Part Approval File Checklist
Mandatory Documents for all Parts
Available Details
S.No. Document Remarks
(Yes / No) (mention for No items)
1 Sample Evaluation Format
2 MIS-P All pages to be signed
3 Process Flow Diagram (PFD)
4 Process Control Standard (PCS)
5 Process Verification as per PCS If NG, Closure to be attached
List of Sub-vendors / Raw material
6
suppliers
7 ECN- IBOM summary sheet
8 Approved Drawing for part
Parameters should be numbered on drawing
Sample Inspection Report and inspection report should be against the
9 Vendor Dimensional report (5 Nos) numbered parameters.
& MSIL Dimensional report(3 Nos) For Multicavity parts report should be there
from each cavity (1/cavity).
Vendor Performance test report as
10
per drawing
11 ELV Report or Declaration
12 Spec Review Meeting Minutes Completion of Spec Review Meeting Points
Documents for selected Parts
a) Check as per MSIL approved drg:
1.Material#
13 Vendor Lab Reports 2.Heat Treatment
3.Surface treatment
#MSIL Lab material test not required for
approved sources- List 1
14 MSIL Lab Reports b)Check as per standard (SIS N4402)
1.Weld Peneteration (all CO2 welding Parts)
15 Process Audit Report For all parts as per List 2
16 Child part inspection reports
For T2 parts as per List 3
17 Tier-2 Process audit
18 Process FMEA For all parts as per List 4
19 PPVT Report For all parts as per List 5
Note : 'Part approval file checklist' must be placed just below 'New Model Part Approval Sheet' .
QAPI/006 ∆
1
Part Approval File Checklist
Mandatory Documents for all Parts
Available Details
S.No. Document Remarks
(Yes / No) (mention for No items)
1 Sample Evaluation Format
2 MIS-P All pages to be signed
3 Process Flow Diagram (PFD)
4 Process Control Standard (PCS)
5 Process Verification as per PCS If NG, Closure to be attached
List of Sub-vendors / Raw material
6
suppliers
7 ECN- IBOM summary sheet
8 Approved Drawing for part
Sample Inspection Report
9 Vendor Dimensional report (5 Nos)
& MSIL Dimensional report(3 Nos)
Vendor Performance test report as
10
per drawing
11 ELV Report or Declaration
12 Spec Review Meeting Minutes Completion of Spec Review Meeting Points
Documents for selected Parts
a) Check as per MSIL approved drg:
1.Material#
13 Vendor Lab Reports 2.Heat Treatment
3.Surface treatment
#MSIL Lab material test not required for
approved sources- List 1
14 MSIL Lab Reports b)Check as per standard (SIS N4402)
1.Weld Peneteration (all CO2 welding Parts)
15 Process Audit Report For all parts as per List 2
16 Child part inspection reports
For T2 parts as per List 3
17 Tier-2 Process audit
18 Process FMEA For all parts as per List 4
19 PPVT Report For all parts as per List 5
Note : 'Part approval file checklist' must be placed just below 'New Model Part Approval Sheet' .
QAPI/006
∆
1