Letter No.: RCC/AE/SK-RP/2020/18 Date: 06.05.2020: Copy To

This letter discusses a proposed change of scope for a highway reconstruction project from Km 338+100 to Km 368+100 in Uttarakhand, India. It references previous correspondence regarding estimates and drawings submitted for the RVNL Narkota Bridge. The letter questions why hypothetical issues are being raised about quantities and rates after initial compliance, as this has already delayed the project by two months. It requests clarification on who is responsible for the delays.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
336 views1 page

Letter No.: RCC/AE/SK-RP/2020/18 Date: 06.05.2020: Copy To

This letter discusses a proposed change of scope for a highway reconstruction project from Km 338+100 to Km 368+100 in Uttarakhand, India. It references previous correspondence regarding estimates and drawings submitted for the RVNL Narkota Bridge. The letter questions why hypothetical issues are being raised about quantities and rates after initial compliance, as this has already delayed the project by two months. It requests clarification on who is responsible for the delays.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Letter No.: RCC/AE/SK-RP/2020/18 Date: 06.05.

2020

The Team Leader


HEC L – Telford Consultancy Service
Sri Nagar, Uttrakhand

Subject: Reconstruction with Geometric Improvement of existing single /intermediate lane


to two lanes with paved shoulder configuration from Existing Km 338+100
(Design Chainage 334+400) to 368+100 (Design Chainage Km 360+579)
excluding existing km 355+495 (kaliyasaur Bypass) NH-58 in state of
Uttarakhand through Engineering and Procurement and Construction (EPC)
contract: Change of scope subjected to RVNL Narkot Bridge .
Ref:
1. your letter no: 980012/3-proj/Contractor/RCC/113. Dated 04.05.2020
2. Contractor’s letter no RCC/HECL/2018-19/49 Dated 02.03.2020
3 . 980012/3-proj/Authority/RCC/99 dated 06-04-2020

What is hypothetical? can you elaborate? Estimates (hard copy and shoft copy as well
) and hard copy of drawings for RVNL Narkota Bridge have been submitted at first just for quantity
calculation and rate analysis on 02.03.2020 after that all other documents supplied to you for other
relevant requirements.

After compliance of ref 3 again you are raising questions of quantity etc . Already you delayed
in quantity and in rate analysis by almost 2 months. All rates except three items taken from
SOR jhakroli Block Rudraprayuag . who are lapsing time of whose, kindly elaborate?

Thanking you

(Authorized Signatory)

RCC DEVELOPERS LTD.

Copy to: - Executive Engineer, NH PWD, Sri Nagar