Location: Doc No: Client: Page No: PMC
Location: Doc No: Client: Page No: PMC
Doc No:
CLIENT:
Page No:
PMC:
7.5 CHECK FOR PILING LOADS .......................................................................................... 45
7.6 STAAD OUTPUT .............................................................................................................. 46
8. DESIGN OF MP GAS COMPRESSOR (611-K-104A) FOUNDATION PILING................................. 52
8.1 DESIGN PHILOSOPHY FOR COMPRESSOR FOUNDATIONS .................................... 52
8.2 MACHINE DATA .............................................................................................................. 52
8.3 SOIL PARAMETERS FOR DESIGN ................................................................................ 55
8.4 FOUNDATION PLAN & ELEVATION .............................................................................. 56
8.5 GEOMETRY OF FOUNDATION ...................................................................................... 59
8.6 CHECK FOR ECCENTRICITY ......................................................................................... 60
8.7 CHECK FOR FOUNDATION WEIGHT ............................................................................ 60
8.8 CHECK FOR FREQUENCY ............................................................................................. 61
8.9 CHECK FOR AMPLITUDE............................................................................................... 64
8.10 DYNAMIC FORCES AND MOMENT ............................................................................... 68
8.11 CHECK FOR AMPLITUDE (ENGINE) ............................................................................. 69
8.12 WIND LOAD CALCULATION .......................................................................................... 77
8.13 SEISMIC LOAD CALCULATION ..................................................................................... 77
8.14 PILE CAPACITY CHECK ................................................................................................. 78
9. DESIGN OF COOLER (611-E-104A) FOUNDATION PILING .......................................................... 82
9.1 DESCRIPTION.................................................................................................................. 82
9.2 LOADING DATA............................................................................................................... 82
9.3 ANALYSIS CONCEPT ..................................................................................................... 83
9.4 STAAD DIAGRAMS ......................................................................................................... 84
9.5 CHECK FOR PILING LOADS .......................................................................................... 85
9.6 STAAD OUTPUT .............................................................................................................. 86
ANNEXURE-1 LP GAS COMPRESSOR ENGINE DRIVEN (611-K-101A) GA DRAWING AND LOAD DATA FROM VENDOR
ANNEXURE-2 COOLER (611-E-101A) GA DRAWING AND LOAD DATA FROM VENDOR
ANNEXURE-3 MP GAS COMPRESSOR ENGINE DRIVEN (611-K-104A) GA DRAWING AND LOAD DATA FROM VENDOR
ANNEXURE-4 COOLER (611-E-104A) GA DRAWING AND LOAD DATA FROM VENDOR
ANNEXURE-5 CALCULATION OF DYNAMIC STIFFNESS OF PILE FOR COMPRESSOR 611-K- 101A
ANNEXURE-6 CALCULATION OF DYNAMIC STIFFNESS OF PILE FOR COMPRESSOR 611-K-
104A
GCPA-611-CV-CL-GCC-A-08 (Rev 1)
Page 3 of 91
M/s PDIL
.......................................... 45
.......................................... 46
DATION PILING................................. 52
NS .................................... 52
.......................................... 52
.......................................... 55
.......................................... 56
.......................................... 59
.......................................... 60
.......................................... 60
.......................................... 61
......................................... 64
.......................................... 68
.......................................... 69
.......................................... 77
.......................................... 77
.......................................... 78
G .......................................................... 82
......................................... 82
......................................... 82
.......................................... 83
.......................................... 84
.......................................... 85
.......................................... 86
101A) GA DRAWING AND LOAD DATA FROM VENDOR
DATA FROM VENDOR
-104A) GA DRAWING AND LOAD DATA FROM VENDOR
DATA FROM VENDOR
E FOR COMPRESSOR 611-K- 101A
E FOR COMPRESSOR 611-K-