FM 200 Fire Suppression System Mechanical Piping Layout: RS RS RS

This document provides a piping layout diagram for a FM 200 fire suppression system. It shows the locations of lower level nozzles at an elevation of 4500mm with 25mm diameter pipes. It also shows an upper level nozzle at an elevation of 7750mm with 40mm and 50mm diameter pipes. The system includes an FM 200 cylinder with a 350lb capacity filled with 254lbs of FM 200 agent.

Uploaded by

Jake Cortez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
523 views

FM 200 Fire Suppression System Mechanical Piping Layout: RS RS RS

This document provides a piping layout diagram for a FM 200 fire suppression system. It shows the locations of lower level nozzles at an elevation of 4500mm with 25mm diameter pipes. It also shows an upper level nozzle at an elevation of 7750mm with 40mm and 50mm diameter pipes. The system includes an FM 200 cylinder with a 350lb capacity filled with 254lbs of FM 200 agent.

Uploaded by

Jake Cortez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LOWER LEVEL NOZZLE LOWER LEVEL NOZZLE

ELEV: 4500 MM ELEV: 4500 MM


25 MM DIA. 25 MM DIA. 25 MM DIA. 25 MM DIA.
RS RS UPPER LEVEL NOZZLE RS
ELEV: 7750 MM
40 MM DIA. 40 MM DIA. 40 MM DIA. 40 MM DIA.

50 MM DIA.
50 MM DIA.

ECS FM 200 CYLINDER 350 LBS.


CAPACITY FILLED WITH 254 FM
200 AGENT

FM 200 FIRE SUPPRESSION SYSTEM MECHANICAL PIPING LAYOUT

CONSTRUCTION DRAWING

DESIGNED BY: APPROVED BY : PROJECT TITLE : DESIGNER: OWNER:


OWNER : REVISIONS: CHECKED BY: SHEET CONTENTS : PLOT DATE
SHIMIZU PHILIPPINE CONTRACTOR'S INC. DRAWN BY :
INSTALLATION OF FM 200 FIRE SUPPRESSION FOR REV. NO. DATE DESCRIPTION
PROFESSIONAL MECHANICAL ENGINEER SOLVENT STORAGE ROOM

REG NO. PTR NO. RECOMMENDING APPROVAL: APPROVED BY : CHECKED BY: CHECKED BY: AS SHOWN SHEET NO. DWG. NO.

1/3 FP -01
LOCATION :
EXP. DATE. DATE
TERUMO - LAGUNA TECHNOPARK