Field Density of GSB Grade-I (Sand Replacement Method)

The document provides test results for field density and gradation of GSB (graded stone base) material used in construction of a minor bridge. Density tests showed relative compactions ranging from 99.38% to 100.18%, meeting the specification of 95% minimum. Gradation test results met the required grading bands for GSB with passing percentages between 13-59% for various sieve sizes. Aggregate impact value tests averaged 10.31%, less than the maximum allowed of 40% for GSB material.

Uploaded by

Subas Chand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
188 views

Field Density of GSB Grade-I (Sand Replacement Method)

The document provides test results for field density and gradation of GSB (graded stone base) material used in construction of a minor bridge. Density tests showed relative compactions ranging from 99.38% to 100.18%, meeting the specification of 95% minimum. Gradation test results met the required grading bands for GSB with passing percentages between 13-59% for various sieve sizes. Aggregate impact value tests averaged 10.31%, less than the maximum allowed of 40% for GSB material.

Uploaded by

Subas Chand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Field Density of GSB Grade-I

(Sand Replacement Method)


Road/Section Details:- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.

Location of Test Point:- Village Side

Thickness of Layer:- 1 Date of Testing:-

M.D.D. of GSB :- 2.18 O.M.C. of GSB :- 6

A Calibration 1 2 3 4 5 6

(i) Wt. of Sand in Cone in gm W2 360.00 360.00 360.00 360.00 360.00 360.00

(ii) Volume of Calibrating Cylinder in cc V 1177.50 1177.50 1177.50 1177.50 1177.50 1177.50

(iii) Wt. of Sand + Cylinder before pouring in gm W1 5544.00 5434.00 5514.00 5324.00 5342.00 5504.00

(iv) Wt. of Sand + Cylinder after pouring in gm W3 3465.00 3355.00 3435.00 3245.00 3263.00 3425.00
Wt. of Sand filled in Calibrating Cylender in gm
(v) 1719.00 1719.00 1719.00 1719.00 1719.00 1719.00
(Wa=W1-W2-W3)
(vi) Bulk Density of Sand Ys=(Wa/V) gm/cc 1.460 1.460 1.460 1.460 1.460 1.460

B Determination of Soil Density

(i) Wt. of wet Soil frome Hole in gm Ww 806.00 856.00 798.00 870.00 843.00 867.00

(ii) Wt. of Sand + Cylinder before pouring in gm W1 5754.00 5709.00 5800.00 5688.00 5700.00 5734.00

(iii) Wt. of Sand + Cylinder after pouring in gm W4 4874.00 4789.00 4917.00 4760.00 4789.00 4803.00

(iv) Wt. of Sand in Hole in gm (Wb=W1-W4-W2) 520.00 560.00 523.00 568.00 551.00 571.00

(v) Bulk Density of Soil Yb=(Ww/Wb) x Ys gm/cc 2.263 2.232 2.227 2.236 2.234 2.217

(vi) Moisture Content w in % 4.00 3.00 2.00 4.00 3.00 2.00

(vii) Dry Density of Soil Yd=(Yb/(1+w)) 2.176 2.167 2.184 2.150 2.168 2.173

(vii) Relative Compaction (Yd/MDD)x100 % 99.81 99.38 100.18 98.63 99.47 99.69

Note:- At least 3 test to be carried out daily.

J.E. A.E.
Field Density of GSB Grade-I
(Sand Replacement Method)
Road/Section Details:- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.

Location of Test Point:- River Side

Thickness of Layer:- 1 Date of Testing:-

M.D.D. of GSB :- 2.18 O.M.C. of GSB :- 6

A Calibration 1 2 3 4 5 6

(i) Wt. of Sand in Cone in gm W2 360.00 360.00 360.00 360.00 360.00 360.00

(ii) Volume of Calibrating Cylinder in cc V 1177.50 1177.50 1177.50 1177.50 1177.50 1177.50

(iii) Wt. of Sand + Cylinder before pouring in gm W1 5544.00 5434.00 5514.00 5324.00 5342.00 5504.00

(iv) Wt. of Sand + Cylinder after pouring in gm W3 3465.00 3355.00 3435.00 3245.00 3263.00 3425.00
Wt. of Sand filled in Calibrating Cylender in gm
(v) 1719.00 1719.00 1719.00 1719.00 1719.00 1719.00
(Wa=W1-W2-W3)
(vi) Bulk Density of Sand Ys=(Wa/V) gm/cc 1.460 1.460 1.460 1.460 1.460 1.460

B Determination of Soil Density

(i) Wt. of wet Soil frome Hole in gm Ww 805.00 857.00 799.00 873.00 840.00 865.00

(ii) Wt. of Sand + Cylinder before pouring in gm W1 5750.00 5706.00 5802.00 5684.00 5704.00 5730.00

(iii) Wt. of Sand + Cylinder after pouring in gm W4 4872.00 4784.00 4914.00 4763.00 4796.00 4800.00

(iv) Wt. of Sand in Hole in gm (Wb=W1-W4-W2) 518.00 562.00 528.00 561.00 548.00 570.00

(v) Bulk Density of Soil Yb=(Ww/Wb) x Ys gm/cc 2.269 2.226 2.209 2.272 2.238 2.215

(vi) Moisture Content w in % 4.00 3.00 2.00 4.00 3.00 2.00

(vii) Dry Density of Soil Yd=(Yb/(1+w)) 2.181 2.161 2.166 2.184 2.173 2.172

(vii) Relative Compaction (Yd/MDD)x100 % 100.07 99.14 99.35 100.20 99.66 99.63

Note:- At least 3 test to be carried out daily.

J.E. A.E.
Field Test Report of GSB Grade-I
Name of Work :- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.

C.B. No. :- 27/SE-Barabanki Circle/2018-19 Date 12-06-2018

Chainage :- Km

Total Wieght :- 2320 g Date:-

Sieve
Material Cummulative Cummulative As per
S.No. Size in Passing % Remark
Retained Retained Retained % Required %
mm

1 75 0 0 0.00 100.00 100

2 26.5 1021 1021 44.00 56.00 55-75

3 4.75 998 2018 87.00 13.00 10-30

4 0.075 255 2274 98.00 2.00 <15

Note:- Average of three test from each source./At least 1 test to be carried out daily.

J.E. A.E.
Field Test Report of GSB Grade-I
Name of Work :- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.

C.B. No. :- 27/SE-Barabanki Circle/2018-19 Date 12-06-2018

Chainage :- Km

Total Wieght :- 2357 g Date:-

Sieve
Material Cummulative Cummulative As per
S.No. Size in Passing % Remark
Retained Retained Retained % Required %
mm

1 75 0 0 0.00 100.00 100

2 26.5 966 966 41.00 59.00 55-75

3 4.75 1061 2027 86.00 14.00 10-30

4 0.075 306 2333 99.00 1.00 <15

Note:- Average of three test from each source./At least 1 test to be carried out daily.

J.E. A.E.
Test For Aggregate Impact Value of Aggregate
Name of Work :- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.

C.B. No. :- 27/SE-Barabanki Circle/2018-19 Date 12-06-2018

Chainage :- Km Date:-

Test Nos.
S.No. Observations Average
1 2 3
1 Weight of Aggregate Sample (Passing through
12.5mm & Retained on 10mm IS Sieve)Filled in the
Cylinder = W1 (gm) 621 621 621 621.00

2 Weight of Aggregate Passing 2.36 mm Seive After


15 Nos. of Blow = W2 (gm)
63 64 65 64.00

3 A I V = (W2 / W1) X100 10.14 10.31 10.47 10.31

Note- 1- Cylindrical Measure shall be filled in 3 Layers by tamping 25 blow.


2- Permissible Limit max. 40% for GSB, 30% for WMM/BM/PC, 27% for DBM, 24% for BC/Seal Coat
3- One Test from each source

J.E. A.E.