This document provides an inspection test plan for combined power sockets for the Aqaba Screening Project task 5 of APC storing. The plan includes 9 items to inspect including documentation review, installation execution, support arrangement, identification tagging, grounding connection, and loop impedance testing. Upon completion of inspections, the contractor, engineer, and employer must sign off to verify all inspection items are accepted.

Uploaded by

Ahmad Dagamseh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
308 views

Combined Socket ITP

This document provides an inspection test plan for combined power sockets for the Aqaba Screening Project task 5 of APC storing. The plan includes 9 items to inspect including documentation review, installation execution, support arrangement, identification tagging, grounding connection, and loop impedance testing. Upon completion of inspections, the contractor, engineer, and employer must sign off to verify all inspection items are accepted.

Uploaded by

Ahmad Dagamseh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Project: J17082 Employer: ITP Ref No.

ITP-I-04

Engineer: Contractor: Date: August / 2 /2020

PO# 201902600 NEGEMCO Job No.: JV19-016 Rev: 00


Project: Aqaba Screening Project task 5 of APC storing
Inspection test Plan Combined Power Sockets
Inspected By 1- APC Amin Mohammad/Eyad N. Abu Adi
1-Employer (APC) QCP Approval
2- DAR
Combined Power Socket Unit 2- Engineer (DAR)
3- Contractor (NEGEMCO) ( )- Approved without Comment
4- Vendor ( )- Approved With Comment- Proceed
5- Third party ( )- Not Approved-Resubmitted
Control Activity
W: Witness
H: Hold
I: Inspection
Item Activity Description Inspection/Test method Referance standard R: Review Verification Documentation
T: Testing
N/A : Not Applicable
1 Documentation
1_1 HSE Plan Document review HSE Policy R H N/A N/A Project requirment
1_2 Related Installation insturuction Document review Vendor Procedure R H N/A N/A Vendor Procedure

1_3 Installation Method of Statement Document review Contractor Procedure R H N/A N/A Method of Statement

1_4 Shop Drawing Document review Contractor Drawing R H N/A N/A Shop Drawing
2 Execution
Comined Unit to be inspected on Project Requirement and
2_1 Delivery visual inspection specification R+I I N/A N/A Material Receiving Report
Mounting height and location as Project Requirement and
2_2 visual inspection I I N/A N/A Visual Inspection+RFI
per approved drawing specification

5000 volt D.c insulation Project Requirement and


2_3 Check support arrangement I I N/A N/A Visual Inspection+RFI
tester. specification

Check cable gland and termination Approved shop drawing


2_4 as specified. visual inspection and approved submittal I I N/A N/A Visual Inspection+RFI

Verify combined socket unit Specification and


2_5 identification is done properly (TAG) visual inspection approved shop drawing. I I N/A N/A Visual Inspection+RFI

2_6 Check labels on socket unit visual inspection Specification and Drawings I I N/A N/A Visual Inspection+RFI

Verify cable identification is done Project Requirement and I


2_7 visual inspection I N/A N/A Visual Inspection+RFI
properly (TAG) specification
Project Requirement and
2_8 Check of earth connection visual inspection I I N/A N/A Visual Inspection+RFI
specification
Project Requirement and
2_9 Loop Impedence Test to be applied Loop Impedence Tester I+W T N/A N/A Testing Report
specification
COMBINED SOCKET INSTALLATION
CHECK LIST

Project: Aqaba Screening Project task 5 of APC storing


Employer: ARAB POTASH COMPANY (APC) Contractor: NEGMCO
EQUIPMENT NO:
DESCRIPTION:
SYSTEM/SUBSYSTEM No:
REPORT No

SL Nº ITEM DESCRIPTION ACCEPTED REJECTED

1 Area classification as per approved drawing

2 Mounting height and location as per approved drawing

3 Check mounting support and bolt

4 Visually Inspected for damage

5 Cable termination done properly

6 Cable colour coding and size are verified

7 Grounding connection done properly

8 Verify cable identification is done propertly (TAG)

9 Verify receptacle identification is done propertly (TAG)

REMARKS:

WITNESSED /
CONTRACTOR (NEGMCO) ENGINEER (DAR) EMPLOYER (IF REQUIRED)
REVIEWED BY:

SIGNATURE:

PRINT NAME:

DATE:
DOCUMENT NUMBERING:

Contractor: NEGMCO

SYSTEM/SUBSYSTEM No: