0% found this document useful (0 votes)
160 views1 page

KIA B03 L&T A - BW L1 SPD 1174 1 - Comments PDF

Uploaded by

Varunn Vel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
160 views1 page

KIA B03 L&T A - BW L1 SPD 1174 1 - Comments PDF

Uploaded by

Varunn Vel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

12 11 10 9 8 7 6 5 4 3 2 1

NOTES
1. ALL DIMENSIONS ARE IN MILLIMETER.
2 ± 0.00 M FFL CORRESPONDS TO +899.14 MSL.
±0.00 M FFL CORRESPONDS TO ARRIVAL LEVEL (LEVEL-0)
TERMINAL 2
3. THIS DRAWING TO BE READ AND NOT TO BE SCALED
L
4. REFER TO GENERAL SHEETS FOR ABBREVIATIONS,
LEGEND OF SYMBOLS, AND MATERIAL KEYNOTES,
Bangalore
AND TYPICAL MOUNTING HEIGHTS.
5. THIS DRAWING SHALL BE READ IN CONJUCTION WITH
International Airport
ALL RELEVANT ARCHITECTURAL, STRUCTURAL AND
SERVICES DRAWINGS. ANY DISCREPANCY NOTICED
SHALL BE BROUGHT TO THE ATTENTION OF THE
CONSULTANTS WITHIN 7 WORKING DAYS OF
RECEIVING THE DRAWINGS, PRIOR TO PROCUREMENT
E48 E49 E50 E51 E52 E53 E54 E55 / EXECUTION OF WORKS.
OWNER

6. ALL DIMENSIONS SHALL BE VERIFIED ON SITE PRIOR TO


START OF WORK AND ANY DISCREPANCY SHALL BE
9000 9000 9000 9000 9150 8750 11950 BROUGHT TO THE NOTICE OF THE EDRC ARCHITECT.
7. ALL WALL/CEILING/FLOOR PENETRATION FOR DUCTS,
PIPES, WIRES, CONDUITS AND GROUPED CONBINATIONS
THEREOF ARE TO BE FIRE STOPPED WITH THE
Bangalore International Airport Limited
APPROPRIATE TESTED AND APPROVED FIRE STOPPING
Project Office
SYSTEM TO MATCH THE RATING OF THE FLOOR THROUGH Kempegowda International
K SEE: 1 / SEE: 1 / SEE: 1 / WHICH THEY ARE PENTRATING Airport Bengaluru
KIA-B03-L&T-A_ KIA-B03-L&T-A_ KIA-B03-L&T-A_ 8. ALL SHAFT ENCLOSURE WALL TO BE CONSTRUCTED AFTER Devanahalli, Bangalore 560 300 India

1000
WD-L1-DWG-1173 WD-L1-DWG-1173 THE INSTALLATION OF RELATED SERVICE EQUIPMENT.
WD-L1-DWG-1183 9. PROVIDE HOUSEKEEPING PADS AT UTILITY ROOMS AS PER
MATCHLINE MATCHLINE MATCHLINE REQUIREMENTS IN MEP DRAWINGS. LEAD CONSULTANT

10. 200mm THK. DOOR SHOULDER TO BE

4250
MATCHLINE MATCHLINE

1000
MAINTAINED UNLESS OTHER SPECIFIED.

1000
SEE: 1 / SEE: 1 / 11. ALL MATERIALS AND COLORS SHALL BE
95 APPROVED BY THE ARCHITECT.
KIA-B03-L&T-A_ KIA-B03-L&T-A_ 12. WHERE NON-RATED/RATED & RATED/RATED PARTITIONS

1000
WD-L1-DWG-1164 WD-L1-DWG-1184 INTERSECT THE PARTITION WITH THE GREATER SOM India LLC
FIRERATING SHALL REMAIN CONTINUOUS THROUGHT 14 Wall Street, New York, NY 10005

1000
THE INTERSECTION TO MAINTAIN THE REQUIRED
335
FIRERESISTANCE RATING FOR THE INTENDED SPACE MEPF ENGINEER BAGGAGE CONSULTANT
585 13. REFER FIINSHING SCHEDULE DWG NO.
ARUP LTD. BNP Associate s

1000
KIA-B03-L&T-A_WD-XX-DWG-7501 to 7507 FIINSHING
P7 77 Water Street P.O. Box 32746

4050
TAG MARKED IN ENLARGED DETAIL DWG. Abu Dhabi, UAE
J 840 New York, NY 10005
14. REFER TO DOOR SCHEDULE DRAWINGS FOR DOOR

1000
LIGHTING CONSULTANT LANDSCAPE
1090 GENERAL NOTES.
15. CONTROL JOINS TO BE PROVIDED PER SPECIFICATIONS BPI Grant Associates

1000
1220
16. REFER TO FIREPROOFING DRAWINGS FOR THE 302 5th Ave, 12th FL 22 Milk Street
TYPES AND EXTENTS OF APPLIED FIREPROOFING. New York, NY 10001 Bath, UK BA1 1UT
N19 17. REFER TO LANDSCAPING DRAWINGS,

1000
IT / SECURITY / PA / FAS SIGNAGE / WAYFINDING

950
1090 FOR GARDEN DETAILS.
18. REFER TO LANDSCAPING DRAWINGS FOR
MBII MSD
3

1000
FORECOURT PAVING LAYOUT 44 Mobile Drive 2 Young Place
840
19. EXACT LOCATION OF SLEEVE DETAILS IN RC WALLS Toronto, ON M4A 2P2 East Kilbride, GLA G75 0TD
2174-3
REFER STRUCTURAL DRAWING.

1000
585 20. ALL DIMENSIONS FOR THE DOORS ARE ACTUAL DOOR
PENING WITHOUT ANY SEALANTS / FINISH.

1000
21. DOOR FRAME TO BE FLUSHED WITH EXTERIOR FINISH.

5000
395
920 22. REFER LINTEL DETAILS & R.C. MULLIONS & TRANSOM AS PER BIAL DESIGN
3650 4580
STRUCTURAL DRAWINGS- KIA-B03-L&T-C_NU-XX-DWG- CHECKED BY APPROVED BY
9000

1000
3000,3001,3002,3003,3004,3005
I P6 395
23.THIS DRAWINGS TO BE READ IN CONJUCTION WITH
RESPECTIVE MEP DRAWING/SHOP DRAWING.

1000
24. ALL DIMENSIONS FROM TOP OF STRUCTURAL SLAB LEVEL.
25. ALL OPENINGS TO BE REVIEWED AND COORNDINATED WITH ARCHITECTS & ENGINEERS:

1000
665
1TPA-02 3457 m² VENDOR GFC SHOP DRAWINGS. Engineering Design and Research Center (EDRC),
920 EAST PIER DOM 26. VHT OPENING TO BE REVIEWED AND COORNDINATED WITH L&T Construction - Buildings & Factories.
ARRIVAL CIRC VENDOR SHOP DRAWINGS.

3050

1000
3050
4500 1000 27. CMU BLOCK WORK DETAILS AS PER SPECIFICATION DESIGN BY DRAWN BY CHECKED BY APPROVED BY
1170 28. 1st BLOCK WORK COURSE SHALL BE FULL COURSE STARTING

1000
FROM SSL.
ST-11 (1-3)* 31 m²
29. REFER VHT GAD DRAWING FOR ELEVATOR OPENING.
N20 STAIRCASE 13 30. SLAB INDICATES CONCRETE SLAB / DECK SLAB AS PER SSK GOPI DG DG

700

1000
1300
1170 2174-1 STRUCTURE. MAIN CONTRACTOR:
31. FOR DECK SLAB LEVEL AND STEEL STRUCTURE REFER
14

1000
12 STRUCTURAL STEEL DRAWINGS.
920
1T74-20 11 m² 2174-1 32. FHC & FEC SHALL BE COORDINATED AS PER VENDOR DETAIL
2174-1

4445
should be 33. 20MM STRUCTURAL TOLERANCE WITH SEALANT / FIRE

1000
ARRIVALS

3750
H 665 CIRCULATION 1000 mm SEALANT WHEREVER APPLICABLE. KEYPLAN
P6 P6 34. ALL CUT-OUTS SHOWN IN TOILET AREA ARE INDICATIVE AND
P6 P6 7
300

1000
1100 1T74-08 9 m²
SHALL BE AS PER APPROVED TOILET SHOP DWG'S T00 T10 T20 T30 T40 T50 T60 T70 T80
2250 850 475 2 3 50MM GAP BETWEEN FACADE &
2174-1 P7 BLOCK WORK (TYP.) 35. REQUIRED OPENINGS FOR FAS CABLING TO BE
ST-11 (1-3)A 2174-1 FAMILY TOILET P7 2174-1 COORDINATED AS PER FAS GFC SHOP DRAWINGS T71
10 T01 T11 T21 T31 T41 T51 T61 T81
9000

1000
1T74-16 3 m²
380 2 750 36. IN HORIZONTAL TRANSOM WHERE EVER ITS CONNECTING TO
P6

300
2174-1 JANITOR'S STEEL MEMBER, THE REBAR OF THE TRANSOM SHOULD BE

1405

1305
1T75-53 2 m² 890 765 425 1175 1960 150 3000 150 1950 1630 430 T02 T12 T22 T32 T42 T52 T62 T72 T82
P6 395 2174-4 CLOSET PROPERLY WELDED ACCORDINGLY

1000

485
100
SHAFT 11

650

300 650
1T74-15 12 m²

300
1T74-10 3 m² FHC T03 T13 T23 T33 T43 T53 T63 T83

350

1T74-16A
T73
2174-1

325
585
P12 1100

950
1755
JANITOR'S

1000
ROP 1100
CHASE

1T74-15B
1T74-11A

300
P6 HATCH LEGEND

4555
CLOSET T04 T14 T24 T34 T44 T54 T64 T74 T84

1T74-10A
840 2025 275

1000
900
2650

700
3490

700
SERVICE RECESSED FOR COORDINATION WITH

1000

1370
1T75-54 5 m² 9 4 T05 T15 T25 T35 T45 T55 T65 T75 T85

1135
1T74-08A P12 STRUCTURES & MEP

725
1090

1610
ELEVATOR P6 P12 2174-1
2174-1

1310

1735

1735
SHAFT T06 T16 T26 T36 T46 T56 T66 T76 T86
P12

1000
15

400 450
1600

230

870
P12 RCC

500
360

230
N21 2174-1 6 T07 T17 T27 T37 T47 T57 T67 T77 T87
450 8 1600 1905

635
G

50

1000
P12

1160

275 1160
2174-1 BLOCK WALL

500
1090 2174-1

1275
3400 T08 T18 T28 T38 T48 T58 T68 T78 T88
1800 650 1675 1675
1 1T74-14 27 m²
FHC P12

1000
P6 WOMEN'S
2174-1

700
840 P12

1460
1

4000

1200
P12 TOILETS DOUBLE HEIGHT AREA
1T74-11 13 m² P12 1T74-13A SEAL & SIGNATURE

1000

485
2174-4

5045

3760

4255
585 CHASE
P12
P7
1175
TOP OF LEVEL 3 - RETAIL ISSUED FOR

1000
395 P12 1175
16

4190
17
SHOP DRAWING SUBMISSION.

1T74-15A
2174-1

3270
1T74-09 26 m² 2174-1 EARTH
9000

1000
MEN'S TOILETS CHECKED BY SIGN DATE CHECKED BY SIGN DATE

700
1
P12 P12

300 700
395 BLOCK WORK SHOWN INDICATIVELY ARCHITECTURE FPS
1T74-11B

1000

150
P6 CIVIL & STRUCTURAL PIPING
P7 ELECTRICAL PHE
4 585
765 1050 430

5000

1000
890 4680 4685 ELV SYSTEM AIRPORT SYSTEM
2174-4 EXT-ST-08 28 m²
1T74-13 7 m² 775 R.C. MULLIONS HVAC VHT
(0-3)

3905
F 840 P7 5 STAIRCASE
P7

1000
CHASE
1605 P7 2174-1 Revision Schedule
3610 2070 730 2805
1090

1000
1220 Revision Revision Revision

515

800
P7 Number Description Date Issued by Issued to

1180
N22 P6

620
1000
P7
WALL LEGEND

1350
1T74-05 178 m² 1090
ISSUED FOR
0 27.12. L&T BIAL

170
1T74-07B

2270
NON PUBLIC APPROVAL

700
1000

300
CIRCULATION P7 P6 Wall Tag Description 2019
840

2150
P6 ISSUED FOR
P6 P7 1 GFC
21.01. L&T BIAL

5000

1000
7 585 5 ROP 1300 P6 23-13 21 11 15 - 200mm 2020

4820
2174-3 2174-2 P6 THK AAC WALL UPTO

1000
500 1100 500

3820
6 SLAB/DECK SLAB. (2HR

5000

1740
345
355
395 2174-2 FIRE RATED)
1 P6
9000

1000
1T74-07 27 m²

300
E 8 MAITENANCE/
3 P7 23-13 21 11 15 - 200mm
2174-3
395 STORAGE 2174-4 THK AAC WALL UPTO

1000

250
2 SLAB. (NON FIRE RATED)

5555
1T74-07A

1100
1TPA-02 3457 m²
2174-3 585 P12 23-13 21 11 13 - 150mm
REFER EXPANSION JOINT

1000
EAST PIER DOM
THK CMU WALL UPTO

3500
DETAILS ARRIVAL CIRC
P7 150 150 P6
SLAB NON FIRE RATED

3560
650 1300 5200 1400 3800 5200 5100 3900 1760 4820 2420 2700 2750 840

1000

2160
4100
150

2650
1090
P6

465
1000
1220 10
5 REVISION HISTORY : 1

510
500
N23 FEC
2174-4
2178-1

540

600 490
1000

35
275
1080 1. REVISED AS PER BIAL COMMENTS
P7 2. CUTOUTS REVISED AS PER

2650
P7 P6 P7

1000
MEP REQUIREMENTS

3300
3150
775 INTERFACE DETAIL BETWEEN ESCALATOR
AND STAIRCASE WILL BE 3. REVISED AS PER STRUCTURAL

1000
D 470 ISSUED AS SEPERATE DRAWING
REQUIREMENT

4600

3675
1

300

1000
1 2 2174-2
-

1T75-18F
1T74-01 717 m² 2174-3 2174-2
-

1840
3
9000

1000
2100
CUSTOMS HOLD
4475 2174-2
-

450
1000

150
P7

300
6
P6 2174-3 470 P7 4

1000
775
2174-2
-

3860
3860
300

3600
2800

5000 1270 3730 5270 2400 2100

1000
P6
1200

1080
FHC
1T74-01C
P7

1000
1220
385

675

350

4
N24
1T74-01B

535
535

535
1000
P6 2174-3
SEE: 1 / 5 P6 SEE: 1 /
2100

1090

KIA-B03-L&T-A_ 2174-3 3415 1100 300


300
1100 60 3355 5645 4800 650 2780 P7 KIA-B03-L&T-A_
2810

1000

840
WD-L1-DWG-1164 1T75-02A 1T75-03A 1T74-05 178 m²
1910 1700 2800 1985 WD-L1-DWG-1184
P6
385

585
MATCHLINE NON PUBLIC MATCHLINE
1000

CIRCULATION
MATCHLINE MATCHLINE 1T75-02 16 m² P6 MATCHLINE MATCHLINE
P6
1000

SEE: 1 / SEE: 1 / L4 RECONCIL. RM 395 1TPA-02 3457 m² SEE: 1 / SEE: 1 /


1T74-01D

KIA-B03-L&T-A_ KIA-B03-L&T-A_ 1T75-03 16 m²


EAST PIER DOM KIA-B03-L&T-A_ KIA-B03-L&T-A_
WD-L1-DWG-1165 WD-L1-DWG-1175 P7 BAGGAGE ARRIVAL CIRC
WD-L1-DWG-1175 WD-L1-DWG-1185
RECONCIL.

BIAPPA Commencement Certificate No:


BIAAPA/TP1/CC/68/2018-19/843, Valid from 23-07-2019 till 22-07-2021
B
QRCODE

DRAWING TITLE

LEVEL 1 - ARRIVAL
MEZZANINE- PART PLAN-74,
BLOCK WORK SETTING OUT
A PLAN
DRAWING NUMBER

BIAL NOTES:- KIA-B03-L&T-A_BW-L1-SPD-1174


WALL CENTER LINES ARE APPROVED
SCALE: 1:100 SHEET SIZE - A0
WITH PLAN DIMENSION.
LEVEL 1 - ARRIVAL MEZZANINE - PART PLAN 74
1 SCALE: 1 : 100
CONSULTANT JOB NO : O18180

© Copyright Bangalore International Airport Limited