This document contains a list of 31 program specific files and details that need to be prepared and assigned to various faculty members for an upcoming NBA accreditation visit. The files include department budgets, student admission and performance data, faculty details, publications, projects, labs, curriculum details, assessments of program outcomes, actions taken for improvement, and stakeholder involvement. Faculty members GKP, VNL, VH, LKS, DRK, and others are assigned responsibilities to compile relevant documents and data from the past three years.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
40 views
Program Specific File List
This document contains a list of 31 program specific files and details that need to be prepared and assigned to various faculty members for an upcoming NBA accreditation visit. The files include department budgets, student admission and performance data, faculty details, publications, projects, labs, curriculum details, assessments of program outcomes, actions taken for improvement, and stakeholder involvement. Faculty members GKP, VNL, VH, LKS, DRK, and others are assigned responsibilities to compile relevant documents and data from the past three years.
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
03/01/2020
Malnad College of Engineering
Department of Electrical and Electronics Engineering NBA Related Work Allocation
Program Specific Files list Faculty
1. NBA accreditation reports of the past visits, if any. GKP + YKB 2. Department budget and allocations (last 3 years data). GKP + Veena 3. Admission – seats filled and ranks ( last 3 years data). VNL + YKB 4. List/Number of students who cleared the program in 4 years (last 3 years data). VNL + YKB 5. Average Grade point (CGPA) (last 3 years data of students’ CGPA/ percentage). VNL + YKB 6. Placement and higher studies data (last 3 years data). VNL + YKB 7. Professional society activities, events, conferences organized, etc. VH + SKH List of students’ papers along with hard-copies of the publications; professional 8. VH + SKH society publications/magazines, etc. 9. Sample best and average project reports/theses. LKS 10. Details of faculty student ratio. VNL + GKP Faculty details with their service books, salary details, sample appointment letters, DRK + Veena + 11. promotion and award letters/certificates. Madhu Faculty list with designation, qualification, joining date, publication, R & D, DRK + Veena + 12. interaction details. Madhu VH + MLJ + 13. List of faculty publications along with DOIs and publication/citation details. VSN List of R & D and consultancy projects along with approvals and project 14. SR + LKS completion reports. VH + MLJ +NSJ 15. List and proofs of faculty interaction with outside world. + RPD 16. List of class rooms, faculty rooms. SKH + GKP 17. List of program specific labs and computing facilities within the department. SKH + GKP DRK + Veena + 18. List of non-teaching staff with their appointment letters, etc. Madhu LKS + SKH + 19. List of short-term courses, workshop arranged and course-modules developed. DRK NSJ + VSN + 20. Records of new program specific facility created, if any. Arjun NSJ + VSN + 21. Records of overall program specific improvements, if any. Arjun 22. Curriculum, POs, PEOs, Mission and Vision statements. VH + SKH 23. Mapping of Course Outcomes with POs and PSOs. NSJ + YKB Course files, plan of course delivery, question papers, answer scripts, assignments, SR + SKH + 24. reports of assignments, project reports, report of design projects, list of laboratory VNL + MET + experiments, reports of laboratory experiments, etc. Madhu LKS + VSN + 25. Rubrics developed to validate the POs and PSOs. YKB HNS + RPD + 26. Improvement in curriculum for mapping POs and PSOs. MLJ YKB + NSJ + 27. Direct and indirect assessment to show attainment of POs and PSOs. MLJ + RPD HNS + RPD + 28. Analysis of assessment and attainment of outcomes. MLJ + Manjunath HNS + RPD + 29. Actions identified for improvement and their impact analysis. MLJ + Manjunath HNS + RPD + 30. Stake-holders involvement in the process of improvement of POs and PSOs; and MLJ + Manjunath 31. Budget allocation and utilization. GKP + Veena
Environment, Development and Sustainability Volume issue 2020 [doi 10.1007_s10668-019-00583-2] Vendoti, Suresh; Muralidhar, M.; Kiranmayi, R. -- Techno-economic analysis of off-grid solar_wind_bioga