Progress Report
Progress Report
-1-
Earthquake Emergency Assistance Project (EEAP)
Rehabilitation and Widening of Earthquake affected Alpuri – Besham Section of National
Highway (N-90)
MONTHLY PROGRESS REPORT
JUNE-2011
Table of Contents
-2-
9. Project Issues 106 – 107
10. Environmental Issues 108 – 109
11. Detail of Consultancy services 110
a. Financial details 111 – 112
b. List of Consultant Staff 113 – 115
12. Quality Control/ Material Test Results 116 – 124
13. Weather Report 125 – 126
14. Detail of Contractor’s resources 127
a. List of Manpower 128 – 129
b. List of Plants & Machinery 130 – 131
15. Site Photographs 132
-3-
1. General Information
-4-
GENERAL INFORMATION
Alpuri – Besham Section of National Highway N-90 is located in the Shangla District of Khyber
Pukhtoon Khwa (KPK) in Pakistan which links the Swat Valley to Karakarum Highway (N-35).
This road provides basic access to a number of remote towns and villages of Shangla District
which are among the summer tourism attraction. The road was federalized in 2007. The
highway section had been damaged due to earthquake of October 08, 2005, torrential rains and
aftershocks. Scope of work of this assignment is to reconstruct the road highway to National
Highway Authority (NHA) standard. Total length of this section of highway is 33.502 Km. The
existing road is almost a single lane road having surface treatment at the top layer of pavement.
Present condition of pavement is poor. The Existing formation width of the road varies from 3.3
m to 4.6 m with shoulder damaged in various sections. The aim is to improve riding quality and
serviceability of the road and enhance its life through widening and strengthening as per NHA’s
standards. The project had been planned to be completed in 12 months’ construction period.
The road passes through hilly area which is prone of landslides and subject to heavy rainfall.
The major work items required for repair / rehabilitation / reconstruction include earthwork,
roadwork, construction of structures, drainage work, retaining structures, highway safety work
and other ancillary works. The NHA General specifications are applicable and the work would
be carried out under the supervision of independent consultants. The contractor is required to
be have adequate resources to meet the time schedule, cost, and quality and other
requirements included in his scope of work.
The road passes through a high to medium grade in the mountains. The Project road caters for
approximately 2,000 vehicles per day. There is no alternate route to divert the traffic. Therefore,
the Contractor has to make appropriate arrangements to keep the road traffic worthy while the
work remains in progress. All safety / precautionary measures are to be taken by the contractor
to keep the traffic plying on the road during the construction period without additional
compensation / claim paid for it. Contractor has to erect the information signboard at the place
of work for awareness and information of general public at his own cost.
During construction of project, a historical flood in July 2010 occurred and completely washed
away some portions of road whereas few portions were badly damaged though not washed
away completely. This situation called for redesigning of the affected portions by keeping in
view the contractor’s pervious performance to complete the project up till revised ADB loan
closing date which is 30.06.2011. The revised / reduced scope of work is agreed by NHA /
ERRA during meeting in ERRA office Islamabad on 22.12.2010.
-5-
2. Office / Contact Details
-6-
CONTACT DATA
Fax: 0996-400460
Cell Phone:
3. Quantity Surveyor :
Email: ____________________________
Head Office
(Transportation Engineering Services Division)
Fax: 042-35171084
Email:
Website: www.acepakistan.com
-7-
3. Location Map
-8-
-9-
4. Project Alignment
- 10 -
NATIONAL HIGHWAY AUTHORITY
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
- 11 -
5. Typical Cross Sections
(a) As per Original Scope of Work
(b) As per Revised Scope of Work
- 12 -
5(a). As per Original Scope of Work
- 13 -
- 14 -
5(b). As per Revised Scope of Work
- 15 -
- 16 -
6. Project Data
(a) Salient Features
(b) Physical Progress Summary (up to date)
(c) Financial Progress Summary (up to date)
- 17 -
6 (a). Salient Features
- 18 -
SALIENT FEATURES
- 19 -
SAILENT FEATURES
Rehabilitation and Widening of Earthquake
affected Alpuri – Besham
Project Name Section of National Highway (N-90)
Lot-II (KM 08+500 to 17+015)
1
6 %age Progress to-date
Planned %age Achieved %age
100% 65.261%
1
7 Structure Work Detail
- 20 -
6 Causeways 1 20 0 1 20 0 0.00%
7 Bridges 3 2 1 0.00%
- 21 -
SALIENT FEATURES
Rehabilitation and Widening of Earthquake
affected Alpuri – Besham Section of National
Project Name Highway (N-90)
Lot-III (KM. 17+015 to 23+300)
- 22 -
SALIENT FEATURES
- 23 -
6 (b). Physical progress Summary (Up to Date)
- 24 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
NATIONAL HIGHWAY AUTHORITY
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-
90)
IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
- 25 -
6 (c). Financial progress Summary (Up to Date)
- 26 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
NATIONAL HIGHWAY AUTHORITY
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
LOT-
17+015 TO 25+000 320,608,457.000 454,907,928 237,843,185 74.185% 52.284%
III
LOT-
25+000 TO 33+502 296,914,934.000 679,611,040 378,090,722 127.340% 55.633%
IV
Total 1,303,158,700.000 2,149,399,485 1,199,002,007
- 27 -
7. Design Parameters
- 28 -
PAVEMENT LAYERS AND THICKNESS (REVISED)
- 29 -
8. Project Status
(a) Physical Progress w.r.t to laying courses
(b) Physical and Financial Progress w.r.t to B.O.Q Items
(c) Bridges, Culverts & Causeways Details with Progress
(i) Bridges
(ii) Culverts
(iii) Causeways
(d) Retaining Walls
(e) Breast Walls
(f) Linear Chart Showing updated Progress
(g) S-Curve
(h) Summary of IPC’s
- 30 -
PROJECT STATUS
- 31 -
a. Physical Progress w.r.t to laying courses
- 32 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM
NATIONAL HIGHWAY (N-90) (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP
PROGRESS OF WORK (LOT - I)
1. Survey
Setting out of new C/L according to design has been completed (From Km. 00+000 to 08+500)
NSL X-sections on new C/L has been completed (From Km. 00+000 to 08+500)
2. Earth Work
Completed In Progress
S.
Location Length Location Length Remarks
No
From KM. To KM. (M) From KM. To KM. (M)
1 Embankment
04+375 04+463 87.5
04+688 04+863 175
05+525 05+600 75
05+788 05+863 75
Total 412.5
1 Sub-Grade
00+300 00+387 87
00+600 01+725 1125
01+875 04+412 2537
04+587 05+000 413
05+200 05+875 675
05+972 06+350 378
06+500 08+500 2000
Total 7215
2 Sub-Base
00+300 00+387 87 0
00+600 01+725 1125 0
01+887 04+200 2313 0
04+350 04+412 62
04+587 05+000 413
05+200 05+875 675
06+037 06+350 313
06+500 08+500 2000
0
Total 6988 Total 0
3 Base Course
03+025 04+087 1062 00+300 00+387 87
06+500 08+500 2000 00+600 01+000 400
03+362 04+100 738 01+175 01+275 100
02+450 03+162 712 01+450 01+725 275
02+000 02+262 262 01+885 02+162 277
0 02+450 02+925 475
0 05+200 05+325 125
Total 4774 Total 1739
4 Asphalt Base Course
07+350 07+666 316 07+666 08+333 667
Total 316 Total 667
- 33 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI -
BESHAM NATIONAL HIGHWAY (N-90) (KM 08+500 TO 17+015) IN DISTRICT
SHANGAL, NWFP
PROGRESS OF WORK (LOT - II)
1.
Survey
Setting out of new C/L according to design has been completed (From Km.
08+000 to 17+015)
NSL X-sections on new C/L has been completed (From Km. 08+000 to 17+015)
Completed In progress
Location Location Remark
Sr. No. Length Length s
From (M) From To (M)
To KM.
KM. KM. KM.
1 Sub Grade
08+500 09+300 800
09+650 10+500 850
10+700 12+600 1900
12+712 15+025 2313
15+150 15+535 385
15+625 17+015 1390
Total (Km) 7638
2 Sub Base
08+500 09+300 800
09+650 10+500 850
10+700 12+600 1900
12+712 15+025 2313
15+150 15+535 385
15+625 17+015 1390
Total (Km) 7638.00
3 Base Course
8+500.0 9+250.0 750
9+650.0 10+500.0 850
10+500.0 11+150.0 650
11+150.0 11+362.0 212
12+300.0 12+600.0 300
12+712.0 13+150.0 438
13+350.0 14+250.0 900
14+325.0 14+750.0 425
14+750.0 15+025.0 275
Total (Km) 4800.00 Total
- 34 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI -
BESHAM NATIONAL HIGHWAY (N-90) (From Km. 17+015 to 25+000) IN DISTRICT
SHANGAL, NWFP
PROGRESS OF WORK (LOT - III)
1. Survey
Setting out of new C/L according to design has been completed (From Km. 17+015 to 25+000)
NSL X-sections on new C/L has been completed (From Km. 17+015 to 25+000)
Completed In progress
S.
Location Length Location Length Remarks
No.
(M) (M)
From KM. To KM. From KM. To KM.
1 Sub Grade
17+015 20+100 3085.00 0.00
20+137 23+175 3038.00
Total Length (m) 6123.00 Total Length (m) 0.00
2 Sub-Base
17+015 18+850 1835.00 0.00
19+000 19+900 900.00 0.00
20+225 20+500 275.00 0.00
20+700 21+100 400.00
21+275 21+475 200.00
22+500 22+800 300.00
Total Length (m) 3910.00 Total Length (m) 0.00
3 Base Course
17+015 17+575 560.00 17+800 18+300 500.00
17+675 17+800 125.00 0.00
Total Length (m) 685.00 Total Length (m) 500.00
- 35 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM
NATIONAL HIGHWAY (N-90) (From Km. 25+000 to 33+502) IN DISTRICT SHANGLA, NWFP
PROGRESS OF WORK (LOT - IV)
1. Survey
Setting out of new C/L according to design has been completed (From Km. 25+000 to 33+502)
NSL X-sections on new C/L has been completed (From Km. 25+000 to 33+502)
2. Earth Work
Completed In progress
Sr.
Location Length Location Length Remarks
No.
(M) (M)
From To From KM. To KM.
i Roadway Excavation
25+475 25+525 50
25+725 26+260 535
26+375 29+530 3155
29+550 29+900 350
30+000 32+550 2550
32+875 32+937 62
33+025 33+150 125
TOTAL 6827
ii Sub-Grade
25+450 30+500 5050.00
30+800 33+300 2500.00 30+500 30+800 300.00
TOTAL 7550 TOTAL 300.00
iii. Sub-Base
25+825 27+900 2075.00 25+600 25+725 125.00
27+900 28+150 250.00 0.00
28+150 28+350 200.00 0.00
28+450 28+575 125.00 0.00
28+575 28+675 100.00 0.00
28+675 28+750 75.00 0.00
28+750 29+000 250.00 0.00
29+000 29+500 500.00 0.00
29+500 29+750 250.00 0.00
29+750 30+500 750.00 0.00
30+850 31+400 550.00 0.00
31+550 31+750 200.00 0.00
32+187 33+300 1113.00 0.00
TOTAL 6438.00 TOTAL 125.00
iv. Aggregate Base Course
25+762 26+730 968.00
26+000 26+700 700.00 29+575 29+700 125.00
26+800 27+100 300.00 31+075 31+375 300.00
29+575 29+800 225.00 0.00
31+000 31+325 325.00
32+180 33+330 1150.00
TOTAL 3668.00 TOTAL 425.00
- 36 -
b. Physical & Financial Progress w.r.t to B.O.Q items
According to Revised Scope of Work
- 37 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
- 38 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Total of Bill No. 3 C/O to Summary 79,642,100.00 101,993,620.00 21,945,234.60 14,992,860.00 36,938,094.60
302 Bituminous Prime Coat m2 40.00 63465.00 2538600.00 57500.00 2300000.00 6894.1 6894.1
275,764.00 275,764.00
303 Bituminous Tack Coat m2 50.00 57082.00 2854100.00 54450.00 2722500.00
- -
305b Asphaltic Concrete for Wearing Course Class-B m3 16000.00 2916.00 46656000.00 2730.00 43680000.00
- -
304b Double Surface Treatment m2 300.00 9413.00 2823900.00 8395.00 2518500.00
- 39 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Total of Bill No. 5A C/O to Summary 90,044,150.00 174,062,773.51 46,457,085.60 19,708,129.93 94,061,822.40
- 40 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
404b Reinforcement as per AASHTO M31 Grade 60 Ton 130000.00 129.89 16885700.00 136.50 17745000.00
- - - -
Premoulded Joint Filler 25mm Thick with
406a m2 1000.00 14.59 14590.00 28.13 28125.00
Bitumastic Joint Seal -
412a Stone Masonry Dressed Course with Mortar m3 3200.00 33.00 105600.00 33.00 105600.00
-
SIW- Provide and Fix Drainage G.I Pipe 100mm in
m 3000.00 10.00 30000.00 14.00 42000.00
6(a) Bridge Deck Slab including Accessories -
SIW- Provide and Fix Drainage PVC Pipe 150mm in
m 3000.00 550.00 1650000.00 550.00 1650000.00
6(b) Bridge Deck Slab including Accessories
NON P/Fixing Pre cast Pre stressed Concrete Girder
No 750000.00 0.00 0.00 4.00 3000000.00
BOQ 25M, Complete in all respect as per drawings
- 41 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Total of Bill No. 6 C/O to Summary 4,144,700.00 8,863,200.00 5,543,100.00 1,367,629.98 6,800,729.98
- 42 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
601dii Concrete Kerbs in place, Single Face m 1000.00 675.00 675000.00 0.00 0.00
604a Metal Beam Guard Rail m 1000.00 1500.00 1500000.00 1700.00 1700000.00
604b Guard Rail End Pieces Each 1500.00 200.00 300000.00 207.00 310500.00
604d Steel Post for Guard Rail Each 2000.00 806.00 1612000.00 1140.00 2280000.00
607a Traffic Road Sign Category 1 Each 5000.00 99.00 495000.00 85.00 425000.00
607b Traffic Road Sign Category 2 Each 5000.00 49.00 245000.00 40.00 200000.00
607c Traffic Road Sign Category 3(a) Each 5000.00 45.00 225000.00 20.00 100000.00
607d Traffic Road Sign Category 3(b) Each 5000.00 18.00 90000.00 18.00 90000.00
607e Traffic Road Sign Category 3(c) Each 15000.00 4.00 60000.00 4.00 60000.00
Pavement Marking in Reflective TP Paint for
608g m 100.00 3002.00 300200.00 0.00 0.00
Lines of 12cm width
Pavement Marking in Reflective TP Paint for
608h2 m 70.00 18008.00 1260560.00 17000.00 1190000.00
Lines of 15cm width
Pavement Marking in Reflective TP Paint for
608j2 Each 1125.00 13.00 14625.00 0.00 0.00
Lines of 4.0M Arrows
610c Kilometre Post Each 20000.00 4.00 80000.00 0.00 0.00
- 43 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Rate Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit
No (Rs.) Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 2 EARTH WORK
- 44 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Rate Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit
No (Rs.) Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 3 SUB-BASE AND BASE COURSES
201 Granular Sub-base m3 1220.00 12503.00 15253660.00 13177.00 16075940.00 3124.913 9605.96
3,812,393.86 6,481.05 7,906,877.34 11,719,271.20
202 Aggregate Base Course m3 1980.00 10470.00 20730600.00 11207.00 22189860.00 2736 5417280 4326913.8 4921.31 9744193.8
2,185.31
203b Asphaltic Base Course Plant Mix Class-B m3 13900.00 2882.00 40059800.00 4506.14 62635318.20
Breaking of Existing Road Pavement
209A m3 1500.00 75.00 112500.00 3028.20 4542300.00 3028.2 4693.78
Structures 4,542,300.00 1,665.58 2,498,370.00 7,040,670.00
209b Scarification of Existing Road Pavement m2 30.00 19675.00 590250.00 19675.00 590250.00 9560.8 286824 5148.61 154458.3 14709.41
441,282.30
Total of Bill No. 3 C/O to Summary 76746810.00 106033668 14,058,797.86 14,886,619.44 28,945,417.30
- 45 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit Rate (Rs.)
No Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 5A STRUCTURES (Culverts, Retaining Walls,
Causeways)
107a Structural Excavation in Common Material m3 350.00 2700.00 945000.00 6668.40 2333940.00
7,256.00 2,539,600.00 1,716.56 600,796.00 8,972.56 3,140,396.00
Structural Excavation in Common Material Below
107bi m3 350.00 1350.00 472500.00 0.00 0.00 0
Water Level - - - -
107ci Structural Excavation in Hard Rock Material m3 680.00 1350.00 918000.00 4270.00 2903600.00 4051.58 6359.81
2,755,074.40 2,308.23 1,569,596.40 4,324,670.80
107cii Structural Excavation in Medium Rock Material m3 400.00 1350.00 540000.00 0.00 0.00 0
- - - -
107ciii Structural Excavation in Soft Rock Material m3 380.00 1753.00 666140.00 0.00 0.00 0
- - - -
107d Granular Backfill m3 1000.00 874.00 874000.00 6005.30 6005300.00 0
- - - -
107e Common Backfill m3 500.00 8737.00 4368500.00 3513.00 1756500.00 0
- - - -
Concrete Class-A Underground or Elevated (210
401a m3 8300.00 5828.00 48372400.00 643.80 5343540.00 33.701 137.98
Kg/Cm2 of 28 Days Cylinder Strength) 279,718.30 104.28 865,515.70 1,145,234.00
Concrete Class-B (170 Kg/Cm2 of 28 Days Cylinder
401b m3 6400.00 151.00 966400.00 513.10 3283840.00 14.89 42.55
Strength) 95,296.00 27.66 177,024.00 272,320.00
Lean Concrete (100 Kg/Cm2 of 28 Days Cylinder
401f m3 4500.00 1350.00 6075000.00 5344.70 24051150.00 3256 3741.9
Strength) 14,652,000.00 485.90 2,186,550.00 16,838,550.00
404b Reinforcement as per AASHTO M31 Grade 60 Ton 105000.00 102.00 10710000.00 25.00 2625000.00 0 14.75
- 14.75 1,548,750.00 1,548,750.00
Premoulded Joint Filler 12mm Thick with Bitumastic
406a m2 70.00 1283.00 89810.00 1283.00 89810.00 0
Joint Seal - - - -
SIW-8 Provide PVC Pipe 76mm dia m 300.00 803.00 240900.00 5495.00 1648500.00 2312 2862.52
693,600.00 550.52 165,156.00 858,756.00
410 Brick Work m3 10000.00 144.00 1440000.00 0.00 0.00 0
- - - -
411a Stone Masonry Random Dry m3 2100.00 486.00 1020600.00 5475.80 11499180.00 170.08 2668.79
357,168.00 2,498.71 5,247,291.00 5,604,459.00
411b Stone Masonry Random with Mortar m3 2250.00 10014.00 22531500.00 11550.20 25987950.00 11399.66 12468.29
25,649,235.00 1,068.63 2,404,417.50 28,053,652.50
412a Stone Masonry Dressed Course with Mortar m3 2490.00 3464.00 8625360.00 2053.00 5111970.00 416.29 1004.67
1,036,562.10 588.38 1,465,066.20 2,501,628.30
411g Roll Pointing m2 150.00 1134.00 170100.00 4400.00 660000.00 416.29 5564.38
62,443.50 5,148.09 772,213.50 834,657.00
SIW-9 Cement Sand Plaster (1:3) m2 350.00 324.00 113400.00 0.00 0.00 0
-
Non 3
Plum Concrete m 5358.00 0.00 0.00 7049.00 37768542.00 6013 32217654 22 117876 6035 32335530
BOQ
Total of Bill No. 5A C/O to Summary 109139610.00 131068822.00 80338351.30 17120252.30 97458603.60
- 46 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit Rate (Rs.)
No Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 5B BRIDGES
107a Structural Excavation in Common Material m3 350.00 44.40 15540.00 144.00 50400.00
Structural Excavation in Common Material 3
107b m 400.00 44.40 17760.00 0.00 0.00
Below Water Level
107c Structural Excavation in Rock Material m3 680.00 355.16 241508.80 144.00 97920.00
144.00 97,920.00 102.00 69,360.00 246.00 167,280.00
107d Granular Backfill m3 1000.00 123.87 123870.00 60.00 60000.00
- - -
107e Common Backfill m3 800.00 123.87 99096.00 181.00 144800.00
- - -
Concrete Class-A Underground, On
401a
Ground or Elevated (210 Kg/Cm2 of 28 m 3
8500.00 248.44 2111740.00 211.00 1793500.00
(I,ii,iii) 33.70 286,450.00 108.79 924,681.00 142.49 1,211,131.00
Days Cylinder Strength)
Concrete Class-A3 Underground
401a3
Onground or Elevated (210 Kg/Cm2 of 28 m3 15050.00 55.52 835576.00 34.38 517419.00
(I,ii,iii) - 26.82 403,641.00 26.82 403,641.00
Days Cylinder Strength)
Lean Concrete (100 Kg/Cm2 of 28 Days 3
401f m 8050.00 9.64 77602.00 15.19 122279.50
Cylinder Strength) 3.75 30,187.50 11.44 92,092.00 15.19 122,279.50
Reinforcement as per AASHTO M31
404b Ton 110000.00 30.40 3344000.00 25.18 2769580.00
Grade 60 9.70 1,067,000.00 8.21 902,880.00 17.91 1,969,880.00
Premoulded Joint Filler 25mm Thick with
406a m2 1100.00 3.20 3520.00 0.00 0.00
Bitumastic Joint Seal - - -
406c Steel Expansion Joint Kg 200.00 511.20 102240.00 511.00 102200.00
- - -
Providing Elastomeric Bearing Pad
406e cm3 10.00 43470.00 434700.00 43470.00 434700.00
(according to Size and Thickness) - 43,470.00 434,700.00 43,470.00 434,700.00
Provide and Fix Drainage G.I Pipe 100mm
SIW-6(a) m 4000.00 3.00 12000.00 3.00 12000.00
in Bridge Deck Slab including Accessories - - -
Provide and Fix Drainage PVC Pipe
SIW-6(b) 150mm in Bridge Deck Slab including m 5000.00 50.00 250000.00 50.00 250000.00
Accessories
Total of Bill No. 5B C/O to Summary 7669152.80 6,354,799 1,481,557.50 2,827,354.00 4,308,911.50
- 47 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Rate Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit
No (Rs.) Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 6 DRAINAGE AND EROSION WORKS
107a Structural Excavation in Common Material m3 350.00 138.00 48300.00 852.00 298200.00 28.896 10113.6 28.896
10,113.60
Structural Excavation in Common Material
107b m3 400.00 28.00 11200.00 0.00 0.00
Below Water Level -
107c Structural Excavation in Rock Material m3 680.00 386.00 262480.00 1278.00 869040.00 16.532 11241.76 16.532
11,241.76
107d Granular Backfill m3 1000.00 17.00 17000.00 40.95 40950.00
- -
107e Common Backfill m3 800.00 157.00 125600.00 41.00 32800.00
- -
AASHTO M 170 Class-II Reinforced Concrete
501e m3
Pipe - -
(i) Diameter 610mm m 10100.00 66.00 666600.00 127.00 1282700.00 38.895 392839.5 38.895
392,839.50
(ii) Diameter 760mm m 15200.00 170.00 2584000.00 37.00 562400.00 27 410400
- -
Granular Material in Bed to Concrete Pipe
502a m3 1000.00 74.00 74000.00 74.00 74000.00
Culvert - -
Concrete Class-B in Bedding and
502b m3 10100.00 44.00 444400.00 74.00 747400.00 54.429 549732.9 54.429
Encasement of Concrete Pipe Culvert 549,732.90
507a Steel Wire Mesh for Gabions Kg 500.00 396.00 198000.00 50.00 25000.00
- -
507b Rock fill in Gabions m2 1700.00 248.00 421600.00 30.00 51000.00
- -
509a Rip Rap Class-A m3 2000.00 258.00 516000.00 258.00 516000.00
- -
509b Rip Rap Class-b m3 2050.00 108.00 221400.00 108.00 221400.00
- -
509e Grouted Rip Rap Class-B m3 2050.00 51.00 104550.00 51.00 104550.00
- -
509h Filter Layer of Granular Material m3 850.00 96.00 81600.00 96.00 81600.00
- -
510 Dismantling of Structures and Obstructions m3 600.00 223.00 133800.00 150.00 90000.00 96.157 0 96.157
57,694.20 - 57,694.20
SIW- Unlined Water Courses, Cross Sectional area
m 550.00 480.00 264000.00 480.00 264000.00
4(a) not exceeding 1.5m2 -
SIW-
25mm Dia G.I Pipes m 550.00 173.00 95150.00 173.00 95150.00
5(a) -
511a Dry Stone Pitching (Hand Packed Stone) m3 1050.00 120.00 126000.00 120.00 126000.00
411b Stone Masonry Random with Mortar m3 2600.00 60.00 156000.00 3.00 7800.00
Lean Concrete (100 Kg/Cm2 of 28 Days 3
401f m 8050.00 10.00 80500.00 25.00 201250.00
Cylinder Strength)
Total of Bill No. 6 C/O to Summary 6632180.00 5691240.00 468,094.20 963,927.76 1,021,621.96
- 48 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Rate Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit
No (Rs.) Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 7 ANCILLARY WORKS
601dii Concrete Kerbs in place, Single Face m 980.00 675.00 661500.00 0.00 0.00
604a Metal Beam Guard Rail m 1050.00 1500.00 1575000.00 200.00 210000.00
604b Guard Rail End Pieces Each 1450.00 200.00 290000.00 20.00 29000.00
604d Steel Post for Guard Rail Each 2000.00 806.00 1612000.00 120.00 240000.00
607a Traffic Road Sign Category 1 Each 5000.00 99.00 495000.00 80.00 400000.00
607b Traffic Road Sign Category 2 Each 6000.00 49.00 294000.00 40.00 240000.00
607c Traffic Road Sign Category 3(a) Each 7000.00 45.00 315000.00 25.00 175000.00
607d Traffic Road Sign Category 3(b) Each 8000.00 18.00 144000.00 12.00 96000.00
607e Traffic Road Sign Category 3(c) Each 15000.00 4.00 60000.00 2.00 30000.00
Pavement Marking in Reflective TP Paint for
608g m 110.00 3002.00 330220.00 0.00 0.00
Lines of 12cm width
Pavement Marking in Reflective TP Paint for
608h2 m 100.00 18008.00 1800800.00 18008.00 1800800.00
Lines of 15cm width
Pavement Marking in Reflective TP Paint for
608j2 Each 1150.00 13.00 14950.00 0.00 0.00
Lines of 4.0M Arrows
610c Kilometre Post Each 25000.00 5.00 125000.00 0.00 0.00
Total Bill No. 2, 3, 4 5A, 5B, 6 & 7 332520533.80 429,769,741 225,270,290.62 57,951,994.23 283,222,284.85
- 49 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
- 50 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
- 51 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
- 52 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
- 53 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
- 54 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Total Bill No. 2, 3, 4 5A, 5B, 6 & 7 320608457 443,405,976 208,976,990.76 39,699,947.06 244,359,243.84
- 55 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-IV KM 25+000 TO 33+502) IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE - 2011
Revised Bill of Quantities
Bill of Quantities BOQ Previous Month This Month To - Date
BOQ
Item Rate
Description Unit
No (Rs.) Amount
Quantity Amount Rs. Quantity Amount Rs. Quantity Quantity Amount Rs. Quantity Amount Rs.
Rs.
106dii Excavate Surplus Medium Rock Material m3 450 21863 9838350 6861 3087450 6028 2712758 0 0 6028 2712758
106diii Excavate Surplus Soft Rock Material m3 400 21863 8745200 5563 2225200 7501 3000573 0 0 7501 3000573
106c Excavate Surplus Common Material m4 300 0 4103 1231014 0 0 4103 1231014
106di Excavate Surplus Hard Rock Material m5 600 0 46823 28093675 0 0 46823 28093675
106dii Excavate Surplus Medium Rock Material m6 450 0 364 163901 0 0 364 163901
106diii Excavate Surplus Soft Rock Material m7 400 0 429 171496 0 0 429 171496
109b Sub-grade Preparation in Existing Road m2 100 8364 836400 500 50000
Total of Bill No. 2 C/O to Summary 58542671 195448400 173282712 -4753200 168529512
- 56 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-IV KM 25+000 TO 33+502) IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE - 2011
Revised Bill of Quantities
Bill of Quantities BOQ Previous Month This Month To - Date
BOQ
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
201 Granular Sub-base m3 1200 12164 14596800 10973 13167600 6658 7989600 0 0 6658 7989600
202 Aggregate Base Course m3 2000 10220 20440000 10040 20080000 3048 6096000 512 1024000 3560 7120000
203b Asphaltic Base Course Plant Mix Class-B m3 15000 2809 42135000 4274 64110000 0 0 0 0
Breaking of Existing Road Pavement
209A m3 1000 77 77000 0 0 0 0 0 0
Structures
209b Scarification of Existing Road Pavement m2 20 18932 378640 18932 378640 1511 30225 0 0 1511 30225
Total of Bill No. 3 C/O to Summary 77627440.00 97,736,240 14,115,825.00 1,024,000.00 15,139,825.00
- 57 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-IV KM 25+000 TO 33+502) IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE - 2011
Revised Bill of Quantities
Bill of Quantities BOQ Previous Month This Month To - Date
BOQ
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
107a Structural Excavation in Common Material m3 300 2346 703800 16191 4857300 8452 2535600 4277 1283172 12729 3818772
Structural Excavation in Common Material
107bi m3 300 1173 351900 0 0 0 0 0 0 0
Below Water Level
107ci Structural Excavation in Hard Rock Material m3 700 1173 821100 5229 3660300 8654 6057464 610 426977 9263 6484441
Structural Excavation in Medium Rock
107cii m3 400 1173 469200 2260 904000 73 29300 0 0 73 29300
Material
107ciii Structural Excavation in Soft Rock Material m3 400 1656 662400 0 0 117 46856 0 2 117 46858
3
107d Granular Backfill m 1000 599 599000 2180 2180000 607 606740 0 0 1231 1231068
107e Common Backfill m3 500 5987 2993500 2553 1276250 0 0 0 0 0 0
Concrete Class-A Underground or Elevated
401a m3 8000 6453 51624000 2322 18576000 28 224880 0 30 28 224910
(210 Kg/Cm2 of 28 Days Cylinder Strength)
Concrete Class-B (170 Kg/Cm2 of 28 Days
401b m3 5800 137 794600 338 1960400 47 271092 0 13 47 271105
Cylinder Strength)
Lean Concrete (100 Kg/Cm2 of 28 Days 3
401f m 5800 1224 7099200 7318 42443240 3032 17587282 580 3362318 3612 20949600
Cylinder Strength)
Reinforcement as per AASHTO M31 Grade
404b Ton 100000 90 9000000 11 1100000 4 403000 0 400 4 403400
60
Premoulded Joint Filler 12mm Thick with 2
406a m 50 824 41200 824 41200 0 0 0 0 0 0
Bitumastic Joint Seal
SIW-8 Provide PVC Pipe 76mm dia m 300 516 154800 8423 2526900 644 193278 0 -1 644 193277
410 Brick Work m3 10000 138 1380000 0 0 0 0 0 0 0 0
411a Stone Masonry Random Dry m3 2000 446 892000 1845 3690000 1602 3203520 114 227014 1715 3430534
411b Stone Masonry Random with Mortar m3 2200 9741 21430200 48872 107518400 8933 19652402 8713 19169578 17646 38821980
412a Stone Masonry Dressed Course with Mortar m3 2400 3366 8078400 1872 4492800 159 381744 0 1198 160 382942
411g Roll Pointing m2 100 1122 112200 4170 417000 1404 140406 -825 -82500 579 57906
SIW-9 Cement Sand Plaster (1:3) m2 300 357 107100 0 0 0 0 0 0
Non
Plum Concrete Cum 5358 0 0 27499 147339500 20092 107651597 1112 5959436 21204 113611032
BOQ
Total of Bill No. 5A C/O to Summary 107,314,600 342,983,290 158,985,161 30,347,637 189,957,125
- 58 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-IV KM 25+000 TO 33+502) IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE - 2011
Revised Bill of Quantities
Bill of Quantities BOQ Previous Month This Month To - Date
BOQ
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
107a Structural Excavation in Common Material m3 300 128 38400 128 38400 81 24366 55 16518 136 40884
Total of Bill No. 6 C/O to Summary 8481000.00 08,899,000 4413453.00 50,808.51 4,464,261.51
- 59 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-IV KM 25+000 TO 33+502) IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE - 2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Total Bill No. 2, 3, 4 5A, 5B, 6 & 7 312542036.00 701,042,730 350,797,150.00 26,669,245.25 378,090,722.75
- 60 -
c. Bridges, Culverts & Causeways Details with Progress
- 61 -
c (i). Bridges
- 62 -
NATIONAL HIGHWAY AUTHORITY
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
LIST OF BRIDGES
Sr. Abutment
Deck
No LOTs Location Status Transom Girders Remarks
slab
.
A B
Progress
9 21+682 L/S Extension Completed Completed Completed 3 1 Steel binding completed for 1 no Girder
- 63 -
C (ii).Culverts
- 64 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
5 Pipe Culverts in Lot - I
Dia Length Lean Class - B
Location Status Excavation Backfill Remarks
S.No (M) (m) Concrete Pipe Concrete
1 00+451 Replace 0.61 10.00 √ √ √ √ √ Full Completed
L/S
2 00+773
Extension
0.61 3.66 √ √ √ √ √ Full Completed
3 00+858 Extension 0.61 2.82 √ √ √ √ √ Full Completed
4 00+959 Replace 0.61 11.10 √ Full Completed
5 01+622 New 0.76 10.00 √ √ √ √ √ Full Completed
L/S
6 02+221 0.61 2.50 Disputed
Extension
7 02+398 10.00 Full Completed
L/S
8 03+556
Extension
0.61 3.66 √ √ √ √ √ Full Completed
9 03+900 New 0.61 11.10 √ √ √ √ √ Full Completed
10 04+315 Replace 0.76 11.10 R/S Completed
11 04+490 New 0.76 11.10
12 04+710 New 0.76 11.10 √ R/S Completed
13 05+176 New 0.76 11.10 √ √ √ √ Full Completed
14 05+325 New 0.61 11.00 √ √ √ √ Full Completed
15 06+200 New 0.76 11.00
R/S
16 07+075 0.61 11.10 √ √ √ √ Full Completed
Extension
R/S
17 07+178 0.61 2.50 √ √ √ √ √ Full Completed
Extension
18 07+470 Replace 0.76 11.10 √ √ √ √ √ Full Completed
19 07+785 Replace 0.76 11.10 √ √ √ √ √ Full Completed
20 07+884 Replace 0.76 11.10 √ √ √ √ √ Full Completed
21 08+041 Replace 0.76 11.10 √ √ Full Completed
Total Length (m) 189.24
- 65 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
3 SLAB CULVERTS IN LOT - II
Lean Concrete
Slab
S. Height Length Concrete Stone
Location Status Exc Coping Backfill Remarks
No (M) (m) Wing Masonry
Abutment Steel Concrete
wall
1 08+930 R/S Extension 4.00 √ √ √ √ √ √ √ Full Completed
2 09+300 New 10.00
3 09+830 R/S Extension 3.00 √ √ √ √ √ √ √ Full Completed
4 10+070 R/S Extension 4.00 √ √ √ √ √ √ √ Full Completed
5 10+475 New 10.00
6 11+070 R/S Extension 2.70 √ √ √ √ √ √ √ Full Completed
7 11+550 New 10.00
8 11+700 New 10.00 L/S 5.0m completed
9 11+868 R/S Extension 2.00 √ √ √ √ √ √ √ Full Completed
10 12+104 New 11.00 R/S Completed
11 12+266 R/S Extension 2.00 √ √ √ √
12 12+575 Replace 10.00 Washed area
13 12+958 R/S Extension 5.00 √ √ √ √ √ √ √ Full Completed
14 13+073 Replace 2.5 10.00 √ √ √ √ √ √ √ Full Completed
15 13+168 Replace 3 10.00 √ √ √ √ √ √ √ √ Full Completed
16 13+234 Replace 10.00
17 13+634 R/S Extension 4.50 √ √ √ √ √ √ √ √ Full Completed
18 13+947 R/S Extension 4.00 √ √ √ √ √ √ √ √ Full Completed
19 14+169 R/S Extension 6.00 √ √ √ √ √ √ √ Full Completed
20 14+370 New 10.00 √ √ √ √ √ √ √ Full Completed
21 15+237 New 10.00 √ √ √ √ √ √ √ √ Full Completed
22 15+535 R/S Extension 6.00 √
23 15+756 R/S Extension 4.00 √
24 15+945 Replace 10.00 √ √ √ √ √ √ √ √ Full Completed
25 16+885 R/S Extension 5.00 √ √ √ √ √ √ √ √ Full Completed
26 16+928 R/S Extension 3.00 √
Total Length (m) 176.20
- 66 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
4 Pipe Culverts in Lot - II
Dia Length Lean Class - B
Location Status Excavation Backfill Remarks
S.No (M) (m) Concrete Pipe Concrete
1 08+750 New 0.60 10.00 √ √ √ √ √ Full Completed
R/S
2 08+661 Extension
0.60 4.00 √ √ √ √ √ Full Completed
3 09+080 New 0.60 10.00 √ √ √ √ √ Full Completed
4 09+657 New 10.00 √ √ √ √ √ Full Completed
R/S
5 09+770
Extension
0.60 3.00 √ √ √ √ √ Full Completed
R/S
6 10+871
Extension
0.60 2.00 √ √ √ √ √ Full Completed
R/S
7 11+000
Extension
0.60 2.00 Existing Culvert is OK
R/S
8 13+494
Extension
0.60 4.00 √ √ √ √ √ Full Completed
R/S
9 13+534
Extension
0.60 4.00 √ √ √ √ √ Full Completed
R/S
10 14+288
Extension
0.60 3.00
11 14+515 Replaced 0.60 10.00
R/S
12 15+625 0.60 3.50
Extension
R/S
13 16+190 0.60 3.00 √ √ √ √ √ Full Completed
Extension
R/S
14 16+275 0.60 3.00
Extension
R/S
15 16+368 0.60 1.50
Extension
16 16+422 Proposed 0.60 10.00 √ √ √ √ √ Full Completed
R/S
17 16+717
Extension
0.60 1.00
Total Length (m) 74.00
- 67 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD NHA (N-90)
3 SLAB CULVERTS IN LOT - III
Lean
Heigh Slab
Locatio Span Length Concrete Stone
Sr Status t Exc Coping Backfill Remarks
n (M) (m) Wing Masonry
(M) Abutment Steel Concrete
wall
1 17+075 R/S Ext 1 1.5 4.00 √ √ √ √ In Progress
1 17+075 R/S Ext 1 1.5 4.00 √ √ √ √ √ √ √ Full Completed
2 17+550 R/S Ext 2 2.75 4.50 √ √ √ √ √ √ √ Full Completed
in
3 17+825 L/S Ext 3 9 4.50 √ √ √ progress
4 18+000 New 1.8 1.6 12.00 √ √ √ Full Completed
5 18+045 R/S Ext 1.7 2 4.50 √ √ √ √ √ √ √ Full Completed
in
6 18+311 New 1 1.75 11.00 √ √ √ progress R/Side Completed
7 19+110 R/S Ext 1 1 2.50 √ √ √ √ √ √ √ Full Completed
8 21+130 New 2 2 11.00 Washed Area
9 21+900 New 1.5 1.5 11.00 Washed Area
1
22+445 New 3 3 11.00 √ √ √ √ √ √ √ Full Completed
0
Total Length (m) 76.00
- 68 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD NHA (N-90)
4 Pipe Culverts in Lot - III
Dia Length Lean Class - B
Location Status Excavation Backfill Remarks
S.No (M) (m) Concrete Pipe Concrete
1 17+187 New 0.76 11.00 √ √ √ √ √ Full width Completed
2 17+737 New 0.76 11.00 √ √ √ √ √ Full width Completed
3 18+100 New 0.76 11.00 √ √ √ √ √ Full width Completed
4 18+787 New 0.76 11.00 √ √ √ √ √ Full width Completed
5 19+000 New 0.76 11.00 √ √ √ √ √ Full width Completed
6 19+809 New 0.76 11.00 √ √ √ √ √ Full width Completed
7 20+375 New 0.76 11.00 √ √ √ √ √ Full width Completed
8 20+635 New 0.76 11.00 √ √ √ √ √ Full width Completed
9 20+987 New 0.76 11.00 √ √ √ √ √ Full width Completed
10 21+425 New 0.76 11.00 √ √ √ √ √ Full width Completed
11 21+550 New 0.76 11.00 √ √ √ √ √ Full width Completed
12 22+012 New 0.76 11.00 Washed Area
13 22+340 New 0.76 11.00 Washed Area
14 22+825 New 0.76 11.00 L/Side Washed Area
15 22+900 New 0.76 11.00 L/Side Washed Area
16 23+112 New 0.76 11.00 √ √ √ √ √ Full width Completed
Total Length (m) 176.00
- 69 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
3 SLAB CULVERTS IN LOT - IV
Lean
Heigt Slab
Span Length Concrete Stone
S.No Location Status h Exc Coping Backfill Remarks
(M) (m) Wing Masonry
(M) Abutment Steel Concrete
wall
R/S
1 25+948 1.5 1 4.20 √ √ √ √ √ √ √ √ Full Completed
Extension
R/S
2 26+465 1.3 1 3.50 √ √ √ √ √ √ √ √ Full Completed
Extension
3 27+950 New 1.5 2 11.00 √ √ √ √ √ √ √ √ Full Completed
- 70 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
4 Pipe Culverts in Lot - IV
Dia Length Lean Class-B
Location Status Excavation Backfill Remarks
S.No (M) (m) Concrete Pipe Concrete
1 25+585 New 9.60 √ √ √ √ √ Full width Completed
2 26+012 New 0.76 11.00 √ √ √ √ √ Full width Completed
3 26+175 New 0.76 11.00 √ √ √ √ √ Full width Completed
4 26+557 New 0.76 11.00 √ √ √ √ √ Full width Completed
5 26+955 New 0.76 11.00 √ √ √ √ √ Full width Completed
6 27+375 New 0.76 11.00 √ √ √ √ √ Full width Completed
7 27+680 New 0.76 11.00 √ √ √ √ √ Full width Completed
8 27+860 New 0.76 11.00 √ √ √ √ √ Full width Completed
9 28+197 0.76 11.00 Washed Area
10 28+400 New 0.76 11.00 √ √ √ √ √ Full width Completed
11 28+987 0.61 11.00 Washed Area
12 29+075 New 0.76 11.00 √ √ √ √ √ Full width Completed
13 29+675 0.61 11.00
14 30+000 New 0.76 11.00 √ √ √ √ √ Full width Completed
15 30+185 New 0.76 11.00 √ √ √ √ √ Full width Completed
16 31+325 2 11.00
17 31+443 0.76 11.00 Washed Area
18 31+660 0.76 11.00
19 32+182 New 0.76 10.00 √ √ √ √ √ Full width Completed
20 32+365 New 0.76 10.00 √ √ √ √ √ Full width Completed
21 33+135 New 0.76 11.00 √ √ √ √ Full width Completed
22 33+300 Extention 0.6 1.80 √ √ Full width Completed
Total Length (m) 219.80
- 71 -
C (iii) Causeways
- 72 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
5 Causeway in Lot - II
Height Lean Stone Masonry SLAB Backfill Remarks
S. Location Length (m) Exc.
No (M) Conc. D/S U/S Steel Concrete
1 16+095 20.00 √ √ √ L/S
Total Length (m) 20.00
5 Causeway in Lot - IV
Height Lean Stone Masonry Class-B Backfill Remarks
S. Location Length (m) Exc.
No (M) Conc. U/S D/S Bed Coping
1 25+750 50 √ √ √
2 26+750 23 √ √ √ √ √ √ √ Completed
3 28+880 20
Total Length (m) 93
- 73 -
d. Retaining Walls
- 74 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
2 RETAINING WALLS WITH PLUMB CONCRETE IN LOT - I
CONCRETE
S.N Location (RD) Length H Lean Plum STONE MASONRY
Excavation CLASS-B PARAPETS REMARKS
O (M) (m) Concrete Concrete
From To Mortar Dry Band Coping
1 01+745 01+768 23.0 4.0 √ √ √ √ √
1 04+312 04+325 13.0 4.0 √ √ √ √ √
1 04+325 04+387 62.0 4.0 √ √ √ √ √
2 04+387 04+440 53.0 4.0 √ √ √ √ √ √
3 04+400 04+470 70.0 4.0 √ √ √ √
In
4 04+628 04+648 20.0 √ √
Progress
5 04+648 04+700 52.0 √ √ √ √ √
6 04+700 04+741 41.0 3.5 √ √ √ √ √
7 04+743 04+800 57.0 √ √ √ √ √
8 04+800 04+825 25.0 √ √ √ √ √
9 04+825 04+865 40.0 √ √ √ √ √ √
10 05+225 05+250 25.0 7.0
11 05+480 05+540 60.0 6.0 √ √ √ √
12 05+540 05+561 21.0 √ √ √ √ √ √
13 05+561 05+609 48.0 √ √ √ √ √ √
14 05+712 05+743 31.0 √ √ √
15 05+800 05+825 25.0 3.0 √ √ √ √ √ √
16 05+825 05+866 41.0 √ √ √ √ √ √
17 06+025 06+080 55.0 2.0 √ √ √ √ √
In
18 06+080 06+112 32.0 √ √ √
Progress
In
19 06+350 06+465 115.0 5.0 √ √ √
Progress
Total Length (m) 909.0
- 75 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - I
CONCRETE
Location (RD) LENGTH Lean STONE MASONRY ROLL
S.NO Excavation CLASS-B PARAPETS REMARKS
(M) Concrete POINTING
From To Mortar Dry Band Coping
1 00+445 00+461 16.0 √ √ √ - √
1 00+549 00+580 31.0 √ √ √ - √ √
2 00+862 00+879 17.0 √ √ √ - √ √
3 00+906 00+916 10.0 √ √ √ - √
4 00+931 00+959 28.0 √ √ √ - √
5 00+962 00+988 26.0 √ √ √ √ √
6 01+003 01+013 10.0 √ √ √ - √
7 01+050 01+075 25.0 √ √ √ - √
8 01+260 01+272 12.0 √ √ √ - √
8 01+283 01+290 7.0 √ √ √ - √
9 01+540 01+568 28.0 √ √ √ - √
10 01+595 01+615 20.0 √ √ √ - √
11 01+625 01+670 45.0 - -
12 01+675 01+689 14.0 √ √ √ - √
13 01+700 01+707 7.0 √ √ √ √
13 01+745 01+768 23.0 √ √ √ √
15 01+806 01+821 15.0 √ √ √ √
16 01+830 01+840 10.0 √ √ √ √
17 01+859 01+876 17.0 √ √ √ -
18 01+859 01+876 17.0 √ √ √
19 02+062 02+083 21.0 √ √ √ - √
20 02+167 02+172 5.0 √ √ √ - √
20 02+387 02+418 31.0 √ √ √ - √
21 02+432 02+487 55.0 - -
22 02+716 02+726 10.0 √ √ √ - √
22 02+980 03+000 20.0 √ √ √ - √
23 03+515 03+525 10.0 √ √ √ -
24 03+950 03+962 12.0 √ √ √ -
25 03+987 04+009 22.0 √ √ √ - √ √
- 76 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - I
CONCRETE
Location (RD) LENGTH Lean STONE MASONRY ROLL
S.NO Excavation CLASS-B PARAPETS REMARKS
(M) Concrete POINTING
From To Mortar Dry Band Coping
26 04+087 04+116 29.0 - -
27 04+350 04+390 40.0 √ √ √ - √ √ washed
28 04+440 04+464 24.0 √ √ √ - √ √
29 04+470 04+490 20.0 √ √ √ - √ √ washed
30 04+657 04+700 43.0 √ √ √ - √ √ Dry washed
31 04+743 04+825 82.0 √ √ √ - √ √
32 04+843 04+865 22.0 √ √ - √ √ √
33 04+875 04+887 12.0 √ √ - √ √ √
34 04+930 04+945 15.0 √ √ - √ √ √
35 04+987 05+012 25.0 √ √ √ - √ √
36 05+083 05+125 42.0 - -
37 05+150 05+178 28.0 √ √ - -
38 05+272 05+285 13.0 √ √ √ - √ √
39 05+285 05+297 12.0 √ √ √ - √ √
40 05+417 05+430 13.0 √ √ √ - √ √
41 05+430 05+439 9.0 √ √ √ - √
42 05+445 05+464 19.0 √ √ √ - √ √
43 05+475 05+509 34.0 √ √ √ - √ √ P. Damaged
44 05+510 05+535 25.0 √ √ √ - √ √ washed
45 05+540 05+550 10.0 √ √ √ - √ √ washed
46 05+571 05+609 38.0 √ √ √ - √ √ washed
47 05+656 05+676 20.0 √ √ - √ √ √
48 05+685 05+700 15.0 √ √ √ - √ √ washed
49 05+807 05+879 72.0 √ √ √ - √ √
50 06+020 06+080 60.0 √ √ √ - √ √ washed
- 77 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - I
CONCRETE
Location (RD) LENGTH Lean STONE MASONRY ROLL
S.NO Excavation CLASS-B PARAPETS REMARKS
(M) Concrete POINTING
From To Mortar Dry Band Coping
51 06+021 06+112 91.0 √ √ √ - √ √
52 06+200 06+240 40.0 √ √ √ √ √
53 06+400 06+440 40.0 √ √ √ - √ √ washed
54 06+409 06+450 41.0 √ √ √ - √ √
55 06+462 06+475 13.0 √ √ √ - √ √ P. Damaged
56 06+925 06+935 10.0 √ √ √ - √ √ P. Damaged
57 07+062 07+090 28.0 √ √ √ - √ √
58 07+107 07+152 45.0 √ √ √ - √ √
59 07+190 07+214 24.0 √ √ √ - √ √
60 07+370 07+396 26.0 √ √ √ - √ √
61 07+616 07+628 12.0 √ √ √ - √ √
62 07+750 07+790 40.0 - -
63 07+872 07+882 10.0 √ √ - √
64 08+025 08+032 7.0 √ √ √ -
65 08+089 08+109 20.0 √ √ √ -
66 08+158 08+165 7.0 √ √ √ -
67 08+190 08+198 8.0 √ √ √ -
68 08+217 08+231 14.0 √ √ √ -
69 08+294 08+315 21.0 √ √ √ -
70 08+315 08+329 14.0 √ √ √ - √ √
71 08+379 08+388 9.0 √ √ √ -
72 08+403 08+412 9.0 √ √ √ -
73 08+462 08+500 38.0 √ √ √ -
Total Length (m) 1,853.0
- 78 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 Retaining Walls with Plumb Concrete II
STONE CONCRETE
Location (RD) Length H Lean Plum
S.NO Excavation MASONRY CLASS-B PARAPETS REMARKS
(M) (m) Concrete Concrete
From To RRM Dry Band Coping
1 09+252 09+275 23 √ √ √ In progress √
2 09+377 09+403 26 √ √ √ √ √
09+455 09+500 45 √ √ √ √ √
3 10+840 10+880 40 √ √ √ √ √
4 10+880 10+923 43 √ √ √ √
5 12+170 12+209 39 √ √ √ √
6 12+209 12+283 74 √ √ √ In progress
7 12+450 12+466 16 √ √ √
8 12+475 12+489 14 √ √ In progress
9 12+525 12+575 50 √ √ √
10 12+571 12+630 59 √ √ √ √
11 12+630 12+662 32 √ √ √
12 12+662 12+700 38 √ √ √
13 15+537 15+552 15 √ √ √ In progress
14 15+552 15+572 20 √ √ √
15 15+572 15+592 20 √ √ √ In progress
16 15+596 15+625 29 √ √ √ In progress
Total Length (m) 583
- 79 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - II
S. Location (RD) Length Lean Stone Masonry Class-B Roll
Exc Remarks
No From To (M) Concrete Mortor Dry Band Coping Pointing
1 08+500 08+522 22.0 √ √ √ √
2 08+661 08+683 22.0 √ √ √ √
3 08+737 08+757 20.0 √ √ √ √
4 09+052 09+080 28.0
5 09+200 09+225 25.0 √ √ √ √
6 09+407 09+455 48.0 √ √ √ √
7 09+510 09+520 10.0 √ √ √ √ Completed and washed
8 09+830 09+875 45.0 √ √ √ √
9 10+112 10+170 58.0 √ √ √ √
10 11+025 11+034 9.0 √ √ √ √
11 11+406 11+423 17.0 √ √ √ √
12 11+425 11+550 125.0 √ √ √ √
13 11+990 12+027 37.0 √ √ √ √
14 12+033 12+085 52.0 √ √ - √ √ √ P. Damaged
15 12+125 12+232 107.0 √ √ √ √ √
16 12+575 12+625 50.0 √ √ √ √ √
17 12+612 12+700 88.0 √ √ √ √ √ Completed and washed
18 13+150 13+160 10.0 √ √ √ √ √
19 14+237 14+271 34.0 √ √ √ √
20 14+462 14+472 10.0 √ √ √ √ √
21 14+755 14+816 61.0 √ √ √ √ √
22 15+005 15+020 15.0 √ √ √ √
23 15+162 15+262 100.0 √ √ √ √ √ Completed and washed
24 15+383 15+430 47.0 √ √ √ √
25 15+637 15+675 38.0 √ √ √ √
26 16+312 16+332 20.0 √ √ √ √ √
27 16+370 16+410 40.0 √ √ √ √ √
28 16+508 16+535 27.0 √ √ √ √ √
Total Length 1138.0
- 80 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS WITH PLUMB CONCRETE IN LOT - III
S. Location (RD) Length Height Lean Plum STONE MASONRY CLASS-B
Excavation PARAPETS REMARKS
NO From To (M) (M) Concrete Concrete Mortar Dry Band Coping
1 18+862 18+912 50.0 2.5 √ √ √ √ √
2 21+125 21+237 112.0 8.0
3 21+475 21+500 25.0 3.0 √ √ √ in progress
4 21+512 21+600 88.0 √ √ in progress
5 21+800 21+850 50.0 3.5 √ √ √ in progress
6 21+850 21+907 57.0 √ √ in progress
7 21+900 22+018 118.0 √ √ √ √ √
8 22+025 22+041 16.0 √ √ √ √ √
9 22+050 22+062 12.0 √ √ in progress
10 22+062 22+075 13.0 7.0 √ √ √ √ √
11 22+087 22+127 40.0 √ √ √ √ √
12 22+125 22+137 12.0 √ √ in progress
13 22+137 22+162 25.0 √ √ √ √ √
14 22+162 22+200 38.0 √ √ √ √ √
15 22+200 22+250 50.0 √ √ √ √ √
16 22+250 22+300 50.0 √ √ in progress
17 22+300 22+318 18.0 √ √ in progress
18 22+325 22+362 37.0 √ √ √ √ √
19 22+817 22+870 53.0 √ √ √ in progress
20 22+870 22+884 14.0 √ √ √ √ √ √
21 22+900 22+931 31.0 √ √ √ in progress
22 22+931 22+975 44.0 √ √ √ in progress
23 22+825 22+875 50.0 5.0 √ √ in progress
24 22+875 22+975 100.0 4.0
Total Length (m) 1,103.0
- 81 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - III
CONCRETE CLASS-
Location (RD) LENGTH Lean STONE MASONRY ROLL
S.NO Excavation B PARAPETS REMARKS
(M) Concrete POINTING
From To Mortar Dry Band Coping
1 17+173 17+187 14.0 √ √ √ √
2 17+187 17+214 27.0 √ √ √ √
3 17+424 17+429 5.0 √ √ √
4 17+429 17+441 12.0 √ √ √ √
4 17+474 17+480 6.0 √ √ √ √
4 17+595 17+612 17.0 √ √ √ √
4 17+686 17+700 14.0 √ √ √ √
5 17+762 17+772 10.0 √ √ √ √
5 17+808 17+817 9.0 √ √ √ √
6 17+875 17+900 25.0 √ √ √ √
7 18+000 18+012 12.0 √ √ √ √
8 18+237 18+250 13.0 √ √ √ √
9 18+372 18+382 10.0 √ √ √ √
10 18+525 18+550 25.0 √ √ √ √
11 18+650 18+700 50.0 √ √ √ √
12 18+862 18+897 35.0 √ √ √
12 18+897 18+912 15.0 √ √ √ √
13 18+937 18+962 25.0 √ √ √
14 19+787 19+862 75.0 √ √ √ √
15 19+930 19+941 11.0 √ √ √ √
16 19+955 19+970 15.0
17 20+025 20+037 12.0 √ √ √ √
18 20+362 20+375 13.0 √ √ √ √
18 20+512 20+537 25.0 √ √ √ √
19 20+537 20+550 13.0
20 20+937 20+960 23.0
- 82 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - III
CONCRETE
Location (RD) LENGTH Lean STONE MASONRY ROLL
S.NO Excavation CLASS-B PARAPETS REMARKS
(M) Concrete POINTING
From To Mortar Dry Band Coping
21 21+005 21+020 15.0
22 21+175 21+185 10.0 √ √ √ √
23 21+237 21+275 38.0 √ √ √ √
24 21+425 21+475 50.0 √ √ √ √
25 21+800 21+825 25.0 √ √ √ √
26 21+825 21+850 25.0 √ √ √ √
27 21+850 21+913 63.0 √ √ √ √
28 22+025 22+041 16.0 √ √ √ √
28 22+062 22+079 17.0 √ √ √ √
28 22+100 22+112 12.0
30 22+137 22+250 113.0 √ √ √ √
30 22+500 22+512 12.0 √ √ √ √
31 22+670 22+685 15.0 √ √ √ √
32 22+725 22+741 16.0 √ √ √ √
33 22+812 22+887 75.0
34 22+912 22+962 50.0
35 22+980 22+992 12.0
36 23+005 23+050 45.0
37 23+150 23+200 50.0
Total Length 1,170.0
- 83 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS WITH PLUMB CONCRETE IN LOT - IV
- 84 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS WITH PLUMB CONCRETE IN LOT - IV
- 85 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - IV
- 86 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - IV
- 87 -
e. Breast Walls
- 88 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
3 BREAST WALLS IN LOT - I
Location (RD) Length Lean Stone Masonry Concrete Class-B Roll
S.No Exc Remarks
From To (M) Concrete Mortar Dry Band Coping Pointing
1 01+283 01+290 7.0 √ √ √ √
2 01+258 01+299 41.0
3 01+442 01+480 38.0
4 01+520 01+562 42.0
5 01+915 01+945 30.0
6 02+450 02+510 60.0
7 02+625 02+673 48.0
8 02+880 02+906 26.0
9 03+025 03+070 45.0 √ √ √ √
In
10 03+162 03+212 50.0 √ √
Progress
11 03+437 03+550 113.0 √ √ √ √
12 04+020 04+050 30.0 √ √ √ √
13 04+050 04+087 37.0 √ √ √ √ P. Damaged
14 05+170 05+207 37.0
15 05+600 05+650 50.0 √ √ √ √
In
16 07+137 07+162 25.0 √ √
Progress
In
17 07+425 07+470 45.0 √ √
Progress
18 07+805 07+817 12.0
19 08+212 08+237 25.0 √ √ √ √
20 08+237 08+267 30.0 √ √ √ √
21 08+270 08+320 50.0 √ √ √ √
22 08+340 08+370 30.0 √ √ √ √
Total Length 871.0
- 89 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
2 BREAST WALLS IN LOT - II
S Location (RD) Length Lean Stone Masonry Concrete Class-B
Exc Roll Pointing Remarks
No From To (M) Concrete Mortar Dry Band Coping
1 08+953 08+970 17.00 √ √ √ √
2 08+970 09+000 30.00 √ √ √ √
3 09+000 09+061 61.00 √ √ √ √
4 09+100 09+125 25.00 √ √ √ √
5 09+127 09+137 10.00
6 09+590 09+620 30.00 √ √ √ √ P. Damaged
7 09+712 09+750 38.00
8 09+762 09+777 15.00 √ √ √ √
9 09+800 09+828 28.00
10 09+880 10+050 170.00 √ √ √ √
11 11+225 11+250 25.00 √ √ √ √
12 12+410 12+455 45.00 √ √ √ √
13 12+535 12+566 31.00 √ √ √ √
14 13+560 13+600 40.00 √ √ √ √
15 13+663 13+687 24.00 √ √ √ √
16 14+037 14+125 88.00 √ √ √ √ P. Damaged
17 14+230 14+240 10.00 √ √ √ √
18 14+252 14+270 18.00 √ √ √ √
19 14+940 14+960 20.00 √ √ √ √
20 15+000 15+025 25.00 √ √ in progress
21 15+280 15+304 24.00 √ √ √ √
22 15+625 15+680 55.00 √ √ √ √
23 15+687 15+750 63.00 √ √ √ √
24 16+322 16+360 38.00 √ √ √ √
25 16+360 16+390 30.00 √ √ √ √
26 16+730 16+762 32.00 √ √ √ √
27 16+762 16+782 20.00 √ √ √ √
28 16+782 16+820 38.00 √ √ √ √
29 16+820 16+875 55.00 √ √ √ √
Total Length 997.00
- 90 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD NHA (N-90)
2 BREAST WALLS IN LOT - III
STONE CONCRETE
Location (RD) LENGTH Lean ROLL
S.NO Excavation MASONRY CLASS-B REMARKS
(M) Concrete POINTING
From To Mortar Dry Bond Coping
1 17+312 17+337 25.0 √ √ √ √
2 17+583 17+606 23.0 √ √ √ √
in
3 17+817 17+825 8.0 √ √ Progress
4 17+825 18+100 275.0
5 18+200 18+275 75.0
6 18+322 18+350 28.0 √ √ √
7 18+475 18+522 47.0 √ √ √ √
in
8 18+675 18+800 125.0 √ √ Progress
8 18+732 18+763 31.0 √ √ √ √
9 19+825 19+925 100.0
10 20+140 20+325 185.0 √ √ √ √ √
11 20+412 20+500 88.0 √ √ √ √ √ √
12 20+725 20+840 115.0 √ √ √ √ √
13 21+075 21+100 25.0 √ √ √ √ √
14 21+295 21+350 55.0 √ √ √ √ √
15 21+351 21+387 36.0 √ √ √ √ √
16 21+425 21+475 50.0 √ √ √ √
17 22+375 22+425 50.0 √ √ √ √ √
18 22+455 22+512 57.0 √ √ √ √
19 22+547 22+587 40.0 √ √ √ √
Total Length 1438.0
- 91 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
2 BREAST WALLS IN LOT - IV
STONE CONCRETE
S Location (RD) LENGTH Lean ROLL
Excavation MASONRY CLASS-B REMARKS
NO (M) Concrete POINTING
From To Mortar Dry Band Coping
1 25+850 25+912 62.0
2 26+787 26+825 38.0 √ √ √ - √
3 27+883 27+913 30.0 √ √ √ - √ √ √
4 28+000 28+050 30.0 √ √ √ - √
5 28+130 28+175 45.0 √ √ √ - √
6 28+450 28+612 162.0 √ √ √ - √ √
7 29+330 29+375 45.0 √ √ √ - √ √ √ 35.o m completed
8 29+425 29+500 75.0 √ √ √ √ √
9 29+525 29+570 45.0
10 29+712 29+850 138.0
11 30+146 30+176 30.0 √ √ √ √ √ √ √ 30.0 m completed
12 30+466 30+544 78.0 √ √ √ √ √ √ √ P. Damaged
13 31+085 31+125 40.0
14 32+143 32+175 32.0 √ √ √ √ √ √ √
15 32+480 32+550 70.0 Disputed
Total Length 920.0
- 92 -
f. Linear Chart showing updated progress
- 93 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ROAD ALPURI - BESHAM (N-90)
PROGRESS BAR CHART (FROM 0+000 TO 08+500 )
LOT - 1
ITEMS Linear Progress Chart up to JUNE-11
Shoulder
Asphaltic
Wearing Course
Tack Coat
Asphaltic Base
Course
Prime Coat
Agg. Base Course
Sub-Base
Sub-Grade
Formation of
Embankment
Roadway
Excavation
00+000
00+100
00+200
00+300
00+400
00+500
00+600
00+700
00+800
00+900
01+000
01+100
01+200
01+300
01+400
01+500
01+600
01+700
01+800
01+900
02+000
02+100
02+200
02+300
02+400
02+500
02+600
02+700
02+800
02+900
03+000
03+100
03+200
03+300
03+400
03+500
03+600
03+700
03+800
03+900
04+000
04+100
04+200
04+300
Location
04+400
04+500
04+600
04+700
04+800
04+900
05+000
05+100
05+200
05+300
05+400
05+500
05+600
05+700
05+800
05+900
06+000
06+100
06+200
06+300
06+400
06+500
06+600
06+700
06+800
06+900
07+000
07+100
07+200
07+300
07+400
07+500
07+600
07+700
07+800
07+900
08+000
08+100
08+200
08+300
08+400
08+500
08+600
Location
- 94 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ROAD ALPURI - BESHAM (N-90)
PROGRESS BAR CHART (FROM 08+500 TO 17+015 )
LOT-2
ITEMS Linear Progress Chart up to JUNE 2011
Shoulder
Asphaltic
Wearing Course
Prime Coat
Agg. Base Course
Sub-Base
Sub-Grade
Formation of
Embankment
Roadway
Excavation
08+500
08+600
08+700
08+800
08+900
09+000
09+100
09+200
09+300
09+400
09+500
09+600
09+700
09+800
09+900
10+000
10+100
10+200
10+300
10+400
10+500
10+600
10+700
10+800
10+900
11+000
11+100
11+200
11+300
11+400
11+500
11+600
11+700
11+800
11+900
12+000
12+100
12+200
12+300
12+400
12+500
12+600
12+700
12+800
LOCATIONS
12+900
13+000
13+100
13+200
13+300
13+400
13+500
13+600
13+700
13+800
13+900
14+000
14+100
14+200
14+300
14+400
14+500
14+600
14+700
14+800
14+900
15+000
15+100
15+200
15+300
15+400
15+500
15+600
15+700
15+800
15+900
16+000
16+100
16+200
16+300
16+400
16+500
16+600
16+700
16+800
16+900
17+000
17+015
LOCATIONS
- 95 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ROAD ALPURI - BESHAM (N-90)
PROGRESS BAR CHART (FROM 17+015 TO 25+000 )
LOT - 03
ITEMS Linear Progress Chart up to JUNE 2011
Shoulder
Asphaltic Wearing
Course
Prime Coat
Agg. Base Course
Sub-Base
Sub-Grade
Formation of
Embankment
Roadway
Excavation
17+015
17+200
17+300
17+400
17+500
17+600
17+700
17+800
17+900
18+000
18+100
18+200
18+300
18+400
18+500
18+600
18+700
18+800
18+900
19+000
19+100
19+200
19+300
19+400
19+500
19+600
19+700
19+800
19+900
20+000
20+100
20+200
20+300
20+400
20+500
20+600
20+700
20+800
20+900
21+000
21+100
21+200
21+300
21+400
Location
21+500
21+600
21+700
21+800
21+900
22+000
22+100
22+200
22+300
22+400
22+500
22+600
22+700
22+800
22+900
23+000
23+100
23+200
23+300
23+400
23+500
23+600
23+700
23+800
23+900
24+000
24+100
24+200
24+300
24+400
24+500
24+600
24+700
24+800
24+900
25+000
Location
- 96 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ROAD ALPURI - BESHAM (N-90)
PROGRESS BAR CHART (FROM 25+000 TO 33+502 )
LOT - 04
ITEMS Linear Progress Chart up to JUNE 2011
Shoulder
Asphaltic Wearing
Course
Prime Coat
Agg. Base Course
Sub-Base
Sub-Grade
Formation of
Embankment
Roadway
Excavation
25+000
25+100
25+200
25+300
25+400
25+500
25+600
25+700
25+800
25+900
26+000
26+100
26+200
26+300
26+400
26+500
26+600
26+700
26+800
26+900
27+000
27+100
27+200
27+300
27+400
27+500
27+600
27+700
27+800
27+900
28+000
28+100
28+200
28+300
28+400
28+500
28+600
28+700
28+800
28+900
29+000
29+100
29+200
29+300
Location
29+400
29+500
29+600
29+700
29+800
29+900
30+000
30+100
30+200
30+300
30+400
30+500
30+600
30+700
30+800
30+900
31+000
31+100
31+200
31+300
31+400
31+500
31+600
31+700
31+800
31+900
32+000
32+100
32+200
32+300
32+400
32+500
32+600
32+700
32+800
32+900
33+000
33+100
33+200
33+300
33+400
33+502
Location
- 97 -
g. S-Curve
- 98 -
- 99 -
- 100 -
- 101 -
- 102 -
h. Summary of IPC’s
- 103 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
NATIONAL HIGHWAY AUTHORITY
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
FINANCIAL PROGRESS
UPTO 30-JUNE-2011
LOT-I (00+000 TO 08+500) LOT-II (08+500 TO 17+015) LOT-III (17+015 TO 25+000) LOT-IV (25+000 TO 33+502)
IPC NO AMOUNT (RS) IPC NO AMOUNT (RS) IPC NO AMOUNT (RS) IPC NO AMOUNT (RS)
7 7 7 7
1,609,103,526.000
Total Project Cost =
Total Payment Recommended = 1,012,064,435.337
% Age = 47.086%
- 104 -
9. Project Issues
- 105 -
PARTICULAR ISSUES / RECOMMENDATIONS
ISSUES
1. Extension of Time.
2. Insufficient Machinery with the Contractor.
3. Removal of Electric Pole in Lot – I.
4. Slow progress of work on Back filling, Bridges.
5. ADB Loan closing date June 30, 2011 approaching fast.
6. LARP implementation.
7. Work Schedule.
RECOMMENDATIONS
1. EOT (beyond ADB Loan closing date) has been discussed and communicated
through various letter by ACE to GM – NHA (ADB-P) but no action has been taken in
this regard so far.
2. The contractor has been directed to provide the required machineries as listed in the
contract documents i.e without the required machineries the required progress
cannot be achieved.
3. Removal of electric pole in Lot – I has been discussed with the concern department
by PD – NHA (N-90) and RE – ACE (N-90), but till date the same have not be
removed/shifted.
4. The contractors are still lagging from the schedule submitted. The contractor has
been directed by the consultants for expedition of the work specially on bridges and
back filling of completed structure but no steps have been taken from their end.
5. Closing date of ADB’s loan is June 30, 2011. The consultants and the contractors
should be notified in writing as to the arrangements for payment after June 30, 2011
in terms of Clause 2.4, Employer’s Financial Arrangements, General Conditions of
Contract, Volume – 1 of Contract Documents.
6. Non implementation of LARP is the major factor of the slow progress especially on
bridges. It is requested that efforts for the same should be initiated positively that
progress may not be suffered.
7. The contractor has been directed to submit the work schedule for remaining work on
original scope of work that achieved and planned progress may be compare easily.
- 106 -
10. Environmental Issues
- 107 -
ENVIRONMENTAL ISSUES
a. Mitigation on dust along the corridor of the works carried out through periodic
water spraying.
b. Road safety and traffic control along the corridor of the road is being
implemented by the Contractor.
c. Air and noise pollution is still manageable within the limit of the environmental
requirements.
d. The Contractors were advised to follow the Labor Laws of Pakistan. So far no
complaint has been lodged against any of them.
e. Land Acquisition and compensation to project affected person of land,
residential, commercial and agriculture is under process.
f. In addition to the unavoidable losses to property due to implementation of the
project, losses to private property have also occurred due to dumping of
excavated materials by the Contractor into the river. The contractor, however,
was of the view that they have dumped the excavated materials in the private
lands at the will of the owners, but could not produce any documentary proof to
this effect.
g. During field survey, it is observed that various utility supply infrastructures such
as water supply line, PTCL cable and electric poles are affected by construction
activities. Being the NHA’s responsibility, according to contractor, the situation
was brought into the notice of the Project Director NHA for its resolution. Except
relocation of some Electric poles almost other issues stands resolved.
1.1 RECOMMENDATIONS
The Contractors have already been advised not dump waste material in the river bed.
The matter has also been brought to the knowledge of the PD. In case the contractors
violate this instruction again, we suggest that penalties as per contract documents be
imposed on them. An assessment of the resettlement impacts at affected locations
would be made and expected loss to private properties on both sides of the river would
be made good at the cost of the Contractor.
Note: Due to unprecedented floods of July 2010, ground situation at many locations have
changed.
- 108 -
8. Detail of Consultancy services
(a) Financial Details for Consultancy Services
(b) List of Consultant Staff
- 109 -
a. Financial details for Consultancy Services
- 110 -
ASSOCIATED CONSULTING ENGINEERS (TRANSPORTATION DIVISION) ACE (PVT) LTD.
BILLING POSITION UPTO Feb-2011
ALPURI-BESHAM PROJECT
NET
INVOICED STAM MOBI TAX
INVOICE ADJ. APPROVE AMOUNT RECEIVE
BILL NO. AMOUNT P ADVANC DEDUCTE RECEIVABLE
PERIOD (+VE/-VE) D AMOUNT APPROVE D
(RUPEES) DUTY E D
D
TOTAl COST AS PER AMMENDMENT NO. 1 = Rs. 44,455,100
DESIGN
PHASE
1st Running Invoice 2,886,380 2,886,380 2,886,380 4,406,415
2nd Running 921,205
2,441,240 2,441,240 2,441,240
Invoice
3rd Running Invoice 727,702 727,702 727,702 727,702 -
SUPERVISION
Apr to Jun-09 ACE/TD/JB-40/01 137,120 137,120 137,120 137,120
Jul to Aug-09 ACE/TD/JB-40/02 113,034 113,034 113,034 113,034
Sep to Nov-09 ACE/TD/JB-40/03 1,993,914 - 1,993,914 401,310 1,592,604 1,592,604 -
Inv Dec-09 ACE/TD/JB-40/04 2,273,620 - 2,273,620 401,310 1,872,310 1,872,310 -
Inv Jan-10 ACE/TD/JB-40/05 1,552,762 - 1,552,762 401,310 1,151,452 1,151,452 -
Inv Feb-10 ACE/TD/JB-40/06 1,457,696 1,457,696 156,549 1,301,147 1,301,147 -
Inv Mar-10 ACE/TD/JB-40/07 2,216,428 2,216,428
249,968 3,916,174 3,916,174 -
Inv April-10 ACE/TD/JB-40/08 1,949,714 1,949,714
Inv May-10 ACE/TD/JB-40/09 1,659,476 1,659,476 87,823 1,571,653 1,375,895 195,758
Inv Jun-10 ACE/TD/JB-40/10 1,723,387 1,723,387 1,723,387 1,723,387
Inv Jul-10 ACE/TD/JB-40/11 1,650,452 1,650,452 1,650,452 1,650,452
Inv Aug-10 ACE/TD/JB-40/12 1,641,183 1,641,183 1,641,183 1,641,183
Inv Sep-10 ACE/TD/JB-40/13 2,725,374 2,725,374 2,725,374 2,725,374
- 111 -
21,094,16
Total 21,094,160 1,203,930 494,340 19,395,890 11,209,582 8,186,308
0
AMOUNT RECEIVABLE 9,107,513
- 112 -
b. List of Consultant Staff
- 113 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI-BESHAM
NATIONAL HIGHWAY (N-90)
LIST OF CONSULTANT’S STAFF
Sr. Date of
Name Designation Remarks
No. Joining
1 Muhammad Ayaz Resident Engineer 19-Mar-11
Muhammad Arshad
2 ARE (Structure) 3-Jan-11
Khan
3 Yousaf Zaman ARE (Highway) 09-Feb-11
4 Muhammad Farooq Material Engineer 5-Aug-10
5 Muhammad Nawaz Quantity Surveyor 15-Jun-2011
Computer
6 Muhammad Jeyad 10-Dec-09
Operator
7 Misbahullah CAD Operator 1-Feb-10
8 Abdullah Ben Ahmad Site Inspector 1-Jan-10
9 Asghar Ali Khan Site Inspector 18-Dec-09
10 Shahzad Khan Site Inspector 18-Dec-09
11 Sohail Imran Site Inspector 24-Mar-10
12 Riaz Ahmad Surveyor 4-Apr-09
13 Asmat Ullah Khan Surveyor 16-Nov-09
14 Muhammad Javeed Surveyor 10- Mar -11
15 Imran Nazir Accountant 1-Jun-10
16 Muhammad Imran Tahir Lab. Tech. 1-Mar-11
17 Shahid Mehmood Lab. Tech. 14-Dec-09
18 Zegham Abbas Lab. Tech. 1-Apr-10
19 Wahid Azam Sur. Helper 1-Feb-10
20 Ahsan Ullah Sur. Helper 1-Apr-10
21 Umer Ali Sur. Helper 1-Apr-10
22 Johar Ali Sur. Helper 1-Mar-11
23 Ahsan Ul Haq Sur. Helper 1-May-10
24 Fazal Bacha Sur. Helper 1-May-10
25 Sultan Alam Lab. Helper 1-Mar-11
26 Muhammad Umair Lab. Helper 1-Mar-11
27 Khalid Khan Lab. Helper 20-Dec-09
28 Said Qayum Lab. Helper 1-Nov-10
29 Tariq Khan Lab. Helper 1-Nov-10
30 Abdul Sattar Lab. Helper 1-Feb-11
31 Fazal Khan Driver 1-Mar-11
32 Lahore Khan Cook 1-Mar-11 Besham Residency
33 Abdur Khan Cook 1-Apr-10 Karora Residency
34 Naseeb Zada Astt.Cook 1-Mar-11 Karora Residency
35 Fazil Muhammad Astt.Cook 1-Mar-11 Besham Residency
36 Naimat Ullah Office Boy 7-Jan-10 Besham Residency
37 Jan Muhammad Watchman 18-Nov-09 Besham Residency
38 Malang Jan Watchman 1-Apr-10 Karora Residency
- 114 -
Rehabilitation and Widening of Earthquake Effected Alpuri – Besham Section of National
Highway (N-90)
Earthquake Emergency Assistance Project (EEAP)
Provision as per
Sr. No. Description Provided Remarks
Contract
Total 4 4
- 115 -
9. Quality Control / Material Test Results
- 116 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Contractor : AM & Consultant :
Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 1 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city
Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation / Classification 4 0 25
P.I 0 21
MDR 9 0 24
Sub Grade
Swelling 4 0 28
F. D. T 43 0 44
C. B. R 4 0 3 1
Gradation 0 0
Existing Material P.I 0 0
C. B. R 0 0
Gradation 12 0 33
P.I 3 0 30
C. B. R 3 0 4
MDR 12 0 23
Granular Sub Base
F. D. T 22 0 31
Specific Gravity 0 8
LA 24 0 9 11
Sand Equi. 3 0 7
Gradation 12 1 22
Plasticity Index 3 1 16
C. B. R 3 1 8
MDR 9 1 8
Aggregate Base Course Specific Gravity 1 7
Soundness 4 0 5
Sand Equi. 3 1 8
LA 4 1 8
F. D. T 85 22 22 63
Submitted By: Checked By: Noted By:
- 117 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Consultant :
Contractor : AM & Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 1 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city
Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation
Fine Agg 8 2 52
Coarse Agg 8 3 65
Concrete
Compressive
Strength
Material
Engineer Material Engineer Engineer
- 118 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Contractor : AM & Consultant :
Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 2 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city
Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation / Classification 4 0 12
P.I 0 12
MDR 9 0 10
Sub Grade
Swelling 4 0 3 1
F. D. T 43 4 31 12
C. B. R 4 0 2 2
Gradation 0 0
Existing Material P.I 0 0
C. B. R 0 0
Gradation 12 0 30
P.I 3 0 30
C. B. R 3 0 6
MDR 12 0 18
Granular Sub Base
F. D. T 22 0 17 5
Specific Gravity 0 7
LA 24 2 6 18
Sand Equi. 3 0 18
Gradation 12 3 10 2
Plasticity Index 3 0 1 2
C. B. R 3 0 1 2
MDR 9 0 2 7
Aggregate Base Course Specific Gravity 0 2
Soundness 4 0 2 2
Sand Equi. 3 0 2 1
LA 4 0 1 3
F. D. T 85 0 0 85
Submitted By: Checked By: Noted By:
- 119 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Consultant :
Contractor : AM & Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 2 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city
Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation 0
Fine Agg 7 1 42
Coarse Agg 7 3 45
Concrete
Compressive
Strength
Material
Engineer Material Engineer Engineer
- 120 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Contractor : AM & Consultant :
Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 3 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city
Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation / Classification 4 0 22
P.I 0 17
MDR 9 0 12
Sub Grade
Swelling 4 0 0 4
F. D. T 43 44 44
C. B. R 4 0 1 3
Gradation 0 0
Existing Material P.I 0 0
C. B. R 0 0
Gradation 12 2 45
P.I 3 1 37
C. B. R 3 1 10
MDR 12 3 24
Granular Sub Base
F. D. T 22 16 36 -2
Specific Gravity 1 7
LA 24 1 12 8
Sand Equi. 3 1 26
Gradation 12 0 0 12
Plasticity Index 3 0 0 3
C. B. R 3 0 0 3
MDR 9 0 0 9
Aggregate Base Course Specific Gravity 0 0 0
Soundness 4 0 0 4
Sand Equi. 3 0 0 3
LA 4 0 0 4
F. D. T 85 0 0 85
Submitted By: Checked By: Noted By:
- 121 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Consultant :
Contractor : AM & Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 3 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city
Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation
Fine Agg 8 2 45
Coarse Agg 8 4 62
Concrete
Compressive
Strength
Material
Engineer Material Engineer Engineer
- 122 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Contractor : AM & Consultant :
Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 4 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city
Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation / Classification 4 0 22
P.I 0 16
MDR 9 0 17
Sub Grade
Swelling 4 0 5
F. D. T 43 0 49
C. B. R 4 0 4
Gradation 0 0
Existing Material P.I 0 0
C. B. R 0 0
Gradation 12 1 28
P.I 3 1 26
C. B. R 3 1 24
MDR 12 1 16
Granular Sub Base
F. D. T 22 4 31 13
Specific Gravity 0 3
LA 24 1 10 15
Sand Equi. 3 1 18
Gradation 12 1 25
Plasticity Index 3 1 13
C. B. R 3 1 9
MDR 9 1 10
Aggregate Base Course Specific Gravity 1 10
Soundness 4 1 4 0
Sand Equi. 3 1 12
LA 4 1 6
F. D. T 85 6 6 79
Submitted By: Checked By: Noted By:
- 123 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Consultant :
Contractor : AM & Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 4 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city
Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation 0
Fine Agg 8 2 46
Coarse Agg 8 3 65
Concrete
Compressive
Strength
Material
Engineer Material Engineer Engineer
- 124 -
10. Weather Report
- 125 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Contractor : AM & Company Consultant : ACE
WEATHER RECORD FOR THE MONTH OF JUNE 2011
Weather
S.No Date Temperature Weather Remarks
Min (C o) Max (C o)
1 1-Jun-11 23 38 Sunny
2 2-Jun-11 22 39 Sunny
3 3-Jun-11 24 40 Sunny
4 4-Jun-11 21 37 Sunny
5 5-Jun-11 24 38 Cloudy
6 6-Jun-11 20 36 Sunny
7 7-Jun-11 23 39 Cloudy
8 8-Jun-11 22 38 Rainy
9 9-Jun-11 25 40 Cloudy
10 10-Jun-11 21 36 Sunny
11 11-Jun-11 24 37 Cloudy
12 12-Jun-11 23 35 Rainy
13 13-Jun-11 22 36 Sunny
14 14-Jun-11 24 39 Sunny
15 15-Jun-11 23 40 Cloudy
16 16-Jun-11 21 34 Rainy
17 17-Jun-11 22 34 Sunny
18 18-Jun-11 21 35 Rainy
19 19-Jun-11 23 38 Sunny
20 20-Jun-11 25 41 Cloudy
21 21-Jun-11 22 36 Sunny
22 22-Jun-11 22 37 Cloudy
23 23-Jun-11 21 35 Rainy
24 24-Jun-11 24 39 Rainy
25 25-Jun-11 23 37 Rainy
26 26-Jun-11 21 36 Sunny
27 27-Jun-11 20 34 Rainy
28 28-Jun-11 22 37 Cloudy
29 29-Jun-11 24 39 Rainy
30 30-Jun-11 21 35 Sunny
Submitted By: Checked By: Noted By:
- 126 -
11. Detail of Contractor’s Resources
(a) List of Manpower
(b) List of Plants & Machinery
- 127 -
a. List of Manpower
- 128 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM ROAD PROJECT (N-90)
MANPOWER JUNE-2011
LOT - I LOT - II LOT - III LOT - IV
Sr.
Designation As per Available As per Available As per Available As per Available Remarks
No.
Contract at Site Contract at Site Contract at Site Contract at Site
- 129 -
b. List of Plant & Machinery
- 130 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM ROAD PROJECT (N-90)
Plant/Equipment at Site during June - 2011
LOT - I LOT - II LOT - III LOT - IV
Sr.
Description As per Available As per Available As per Available As per Available Remarks
No
Contract at Site Contract at Site Contract at Site Contract at Site
1 Asphalt Mixing Plant 1 1 1 Nil 1 Nil 1 1
2 Bulldozer D-8 1 Nil 1 Nil 1 Nil 1 1
4 Bulldozer D-6 1 Nil 1 Nil 1 Nil 1 Nil
5 Excavators 2 7 2 3 2 1 2 2
6 Front End Loaders 2 1 2 1 2 Nil 2 1
7 Dump Trucks 10 11 10 6 10 2 10 1
8 Motor Graders 2 1 2 1 2 1 2 1
9 Tractors 2 2 2 6 2 2 2 4
10 Transit Mixers 1 Nil 1 Nil 1 Nil 1 Nil
11 Concrete Batching Plant 1 Nil 1 Nil 1 Nil 1 Nil
12 Concrete Mixer 1 7 1 5 1 2 1 2
13 Asphalt Pavers 1 1 1 Nil 1 Nil 1 Nil
14 Steel Wheel Rollers 8 Ton 2w Nil 2w 1 2w 1 2w Nil
15 Pneumatic Tire Rollers 2 1 2 Nil 2 Nil 2 Nil
16 Vibratory Rollers-15-20T 2 1 2 2 2 1 2 1
17 Static Tandem Roller-8-12T 1 1 1 1 1 Nil 1 Nil
18 Water Tankers 2 4 2 1 2 1 2 1
19 Generators 1 2 1 2 1 Nil 1 1
20 Crushing Plant 1 1 1 2 1 1 1 1
21 Road Broom 1 Nil 1 Nil 1 Nil 1 Nil
22 Air compressors 1 1 1 1 1 Nil 1 1
23 Crawler Rock Drill 1 1 1 Nil 1 Nil 1 Nil
24 Air Drill (Manual) 2 2 2 2 2 Nil 2 Nil
25 Jack Hammer 2 Nil 2 Nil 2 Nil 2 Nil
26 Crane 1 Nil 1 Nil 1 Nil 1 Nil
27 Concrete Vibrators 2 Nil 2 2 2 Nil 2 2
28 Vehicles 2 3 2 4 2 2 2 2
29 Asphalt Cutter 1 Nil 1 Nil 1 Nil 1 Nil
30 Concrete Pump 0 Nil 0 Nil 0 Nil 0 Nil
31 Bitumen Distributor 1 Nil 1 Nil 1 Nil 1 Nil
- 131 -
16. Site Photographs
- 132 -