The scope of work includes: 1) Refurbishing 21 radial gates, 6 head gates, 2 penstock gates, and 3 canal head gates at Messanjore Dam, including replacement of components, rust removal, and painting. 2) Establishing an automatic reservoir operation system through a Supervisory Control and Data Acquisition (SCADA) system to automatically operate the gates. 3) Acquiring hydrological data and integrating it with the SCADA system to provide real-time water level and flow data.

Uploaded by

om jangid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
131 views2 pages

Scope of Work - MASSANJORE DAM

The scope of work includes: 1) Refurbishing 21 radial gates, 6 head gates, 2 penstock gates, and 3 canal head gates at Messanjore Dam, including replacement of components, rust removal, and painting. 2) Establishing an automatic reservoir operation system through a Supervisory Control and Data Acquisition (SCADA) system to automatically operate the gates. 3) Acquiring hydrological data and integrating it with the SCADA system to provide real-time water level and flow data.

Uploaded by

om jangid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Scope of work:

A. Refurbishing of all 21 no. spillway radial gates, high level and low level Head gates (Total 06
nos.), 02 nos. hydel penstock gates, 03 nos. Jharkhand canal Head gates gate, Gantry crane
for high level and low level gates only, repair and servicing, change of spares & components
of radial gates and hoist as required & finally suitable rust removal treatment and painting of
all structural steel members of Messanjore Dam.

Not our Scope (scope of Steel gate manufacturer/ maintenance)

B. Refurbishing including replacement of components as necessary of electrical drive motors,


local control panels and gate drive mechanisms master control panel, revamping of
dedicated AC electric power supply & distribution to Dam proper for automation & DCR
including provision for an additional DG set.

Not our Scope (scope of Electrical equipment supplier/ maintenance)

C. Establishing automatic reservoir operation system through tender in item rate contract
under EPC. Design, formulation, supply, integration, installation, testing, conducting trial
runs, and commissioning state-of-the-art Supervisory Control and Data Acquisition System
(SCADA) for automatic operation of radial (Tainter) spillway and canal head regulator sluice
(vertical) gates. The SCADA system consist of a Master Control Station(The Dam Control
Room or DCR) involving Master Control Panel at the Dam inspection gallery and an ancillary
control panel, computer servers ( with standby computer with video wall)for Human
Machine Interface (HMI), data collection, data base and communication with remote field
data collection units for exchange of data and control commands; Remote Terminal Units
(RTUs) for each gates connecting to sensors in the process, converting sensor signals to
digital data and sending digital data to the Master Control Station system; Controller used in
RTUs for initiating control action and matching set point under DCS control; and
communication network connecting the supervisory system to the Remote Terminal Units.

Scope for Radial steel gate automation through SCADA

D. Collection and dissemination of real time hydrological inflow data of CWC either by sms
(GSM) to servers or integrating with CWC flood forecasting website to be integrated with
SCADA system; Provide advanced measuring instrumentation such as ARG, silt transducers,
strain-stress measurement instrument and water level measuring sensors at upstream and
downstream of Dam and Gate position sensors interfaced with the SCADA Master Station.

Scope for Hydrological data acquisition and integration with Scada.

E. Demonstration of trial runs of the systems installed for satisfactory operation of Authority.

F. Civil construction of the SCADA Master Control Station known as Dam Control Room
adjoining to the Dam and construction two other Monitoring Stations at Suri & Burdwan in
campuses of offices of Irrigation & Waterways Directorate.
G. Operation & Maintenance (O&M) of hardware and software systems during guarantee and
Extended Warranty for six years

H. Imparting training on to the project both by way of class room and on-the-job training
sessions.

I. Guarantee against defect liability for one year after the satisfactory completion of total work
and Extended Warranty of further five years.