Field Density of GSB Grade-I (Sand Replacement Method)
Field Density of GSB Grade-I (Sand Replacement Method)
A Calibration 1 2 3 4 5 6
(i) Wt. of Sand in Cone in gm W2 360.00 360.00 360.00 360.00 360.00 360.00
(ii) Volume of Calibrating Cylinder in cc V 1177.50 1177.50 1177.50 1177.50 1177.50 1177.50
(iii) Wt. of Sand + Cylinder before pouring in gm W1 5544.00 5434.00 5514.00 5324.00 5342.00 5504.00
(iv) Wt. of Sand + Cylinder after pouring in gm W3 3465.00 3355.00 3435.00 3245.00 3263.00 3425.00
Wt. of Sand filled in Calibrating Cylender in gm
(v) 1719.00 1719.00 1719.00 1719.00 1719.00 1719.00
(Wa=W1-W2-W3)
(vi) Bulk Density of Sand Ys=(Wa/V) gm/cc 1.460 1.460 1.460 1.460 1.460 1.460
(i) Wt. of wet Soil frome Hole in gm Ww 806.00 856.00 798.00 870.00 843.00 867.00
(ii) Wt. of Sand + Cylinder before pouring in gm W1 5754.00 5709.00 5800.00 5688.00 5700.00 5734.00
(iii) Wt. of Sand + Cylinder after pouring in gm W4 4874.00 4789.00 4917.00 4760.00 4789.00 4803.00
(iv) Wt. of Sand in Hole in gm (Wb=W1-W4-W2) 520.00 560.00 523.00 568.00 551.00 571.00
(v) Bulk Density of Soil Yb=(Ww/Wb) x Ys gm/cc 2.263 2.232 2.227 2.236 2.234 2.217
(vii) Dry Density of Soil Yd=(Yb/(1+w)) 2.176 2.167 2.184 2.150 2.168 2.173
(vii) Relative Compaction (Yd/MDD)x100 % 99.81 99.38 100.18 98.63 99.47 99.69
J.E. A.E.
Field Density of GSB Grade-I
(Sand Replacement Method)
Road/Section Details:- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.
A Calibration 1 2 3 4 5 6
(i) Wt. of Sand in Cone in gm W2 360.00 360.00 360.00 360.00 360.00 360.00
(ii) Volume of Calibrating Cylinder in cc V 1177.50 1177.50 1177.50 1177.50 1177.50 1177.50
(iii) Wt. of Sand + Cylinder before pouring in gm W1 5544.00 5434.00 5514.00 5324.00 5342.00 5504.00
(iv) Wt. of Sand + Cylinder after pouring in gm W3 3465.00 3355.00 3435.00 3245.00 3263.00 3425.00
Wt. of Sand filled in Calibrating Cylender in gm
(v) 1719.00 1719.00 1719.00 1719.00 1719.00 1719.00
(Wa=W1-W2-W3)
(vi) Bulk Density of Sand Ys=(Wa/V) gm/cc 1.460 1.460 1.460 1.460 1.460 1.460
(i) Wt. of wet Soil frome Hole in gm Ww 805.00 857.00 799.00 873.00 840.00 865.00
(ii) Wt. of Sand + Cylinder before pouring in gm W1 5750.00 5706.00 5802.00 5684.00 5704.00 5730.00
(iii) Wt. of Sand + Cylinder after pouring in gm W4 4872.00 4784.00 4914.00 4763.00 4796.00 4800.00
(iv) Wt. of Sand in Hole in gm (Wb=W1-W4-W2) 518.00 562.00 528.00 561.00 548.00 570.00
(v) Bulk Density of Soil Yb=(Ww/Wb) x Ys gm/cc 2.269 2.226 2.209 2.272 2.238 2.215
(vii) Dry Density of Soil Yd=(Yb/(1+w)) 2.181 2.161 2.166 2.184 2.173 2.172
(vii) Relative Compaction (Yd/MDD)x100 % 100.07 99.14 99.35 100.20 99.66 99.63
J.E. A.E.
Field Test Report of GSB Grade-I
Name of Work :- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.
Chainage :- Km
Sieve
Material Cummulative Cummulative As per
S.No. Size in Passing % Remark
Retained Retained Retained % Required %
mm
Note:- Average of three test from each source./At least 1 test to be carried out daily.
J.E. A.E.
Field Test Report of GSB Grade-I
Name of Work :- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.
Chainage :- Km
Sieve
Material Cummulative Cummulative As per
S.No. Size in Passing % Remark
Retained Retained Retained % Required %
mm
Note:- Average of three test from each source./At least 1 test to be carried out daily.
J.E. A.E.
Test For Aggregate Impact Value of Aggregate
Name of Work :- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.
Chainage :- Km Date:-
Test Nos.
S.No. Observations Average
1 2 3
1 Weight of Aggregate Sample (Passing through
12.5mm & Retained on 10mm IS Sieve)Filled in the
Cylinder = W1 (gm) 621 621 621 621.00
J.E. A.E.