Starter Panel Drawing-Pandamaran

1. The document is a list of materials for a flood mitigation project in Pandamaran Pelabuhan Klang, Selangor, Malaysia. 2. It includes a legend describing abbreviations and brands for various electrical components, including molded case circuit breakers, residual current circuit breakers, and earth leakage relays. 3. Notes provide additional information on indicators, switches, and meters to be included in the electrical control panel.

Uploaded by

WAN CHAND
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
662 views

Starter Panel Drawing-Pandamaran

1. The document is a list of materials for a flood mitigation project in Pandamaran Pelabuhan Klang, Selangor, Malaysia. 2. It includes a legend describing abbreviations and brands for various electrical components, including molded case circuit breakers, residual current circuit breakers, and earth leakage relays. 3. Notes provide additional information on indicators, switches, and meters to be included in the electrical control panel.

Uploaded by

WAN CHAND
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

LIST OF MATERIALS
C C
LEGEND DESCRIPTIONS BRAND
MCCB MOLDED CASE CIRCUIT BREAKER TERASAKI
RCCB RESIDUAL CURRENT CIRRUIT BREAKER TERASAKI
D ELR EARTH LEAKAGE RELAY DELAB D

- STARTER LS
A/T AUTOTRANSFORMER ZENITH
PSR PHASE SEQUENCE RELAY CHIKACHI
E E

START/STOP BUTTON AMICO


INDICATOR LIGHT AMICO

F F

G G

H H
Manufacturer: LOGIC RESOURCES Project: PROJEK TEBATAN BANJIR DI PANDAMARAN PELABUHAN KLANG, DAERAH KLANG, Scale: NTS Description: LIST OF MATERIAL
SELANGOR DARUL EHSAN. Date: MARCH 2020
Supplier: Design By: AR Drawing no.: LFE/6532/03/2020/E-01
Drawn By: AR Revision: 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

CONSULTANT COMMENT

1. STATE THE PANEL MANUC. MATERIAL


A 2 STATE THE SHEET METAL PANEL THICKNESS ( COMPLY LS SPEC) A
3. STATE THE PROTECTIVE COATING APPLIED (COMPLY LS SPEC)
4. REFER TO CONSTRUCTION DRAWING ZHL18/1062/JPSS/PDMRN/M/06 : THE PANEL SHALL BE FLOOR MOUNTED
AS THERE IS TRENCH PROVIDED FOR PANEL. WALL MOUNTED PANEL REQUIRES ABOVE GROUND CABLING
WORKS AND THE WALL AREA PROBABY WOULD NOT BE ADEQUATE (DISCUSSION REQUIRED TO LIASE NOTE
WITH JPS,ELECTRICALCONTRACTOR AND OTHER MSB,SCADE PANEL MANUC.)
5. REPLACE ANALOGUE AMMETER ANND VOLTMETER WITH DIGITAL POWER METER 1) RUN LIGHT (GREEN)
6. TRIPS BASICALLY OCCUR DUE TO THERMALOVERCURRENT RELAY AND OVERCURRENT RELAY, PROVIDE
SEPERATE TRIP INDICATOR LIGHT TO ALLOW MAINTAINANCE PERSONAL TO ACCESS THE TRIP FASTER. LABEL
2) TRIP LIGHT (RED)
THE TRIPS ACCOSRINGLY. 3) START BUTTON (GREEN)
B 7.PLEASE INCLUDE AUTOMATIC - MANUAL SELECTOR SWTICH B
8. PLEASE INCLUDE RESET BUTTON 4) STOP BUTTON (RED)
9. PLEASE INCLUDE HOUR METER

C A ELR V C
. . AUX

400 500
. TRIP In

550mm
EARTH LEAKAGE RELAY
.
DELAY
300
0.5A 1.5s

. 0.3A 0.7A
1s 2s

200
0.5s 2.5s

.
0.1A 1.0A
0.1s 3s

In DELAY

100
0 0

ELR 301A TEST RESET

R Y B

A/S V/S
1000mm

D D

1 2
3 4

450mm
E-STOP
E E

F F

600mm 500mm
300mm
1100mm
G FRONT VIEW SIDE VIEW G

H H
Manufacturer: LOGIC RESOURCES Project: PROJEK TEBATAN BANJIR DI PANDAMARAN PELABUHAN KLANG, DAERAH KLANG, Scale: NTS Description: CONTROL PANEL LAYOUT
SELANGOR DARUL EHSAN. Date: MARCH 2020
Supplier: Design By: AR Drawing no.: LFE/6532/03/2020/E-02
Drawn By: AR Revision: 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B
1

C C

D D

4
E E

5 6

F F

N
G G

H H
Manufacturer: LOGIC RESOURCES Project: PROJEK TEBATAN BANJIR DI PANDAMARAN PELABUHAN KLANG, DAERAH KLANG, Scale: NTS Description: CONTROL CIRCUIT DIAGRAM
SELANGOR DARUL EHSAN. Date: MARCH 2020
Supplier: Design By: AR Drawing no.: LFE/6532/03/2020/E-03
Drawn By: AR Revision: 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

V
400 500
300

200

100
0

D D

A
. .

.
.

E E
7
8
1
2

F F

G G

H H
Manufacturer: LOGIC RESOURCES Project: PROJEK TEBATAN BANJIR DI PANDAMARAN PELABUHAN KLANG, DAERAH KLANG, Scale: NTS Description: SINGLE LINE DIAGRAM
SELANGOR DARUL EHSAN. Date: MARCH 2020
Supplier: Design By: AR Drawing no.: LFE/6532/03/2020/E-04