HIRA RCC Work (3) Approed by Client
HIRA RCC Work (3) Approed by Client
CURRENT REVISION
SR.NO DATE NO. NATURE OF AMENDMENT
1 02.03.2020 00 INTRODUCTION
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
1 2 3 4 5=3*4
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Plaster Breaking
3 Eye injury 2 2 4
N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Demolishing of RCC Road
1 Minor cut injury 3 2 6
N
2 Eye injury 3 2 6
N
3 Electric shock 2 3 6
A
4 Fire hazards. 2 3 6
E
5 Vibrating Hazard 3 2 6
N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Manual Excavation & Trenching
3 Underground cables 3 3 9
A
5 Vehicle hit 3 3 9
N
N
Sub activity / Sub assembly of facilities & equipments / Situation / Event - Cement Concrete.
1 Fall of objects 3 1 3
N
1 Collapse of soil/pits 4 1 4
N
Prepared by
Department Representative
Note:- Refer "Amendment Control Record (ACR) to note history of changes / periodic review
OHSP 01
RF/SJ
Risk Evaluation
Risk Rating Ri - Risk rating
after valuation
Adequacy of of control
Existing controls Preventive Additional controls
control (Ro x C)
6 7=5*6 H T
The Work Area cover by safety barrigation Tape at site And Protection Screen 2 12 Only experience & skills labours allow to
applying work with all PPE
2 12
Use Safety Helmet, Handgloves, safety shoes, safety goggles. Use Tested hand tools such as breaker
1 6
Use Safety goggles. Check All PPE is used or not by labours
Excavation only done through permit to work,Check Live Cable from Continuous Dewatering is Required in high
Electrical and keep away From trench 2 18 Seepages area so cable remain always free
from water
Diversion sign board placed Properly at site so traffic diverted to another way 2 18 Diversion Sign Board Position Check regulary
1 6
Use of good quality nose mask Check All PPE is used or not by labours
Proper safety Handgloves and contruction equipemnt gien to labour 1 6 Work to be Supervised By Experienced &
responsible Person
Workers must be provided with safe access to the work and work carried out Equipment must be in good order
1 4 before use. Original manufacturer’s pins
in rotation wise
must be used in adjustable props so less
effort required
2 6
Only experience & skills labours allow to work. Use Tested hand tools.
1 4
Safe access shall be provided for unloading the sand/soil. Use stopper at the time of unloading
2 10
Checking of live lighting cable from Electrical and keep away From trench Checking of live lighting cable.
1 5
Use Safety Helmet, Handgloves, safety shoes, safety goggles. Inspect All PPE Before Use
Reviewed by
Head of Function
Function