0% found this document useful (0 votes)
53 views

Annex 17: Summary of Quality Control Test Performed

This document summarizes quality control tests performed on an infrastructure project in Prosperidad and San Luis, Agusan del Sur from March to June 2020. It shows that soil compaction tests were conducted at multiple stations along the project route to check for compliance with specifications. All test results met or exceeded the required 95% minimum compaction under ASTM D-1556 standards, demonstrating that the embankment construction passed quality control.

Uploaded by

FBVid Uploads
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views

Annex 17: Summary of Quality Control Test Performed

This document summarizes quality control tests performed on an infrastructure project in Prosperidad and San Luis, Agusan del Sur from March to June 2020. It shows that soil compaction tests were conducted at multiple stations along the project route to check for compliance with specifications. All test results met or exceeded the required 95% minimum compaction under ASTM D-1556 standards, demonstrating that the embankment construction passed quality control.

Uploaded by

FBVid Uploads
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Annex 17 Form No.

Republic of the Philippines


PHILIPPINE RURAL DEVELOPMENT PROJECT (PRDP)
SUMMARY OF QUALITY CONTROL TEST PERFORMED

as of June 25, 2020


Municipality of: Prosperidad/San Luis Province of: Agusan del Sur Region: Caraga Contract No.
Project Name: CONCRETING OF BUCAC-MARCELINA-MAHAPAG-SAN VICENTE FMR PACKAGE 3: CONCRETING OF SAN VICENTE-MAHAPAG FMR Referrence No. PRDP-IB-RO13-ADS-007-000-000-2015-B-R1
Project Location: Prosperidad-San Luis, Agusan del Sur Period Covered: March 14, 2020 - June 25, 2020

Quantity Date
Lab. No. Item Description Station Represented Date Tested Kind of Test Test Result Spec's Remarks / Recommendation
Represented Sampled

D104-217,218 4+980 LR 2 HOLES 9-Jun-20 9-Jun-20 Field Density of Soil in Place 100.00% ASTM D-1556=95% Passed
Item 104-Embankment
5+000 LL by Sand Cone Method 102.00% ASTM D-1556=95% Passed

D104 211,212,213,214,215,216 4+860 CL 6 HOLES 9-Jun-20 9-Jun-20 Field Density of Soil in Place 99.00% ASTM D-1556=95% Passed
Item 104-Embankment
4+880 LL by Sand Cone Method 97.00% ASTM D-1556=95% Passed
4+900 CL Field Density of Soil in Place 97.00% ASTM D-1556=95% Passed
4+920 RL by Sand Cone Method 100.00% ASTM D-1556=95% Passed
4+940 CL Field Density of Soil in Place 98.00% ASTM D-1556=95% Passed
4+960 LL by Sand Cone Method 103.00% ASTM D-1556=95% Passed

D104 205,206,207,208,209,210 4+740 CL 6 HOLES 9-Jun-20 9-Jun-20 Field Density of Soil in Place 102.00% ASTM D-1556=95% Passed
Item 104-Embankment
4+760 RL by Sand Cone Method 102.00% ASTM D-1556=95% Passed
4+780 CL Field Density of Soil in Place 101.00% ASTM D-1556=95% Passed
4+800 LL by Sand Cone Method 102.00% ASTM D-1556=95% Passed
4+820 CL Field Density of Soil in Place 102.00% ASTM D-1556=95% Passed
4+840 RL by Sand Cone Method 101.00% ASTM D-1556=95% Passed

D104 193,194,195,196,197,198 5+500 CL 6 HOLES 10-Jun-20 10-Jun-20 Field Density of Soil in Place 97.00% ASTM D-1556=95% Passed
Item 104-Embankment
5+520 RL by Sand Cone Method 97.00% ASTM D-1556=95% Passed
5+540 CL Field Density of Soil in Place 100.00% ASTM D-1556=95% Passed
5+560 LL by Sand Cone Method 98.00% ASTM D-1556=95% Passed
5+580 RL Field Density of Soil in Place 97.00% ASTM D-1556=95% Passed
5+600 CL by Sand Cone Method 101.00% ASTM D-1556=95% Passed

D104 187,188,189,190,191,192 5+380 CL 6 HOLES 10-Jun-20 10-Jun-20 Field Density of Soil in Place 96.00% ASTM D-1556=95% Passed
Item 104-Embankment
5+400 RL by Sand Cone Method 100.00% ASTM D-1556=95% Passed
5+420 LL Field Density of Soil in Place 101.00% ASTM D-1556=95% Passed
5+440 CL by Sand Cone Method 104.00% ASTM D-1556=95% Passed
5+460 RL Field Density of Soil in Place 101.00% ASTM D-1556=95% Passed
5+480 CL by Sand Cone Method 101.00% ASTM D-1556=95% Passed

D104 181,182,183,184,185,186 5+260 CL 6 HOLES 10-Jun-20 10-Jun-20 Field Density of Soil in Place 96.00% ASTM D-1556=95% Passed
Item 104-Embankment
5+280 LL by Sand Cone Method 97.00% ASTM D-1556=95% Passed
5+300 CL Field Density of Soil in Place 99.00% ASTM D-1556=95% Passed
5+320 RL by Sand Cone Method 101.00% ASTM D-1556=95% Passed
5+340 CL Field Density of Soil in Place 104.00% ASTM D-1556=95% Passed
5+360 LL by Sand Cone Method 101.00% ASTM D-1556=95% Passed

D104 175,176,177,1789,179,180 5+140 CL 6 HOLES 10-Jun-20 10-Jun-20 Field Density of Soil in Place 103.00% ASTM D-1556=95% Passed
Item 104-Embankment
by Sand Cone Method

Page 1 SQC-R0
Annex 17
Republic of the Philippines
PHILIPPINE RURAL DEVELOPMENT PROJECT (PRDP)
SUMMARY OF QUALITY CONTROL TEST PERFORMED

as of June 25, 2020


Municipality of: Prosperidad/San Luis Province of: Agusan del Sur Region: Caraga Contract No.
Project Name: CONCRETING OF BUCAC-MARCELINA-MAHAPAG-SAN VICENTE FMR PACKAGE 3: CONCRETING OF SAN VICENTE-MAHAPAG FMR Referrence No. PRDP-IB-RO13-ADS-007-000-000-2015-B-R1
Project Location: Prosperidad-San Luis, Agusan del Sur Period Covered: March 14, 2020 - June 25, 2020

Quantity Date
Lab. No. Item Description Station Represented Date Tested Kind of Test Test Result Spec's Remarks / Recommendation
Represented Sampled
Field Density of Soil in Place
Item 104-Embankment
5+160 RL by Sand Cone Method 101.00% ASTM D-1556=95% Passed
5+180 CL Field Density of Soil in Place 98.00% ASTM D-1556=95% Passed
5+200 LL by Sand Cone Method 98.00% ASTM D-1556=95% Passed
5+220 CL Field Density of Soil in Place 98.00% ASTM D-1556=95% Passed
5+240 RL by Sand Cone Method 102.00% ASTM D-1556=95% Passed

D104 169,170,171,172,173,174 5+020 CL 6 HOLES 10-Jun-20 10-Jun-20 Field Density of Soil in Place 99.00% ASTM D-1556=95% Passed
Item 104-Embankment
5+040 LL by Sand Cone Method 101.00% ASTM D-1556=95% Passed
5+060 CL Field Density of Soil in Place 99.00% ASTM D-1556=95% Passed
5+080 RL by Sand Cone Method 100.00% ASTM D-1556=95% Passed
5+100 CL Field Density of Soil in Place 99.00% ASTM D-1556=95% Passed
5+120 LL by Sand Cone Method 99.00% ASTM D-1556=95% Passed

D104 167,168 4+980 RL 2 HOLES 9-Jun-20 9-Jun-20 Field Density of Soil in Place 102.00% ASTM D-1556=95% Passed
Item 104-Embankment
5+000 LL by Sand Cone Method 98.00% ASTM D-1556=95% Passed

D104 161,162,163,164,165,166 4+860 CL 6 HOLES 9-Jun-20 9-Jun-20 Field Density of Soil in Place 97.00% ASTM D-1556=95% Passed
Item 104-Embankment
4+880 LL by Sand Cone Method 98.00% ASTM D-1556=95% Passed
4+900 CL Field Density of Soil in Place 105.00% ASTM D-1556=95% Passed
4+920 RL by Sand Cone Method 98.00% ASTM D-1556=95% Passed
4+940 CL Field Density of Soil in Place 103.00% ASTM D-1556=95% Passed
4+960 LL by Sand Cone Method 104.00% ASTM D-1556=95% Passed

D104 155,156,157,158,159,160 4+740 CL 6 HOLES 9-Jun-20 9-Jun-20 Field Density of Soil in Place 104.00% ASTM D-1556=95% Passed
Item 104-Embankment
4+760 RL by Sand Cone Method 97.00% ASTM D-1556=95% Passed
4+780 CL Field Density of Soil in Place 99.00% ASTM D-1556=95% Passed
4+800 LL by Sand Cone Method 96.00% ASTM D-1556=95% Passed
4+820 CL Field Density of Soil in Place 97.00% ASTM D-1556=95% Passed
4+840 RL by Sand Cone Method 100.00% ASTM D-1556=95% Passed

D104 149,150,151,152,153,154 4+620 CL 6 HOLES 9-Jun-20 9-Jun-20 Field Density of Soil in Place 100.00% ASTM D-1556=95% Passed
Item 104-Embankment
4+640 LL by Sand Cone Method 98.00% ASTM D-1556=95% Passed
4+680 CL Field Density of Soil in Place 97.00% ASTM D-1556=95% Passed
4+680 RL by Sand Cone Method 98.00% ASTM D-1556=95% Passed
4+700 CL Field Density of Soil in Place 100.00% ASTM D-1556=95% Passed
4+720 LL by Sand Cone Method 102.00% ASTM D-1556=95% Passed

Page 2 SQC-R0
Annex 17
Republic of the Philippines
PHILIPPINE RURAL DEVELOPMENT PROJECT (PRDP)
SUMMARY OF QUALITY CONTROL TEST PERFORMED

as of June 25, 2020


Municipality of: Prosperidad/San Luis Province of: Agusan del Sur Region: Caraga Contract No.
Project Name: CONCRETING OF BUCAC-MARCELINA-MAHAPAG-SAN VICENTE FMR PACKAGE 3: CONCRETING OF SAN VICENTE-MAHAPAG FMR Referrence No. PRDP-IB-RO13-ADS-007-000-000-2015-B-R1
Project Location: Prosperidad-San Luis, Agusan del Sur Period Covered: March 14, 2020 - June 25, 2020

Quantity Date
Lab. No. Item Description Station Represented Date Tested Kind of Test Test Result Spec's Remarks / Recommendation
Represented Sampled

Submitted by: Check by: Reviewed by: Approved by: Noted by:

GILBERT SILOT ANA G. TIU VIRGINIA M. URBIZTONDO DEANNA P. FUDALAN RHIDGE L. BERDERA
Material Engineer/ Contractor PPMIU-Resident Engineer PPMIU Engineer PPMIU Head RPCO Rural Infrastructure Specialist

Page 3 SQC-R0
Annex 17
Republic of the Philippines
PHILIPPINE RURAL DEVELOPMENT PROJECT (PRDP)
SUMMARY OF QUALITY CONTROL TEST PERFORMED

as of Oct 30, 2017


Province of: Agusan del Sur Region: Caraga
Municipality

Project Na Concreting of Marcelina-Mahapag FMR (Sta.9+020-Sta.22+320)


Project LocBayugan City-San Luis, Agusan del Sur

Item Station Quantity


Date Date
Lab. No. Descriptio Represent Represent Kind of Test
Sampled Tested
n ed ed

Item 105 09+020 Sieve Analysis


09+036
09+052

09+068
09+084
09+100
09+116
09+132
09+148
09+164
09+180
09+196
09+212
09+228
09+244
09+260
09+276
09+292
09+308
09+324
09+340
09+356
09+372
09+388
09+400
Submitted
Check by: Reviewed by: Approved by:
by:

PPMIU-
Material
Resident PPMIU-Project Engineer PPMIU Head
Engineer
Engineer
Contractor
Form No.

JECT (PRDP)
T PERFORMED

Contract
Region: Caraga
No.
Referenc
e No.
Period Covered:

Remarks /
Test Result Spec's Recomme
ndation
Approved by:
Noted by:

RPCO
PPMIU Head
Engineer