstream in the
Coolstream.
_ If other extraction/central extraction systems are in use: Are the correct connections (9-pin D-sub cable –
available from your extractor supplier) and hose diameter (38 mm) available?
6
AmannGirrbach
1415 mm
7
AmannGirrbach AmannGirrbach
>> 200
200 mm
mm 516 mm
516 mm >> 200
200 mm
mm >> 200
200 mm
mm 588 mm
588 mm
>>200
mm
755mm
80 kg
80 kg
755
mm
675mm
>>675
140
140
= ==
= 60
60
60
60
60
60
8
AmannGirrbach
9
AmannGirrbach AmannGirrbach
Internet connection
A connection to Internet (DSL/Flatrate recommended) must be available on the day of installation. If no-one
is available with sufficient knowledge about creating an Internet connection, an network specialist must be
present on the day of installation.
Please check:
_ Is a LAN cable available? If yes, is it long enough?
_ Does the router have a free socket?
_ Is the system to be connected to an existing network? If yes, will there be someone present on the day of
installation who can guarantee this?
Generally, we cannot provide support with network or Internet connection problems. Please make sure that
there is an existing network and also a specialist present on the day of installation when you connect the
system to a network.
Network connection
10
AmannGirrbach
_ The machine is intended exclusively for use within dry, closed rooms.
_ The machine must be positioned below an exhaust pipe or an exhaust hood (as used for pre-heating
furnaces).
_ Sufficient ventilation must be ensured at the set-up location, in order to draw off the heat and possibly
developing exhaust gas.
_ A clearance of at least 50 mm is to be observed sidewards, to the rear and upwards of the furnace. The
lateral clearance to non-flammable materials can be reduced to 20 cm. Minimum space requirements for
the Ceramill Argotherm (incl. connections):
_ The empty weight of the machine is 30 kg. The set-up surface must withstand an appropriate load.
_ During operation, the room temperature must be between 5 °C and 40 °C; avoid large variations in
temperature.
_ The floor covering must be made of non-flammable material, so that hot material falling out of the furnace
can not inflame the covering.
For operation, the protective gas must fulfil the following minimum requirements:
_ Argon 4.6 from commercially available cylinders (preferably 20 l)
_ Cylinder pressure 200 bar/2900 psi
_ To provide operation with air cooling, the furnace must be connected to the compressed-air supply.
_ A permanent supply of compressed air at adequate pressure must be guaranteed during operation of the
Argotherm sinter furnace. It must be ensured that:
- The compressed air connection continuously delivers 6 bar (87 psi) to the Argotherm sinter furnace.
-T he required minimum air consumption of the sinter furnace of 100 L/min (3.54 CFM) is supplied
continually.
- The pressure does not fluctuate due to additionally connected machines.
_ When planning and purchasing the compressor provide for sufficient volume flow reserve.
11
AmannGirrbach AmannGirrbach
3. DELIVERY INFORMATION
_ PC on top of it
12
AmannGirrbach
13
AmannGirrbach AmannGirrbach
Ceramill Therm 3
Ceramill Argotherm 2
14
AmannGirrbach
_ In the event the indicator shows a defect, please proceed according to instruc-
tions (see fig.). Following the malfunction report by the carrier, we will contact
you.
15
Made in the European Union
TSMANAG
TÄ
EM
LI
QUA
ENT
ISO 9001
Manufacturer | Hersteller
Distribution | Vertrieb Distribution | Vertrieb D/A