0% found this document useful (0 votes)
191 views

Check List For Transformer

This document is a checklist for designing power transformers that includes fields for specifying requirements such as company information, application details, safety requirements, usage levels, quality management standards, circuit topology, transformer secondary windings, insulation and environmental requirements, operational characteristics, additional specifications, and space to include a circuit diagram and additional information. Key mandatory fields include the company name, contact person, application, and safety requirements.

Uploaded by

Kyaw Htike
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
191 views

Check List For Transformer

This document is a checklist for designing power transformers that includes fields for specifying requirements such as company information, application details, safety requirements, usage levels, quality management standards, circuit topology, transformer secondary windings, insulation and environmental requirements, operational characteristics, additional specifications, and space to include a circuit diagram and additional information. Key mandatory fields include the company name, contact person, application, and safety requirements.

Uploaded by

Kyaw Htike
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Power Transformer Design Checklist Feb 2008

NOTE: The yellow f ields are mandatory. Additional inf ormation should be added in the white fields.

Company name: Contact person:

Address: Tel.:

Application: p New project Email:


1)
p Replacement type:_____________
Application
2)
:__________________
Safety p Medical: _____________________ Date:
requirements p Railway: _____________________
(please specify p Automotive: __________________ Project name, description:
standards, use p. 2):
p Aerospace: ___________________
p Other: _______________________

Expected annual Current year:______ Next year: ______ Target price [€]: ________________
usage [pcs./a]:
Year 3: _______ Year 4: _______ Product life cycle [years]: ________________
Samples quantity: ________________ pcs. Desired sample date: ________________

QM-Requirement: p ISO 9000 p TS16949 p Others: ______________________


1) 2)
e.g. NiFe core, ferrite core e.g. power supply, inverter, solar, drive, UPS, welding

Circuit topology3)
p Forward Transformer p Push / pull Transformer p Flyback Transformer
p …with demagnetization winding p …full bridge p …trapezoidal current
p …with 2 switching transistors p …half bridge p …triangular current
p …half bridge center-tapped 4)

3) 4)
Use p. 2 to draw circuit diagram Two primary side windings

Transformer secondary windings


No. of windings: _________ Specify center taps (use p. 2): _____________________

Output voltage(s) with ____ / ____ / ____ Output current(s) with load ____ / ____ / ____
load ____ / ____ / ____ [Ampere, 1/2/3/4/5/6]: ____ / ____ / ____
[Volt, 1/2/3/4/5/6]:

Insulation & environmental requirements


Insulation type: p basic p reinforced p other: _______________________________
Insulation voltage PRI – SEC [Vrm s]: ___________________
Electrical standards: p none p EN ________ p UL: ______ p others: _________________

System voltage (e.g. 230V, 390V) [Vrm s]: _______ Partial discharge voltage PRI - SEC [Vrms]: __________
Working voltage (across xfmr) [Vrm s]: _______ Partial discharge voltage SEC - SEC [Vrms]: __________
Recurring peak voltage [V]: Partial discharge voltage PRI - casing [Vrms]: __________

CheckList Power Transformers 2008.doc [10.03.2008] / page 1 of 2


- 2-

Power Transformer Design Checklist Feb 2008

Pollution degree (typically 2): Other: __________

Environmental requirements: Vibration: _________ Humidity: __________ Dust: __________

Important Operational Characteristics


Nominal power [W]: __________ Operating frequency [kHz]: __________
Input voltage range [Volt]: _______ to _______ Maximum pulse width [%]: __________
Ambient temperature range [°C]: _____°C to _____°C Convection cooling: p
Max. operating temperature [°C]: __________ Forced cooling: p ___ [K/W]
Max. dimensions: W × D × H [mm]: ____ x ____ x ____ Heat sink: p ____ [m/s]

Desired contacts : p none (tinned leads) p Cable lugs p other: ______________________


Lead length [mm]: _____________________

Additional Specifications
Test voltage PRI – SEC [Vrms] / _______________ / Test voltage SEC – SEC [Vrms] / _______________ /
Time [s]: ________________ Time [s]: ________________

Core (if already defined):

Circuit diagram:

Additional information:

CheckList Power Transformers 2008.doc [10.03.2008] / page 2 of 2

You might also like