This document identifies hazards and assesses risks for various activities involved in RCC drainage work done by contractor Gubbi Civil Engineers. It lists hazards for activities like plaster breaking, demolishing RCC road, manual excavation, rubble soling, shuttering, cement concreting, RCC hume pipe joints, backfilling, and plastering. Risks are evaluated based on likelihood and consequence of each hazard to determine the risk rating. Control measures need to be implemented to reduce risks. The document was originally created on 09/09/2020 and is subject to periodic review.

Uploaded by

HARSHAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
449 views11 pages

HIRA RCC Work (3) Approed by Client

This document identifies hazards and assesses risks for various activities involved in RCC drainage work done by contractor Gubbi Civil Engineers. It lists hazards for activities like plaster breaking, demolishing RCC road, manual excavation, rubble soling, shuttering, cement concreting, RCC hume pipe joints, backfilling, and plastering. Risks are evaluated based on likelihood and consequence of each hazard to determine the risk rating. Control measures need to be implemented to reduce risks. The document was originally created on 09/09/2020 and is subject to periodic review.

Uploaded by

HARSHAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

AMENDMENT CONTROL RECORD

CURRENT REVISION
SR.NO DATE NO. NATURE OF AMENDMENT
1 02.03.2020 00 INTRODUCTION
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved


CORD
AMENDMENT Entered by
UCTION SJ / RF

# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved


HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA)
A. Document Number : HIRA/Projects/2020/09 Revision Number
0 : B.Date: Original-09.09.2020

C. Department / Area: Engg & Projects D.Team Members


E: Activities / Resource at workplace / work environment: RCC Drainage Work
F. Work done / Resource provided by : Contractor Gubbi Civil Engineers

Hazard Identification Risk Evaluation

Normal / Risk Rating


Abnormal /
S.No Hazard
Emergency Likelyhood (Probability) Consequence Ro - Risk Rating before
(N/A/E) (Severity) Control Implementation

1 2 3 4 5=3*4
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Plaster Breaking

1 Loose Material Collapse 3 2 6


N

3 Eye injury 2 2 4
N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Demolishing of RCC Road
1 Minor cut injury 3 2 6
N
2 Eye injury 3 2 6
N

3 Electric shock 2 3 6
A

4 Fire hazards. 2 3 6
E

5 Vibrating Hazard 3 2 6
N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Manual Excavation & Trenching

1 Fall in excavated pit 3 2 6


N

2 Damage to underground pipeline 3 3 9


A

3 Underground cables 3 3 9
A

5 Vehicle hit 3 3 9
N

# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved


6 Dust 3 2 6
N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Rubble Soling

1 Fall of bricks During Handling 3 2 6


N

2 Dust/ Particulate matter 3 2 6


N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Conventional Shutttering

1 Materials falling during the striking of formwork 3 1 3


N

2 Silica dust from scrabbling operations 3 2 6


N

3 Manual handling of shutters, reinforcing bars etc 3 2 6


N

4 Arm and back strain for steel fixers 4 1 4

N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Cement Concrete.

1 Work without safety of hands causes skin problems. 3 1 3


N
Careless work causes falling of materials and workmen causing
2 3 1 3
major injuries. N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - RCC Hume Pipe Joints

1 Fall of objects 3 1 3
N

2 Cut, crush, abrasion injury 4 1 4


N

3 Health hazard due to cement dust 3 1 3


N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Backfilling & Leveling

1 Collapse of soil/pits 4 1 4
N

2 Electric shock while touch to cable 5 1 5


E
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Plastering

1 Improper use of tools and equipment may cause accidents. 5 1 5


N

2 Proximity to loose debris and falling objects. 3 1 3

# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved


2 Proximity to loose debris and falling objects. 3 1 3
N

3 Exposure to hazardous chemicals and airborne particles. 5 1 5


N

4 Airborne irritants may get inhaled or enter the eyes. 5 1 5


N

Prepared by

Department Representative

Note:- Refer "Amendment Control Record (ACR) to note history of changes / periodic review

OHSP 01

# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved


HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) SHEET
Current -dd/mm/yy & Revision Number xx

RF/SJ

Risk Evaluation
Risk Rating Ri - Risk rating
after valuation
Adequacy of of control
Existing controls Preventive Additional controls
control (Ro x C)

6 7=5*6 H T

The Work Area cover by safety barrigation Tape at site And Protection Screen 2 12 Only experience & skills labours allow to
applying work with all PPE

Use Safety goggles. 2 8


Check All PPE is used or not by labours

2 12
Use Safety Helmet, Handgloves, safety shoes, safety goggles. Use Tested hand tools such as breaker
1 6
Use Safety goggles. Check All PPE is used or not by labours

ELCB board must present on the site. 2 12


Use Rubber Safety Shoes

Keep suitable Fire Extinguisher Near Working Place. 2 12


Fire Extinguisher Equipment inspect Daily

Check Oil & Weekly Maintenace carried out


Breaker operator work in rotation wise. 2 12 at Site to Reduce Vibration of Breaker

2 12 Keep heavy equipment away from trench


Barricading of the area by barrigation tape all around site. edges.
Allow only authorized person inside the barricading and check location of 2 18 Work to be Supervised By Experienced &
Existing Pipe line through Existing Drawing responsible Person

Excavation only done through permit to work,Check Live Cable from Continuous Dewatering is Required in high
Electrical and keep away From trench 2 18 Seepages area so cable remain always free
from water

Diversion sign board placed Properly at site so traffic diverted to another way 2 18 Diversion Sign Board Position Check regulary

# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved


Use of good quality nose mask 2 12
The expose Soil Surface wetted by water
regulary so dust will be in control

Use of Safety Helmet, Handgloves, safety shoes.Bricks are carrying inside 2 12


trolley,Bricks placed away from trench. Use of Wheelbarrow vehicle

1 6
Use of good quality nose mask Check All PPE is used or not by labours

1 3 Keep Construction Material Safely While


Guard rails must be put in place as work progresses Handling.

2 12 Shuttering Work is carried out inside


Use of good quality nose mask covering room

Proper safety Handgloves and contruction equipemnt gien to labour 1 6 Work to be Supervised By Experienced &
responsible Person

Workers must be provided with safe access to the work and work carried out Equipment must be in good order
1 4 before use. Original manufacturer’s pins
in rotation wise
must be used in adjustable props so less
effort required

1 3 Use Rubber handglooves for Mixing


Use Safety Handgloves, safety shoes, safety goggles. Concrete.

2 6
Only experience & skills labours allow to work. Use Tested hand tools.

1 3 Use of PPE’s Like Safety Shoes, Hardhat &


Use of PPE’s Like Safety Shoes, Hardhat & Handgloves Handgloves

1 4 Work to be Supervised By Experienced &


Use of PPE’s Like Safety Shoes & Handgloves responsible Person

Use of good quality nose mask 1 3


Check All PPE is used or not by labours

1 4
Safe access shall be provided for unloading the sand/soil. Use stopper at the time of unloading

2 10
Checking of live lighting cable from Electrical and keep away From trench Checking of live lighting cable.

1 5
Use Safety Helmet, Handgloves, safety shoes, safety goggles. Inspect All PPE Before Use

1 3 Work to be Supervised By Experienced &


Workers must be provided with safe access to the work. responsible Person

# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved


1 3 Work to be Supervised By Experienced &
Workers must be provided with safe access to the work. responsible Person

Use of good quality nose mask & Handgloves 1 5


Check All PPE is used or not by labours

Use safety goggles 1 5 Only experience & skills labours allow to


work.

Reviewed by

Head of Function

# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved


Related Legal
l controls
requirements

# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved


# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved
wed by

Function

# TOTAL Classification: Restricted Distribution TOTAL - All rights reserved

You might also like