Pipe Hanger: Fire Protection Detail 1
Pipe Hanger: Fire Protection Detail 1
REVIEWED AS TO
DESIGNED: SUBMITTED: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.
DESIGN CONCEPT:
VARIOUS DPWH
PROPOSED PROJECTS
MANUEL D. TORRES PABLO G. RACINES (SEE COVER SHEET) (SEE COVER SHEET) BOD
STANDARD THREE-STOREY FIRE PROTECTION DETAIL, 59
MECHANICAL DESIGN MANAGING PARTNER JOSEPHINE P. ISTURIS DANTE B. POTANTE RAUL C. ASIS SCHOOL BUILDING SCHEDULE OF EQUIPMENT FP-3
POSITION: MECHANICAL ENGINEER 63
PRC No.: 2195 TIN No.: 145-553-983 CHIEF, DIRECTOR IV, BOD UNDERSECRETARY ( 12 CLASSROOMS )
PTR No.: 3399286 BUILDINGS DIVISION, BOD (REVISED 3-24-17)