Highway Engineering Consultant Ltelford Consulting Engineers Pvt. LTD

This document is a letter from Highway Engineering Consultant to RCC Developers Ltd regarding the reconstruction and geometric improvement of a highway section in Uttarakhand. It notes that 57 existing culverts will be reconstructed as new culverts, with locations to be decided in consultation with the Authority Engineer due to site conditions. It also references clauses in the EPC agreement regarding submitting proposals and cost details for any necessary changes in scope, as directed by the Authority. The letter is providing information and observations to RCC Developers Ltd as requested in their previous letter.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
247 views1 page

Highway Engineering Consultant Ltelford Consulting Engineers Pvt. LTD

This document is a letter from Highway Engineering Consultant to RCC Developers Ltd regarding the reconstruction and geometric improvement of a highway section in Uttarakhand. It notes that 57 existing culverts will be reconstructed as new culverts, with locations to be decided in consultation with the Authority Engineer due to site conditions. It also references clauses in the EPC agreement regarding submitting proposals and cost details for any necessary changes in scope, as directed by the Authority. The letter is providing information and observations to RCC Developers Ltd as requested in their previous letter.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Highway Engineering Consultant

in Association with
LTelford Consulting Engineers Pvt. Ltd.

980012/3-proj/Contractor/RCC/ 08-04-2020

To,
M/s. RCC Developers Ltd
109 City center, Bachha Park
Meerut

Sub:Reconstruction with geometric improvement of existing single/ Intermediate lane to 2 Lane with Paved
Shoulder Configuration from Existing Km 338.100 (Design Km 333.410) to Km 368.000 (Design Km 360.579)
excluding existing Km 349.800 to km 355.495 (Kaliyasaur bypass of NH-58) in the State of Uttarakhand under
EPC mode. COS for 2 nos. additional Culvert.

Ref:- RCC/AE/SK-RP/2020/11 dated 06.04.2020

Dear Sir,

With reference to above mentioned letter herewith we are submitting our observations:-

1. As per EPC agreement schedule-B clause 7.2.4, 57 Nos. existing culvert shall be re-
constructed as new culvert. Kindly go through (*) mark note where clearly write: - Actual
chainage shall be decided at site in consultation with Authority Engineer. It means the
location may be change as per site condition, so arrange joint visit/inspection along with
Authority Representative for decision of changing of locations of balance culverts.

2. Please refer clause 13.1.3, The Contractor shall submit the proposal with the relevant
details with cost to Authority and refer clause 13.2, in the event of the Authority
determining that a change of Scope is necessary, it may direct the Authority’s Engineer to
issue to the Contractor a notice specifying in reasonable details the works and services
contemplated there under (the “Change of Scope Notice”)

This is for your information please.

Yours faithfully,

Manjul Kumar
Team Leader

Cc: 1. Executive Engineer, NH, Div. PWD, Rudraprayag, Uttarakhand.

HEC Office: JM-89/3C, Behind Panchwati Market, Saket Nagar, Bhopal (M P) PIN- 462024 Phone: +91-755-4236317
LTCE Office:RZF-779/2, Lane No-17, Raj Nagar-2,Dwarka, Sector-8, Palam, New Delhi-110077 Phone: +91-11- 49095718 (Email- [email protected])
CIN No.: U74999DL2016PTC305247