The document provides a piping analysis summary for a compressor piping system at an Apache Alpine Jade Facility compressor piping station. A dynamic analysis was performed to determine piping natural frequencies and separation margins per API 618 criteria. The analysis identified modifications needed to meet criteria, including support additions/shifts and piping modifications. A stress analysis was also performed. General recommendations are provided regarding piping design and support to reduce vibration.

Uploaded by

Edward Julian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
567 views80 pages

Piping Analysis Report R0 PDF

The document provides a piping analysis summary for a compressor piping system at an Apache Alpine Jade Facility compressor piping station. A dynamic analysis was performed to determine piping natural frequencies and separation margins per API 618 criteria. The analysis identified modifications needed to meet criteria, including support additions/shifts and piping modifications. A stress analysis was also performed. General recommendations are provided regarding piping design and support to reduce vibration.

Uploaded by

Edward Julian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 80

Apache

Alpine Jade Facility


Compressor Piping Station
TTI - 18048-1400 - Piping Analysis Report

Analysis by: Reviewed by Approved by:


James Poole Brian Remy P.E. Geoffrey Anderson, P.E.
Senior Piping Engineer Mechanical Engineering Manager President
Tech Transfer, Inc. Tech Transfer, Inc. Tech Transfer, Inc.
12-Jun-18 12-Jun-18 12-Jun-18

Rev. Description Date


0 Initial Issue 12-Jun-18
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Piping Analysis Report
Date: 12-Jun-18
Table of Contents
Section Description

1. Piping Analysis Summary


● General

● Piping Analysis Software

● Piping Dynamic Analysis

● Piping Stress Analysis

● Additional Analysis Conditions

● Summary

● Recommendations

● Conclusion

2. Piping Analysis Scope


● General

● Piping Scope

● Piping Analysis

● Piping Dynamic Analysis

● Piping Stress Analysis

● Additional Analysis Conditions

3. Piping Dynamic Analysis


● Calculated Natural Frequencies

● Mode Shape Plots

4. Piping Stress Analysis


● Piping Analysis Parameters

● Piping Stress Plots

5. Piping Recommendations
● Recommended Modification Plots

● Recommended Pipe Support Drawings

Appendices
A. ● Compressor Performance Sheets

B. ● General Arrangement Drawings

C. ● P&ID's
SECTION 1
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: JP Compressor Piping Station
Date: 12-Jun-18 Piping Analysis Summary

1.1 General
This document outlines the Piping Analysis Summary for the compressor piping system. The
acoustical study per API 618 is provided in a separate report (TTI - 18048-1300).

Driver Frame Stages Number of Units


G3612A4 KBZ/4 3 10

1.2 Piping Analysis Scope


Refer to Section 2 for the Piping Scope.

1.3 Piping Analysis Software


The piping analysis was performed with Bentley AutoPIPE software. AutoPIPE is a finite
element computer program used to analyze static and dynamic loads on piping systems. It is a
proven, well-established program that has been commercially available since 1986.

1.4 Piping Dynamic Summary


Reciprocating compressor packages are unique in their application and design. In comparison
to conventional piping design, this piping requires a significant increase in the number of pipe
supports with hold-down clamps to prevent excessive vibration. Pipe supports are modeled with
structural beams and/or square tube members at each pipe support location to ensure proper
flexibility and accurate natural frequency results.

A dynamic analysis was performed to determine the piping mechanical natural frequencies in
accordance with API 618. The intent is to be above twice running speed as there is typically
sufficient excitation energy at 1X & 2X to excite resonances to a dangerous level. The predicted
mechanical natural frequencies shall be designed to be separated from significant excitation
frequencies by 20%. These separation margins are intended to avoid coincidence with
significant excitation frequencies that may produce excessive vibration in the system.

The separation margins per API 618 criteria were not met; therefore, a forced response analysis
was performed for the excitation frequencies of concern. The predicted piping mode shape plots
and displacement plots VS API limits are also shown in Section 3.

The recommended pipe supports are per Tech Transfer’s standards. In general, they will be
HSS supports with bolted clamps. Typical industry pipe supports (sliders & U-bolts) will not be
utilized due to inherent vibration problems. If support locations are provided in original
documentation, all efforts will be made to keep existing support locations. Where necessary,
existing supports will be moved and modified to prevent excessive vibration and/or stress.

1.5 Piping Stress Summary


Flexibility (stress) analysis for piping shall be per applicable codes. The displacement stress
range is based on minimum to maximum temperature under analysis (7,000 thermal cycles).
The following code combinations shall be performed; no other combinations will be considered.
Refer to Section 4 for the analysis parameters & stress plots.
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: JP Compressor Piping Station
Date: 12-Jun-18 Piping Analysis Summary

1.6 Nozzle Load Summary


Piping nozzle loads are provided in Section 4. It is the responsibility of the manufacturer to
consider the overall effects on the vessel or equipment for qualification purposes.

1.7 Support Load Summary


Piping support loads are provided in Section 4. Refer to the piping support location and detail
drawings for global axis orientation.

1.8 Analysis Recommendations/Assumptions


The following recommendations were necessary to meet applicable codes and/or remove
coinciding natural frequencies in the piping system and/or piping support structures:
 Suction header branch modified to meet code stress
 Supports added and shifted throughout to meet API 618 margins
 Cooler riser piping modified to meet cooler nozzle allowable
 1st stage discharge bottle nozzle increased to sch 100 for compliance
 2nd stage to dehy piping header assumed to be 1/16” CA to meet hoop @ 635 PSI

For recommended pipe support locations and details see recommendations CAD model

CAUTION: Do not allow clamp bolt sleeve to bottom to ensure proper tension is maintained.

1.9 General Recommendations


As TTI standard, Dwgs. INS-01, INS-02 & INS-04 are provided as guidelines to eliminate or
reduce elevated/cantilevered mass that can cause excessive vibration and premature failure in
the piping system and/or connections. Piping less than 2” is not recommended as it does not
provide adequate stiffness and cannot be accurately predicted with computer calculations.
Variations in instrumentation connections from what is recommended cannot be warranted
against failures due to vibration.

TTI’s field experience has shown that many instrumentation connections with flanged isolation
valves experience a high occurrence of fatigue failure due to vibration energy. Analysis cannot
confirm where there will be coincidence between the modal natural frequency and the excitation
energy that could result in failure at higher frequencies. TTI recommends that these
connections should be adequately supported or relocated. Instrumentation transmitters should
be remotely mounted. Heavy full bore isolation valves to vessels and piping should be avoided.

For recommended vessel/branch connection details, see Dwg. INS-01 & INS-02 (Section 5)
For recommended instrumentation connection details, see Dwg. INS-04 (Section 5)

1.10 Conclusion
The piping system with the recommended modifications is code compliant and fit for purpose.
SECTION 2
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: J.P. Compressor Piping Station
Date: 12-Jun-18 Piping Analysis Scope

2.1 - General Number of Units 10


This document outlines the Piping Analysis Scope for the compressor piping system. The
acoustical study per API 618 will be provided in a separate report (TTI -18048-1300).
2.2 - Piping Analysis Scope
Studies and Piping Systems ( if applicable)

Step 3a & Step 3b2 - API 618 5th Edition Design Approach 3 (Formerly 4th Edition M7)
Step 3a & Step 3b2 & Flexibility Analysis - API 618 5th Edition Design Approach 3
(Formerly 4th Edition M7 + M11)

Suction Piping On-Skid Skid-to-Cooler Off-Skid-to-Header Header


Inter-stage Piping On-Skid Skid-to-Cooler Off-Skid-to-Header Header
Discharge Piping On-Skid Skid-to-Cooler Off-Skid-to-Header Header
PSV Piping On-Skid Skid-to-Cooler Off-Skid-to-Header Header
Recycle Piping On-Skid Skid-to-Cooler Off-Skid-to-Header Header
Blow Down Piping On-Skid Skid-to-Cooler Off-Skid-to-Header Header

Excluded items (by others)


Water and oil piping
Drain and dump piping
Engine exhaust piping
Aux tubing lines
Pressure and temperature instrumentation
Piping less than 2” NPS
2.3 - Additional Specific Analysis
Additional Analysis ( if applicable)
 Piping Support Displacements1  Transportation Loads
1
 Piping Support Loads  Wind Analysis
 Seismic Analysis  PSV Analysis
 Skid Edge Flange Loads  Nozzle Load Analysis
 Metric Units  Buried Lines
1
- Available for off-skid piping supports only.
2.4 - Piping Analysis
Codes & Standards ( if applicable)
 ASME B31.3 - Process Piping (AutoPIPE software)
 ASME B31.8 - Gas Transmission & Distribution Piping Systems
 API 618 - Reciprocating Compressors
 API 619 - Rotary-type Positive Displacement Compressors
 API 661 - Air Cooled Heat Exchangers (2X API 661 - Table 4)
 ASME BPVC Section VIII Div. 2 - (NozzlePRO FEA software)
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: J.P. Compressor Piping Station
Date: 12-Jun-18 Piping Analysis Scope

Piping Specifications ( if applicable)


P&ID’s Compressor Performance
Piping CADWorx Model Piping Line List
3D Model Piping Isometrics
2.5 - Piping Stress Analysis
Analysis Case Category
Max Temperature T1 = Per Compressor Performance Data + 10%
Max Pressure P = Per P&ID Relief Valve Setpoints
Min Temperature2 T2 = -20⁰F

Code Combination Category Allowable Stress


Gravity + Max P Sustain Per ASME B31.3
2
Max Range Expansion Per ASME B31.3
Amb to T1 Expansion Per ASME B31.3
Amb to T2 Expansion Per ASME B31.3
Max P Hoop Per ASME B31.3
Gravity + Wind Occasional Per ASME B31.3
Sus + PSV Occasional Per ASME B31.3
o
Ambient Temperature = 70 F (Fabrication/Installation temperature)
2-
If min temp not specified, -20⁰F will be used for Max Range code combination

2.6 - Additional Required Information


Required Items ( if applicable )
 Seismic accelerations  Piping spec
 PSV reaction forces  Line list
 Wind Speed Data  P&ID’s
 Off-skid piping support loads  Piping isometrics
 Piping to battery limit  Piping support steel
2.7 - Project Deliverables
Deliverable Items (Only  items provided)
Tech Transfer Standard Formal Report
 Tech Transfer Conceptual Piping Support Recommendation Drawings
 Tech Transfer Conceptual Piping Support Recommendation Model
SECTION 3
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Calculated System Natural Frequencies
Date: 12-Jun-18
As Modified
Frequency Multiples of Operating Speed
Mode Mode Shape Description
Hz CPM 750 830 920 1000

1 Suction Piping (X-Dir) 11.71 703 0.94 0.85 0.76 0.70

2 Cooler Riser Piping (Y-Dir) 20.82 1249 1.67 1.50 1.36 1.25

3 Branch to Header Piping (X-Dir) 21.97 1318 1.76 1.59 1.43 1.32

4 Cooler Riser Piping (Y-Dir) 22.33 1340 1.79 1.61 1.46 1.34

5 Bypass Piping (Y-Dir) 28.54 1712 2.28 2.06 1.86 1.71


Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Natural Frequency Plot
Date: 12-Jun-18
Mode 1 As Modified
Natural Frequency: 11.71 Hz = 703 RPM

Note: Mode plots exaggerated for illustration only


Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Natural Frequency Plot
Date: 12-Jun-18
Mode 2 As Modified
Natural Frequency: 20.82 Hz = 1249 RPM

Note: Mode plots exaggerated for illustration only


Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Natural Frequency Plot
Date: 12-Jun-18
Mode 3 As Modified
Natural Frequency: 21.97 Hz = 1318 RPM

Note: Mode plots exaggerated for illustration only


Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Natural Frequency Plot
Date: 12-Jun-18
Mode 4 As Modified
Natural Frequency: 22.33 Hz = 1340 RPM

Note: Mode plots exaggerated for illustration only


Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Natural Frequency Plot
Date: 12-Jun-18
Mode 5 As Modified
Natural Frequency: 28.54 Hz = 1712 RPM

Note: Mode plots exaggerated for illustration only


Apache
TTI No - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Forced Response Results Summary
Date: 12-Jun-18

API 618 (Figure 4) Design Vibration Guideline
0.1
TTI Field Limit
API 618 Design Guideline
Vibration Guideline (Inches, p-p)

0.020 inches constant to 10 Hz


As Recommended
0.01

2X

0.001 inches
constant above
200 Hz
0.001
4X

1X 6X

0.0001
1 10 100 1000
Frequency (Hz)

NOTES: A forced response analysis was performed in accordance with the requirements of API 618 due to natural frequencies below the 2.4 times
maximum runspeed allowable.

The worst case vibrations present within the system for the acoustical shaking forces calculated and reported in the TTI Acoustical Report
(18048 - 1300) are plotted against the API 618 design allowable in the Forced Response Results figure above.

Forced response results with displacements less than 0.0001 inches are not shown.
SECTION 4
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Piping Stress Analysis Parameters
Date: 12-Jun-18

Temperature & Pressure


Ambient P T1 T2
Piping System
°F PSIG °F °F
1st Stage Suction 70 245 132 -20
1st Stage Discharge 70 245 312 -20
2nd Stage Suction 70 245 132 -20
2nd Stage Discharge 70 635 311 -20
3rd Stage Suction 70 635 132 -20
3rd Stage Discharge 70 1425 305 -20

Piping Specifications
Corrosion Allowance 1/8"
Materials See P&ID / CADWorx Model

Code Combination Category Allowable Stress


Gravity + Max P Sustain Per ASME B31.3
Max Range Expansion Per ASME B31.3
Amb to T1 Expansion Per ASME B31.3
Amb to T2 Expansion Per ASME B31.3
Max P Hoop Per ASME B31.3
Gr + Wind Ocassional Per ASME B31.3
Gr + PSV Ocassional Per ASME B31.3
T1 / T2 = Max Temperature / Min Temperature
P = Max pressure
W1 / W2 / W3 / W4 = Gr + Wind (120 mph)
U1 / U2 / U3 = Gr + PSV Reaction Force
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Stress Plot
Date: 12-Jun-18
Case 1 (Sustained) = GR + Max P

Ratio:
0.0 - 0.2
0.2 - 0.4

0.4 - 0.6
0.6 - 0.8

0.8 - 1.0
> 1.0
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Stress Plot
Date: 12-Jun-18
Case 2 (Expansion) = Max Range

Ratio:
0.0 - 0.2
0.2 - 0.4

0.4 - 0.6
0.6 - 0.8

0.8 - 1.0
> 1.0
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Stress Plot
Date: 12-Jun-18
Case 3 (Expansion) = Amb To T1

Ratio:
0.0 - 0.2
0.2 - 0.4

0.4 - 0.6
0.6 - 0.8

0.8 - 1.0
> 1.0
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Stress Plot
Date: 12-Jun-18
Case 4 (Expansion) = Amb To T2

Ratio:
0.0 - 0.2
0.2 - 0.4

0.4 - 0.6
0.6 - 0.8

0.8 - 1.0
> 1.0
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Stress Plot
Date: 12-Jun-18
Case 5 (Hoop) = Max P

Ratio:
0.0 - 0.2
0.2 - 0.4

0.4 - 0.6
0.6 - 0.8

0.8 - 1.0
> 1.0
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Stress Plot
Date: 12-Jun-18
Case 1 (Sustained) = GR + Max P

Ratio:
0.0 - 0.2
0.2 - 0.4

0.4 - 0.6
0.6 - 0.8

0.8 - 1.0
> 1.0
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Stress Plot
Date: 12-Jun-18
Case 2 (Expansion) = Max Range

Ratio:
0.0 - 0.2
0.2 - 0.4

0.4 - 0.6
0.6 - 0.8

0.8 - 1.0
> 1.0
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Stress Plot
Date: 12-Jun-18
Case 3 (Expansion) = Amb To T1

Ratio:
0.0 - 0.2
0.2 - 0.4

0.4 - 0.6
0.6 - 0.8

0.8 - 1.0
> 1.0
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Stress Plot
Date: 12-Jun-18
Case 4 (Expansion) = Amb To T2

Ratio:
0.0 - 0.2
0.2 - 0.4

0.4 - 0.6
0.6 - 0.8

0.8 - 1.0
> 1.0
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
Stress Plot
Date: 12-Jun-18
Case 5 (Hoop) = Max P

Ratio:
0.0 - 0.2
0.2 - 0.4

0.4 - 0.6
0.6 - 0.8

0.8 - 1.0
> 1.0
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: JP Compressor Piping Station
Date: 12-Jun-18 Nozzle Loads

R E F E R E N C E P O I N T L O A D S

Load FORCES (lb ) MOMENTS (ft-lb )


Combination Actual Allow. Ratio Actual Allow. Ratio
---------------------- -------- -------- ------ --------- --------- ------
Tag No.: S3SSNI
Ref. ID: A21-1 [After A24, Seg A, Global loads applied towards A02]

Gravity{1} FX 18 MX -32
FY 23 MY 332
FZ -350 MZ 63
FR 352 MR 340

GT1P1{1} FX -241 MX -395


FY -163 MY 349
FZ -166 MZ -390
FR 335 MR 655

Tag No.: S3SSNO


Ref. ID: C02-1 [After C02, Seg C, Global loads applied towards C01]

Gravity{1} FX -3 MX 287
FY 165 MY -3
FZ -423 MZ -9
FR 455 MR 288

GT1P1{1} FX -10 MX 231


FY 8180 MY -1
FZ 463 MZ -11
FR 8193 MR 231

Tag No.: S3SBNI


Ref. ID: C05-1 [After C05, Seg C, Global loads applied towards C06]

Gravity{1} FX 3 MX -28
FY -165 MY 3
FZ -314 MZ -5
FR 355 MR 28

GT1P1{1} FX 10 MX -4574
FY -8180 MY 1
FZ -1201 MZ -42
FR 8268 MR 4574
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: JP Compressor Piping Station
Date: 12-Jun-18 Nozzle Loads

R E F E R E N C E P O I N T L O A D S

Load FORCES (lb ) MOMENTS (ft-lb )


Combination Actual Allow. Ratio Actual Allow. Ratio
---------------------- -------- -------- ------ --------- --------- ------
Tag No.: S3CNO
Ref. ID: K35-1 [After K42, Seg K, Global loads applied towards K43]

Gravity{1} FX 1 2260 0.00 MX 75 2400 0.03


FY 13 1800 0.01 MY -8 3160 0.00
FZ -671 2260 0.30 MZ 3 4500 0.00
FR 671 3668 0.18 MR 76 6000 0.01

GT1P1{1} FX -11 2260 0.00 MX -1896 2400 0.79


FY -148 1800 0.08 MY -31 3160 0.01
FZ -588 2260 0.26 MZ 120 4500 0.03
FR 606 3668 0.17 MR 1900 6000 0.32

Tag No.: S3CNI


Ref. ID: K36-1 [After K44, Seg K, Global loads applied towards K43]

Gravity{1} FX -1 2260 0.00 MX -73 2400 0.03


FY 14 1800 0.01 MY -1 3160 0.00
FZ -115 2260 0.05 MZ 2 4500 0.00
FR 116 3668 0.03 MR 73 6000 0.01

GT1P1{1} FX 18 2260 0.01 MX 1504 2400 0.63


FY -420 1800 0.23 MY 1 3160 0.00
FZ 1406 2260 0.62 MZ -85 4500 0.02
FR 1467 3668 0.40 MR 1506 6000 0.25

Tag No.: S3DBNO


Ref. ID: O02-1 [After T02, Seg T, Global loads applied towards T01]

Gravity{1} FX 2 MX 3
FY -6 MY 114
FZ -168 MZ -22
FR 168 MR 116

GT1P1{1} FX -4013 MX -566


FY -847 MY -789
FZ 299 MZ -2791
FR 4113 MR 2956
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: JP Compressor Piping Station
Date: 12-Jun-18 Nozzle Loads

R E F E R E N C E P O I N T L O A D S

Load FORCES (lb ) MOMENTS (ft-lb )


Combination Actual Allow. Ratio Actual Allow. Ratio
---------------------- -------- -------- ------ --------- --------- ------
Tag No.: S2CNO
Ref. ID: Z29-1 [After AA34, Seg AA, Global loads applied towards AA35]

Gravity{1} FX 6 2260 0.00 MX 97 2400 0.04


FY 26 1800 0.01 MY -26 3160 0.01
FZ -913 2260 0.40 MZ 0 4500 0.00
FR 914 3668 0.25 MR 100 6000 0.02

GT1P1{1} FX 117 2260 0.05 MX -2654 2400 1.11* FAIL


FY -184 1800 0.10 MY -1305 3160 0.41
FZ -931 2260 0.41 MZ -104 4500 0.02
FR 956 3668 0.26 MR 2959 6000 0.49

Tag No.: S2CNI


Ref. ID: Z30-1 [After AA36, Seg AA, Global loads applied towards AA35]

Gravity{1} FX -6 2260 0.00 MX -89 2400 0.04


FY 31 1800 0.02 MY -97 3160 0.03
FZ -141 2260 0.06 MZ -34 4500 0.01
FR 144 3668 0.04 MR 136 6000 0.02

GT1P1{1} FX 12 2260 0.01 MX 2103 2400 0.88


FY -566 1800 0.31 MY 1668 3160 0.53
FZ 1677 2260 0.74 MZ 851 4500 0.19
FR 1770 3668 0.48 MR 2816 6000 0.47

Tag No.: S2DBNO


Ref. ID: Z49-1 [After AA61, Seg AA, Global loads applied towards AA02]

Gravity{1} FX 0 MX -56
FY -4 MY 4
FZ -266 MZ -13
FR 266 MR 57

GT1P1{1} FX -3730 MX -1563


FY 3901 MY -1038
FZ 627 MZ 11561
FR 5434 MR 11712
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: JP Compressor Piping Station
Date: 12-Jun-18 Nozzle Loads

R E F E R E N C E P O I N T L O A D S

Load FORCES (lb ) MOMENTS (ft-lb )


Combination Actual Allow. Ratio Actual Allow. Ratio
---------------------- -------- -------- ------ --------- --------- ------
Tag No.: S1DBNO
Ref. ID: AE02-1 [After AF02, Seg AF, Global loads applied towards AF01]

Gravity{1} FX -3 MX -276
FY 12 MY -161
FZ -339 MZ -30
FR 340 MR 321

GT1P1{1} FX 7922 MX -3552


FY 23447 MY 8835
FZ 7811 MZ -37379
FR 25952 MR 38573

Tag No.: S1CNI


Ref. ID: AF27-1 [After AF27, Seg AF, Global loads applied towards AF28]

Gravity{1} FX -11 4500 0.00 MX -98 3760 0.03


FY 38 3000 0.01 MY -231 6000 0.04
FZ -494 6000 0.08 MZ -83 9000 0.01
FR 496 8078 0.06 MR 264 11452 0.02

GT1P1{1} FX 706 4500 0.16 MX 3131 3760 0.83


FY -941 3000 0.31 MY 4386 6000 0.73
FZ 1945 6000 0.32 MZ 1592 9000 0.18
FR 2273 8078 0.28 MR 5619 11452 0.49

Tag No.: S1CNO


Ref. ID: AE21-1 [After AF29, Seg AF, Global loads applied towards AF28]

Gravity{1} FX 11 4500 0.00 MX 126 3760 0.03


FY 18 3000 0.01 MY -52 6000 0.01
FZ -1042 6000 0.17 MZ -26 9000 0.00
FR 1043 8078 0.13 MR 139 11452 0.01

GT1P1{1} FX 110 4500 0.02 MX -3907 3760 1.04* FAIL


FY -404 3000 0.13 MY -4917 6000 0.82
FZ -833 6000 0.14 MZ -865 9000 0.10
FR 932 8078 0.12 MR 6339 11452 0.55
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: JP Compressor Piping Station
Date: 12-Jun-18 Nozzle Loads

R E F E R E N C E P O I N T L O A D S

Load FORCES (lb ) MOMENTS (ft-lb )


Combination Actual Allow. Ratio Actual Allow. Ratio
---------------------- -------- -------- ------ --------- --------- ------
Tag No.: S2SSNI
Ref. ID: AE38-1 [After AF47, Seg AF, Global loads applied towards AF48]

Gravity{1} FX 0 MX 220
FY -19 MY 45
FZ -426 MZ 7
FR 426 MR 224

GT1P1{1} FX 3218 MX -3553


FY 15782 MY -4245
FZ 10684 MZ 480
FR 19328 MR 5556

Tag No.: S2SSNO


Ref. ID: BW02-1 [After AH02, Seg AH, Global loads applied towards AH01]

Gravity{1} FX 0 MX -336
FY -146 MY 0
FZ -624 MZ 1
FR 641 MR 336

GT1P1{1} FX -20 MX -2006


FY -11421 MY -17
FZ 105 MZ -40
FR 11421 MR 2006

Tag No.: S2SBNI


Ref. ID: BW05-1 [After AH05, Seg AH, Global loads applied towards AH06]

Gravity{1} FX 0 MX -293
FY 146 MY 0
FZ -300 MZ 1
FR 334 MR 293

GT1P1{1} FX 20 MX 4545
FY 11421 MY 17
FZ -1029 MZ 127
FR 11467 MR 4546
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: JP Compressor Piping Station
Date: 12-Jun-18 Nozzle Loads

R E F E R E N C E P O I N T L O A D S

Load FORCES (lb ) MOMENTS (ft-lb )


Combination Actual Allow. Ratio Actual Allow. Ratio
---------------------- -------- -------- ------ --------- --------- ------
Tag No.: S1SSNI
Ref. ID: AJ21-1 [After AR27, Seg AR, Global loads applied towards AR28]

Gravity{1} FX 2 MX -660
FY 1 MY -6
FZ -1230 MZ -5
FR 1230 MR 660

GT1P1{1} FX -1429 MX -1640


FY -10155 MY 583
FZ -1789 MZ 841
FR 10410 MR 1933

Tag No.: S1SSNO


Ref. ID: AL02-1 [After AT02, Seg AT, Global loads applied towards AT01]

Gravity{1} FX 0 MX 174
FY -60 MY 0
FZ -779 MZ 0
FR 782 MR 174

GT1P1{1} FX 294 MX 18561


FY 17121 MY -338
FZ -19701 MZ 82
FR 26102 MR 18564

Tag No.: S1SBNI


Ref. ID: AT04-1 [After AT04, Seg AT, Global loads applied towards AT05]

Gravity{1} FX 0 MX 462
FY 60 MY 0
FZ -8 MZ 0
FR 61 MR 462

GT1P1{1} FX -294 MX 12973


FY -17121 MY 338
FZ 18913 MZ 399
FR 25513 MR 12983

*Cooler nozzles loads compared to 2X API 661*

*Vessel nozzle load compliance per ASME Sec 8 Div 2*


TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: J.P. Compressor Piping Station
Date: 08-Jun-18 SUPPORT POINT STEEL DISPLACEMENTS
10 11 12 10 11 12
Gravity Load Case Load Case
Gravity{1} (in) GT1P1{1} (in)
Support Dx Dy Dz Dx Dy Dz
A03 0.003 0.010 -0.010 0.377 0.020 0.019
A09 0.000 0.000 -0.001 0.001 0.002 -0.002
A10 0.000 0.000 0.000 0.000 -0.003 0.000
AA00 0.000 0.001 -0.014 0.767 -0.019 -0.014
AA01 0.000 0.001 -0.025 0.699 0.005 -0.025
AA02 0.000 0.002 -0.023 0.709 0.000 -0.022
AA03 0.000 0.001 -0.020 0.596 0.002 -0.021
AA04 0.000 0.001 -0.020 0.593 0.000 -0.020
AA05 0.000 0.001 -0.022 0.575 -0.006 -0.020
AA06 0.000 0.002 -0.026 0.410 -0.006 -0.026
AA08 0.000 0.002 -0.027 0.381 0.010 -0.028
AA10 0.000 0.002 -0.027 0.301 0.009 -0.028
AA11 0.000 0.001 -0.025 0.184 0.006 -0.026
AA12 0.000 0.001 -0.022 0.108 0.014 -0.023
AA13 0.000 0.001 -0.024 0.031 0.005 -0.024
AA14 0.000 0.001 -0.024 -0.084 0.004 -0.024
AA15 0.000 0.001 -0.022 -0.158 0.013 -0.023
AA16 0.000 0.001 -0.024 -0.233 0.003 -0.024
AA17 0.000 0.001 -0.024 -0.343 0.003 -0.023
AA18 0.000 0.001 -0.022 -0.422 0.007 -0.022
AA19 0.000 0.001 -0.022 -0.452 -0.004 -0.022
AA20 0.000 0.002 -0.025 -0.597 -0.006 -0.023
AA21 0.000 0.004 -0.039 -0.585 -0.002 -0.039
AA22 0.000 0.006 -0.081 -0.579 0.004 -0.082
AA27 0.000 0.006 -0.074 -0.609 0.010 -0.073
AA28 0.000 0.004 -0.037 -0.606 0.009 -0.037
AA29 0.000 0.003 -0.032 -0.664 -0.013 -0.033
AB03 0.000 -0.004 -0.013 0.163 0.022 0.041
AB09 0.000 0.000 0.000 0.000 0.000 0.000
AB12 0.000 0.000 0.000 0.000 0.001 0.000
B00 0.000 0.001 -0.006 0.708 -0.019 -0.006
B01 0.000 0.001 -0.012 0.675 0.005 -0.012
B02 0.000 0.002 -0.011 0.680 0.000 -0.009
B03 0.000 0.001 -0.009 0.570 0.002 -0.011
B04 0.000 0.001 -0.009 0.567 0.000 -0.009
B05 0.000 0.001 -0.010 0.556 -0.006 -0.008
B06 0.000 0.002 -0.012 0.375 -0.007 -0.013
B08 0.000 0.002 -0.012 0.355 0.010 -0.015
B10 0.000 0.002 -0.013 0.297 0.009 -0.012
B11 0.000 0.001 -0.011 0.154 0.006 -0.012
B12 0.000 0.001 -0.010 0.104 0.014 -0.011
B13 0.000 0.001 -0.011 0.049 0.004 -0.011
B14 0.000 0.001 -0.011 -0.098 0.004 -0.011
B15 0.000 0.001 -0.010 -0.151 0.013 -0.011
B16 0.000 0.001 -0.011 -0.201 0.003 -0.012
B17 0.000 0.001 -0.011 -0.339 0.003 -0.010
B18 0.000 0.001 -0.010 -0.398 0.007 -0.010
B19 0.000 0.001 -0.010 -0.418 -0.004 -0.011
B20 -0.001 0.002 -0.011 -0.569 -0.006 -0.009
B21 -0.001 0.004 -0.017 -0.562 -0.002 -0.017
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: J.P. Compressor Piping Station
Date: 08-Jun-18 SUPPORT POINT STEEL DISPLACEMENTS

Gravity Load Case Load Case


Gravity{1} (in) GT1P1{1} (in)
Support Dx Dy Dz Dx Dy Dz
B22 -0.001 0.006 -0.038 -0.559 0.004 -0.039
B27 0.001 0.006 -0.034 -0.585 0.010 -0.033
B28 0.000 0.004 -0.016 -0.585 0.009 -0.016
B29 0.000 0.003 -0.015 -0.614 -0.013 -0.016
C00 0.000 0.000 0.000 0.000 0.003 0.000
C01 0.000 0.000 -0.001 0.000 -0.003 -0.001
C07 0.000 -0.004 -0.011 0.163 0.040 0.025
D00 0.005 0.001 -0.003 0.017 -0.009 -0.002
D01 0.000 0.000 -0.006 0.000 0.000 -0.004
D03 -0.002 0.000 -0.006 -0.013 0.016 -0.005
D05 -0.001 -0.001 -0.006 -0.023 0.014 -0.006
D06 -0.002 -0.001 -0.006 -0.042 0.014 -0.005
D07 0.001 -0.001 -0.005 -0.051 0.013 -0.005
D08 0.003 -0.001 -0.006 -0.061 0.008 -0.005
D09 -0.002 -0.002 -0.006 -0.084 0.007 -0.005
D10 0.000 -0.001 -0.005 -0.094 0.009 -0.005
D11 0.003 -0.002 -0.006 -0.104 0.006 -0.006
D12 -0.003 -0.002 -0.006 -0.126 0.002 -0.005
D13 0.000 -0.002 -0.005 -0.136 0.000 -0.005
D14 0.003 -0.001 -0.005 -0.145 -0.008 -0.006
D15 -0.003 0.002 -0.005 -0.166 -0.012 -0.005
D16 0.000 0.007 -0.004 -0.175 -0.003 -0.004
D17 0.002 0.010 -0.004 -0.183 0.008 -0.005
D18 -0.002 0.011 -0.004 -0.201 0.014 -0.003
D19 0.001 0.009 -0.004 -0.208 0.009 -0.004
D20 0.003 0.006 -0.002 -0.215 0.001 -0.002
E00 0.000 0.000 0.000 0.000 0.000 0.000
E01 0.000 0.000 0.000 0.001 0.001 0.000
E04 0.001 0.008 -0.008 0.376 0.026 0.014
E05 0.000 -0.004 -0.005 0.163 0.018 0.002
E08 -0.001 -0.001 -0.007 -0.036 0.015 -0.003
F00 0.000 0.000 0.000 0.000 0.000 0.000
F01 0.000 0.000 0.000 0.000 -0.001 0.000
F04 -0.001 -0.001 -0.005 -0.036 0.014 -0.005
G00 0.000 0.001 -0.015 0.728 -0.018 -0.018
G01 0.000 0.001 -0.027 0.668 0.004 -0.027
G02 0.000 0.001 -0.025 0.678 0.000 -0.024
G03 0.000 0.001 -0.022 0.575 0.002 -0.022
G04 0.000 0.001 -0.022 0.566 0.000 -0.022
G05 0.000 0.001 -0.024 0.556 -0.007 -0.023
G06 0.000 0.001 -0.028 0.411 -0.006 -0.026
G10 0.000 0.001 -0.029 0.376 0.009 -0.027
G14 0.000 0.001 -0.030 0.302 0.009 -0.034
G15 0.000 0.001 -0.027 0.183 0.006 -0.028
G16 0.000 0.001 -0.024 0.110 0.013 -0.024
G17 0.000 0.001 -0.026 0.034 0.005 -0.025
G18 0.000 0.001 -0.026 -0.089 0.004 -0.025
G19 0.000 0.001 -0.024 -0.162 0.012 -0.023
G20 0.000 0.001 -0.026 -0.235 0.003 -0.026
G21 0.000 0.001 -0.026 -0.348 0.003 -0.025
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: J.P. Compressor Piping Station
Date: 08-Jun-18 SUPPORT POINT STEEL DISPLACEMENTS

Gravity Load Case Load Case


Gravity{1} (in) GT1P1{1} (in)
Support Dx Dy Dz Dx Dy Dz
G22 0.000 0.001 -0.024 -0.421 0.006 -0.023
G23 0.000 0.001 -0.025 -0.451 -0.003 -0.025
G24 0.000 0.002 -0.027 -0.571 -0.007 -0.027
G25 0.000 0.004 -0.041 -0.556 -0.002 -0.042
G26 0.000 0.005 -0.082 -0.552 0.003 -0.082
G31 0.000 0.005 -0.074 -0.579 0.009 -0.073
G32 0.000 0.004 -0.039 -0.582 0.008 -0.039
G33 0.000 0.003 -0.033 -0.635 -0.011 -0.035
H00 0.000 0.000 0.000 0.000 -0.002 0.000
H09 0.000 0.000 0.000 0.000 0.001 -0.001
H12 0.001 0.009 -0.014 0.376 -0.027 0.022
I00 0.000 0.000 0.000 0.000 0.002 0.000
I05 0.000 0.000 0.000 0.000 -0.001 -0.001
I08 0.000 -0.004 -0.013 0.163 -0.002 0.047
J03 0.001 0.009 -0.014 0.376 -0.044 0.018
J06 0.000 0.000 0.000 0.000 0.000 0.000
J15 0.000 0.000 0.000 0.000 0.000 0.000
K00 0.000 0.001 -0.020 0.788 -0.018 -0.022
K01 0.000 0.001 -0.034 0.706 0.004 -0.034
K02 0.000 0.001 -0.032 0.718 0.000 -0.031
K03 0.000 0.001 -0.028 0.609 0.002 -0.028
K04 0.000 0.001 -0.028 0.602 0.000 -0.027
K05 0.000 0.001 -0.031 0.589 -0.007 -0.029
K06 0.000 0.001 -0.036 0.439 -0.006 -0.033
K08 0.000 0.001 -0.036 0.401 0.009 -0.035
K10 0.000 0.001 -0.038 0.316 0.009 -0.042
K11 0.000 0.001 -0.034 0.199 0.006 -0.036
K12 0.000 0.001 -0.031 0.114 0.013 -0.031
K13 0.000 0.001 -0.033 0.029 0.005 -0.032
K14 0.000 0.001 -0.033 -0.086 0.004 -0.032
K15 0.000 0.001 -0.031 -0.169 0.012 -0.030
K16 0.000 0.001 -0.033 -0.252 0.003 -0.033
K17 0.000 0.001 -0.033 -0.363 0.003 -0.032
K18 0.000 0.001 -0.030 -0.447 0.006 -0.030
K19 0.000 0.001 -0.031 -0.480 -0.003 -0.032
K20 0.000 0.002 -0.035 -0.608 -0.007 -0.035
K21 0.000 0.004 -0.054 -0.591 -0.002 -0.054
K22 0.000 0.005 -0.105 -0.584 0.004 -0.106
K27 0.000 0.005 -0.096 -0.614 0.009 -0.095
K28 0.000 0.004 -0.051 -0.615 0.009 -0.051
K29 0.000 0.003 -0.042 -0.686 -0.012 -0.044
L00 0.000 0.000 0.000 0.000 0.000 0.000
L05 0.000 0.000 0.000 0.000 0.000 0.000
L08 0.000 -0.004 -0.012 0.163 -0.022 0.048
M09 0.000 0.013 -0.002 0.053 -0.001 -0.001
M16 0.000 -0.005 0.000 -0.007 -0.062 0.000
N00 0.000 0.001 -0.022 0.811 -0.018 -0.022
N01 0.000 0.001 -0.037 0.718 0.005 -0.037
N02 0.000 0.001 -0.035 0.731 0.000 -0.034
N03 0.000 0.001 -0.031 0.618 0.002 -0.031
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: J.P. Compressor Piping Station
Date: 08-Jun-18 SUPPORT POINT STEEL DISPLACEMENTS

Gravity Load Case Load Case


Gravity{1} (in) GT1P1{1} (in)
Support Dx Dy Dz Dx Dy Dz
N04 0.000 0.001 -0.030 0.613 0.000 -0.030
N05 0.000 0.001 -0.034 0.597 -0.006 -0.032
N06 0.000 0.001 -0.039 0.441 -0.006 -0.037
N10 0.000 0.001 -0.040 0.406 0.009 -0.040
N14 0.000 0.001 -0.041 0.321 0.009 -0.044
N15 0.000 0.001 -0.038 0.206 0.006 -0.039
N19 0.000 0.001 -0.034 0.117 0.014 -0.034
N23 0.000 0.001 -0.036 0.028 0.005 -0.036
N24 0.000 0.001 -0.036 -0.089 0.005 -0.036
N28 0.000 0.001 -0.034 -0.175 0.012 -0.034
N32 0.000 0.001 -0.036 -0.258 0.003 -0.036
N33 0.000 0.001 -0.036 -0.364 0.003 -0.035
N37 0.000 0.001 -0.033 -0.450 0.007 -0.033
N41 0.000 0.001 -0.034 -0.483 -0.004 -0.034
N42 0.000 0.002 -0.038 -0.619 -0.007 -0.037
N46 0.000 0.004 -0.061 -0.603 -0.002 -0.061
N50 0.000 0.005 -0.120 -0.592 0.004 -0.121
N55 0.000 0.006 -0.112 -0.625 0.010 -0.111
N59 0.000 0.004 -0.058 -0.623 0.009 -0.058
N63 0.000 0.003 -0.047 -0.703 -0.012 -0.048
O09 0.000 -0.014 -0.002 0.063 0.010 -0.001
O18 0.000 0.007 0.000 -0.018 0.074 0.000
Z03 0.001 0.009 -0.013 0.376 -0.005 0.023
Z09 0.000 0.000 0.000 0.001 0.000 0.000
Z14 0.000 0.000 0.000 0.000 -0.001 0.000
0
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: J.P. Compressor Piping Station
Date: 08-Jun-18 SUPPORT LOADS
13 14 15 13 14 15
Gravity Load Case Load Case
Gravity{1} (lb) GT1P1{1} (lb)
Support Fx Fy Fz Fx Fy Fz
A03 5 0 -293 -1,003 -127 3,151
A09 -2 0 -1,199 1,057 5,542 -2,139
A10 1 0 -93 -33 -6,009 -103
AA00 0 1 -513 12,373 -2,740 -517
AA01 0 -2 -1,397 11,707 1,378 -1,378
AA02 0 -1 -1,081 11,699 -1,070 -1,124
AA03 0 0 -918 11,498 191 -876
AA04 0 0 -907 11,469 102 -908
AA05 0 2 -1,087 3,401 366 -1,097
AA06 0 -1 -1,141 11,588 -836 -1,267
AA08 0 1 -1,194 8,143 679 -1,343
AA10 0 -2 -1,298 -3,485 149 -1,371
AA11 0 -1 -1,164 11,095 -480 -1,146
AA12 0 2 -851 -1,310 1,867 -851
AA13 0 -1 -1,133 -11,061 -103 -1,136
AA14 0 -1 -1,134 11,398 66 -1,142
AA15 0 1 -858 3,776 1,715 -849
AA16 0 -1 -1,134 -11,132 -697 -1,127
AA17 0 -1 -1,135 3,807 514 -1,154
AA18 0 2 -853 -4,615 980 -847
AA19 0 0 -1,112 -11,654 -1,006 -1,092
AA20 0 4 -1,105 -11,189 577 -1,131
AA21 0 9 -969 -11,534 -583 -976
AA22 0 -16 -4,473 -10,433 -285 -4,433
AA27 0 -6 -1,760 -11,238 279 -1,798
AA28 0 7 -836 -11,988 1,793 -815
AA29 0 2 -1,581 -12,276 -3,520 -1,585
AB03 -3 0 -228 -330 354 130
AB09 0 0 -1,748 433 -5,445 -1,953
AB12 1 0 -211 -11 5,950 -264
B00 0 2 -502 12,851 -4,358 -542
B01 0 -2 -1,420 11,896 2,003 -1,372
B02 0 -1 -1,074 11,902 -1,782 -1,157
B03 0 1 -915 11,555 329 -825
B04 0 0 -903 11,566 475 -950
B05 0 2 -1,086 10,482 705 -993
B06 0 -1 -1,145 11,717 -1,745 -1,729
B08 0 0 -1,525 11,341 2,559 -3,860
B10 0 -1 -1,315 -11,275 -300 -1,231
B11 0 -1 -1,169 11,874 -1,804 -1,175
B12 0 2 -828 4,038 4,581 -819
B13 0 -1 -1,146 -11,760 -1,375 -1,146
B14 0 -1 -1,145 11,766 -1,300 -1,148
B15 0 1 -835 -4,722 4,445 -832
B16 0 -1 -1,146 -11,895 -1,959 -1,128
B17 0 -1 -1,145 12,091 15 -1,163
B18 0 2 -839 -12,214 3,049 -838
B19 0 0 -1,116 -11,833 -1,645 -1,082
B20 0 5 -1,237 -11,431 1,116 -1,269
B21 0 7 -377 -11,667 -465 -382
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: J.P. Compressor Piping Station
Date: 08-Jun-18 SUPPORT LOADS

Gravity Load Case Load Case


Gravity{1} (lb) GT1P1{1} (lb)
Support Fx Fy Fz Fx Fy Fz
B22 0 -14 -4,375 -10,742 -1,233 -4,328
B27 0 -11 -4,419 -10,669 1,073 -4,475
B28 0 8 -341 -12,355 2,507 -291
B29 0 4 -2,147 -12,766 -5,769 -2,189
C00 -1 0 -96 -8 5,973 -158
C01 16 0 -1,152 609 -5,173 -2,052
C07 -19 0 -462 -370 675 779
D00 20 -6 -750 -3,716 41 -781
D01 30 21 -1,797 -3,333 381 -1,299
D03 21 -18 -1,100 -5,319 -1,088 -1,237
D05 3 2 -1,820 -5,382 497 -2,441
D06 3 9 -1,777 -665 143 -1,723
D07 3 -12 -1,280 -1,020 -185 -1,267
D08 3 5 -1,715 -1,003 68 -1,718
D09 3 6 -1,714 472 53 -1,743
D10 3 -12 -1,298 345 -215 -1,277
D11 0 3 -1,713 130 80 -1,698
D12 0 3 -1,716 1,435 -5 -1,760
D13 0 -13 -1,297 1,512 -188 -1,284
D14 0 12 -1,715 1,129 53 -1,674
D15 0 28 -1,710 1,941 51 -1,764
D16 0 2 -1,296 2,180 5 -1,296
D17 2 -33 -1,716 1,742 -10 -1,653
D18 0 -27 -1,730 1,896 -137 -1,810
D19 2 35 -1,452 2,114 -142 -1,399
D20 2 -3 -601 1,696 447 -610
E00 3 0 -161 -103 -2,470 -166
E01 -35 0 -517 2,381 2,688 106
E04 37 0 -100 -3,168 159 -868
E05 -23 0 -663 600 -389 -437
E08 57 0 -577 2,470 -239 -1,048
F00 -1 0 -151 12 2,670 -166
F01 4 0 -765 -39 -2,625 -936
F04 -134 0 -161 1,693 357 658
G00 0 0 -260 6,269 1,162 -267
G01 0 0 -748 5,843 -219 -745
G02 0 0 -558 6,025 644 -563
G03 0 0 -475 5,892 -108 -469
G04 0 0 -478 5,867 -39 -485
G05 0 1 -548 6,022 -605 -533
G06 0 1 -719 5,954 551 -706
G10 0 0 -839 5,833 380 -936
G14 0 -1 -757 5,690 -1,069 -2,102
G15 0 -1 -608 5,903 156 -478
G16 0 0 -426 5,994 -453 -473
G17 0 0 -603 2,774 -63 -591
G18 0 0 -603 -5,852 -110 -603
G19 0 0 -428 -6,008 -457 -429
G20 0 0 -603 -5,871 171 -601
G21 0 0 -602 -5,968 -494 -602
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: J.P. Compressor Piping Station
Date: 08-Jun-18 SUPPORT LOADS

Gravity Load Case Load Case


Gravity{1} (lb) GT1P1{1} (lb)
Support Fx Fy Fz Fx Fy Fz
G22 0 1 -429 -5,965 -317 -431
G23 0 0 -596 -5,947 419 -594
G24 0 2 -627 -6,023 -711 -627
G25 0 0 -327 -5,925 82 -327
G26 0 -3 -1,315 -5,779 582 -1,314
G31 0 -2 -1,020 -5,902 -697 -1,021
G32 0 0 -394 -5,948 -221 -391
G33 0 2 -611 -6,347 1,776 -617
H00 -1 0 -364 -6 -4,084 -392
H09 1 0 -1,017 500 3,197 -2,278
H12 0 0 -90 111 49 1,641
I00 1 0 -359 -2 4,096 -376
I05 -3 0 -1,106 120 -3,356 -2,227
I08 1 0 53 2,747 -262 2,078
J03 -5 0 -136 -428 209 278
J06 3 0 -692 419 3,833 -1,014
J15 -1 0 -216 -7 -4,158 -223
K00 0 2 -717 12,514 3,404 -715
K01 0 -2 -1,996 11,596 -1,628 -1,998
K02 0 -2 -1,525 11,629 1,251 -1,535
K03 0 0 -1,297 11,445 -410 -1,281
K04 0 1 -1,285 11,327 5 -1,293
K05 0 3 -1,534 11,649 -1,185 -1,523
K06 0 1 -1,674 11,470 860 -1,726
K08 0 0 -1,424 7,377 -824 -1,470
K10 0 -4 -1,778 2,652 -1,100 -1,820
K11 0 -2 -1,668 -132 499 -1,702
K12 0 2 -1,186 -2,491 -1,405 -1,177
K13 0 0 -1,615 -2,800 212 -1,615
K14 0 0 -1,610 7,387 44 -1,607
K15 0 1 -1,202 3,272 -1,320 -1,210
K16 0 -1 -1,614 -1,385 613 -1,604
K17 0 -1 -1,612 -4,966 -598 -1,618
K18 0 3 -1,197 -10,446 -832 -1,202
K19 0 0 -1,591 -11,385 634 -1,577
K20 0 6 -1,573 -11,473 -1,398 -1,584
K21 0 4 -1,404 -11,422 608 -1,407
K22 0 -14 -4,296 -10,459 208 -4,279
K27 0 -6 -2,022 -11,190 -358 -2,034
K28 0 2 -1,440 -11,861 -1,997 -1,440
K29 0 6 -1,538 -12,574 4,468 -1,536
L00 1 0 -220 -1 4,141 -222
L05 -4 0 -705 142 -4,007 -735
L08 6 0 -121 141 231 -19
M09 -8 0 -5,853 2,361 -434 -4,542
M16 9 0 1,229 -1,201 -2,880 -426
N00 0 6 -1,496 11,301 -140 -1,493
N01 0 -8 -2,526 11,284 -1,079 -2,493
N02 0 -5 -2,672 11,179 1,064 -2,844
N03 0 3 -2,227 11,222 -424 -2,038
TTI - 18048 Apache
Rev: 0 Alpine Jade Facility
By: J.P. Compressor Piping Station
Date: 08-Jun-18 SUPPORT LOADS

Gravity Load Case Load Case


Gravity{1} (lb) GT1P1{1} (lb)
Support Fx Fy Fz Fx Fy Fz
N04 0 2 -2,166 11,281 -684 -2,126
N05 0 10 -2,447 10,996 110 -2,525
N06 0 -14 -3,109 10,962 -253 -2,788
N10 0 13 -3,148 12,006 -3,963 -3,057
N14 0 -11 -3,342 12,180 4,391 -2,975
N15 0 -2 -2,882 10,096 1,936 -3,068
N19 0 11 -2,885 5,470 -2,724 -2,841
N23 0 -6 -2,654 1,476 1,731 -2,664
N24 0 -4 -2,685 -7,934 1,743 -2,720
N28 0 9 -2,879 -11,513 -2,639 -2,851
N32 0 -8 -2,700 -11,372 1,833 -2,646
N33 0 -7 -2,707 -11,195 1,196 -2,813
N37 0 2 -2,799 -11,395 -1,884 -2,777
N41 0 0 -2,249 -11,230 619 -2,123
N42 0 29 -2,292 -10,933 -168 -2,455
N46 0 62 -6,599 -9,774 -260 -6,600
N50 0 -87 -12,486 -8,036 -137 -12,307
N55 0 -76 -14,339 -7,584 790 -14,494
N59 0 88 -5,861 -10,257 -1,032 -5,829
N63 0 -8 -3,605 -10,655 -120 -3,588
O09 -4 0 -6,079 2,901 805 -4,332
O18 2 0 1,274 -1,638 2,603 -767
Z03 6 0 -209 -1,463 266 350
Z09 -3 0 -1,713 1,372 5,506 -1,996
Z14 -1 0 -203 -40 -5,966 -249
0
SECTION 5
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
TTI Recommendation Plots
Date: 12-Jun-18

See recommendation CAD model for modifications

See following page for skid to rack piping

Notes:
Apache
TTI - 18048
Alpine Jade Facility
Rev: 0
Compressor Piping Station
By: J.P.
TTI Recommendation Plots
Date: 12-Jun-18

See recommendation CAD model for modifications

Notes:
APPENDIX A
Ariel Performance
Company: Enerflex Energy Systems Inc. Customer: Apache
Project #: AP032215 Rev:6 Inquiry:
Coral Central Processing Gas
7.7.5.0 Case 1: DESIGN: 50-1250PSIG Project:
Compression

Compressor Data: Driver Data:


Elevation,ft: 2999.00 Barmtr,psia: 13.153 Ambient,F: 100.00 Type: Nat. Gas
Frame: (ELP) KBZ/4 Stroke, in: 6.75 Rod Dia, in: 2.875 Mfg: Caterpillar
Max RL Tot, lbf: 150000 Max RL Tens, lbf: 75000 Max RL Comp, lbf: 80000 Model: G3612 A4
Rated RPM: 1000 Rated BHP: 5200.0 Rated PS FPM: 1125.0 BHP: 3750
Calc RPM: 1000.0 BHP: 3727 Calc PS FPM: 1125.0 Avail: 3750

Services Main Gas Residue


Gas Model VMG-APRNGL2 VMG-APRNGL2
Stage Data: 1 --- 2 1
Target Flow, MMSCFD 20.000 --- 20.000 19.700
Flow Calc, MMSCFD 18.878 --- 18.668 18.235
BHP per Stage 1500.6 --- 1174.2 1006.0
Specific Gravity 0.7973 --- 0.7891 0.6919
Ratio of Sp Ht (N) 1.2111 --- 1.2244 1.2615
Comp Suct (Zs) 0.9833 --- 0.9494 0.9115
Comp Disch (Zd) 0.9723 --- 0.9322 0.9109
Pres Suct Line, psig 50.00 --- N/A 505.00
Pres Suct Flg, psig 49.37 --- 204.22 502.41
Pres Disch Flg, psig 209.22 --- 560.00 1262.63
Pres Disch Line, psig N/A --- 550.00 1250.00
Pres Ratio F/F 3.557 --- 2.637 2.475
Temp Suct, F 100.00 --- 120.00 120.00
Temp Clr Disch, F 120.00 --- 120.00 120.00
Cylinder Data: Throw 1 Throw 3 Throw 2 Throw 4
Cyl Model 20-1/8Z:10 20-1/8Z:10 14-1/8Z 9-5/8Z
Cyl Bore, in 20.125 20.125 14.125 9.125
Cyl RDP (API), psig 313.6 313.6 740.9 1727.3
Cyl MAWP, psig 345.0 345.0 815.0 1900.0
Cyl Action DBL DBL DBL DBL
Cyl Disp, CFM 2459.8 2459.8 1198.9 485.6
Pres Suct Intl, psig 44.26 44.26 185.75 468.61
Temp Suct Intl, F 110 110 127 126
Pres Disch Intl, psig 223.96 223.96 612.86 1342.16
Temp Disch Intl, F 270 270 264 266
HE Suct Gas Vel, FPM 8595 8595 8873 8385
HE Disch Gas Vel, FPM 7259 7259 8481 7584
HE Spcrs Used/Max 0/0 0/0 0/4 0/4
HE Vol Pkt Avail 0.62+42.28 0.62+42.28 0.66+37.59 0.65+40.03
Vol Pkt Used 0.00 (V) % 0.00 (V) % 0.00 (V) % 3.08 (V) %
HE Min Clr, % 13.91 13.91 13.21 15.80
HE Total Clr, % 14.53 14.53 13.87 17.68
CE Suct Gas Vel, FPM 8420 8420 8505 7553
CE Disch Gas Vel, FPM 7111 7111 8129 6831
CE Spcrs Used/Max 0/0 0/0 0/4 0/4
CE Min Clr, % 14.56 14.56 14.32 18.61
CE Total Clr, % 14.56 14.56 14.32 18.61
Suct Vol Eff HE/CE, % 66.4/66.3 66.4/66.3 77.7/77.1 76.2/75.0
Disch Event HE/CE, ms 9.0/10.3 9.0/10.3 11.3/13.0 11.7/13.3
Suct Pseudo-Q HE/CE 6.7/6.4 6.7/6.4 7.8/7.2 7.5/6.1
Gas Rod Ld Comp, % 71.9 C 71.9 C 85.4 C 75.6 C
Gas Rod Ld Tens, % 74.2 T 74.2 T 83.7 T 64.2 T
Gas Rod Ld Total, % 75.4 75.4 87.4 72.4
Xhd Pin Deg/%Rvrsl lbf 140/91.1 140/91.1 149/79.0 175/65.8
Flow Calc, MMSCFD 9.439 9.439 18.668 18.235
Cyl BHP 750.3 750.3 1174.2 1006.0

05/21/2018 09:38:14 Note: BOLD=Out of Limits, ITALIC=Special Appl, BOLD=Review Base: 14.70 psia, 60.0 F Page: 1 of 5
File: K:\Projects\2017 Projects\17118 - Enerflex-H - E002498 - Apache - Alpine Diamond - Gathering Gathering Case:1 - Pkg:1
Units\Client Data & Dwgs\Compressor\17-11-30 (Different Facility Conditions)\AP032215 - 11.30.17.run
Ariel Performance
Company: Enerflex Energy Systems Inc. Customer: Apache
Project #: AP032215 Rev:6 Inquiry:
Coral Central Processing Gas
7.7.5.0 Case 2: 20MMSCFD -67Ps Project:
Compression

Compressor Data: Driver Data:


Elevation,ft: 2999.00 Barmtr,psia: 13.153 Ambient,F: 100.00 Type: Nat. Gas
Frame: (ELP) KBZ/4 Stroke, in: 6.75 Rod Dia, in: 2.875 Mfg: Caterpillar
Max RL Tot, lbf: 150000 Max RL Tens, lbf: 75000 Max RL Comp, lbf: 80000 Model: G3612 A4
Rated RPM: 1000 Rated BHP: 5200.0 Rated PS FPM: 1125.0 BHP: 3750
Calc RPM: 1000.0 BHP: 3712 Calc PS FPM: 1125.0 Avail: 3750

Services Main Gas Residue


Gas Model VMG-APRNGL2 VMG-APRNGL2
Stage Data: 1 --- 2 1
Target Flow, MMSCFD 20.000 --- 20.000 19.700
Flow Calc, MMSCFD 20.513 --- 20.333 19.335
BHP per Stage 1407.2 --- 1230.3 1028.3
Specific Gravity 0.7969 --- 0.7881 0.6916
Ratio of Sp Ht (N) 1.2144 --- 1.2261 1.2626
Comp Suct (Zs) 0.9788 --- 0.9461 0.9089
Comp Disch (Zd) 0.9674 --- 0.9290 0.9086
Pres Suct Line, psig 67.00 --- N/A 522.00
Pres Suct Flg, psig 66.20 --- 219.25 519.32
Pres Disch Flg, psig 224.25 --- 577.00 1262.63
Pres Disch Line, psig N/A --- 567.00 1250.00
Pres Ratio F/F 2.992 --- 2.539 2.396
Temp Suct, F 100.00 --- 120.00 120.00
Temp Clr Disch, F 120.00 --- 120.00 120.00
Cylinder Data: Throw 1 Throw 3 Throw 2 Throw 4
Cyl Model 20-1/8Z:10 20-1/8Z:10 14-1/8Z 9-5/8Z
Cyl Bore, in 20.125 20.125 14.125 9.125
Cyl RDP (API), psig 313.6 313.6 740.9 1727.3
Cyl MAWP, psig 345.0 345.0 815.0 1900.0
Cyl Action DBL DBL DBL DBL
Cyl Disp, CFM 2459.8 2459.8 1198.9 485.6
Pres Suct Intl, psig 59.67 59.67 199.45 484.31
Temp Suct Intl, F 109 109 127 125
Pres Disch Intl, psig 240.53 240.53 631.86 1342.82
Temp Disch Intl, F 249 249 260 261
HE Suct Gas Vel, FPM 8595 8595 8873 8385
HE Disch Gas Vel, FPM 7259 7259 8481 7584
HE Spcrs Used/Max 0/0 0/0 0/4 0/4
HE Vol Pkt Avail 0.62+42.28 0.62+42.28 0.66+37.59 0.65+40.03
Vol Pkt Used 53.00 (V) % 50.00 (V) % 0.00 (V) % 0.00 (V) %
HE Min Clr, % 13.91 13.91 13.21 15.80
HE Total Clr, % 36.94 35.68 13.87 16.45
CE Suct Gas Vel, FPM 8420 8420 8505 7553
CE Disch Gas Vel, FPM 7111 7111 8129 6831
CE Spcrs Used/Max 0/0 0/0 0/4 0/4
CE Min Clr, % 14.56 14.56 14.32 18.61
CE Total Clr, % 14.56 14.56 14.32 18.61
Suct Vol Eff HE/CE, % 39.5/73.0 41.4/73.0 78.9/78.3 78.5/76.2
Disch Event HE/CE, ms 7.3/11.8 7.5/11.8 11.7/13.3 12.2/13.7
Suct Pseudo-Q HE/CE 6.4/6.4 6.5/6.4 7.9/7.2 7.5/6.1
Gas Rod Ld Comp, % 72.5 C 72.5 C 86.6 C 74.5 C
Gas Rod Ld Tens, % 74.5 T 74.5 T 84.6 T 62.9 T
Gas Rod Ld Total, % 75.9 75.9 88.5 71.2
Xhd Pin Deg/%Rvrsl lbf 142/93.3 142/93.0 150/80.0 179/67.7
Flow Calc, MMSCFD 10.170 10.344 20.333 19.335
Cyl BHP 697.6 709.6 1230.3 1028.3

05/21/2018 09:38:15 Note: BOLD=Out of Limits, ITALIC=Special Appl, BOLD=Review Base: 14.70 psia, 60.0 F Page: 2 of 5
File: K:\Projects\2017 Projects\17118 - Enerflex-H - E002498 - Apache - Alpine Diamond - Gathering Gathering Case:2 - Pkg:1
Units\Client Data & Dwgs\Compressor\17-11-30 (Different Facility Conditions)\AP032215 - 11.30.17.run
Ariel Performance
Company: Enerflex Energy Systems Inc. Customer: Apache
Project #: AP032215 Rev:6 Inquiry:
Coral Central Processing Gas
7.7.5.0 Case 4: HIGH DISH: 50-1350PSIG Project:
Compression

Compressor Data: Driver Data:


Elevation,ft: 2999.00 Barmtr,psia: 13.153 Ambient,F: 100.00 Type: Nat. Gas
Frame: (ELP) KBZ/4 Stroke, in: 6.75 Rod Dia, in: 2.875 Mfg: Caterpillar
Max RL Tot, lbf: 150000 Max RL Tens, lbf: 75000 Max RL Comp, lbf: 80000 Model: G3612 A4
Rated RPM: 1000 Rated BHP: 5200.0 Rated PS FPM: 1125.0 BHP: 3750
Calc RPM: 1000.0 BHP: 3724 Calc PS FPM: 1125.0 Avail: 3750

Services Main Gas Residue


Gas Model VMG-APRNGL2 VMG-APRNGL2
Stage Data: 1 --- 2 1
Target Flow, MMSCFD 20.000 --- 20.000 19.700
Flow Calc, MMSCFD 18.481 --- 18.280 17.735
BHP per Stage 1452.9 --- 1166.1 1058.9
Specific Gravity 0.7973 --- 0.7893 0.6919
Ratio of Sp Ht (N) 1.2112 --- 1.2240 1.2604
Comp Suct (Zs) 0.9833 --- 0.9501 0.9115
Comp Disch (Zd) 0.9724 --- 0.9328 0.9128
Pres Suct Line, psig 50.00 --- N/A 505.00
Pres Suct Flg, psig 49.37 --- 201.12 502.41
Pres Disch Flg, psig 206.12 --- 560.00 1363.63
Pres Disch Line, psig N/A --- 550.00 1350.00
Pres Ratio F/F 3.507 --- 2.675 2.670
Temp Suct, F 100.00 --- 120.00 120.00
Temp Clr Disch, F 120.00 --- 120.00 120.00
Cylinder Data: Throw 1 Throw 3 Throw 2 Throw 4
Cyl Model 20-1/8Z:10 20-1/8Z:10 14-1/8Z 9-5/8Z
Cyl Bore, in 20.125 20.125 14.125 9.125
Cyl RDP (API), psig 313.6 313.6 740.9 1727.3
Cyl MAWP, psig 345.0 345.0 815.0 1900.0
Cyl Action DBL DBL DBL DBL
Cyl Disp, CFM 2459.8 2459.8 1198.9 485.6
Pres Suct Intl, psig 44.26 44.26 182.92 468.63
Temp Suct Intl, F 110 110 127 126
Pres Disch Intl, psig 220.69 220.69 612.72 1447.95
Temp Disch Intl, F 268 268 266 277
HE Suct Gas Vel, FPM 8595 8595 8873 8385
HE Disch Gas Vel, FPM 7259 7259 8481 7584
HE Spcrs Used/Max 0/0 0/0 0/4 0/4
HE Vol Pkt Avail 0.62+42.28 0.62+42.28 0.66+37.59 0.65+40.03
Vol Pkt Used 5.00 (V) % 5.00 (V) % 0.00 (V) % 0.68 (V) %
HE Min Clr, % 13.91 13.91 13.21 15.80
HE Total Clr, % 16.65 16.65 13.87 16.72
CE Suct Gas Vel, FPM 8420 8420 8505 7553
CE Disch Gas Vel, FPM 7111 7111 8129 6831
CE Spcrs Used/Max 0/0 0/0 0/4 0/4
CE Min Clr, % 14.56 14.56 14.32 18.61
CE Total Clr, % 14.56 14.56 14.32 18.61
Suct Vol Eff HE/CE, % 63.1/66.9 63.1/66.9 77.3/76.7 74.7/72.3
Disch Event HE/CE, ms 8.7/10.5 8.7/10.5 11.2/12.8 11.2/12.5
Suct Pseudo-Q HE/CE 6.7/6.4 6.7/6.4 7.8/7.2 7.5/6.1
Gas Rod Ld Comp, % 70.6 C 70.6 C 85.9 C 84.3 C
Gas Rod Ld Tens, % 72.8 T 72.8 T 84.2 T 72.5 T
Gas Rod Ld Total, % 74.1 74.1 87.9 81.2
Xhd Pin Deg/%Rvrsl lbf 140/85.9 140/85.9 149/80.6 156/64.0
Flow Calc, MMSCFD 9.241 9.241 18.280 17.735
Cyl BHP 726.4 726.4 1166.1 1058.9

05/21/2018 09:38:15 Note: BOLD=Out of Limits, ITALIC=Special Appl, BOLD=Review Base: 14.70 psia, 60.0 F Page: 3 of 5
File: K:\Projects\2017 Projects\17118 - Enerflex-H - E002498 - Apache - Alpine Diamond - Gathering Gathering Case:4 - Pkg:1
Units\Client Data & Dwgs\Compressor\17-11-30 (Different Facility Conditions)\AP032215 - 11.30.17.run
Ariel Performance
Company: Enerflex Energy Systems Inc. Customer: Apache
Project #: AP032215 Rev:6 Inquiry:
Coral Central Processing Gas
7.7.5.0 Case 5: LOW SUCT: 35-1250PSIG Project:
Compression

Compressor Data: Driver Data:


Elevation,ft: 2999.00 Barmtr,psia: 13.153 Ambient,F: 100.00 Type: Nat. Gas
Frame: (ELP) KBZ/4 Stroke, in: 6.75 Rod Dia, in: 2.875 Mfg: Caterpillar
Max RL Tot, lbf: 150000 Max RL Tens, lbf: 75000 Max RL Comp, lbf: 80000 Model: G3612 A4
Rated RPM: 1000 Rated BHP: 5200.0 Rated PS FPM: 1125.0 BHP: 3750
Calc RPM: 1000.0 BHP: 2841 Calc PS FPM: 1125.0 Avail: 3750
Rod Load
Services Main Gas Residue
Gas Model VMG-APRNGL2 VMG-APRNGL2
Stage Data: 1 --- 2 1
Target Flow, MMSCFD 20.000 --- 20.000 19.700
Flow Calc, MMSCFD 11.185 --- 11.092 18.400
BHP per Stage 973.4 --- 806.2 1015.2
Specific Gravity 0.7973 --- 0.7921 0.6919
Ratio of Sp Ht (N) 1.2083 --- 1.2199 1.2615
Comp Suct (Zs) 0.9873 --- 0.9564 0.9115
Comp Disch (Zd) 0.9776 --- 0.9381 0.9109
Pres Suct Line, psig 35.00 --- N/A 505.00
Pres Suct Flg, psig 34.52 --- 172.41 502.41
Pres Disch Flg, psig 177.32 --- 560.00 1262.63
Pres Disch Line, psig N/A --- 550.00 1250.00
Pres Ratio F/F 3.996 --- 3.089 2.475
Temp Suct, F 100.00 --- 120.00 120.00
Temp Clr Disch, F 120.00 --- 120.00 120.00
Cylinder Data: Throw 1 Throw 3 Throw 2 Throw 4
Cyl Model 20-1/8Z:10 20-1/8Z:10 14-1/8Z 9-5/8Z
Cyl Bore, in 20.125 20.125 14.125 9.125
Cyl RDP (API), psig 313.6 313.6 740.9 1727.3
Cyl MAWP, psig 345.0 345.0 815.0 1900.0
Cyl Action DBL DBL DBL DBL
Cyl Disp, CFM 2459.8 2459.8 1198.9 485.6
Pres Suct Intl, psig 30.64 30.64 156.72 468.61
Temp Suct Intl, F 111 111 128 126
Pres Disch Intl, psig 189.65 189.65 611.36 1342.16
Temp Disch Intl, F 284 284 283 266
HE Suct Gas Vel, FPM 8595 8595 8873 8385
HE Disch Gas Vel, FPM 7259 7259 8481 7584
HE Spcrs Used/Max 0/0 0/0 0/4 0/4
HE Vol Pkt Avail 0.62+42.28 0.62+42.28 0.66+37.59 0.65+40.03
Vol Pkt Used 22.00 (V) % 19.00 (V) % 59.00 (V) % 0.00 (V) %
HE Min Clr, % 13.91 13.91 13.21 15.80
HE Total Clr, % 23.84 22.57 36.05 16.45
CE Suct Gas Vel, FPM 8420 8420 8505 7553
CE Disch Gas Vel, FPM 7111 7111 8129 6831
CE Spcrs Used/Max 0/0 0/0 0/4 0/4
CE Min Clr, % 14.56 14.56 14.32 18.61
CE Total Clr, % 14.56 14.56 14.32 18.61
Suct Vol Eff HE/CE, % 41.1/61.3 43.8/61.3 37.6/71.7 77.5/75.0
Disch Event HE/CE, ms 6.5/9.5 6.8/9.5 7.0/11.5 11.8/13.3
Suct Pseudo-Q HE/CE 6.4/6.3 6.5/6.3 7.4/7.2 7.5/6.1
Gas Rod Ld Comp, % 63.5 C 63.5 C 90.6 C 75.6 C
Gas Rod Ld Tens, % 65.7 T 65.7 T 89.4 T 64.2 T
Gas Rod Ld Total, % 66.8 66.8 93.0 72.4
Xhd Pin Deg/%Rvrsl lbf 141/79.9 141/82.2 163/84.5 175/67.0
Flow Calc, MMSCFD 5.517 5.668 11.092 18.400
Cyl BHP 480.1 493.3 806.2 1015.2

05/21/2018 09:38:15 Note: BOLD=Out of Limits, ITALIC=Special Appl, BOLD=Review Base: 14.70 psia, 60.0 F Page: 4 of 5
File: K:\Projects\2017 Projects\17118 - Enerflex-H - E002498 - Apache - Alpine Diamond - Gathering Gathering Case:5 - Pkg:1
Units\Client Data & Dwgs\Compressor\17-11-30 (Different Facility Conditions)\AP032215 - 11.30.17.run
Ariel Performance
Company: Enerflex Energy Systems Inc. Customer: Apache
Project #: AP032215 Rev:6 Inquiry:
Coral Central Processing Gas
7.7.5.0 Case 6: HIGH SUCT: 65-1250PSIG Project:
Compression

Compressor Data: Driver Data:


Elevation,ft: 2999.00 Barmtr,psia: 13.153 Ambient,F: 100.00 Type: Nat. Gas
Frame: (ELP) KBZ/4 Stroke, in: 6.75 Rod Dia, in: 2.875 Mfg: Caterpillar
Max RL Tot, lbf: 150000 Max RL Tens, lbf: 75000 Max RL Comp, lbf: 80000 Model: G3612 A4
Rated RPM: 1000 Rated BHP: 5200.0 Rated PS FPM: 1125.0 BHP: 3750
Calc RPM: 1000.0 BHP: 3713 Calc PS FPM: 1125.0 Avail: 3750

Services Main Gas Residue


Gas Model VMG-APRNGL2 VMG-APRNGL2
Stage Data: 1 --- 2 1
Target Flow, MMSCFD 20.000 --- 20.000 19.700
Flow Calc, MMSCFD 20.317 --- 20.131 19.225
BHP per Stage 1415.9 --- 1223.7 1026.9
Specific Gravity 0.7972 --- 0.7881 0.6917
Ratio of Sp Ht (N) 1.2140 --- 1.2259 1.2625
Comp Suct (Zs) 0.9793 --- 0.9465 0.9092
Comp Disch (Zd) 0.9679 --- 0.9294 0.9088
Pres Suct Line, psig 65.00 --- N/A 520.00
Pres Suct Flg, psig 64.22 --- 217.43 517.33
Pres Disch Flg, psig 222.43 --- 575.00 1262.63
Pres Disch Line, psig N/A --- 565.00 1250.00
Pres Ratio F/F 3.045 --- 2.551 2.405
Temp Suct, F 100.00 --- 120.00 120.00
Temp Clr Disch, F 120.00 --- 120.00 120.00
Cylinder Data: Throw 1 Throw 3 Throw 2 Throw 4
Cyl Model 20-1/8Z:10 20-1/8Z:10 14-1/8Z 9-5/8Z
Cyl Bore, in 20.125 20.125 14.125 9.125
Cyl RDP (API), psig 313.6 313.6 740.9 1727.3
Cyl MAWP, psig 345.0 345.0 815.0 1900.0
Cyl Action DBL DBL DBL DBL
Cyl Disp, CFM 2459.8 2459.8 1198.9 485.6
Pres Suct Intl, psig 57.85 57.85 197.80 482.46
Temp Suct Intl, F 109 109 127 125
Pres Disch Intl, psig 238.54 238.54 629.61 1342.74
Temp Disch Intl, F 251 251 260 262
HE Suct Gas Vel, FPM 8595 8595 8873 8385
HE Disch Gas Vel, FPM 7259 7259 8481 7584
HE Spcrs Used/Max 0/0 0/0 0/4 0/4
HE Vol Pkt Avail 0.62+42.28 0.62+42.28 0.66+37.59 0.65+40.03
Vol Pkt Used 44.00 (V) % 47.00 (V) % 0.00 (V) % 0.00 (V) %
HE Min Clr, % 13.91 13.91 13.21 15.80
HE Total Clr, % 33.14 34.41 13.87 16.45
CE Suct Gas Vel, FPM 8420 8420 8505 7553
CE Disch Gas Vel, FPM 7111 7111 8129 6831
CE Spcrs Used/Max 0/0 0/0 0/4 0/4
CE Min Clr, % 14.56 14.56 14.32 18.61
CE Total Clr, % 14.56 14.56 14.32 18.61
Suct Vol Eff HE/CE, % 43.9/72.3 41.9/72.3 78.8/78.2 78.4/76.0
Disch Event HE/CE, ms 7.7/11.7 7.5/11.7 11.7/13.2 12.0/13.5
Suct Pseudo-Q HE/CE 6.5/6.4 6.5/6.4 7.9/7.2 7.5/6.1
Gas Rod Ld Comp, % 72.4 C 72.4 C 86.5 C 74.6 C
Gas Rod Ld Tens, % 74.5 T 74.5 T 84.5 T 63.1 T
Gas Rod Ld Total, % 75.9 75.9 88.4 71.3
Xhd Pin Deg/%Rvrsl lbf 141/92.1 141/92.4 150/80.0 179/67.7
Flow Calc, MMSCFD 10.245 10.072 20.131 19.225
Cyl BHP 714.0 701.9 1223.7 1026.9

05/21/2018 09:38:15 Note: BOLD=Out of Limits, ITALIC=Special Appl, BOLD=Review Base: 14.70 psia, 60.0 F Page: 5 of 5
File: K:\Projects\2017 Projects\17118 - Enerflex-H - E002498 - Apache - Alpine Diamond - Gathering Gathering Case:6 - Pkg:1
Units\Client Data & Dwgs\Compressor\17-11-30 (Different Facility Conditions)\AP032215 - 11.30.17.run
APPENDIX B
JADE COMPRESSOR PIPING MODEL 2018-04-15
JADE COMPRESSOR PIPING MODEL 2018-04-15
APPENDIX C
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
PROJECTS

FOR APPROVAL Houston, Texas,


USA
TOTAL PACKAGES REQ'D = 10
PROJECTS

FOR APPROVAL Houston, Texas,


USA
TOTAL PACKAGES REQ'D = 10
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
FOR APPROVAL

PROJECTS

Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
PROJECTS
FOR APPROVAL Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10
PROJECTS
FOR APPROVAL Houston, Texas,
USA
TOTAL PACKAGES REQ'D = 10

You might also like