0% found this document useful (0 votes)
288 views

Progress Report

The document provides details of the rehabilitation and widening project of the Alpuri-Besham section of National Highway N-90 in Khyber Pakhtunkhwa, Pakistan. The 33.5 km road project was damaged in the 2005 earthquake and heavy rains. The scope of work includes reconstructing the single lane mountainous road to National Highway Authority standards. The project aims to improve road quality, serviceability, and lifespan. It involves earthworks, structures, drainage works, retaining walls, safety features, and other ancillary construction. Significant progress has been made with physical works, though heavy flooding in 2010 impacted the schedule which has since been revised.

Uploaded by

Khan Engr
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
288 views

Progress Report

The document provides details of the rehabilitation and widening project of the Alpuri-Besham section of National Highway N-90 in Khyber Pakhtunkhwa, Pakistan. The 33.5 km road project was damaged in the 2005 earthquake and heavy rains. The scope of work includes reconstructing the single lane mountainous road to National Highway Authority standards. The project aims to improve road quality, serviceability, and lifespan. It involves earthworks, structures, drainage works, retaining walls, safety features, and other ancillary construction. Significant progress has been made with physical works, though heavy flooding in 2010 impacted the schedule which has since been revised.

Uploaded by

Khan Engr
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 132

REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI –BESHAM

SECTION OF NATIONAL HIGHWAY (N-90) IN DITT SHANGLA, KPK (33.502 KM)

ASSOCIATED CONSULTING ENGINEERS-ACE (PVT.) LTD.

AM & COMPANY (for LOT-I, III & IV)


&
MUHAMMAD IRSHAD & COMPANY (MIC) (for LOT-II)

-1-
Earthquake Emergency Assistance Project (EEAP)
Rehabilitation and Widening of Earthquake affected Alpuri – Besham Section of National
Highway (N-90)
MONTHLY PROGRESS REPORT
JUNE-2011
Table of Contents

Sr.No. DESCRIPTION Page

1. General Information 4–5


2. Office / Contact Details 6–7
3. Location Map 8–9
4. Project Alignment 10 – 11
5. Typical Cross Section 12
a) As per Original Scope of Work 13 – 14
b) As per Revised Scope of Work 15 – 16
6. Project Data 17
a. Salient Features 18 – 22
b. Physical progress Summary (Up to Date) 23 – 24
c. Financial progress Summary (Up to Date) 25 – 26
7. Design Parameters 27
a. Pavement Layers & Thickness 28
8. Project Status 29 – 30
a. Physical Progress w.r.t to laying courses 31 – 35
b. Physical & Financial Progress w.r.t to B.O.Q items 36 – 59
c. Bridges, Culverts & Causeways Details with Progress 60
(i) Bridges 61 – 62
(ii) Culverts 63 – 72
(iii) Causeways 73 – 74
d. Retaining Walls 75 – 88
e. Breast Walls 89 – 93
f. Linear Chart showing updated progress 94 – 98
g. S-Curve 99 – 103
h. Summary of IPC’s 104 – 105

-2-
9. Project Issues 106 – 107
10. Environmental Issues 108 – 109
11. Detail of Consultancy services 110
a. Financial details 111 – 112
b. List of Consultant Staff 113 – 115
12. Quality Control/ Material Test Results 116 – 124
13. Weather Report 125 – 126
14. Detail of Contractor’s resources 127
a. List of Manpower 128 – 129
b. List of Plants & Machinery 130 – 131
15. Site Photographs 132

-3-
1. General Information

-4-
GENERAL INFORMATION

Alpuri – Besham Section of National Highway N-90 is located in the Shangla District of Khyber
Pukhtoon Khwa (KPK) in Pakistan which links the Swat Valley to Karakarum Highway (N-35).
This road provides basic access to a number of remote towns and villages of Shangla District
which are among the summer tourism attraction. The road was federalized in 2007. The
highway section had been damaged due to earthquake of October 08, 2005, torrential rains and
aftershocks. Scope of work of this assignment is to reconstruct the road highway to National
Highway Authority (NHA) standard. Total length of this section of highway is 33.502 Km. The
existing road is almost a single lane road having surface treatment at the top layer of pavement.
Present condition of pavement is poor. The Existing formation width of the road varies from 3.3
m to 4.6 m with shoulder damaged in various sections. The aim is to improve riding quality and
serviceability of the road and enhance its life through widening and strengthening as per NHA’s
standards. The project had been planned to be completed in 12 months’ construction period.

The road passes through hilly area which is prone of landslides and subject to heavy rainfall.
The major work items required for repair / rehabilitation / reconstruction include earthwork,
roadwork, construction of structures, drainage work, retaining structures, highway safety work
and other ancillary works. The NHA General specifications are applicable and the work would
be carried out under the supervision of independent consultants. The contractor is required to
be have adequate resources to meet the time schedule, cost, and quality and other
requirements included in his scope of work.

The road passes through a high to medium grade in the mountains. The Project road caters for
approximately 2,000 vehicles per day. There is no alternate route to divert the traffic. Therefore,
the Contractor has to make appropriate arrangements to keep the road traffic worthy while the
work remains in progress. All safety / precautionary measures are to be taken by the contractor
to keep the traffic plying on the road during the construction period without additional
compensation / claim paid for it. Contractor has to erect the information signboard at the place
of work for awareness and information of general public at his own cost.

Recent Status of the Project:

During construction of project, a historical flood in July 2010 occurred and completely washed
away some portions of road whereas few portions were badly damaged though not washed
away completely. This situation called for redesigning of the affected portions by keeping in
view the contractor’s pervious performance to complete the project up till revised ADB loan
closing date which is 30.06.2011. The revised / reduced scope of work is agreed by NHA /
ERRA during meeting in ERRA office Islamabad on 22.12.2010.

-5-
2. Office / Contact Details

-6-
CONTACT DATA

Consultant: Associated Consulting Engineers - ACE (Pvt.) Ltd

Resident Engineer’s Office:

Address: Opposite PTCL Exchange at K.K.H Karakorum


Highway N – 35, Besham KPK

Phone No. (Land Line): 0996-400460

Fax: 0996-400460

Cell Phone:

1. Resident Engineer: 0300-9324637

2. Assistant Resident Engineer: 0315-6911999

3. Quantity Surveyor :

Email: ____________________________

Head Office
(Transportation Engineering Services Division)

Name of Head of Division: Mr. Mohammad Azad Khan

Address: 45 — L, Model Town Extension, Lahore

Phone Nos. (Land Line) 042-35171081 - 042-35171082 - 042-35171083

Fax: 042-35171084

Email:

1. [email protected]

2. [email protected]

3. [email protected]

Website: www.acepakistan.com

-7-
3. Location Map

-8-
-9-
4. Project Alignment

- 10 -
NATIONAL HIGHWAY AUTHORITY
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)

REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI –


BESHAM SECTION OF NATIONAL HIGHWAY (N-90)
ROAD ALIGNMENT

- 11 -
5. Typical Cross Sections
(a) As per Original Scope of Work
(b) As per Revised Scope of Work

- 12 -
5(a). As per Original Scope of Work

- 13 -
- 14 -
5(b). As per Revised Scope of Work

- 15 -
- 16 -
6. Project Data
(a) Salient Features
(b) Physical Progress Summary (up to date)
(c) Financial Progress Summary (up to date)

- 17 -
6 (a). Salient Features

- 18 -
SALIENT FEATURES

Rehabilitation and Widening of Earthquake


affected Alpuri – Besham Section of National
Project Name Highway (N-90)
Lot-I (KM 00+000 to 08+500)

1 Length of Project 8.5 Km.


2 Contractor AM & Company
3 Consultant Associated Consulting Engineers (ACE)
4 Date of Commencement 15-Oct-09
5 Contract Period, Original 365 Calendar Days (12 Months)
6 Contract Period, Revised 259 Calendar Days (8.7 Months)
7 Date of Completion, Original 14-Oct-10
8 Date of Completion, Revised 30-June-2011
9 Cost of Project Rs. 353,114,775
10 Revised Cost of Project Rs. 580,896,033
11 Mobilization Advance Rs. 52,967,218

12 Mobilization Advance Recovered Rs. 52,967,218

13 Value of Work done this Month Rs. 31,637,575


14 Value of Work done to-date Rs. 299,845,815.00
15 %age Progress this Month
Planned
%age Achieved %age
2.571%  6.918%
16 %age Progress to-date
Planned
%age Achieved %age
 100% 51.618%
17 Structure Work Detail

Total Completed In Progress Balanced


Complete
S.N Lengt Lengt
Description N Lengt N Length N N d
o h h
o h (m) o (m) o o % age
(m) (m)
1 Retaining Walls 64 1380 56 1098 0 0 8 282 79.56%
Retaining Walls with Plum
2 19 909 15 831 2 20 2 58 91.419%
Concrete
3 Breast Walls 22 894 9 392 3 95 10 407 43.84%
4 Slab Culverts 16 71 13 45 0 0 3 26 63.380%
5 Pipe Culverts 21 189 16 153 0 0 5 36 80.952%
7 Bridges 4 4 0

- 19 -
SAILENT FEATURES
Rehabilitation and Widening of Earthquake
affected Alpuri – Besham
Project Name Section of National Highway (N-90)
Lot-II (KM 08+500 to 17+015)

1 Length of Project 8.515 Km.


2 Contractor M/s Muhammad Irshad & Company
3 Consultant Associated Consulting Engineers (ACE)
4 Date of Commencement 30-Oct-09
5 Contract Period, Original 365 Calendar Days (12 Months)
6 Contract Period, Revised 244 Calendar Days (8 Months)
7 Date of Completion, Original 29-Oct-10
8 Date of Completion, Revised 30-June-2011
9 Cost of Project Rs. 332,520,534
1
0 Revised Cost of Project Rs. 433,984,484
1
1 Mobilization Advance Rs. 49.879 (million)
1
2 Mobilization Advance Recovered Rs. 49.879 (million)
1
3 Value of Work done this Month Rs. 64,084,696
1
4 Value of Work done to-date Rs. 283,222,284
1
5 %age Progress this Month
Planned %age Achieved %age
 3.45% 18.168%

1
6 %age Progress to-date
Planned %age Achieved %age

100% 65.261%

1
7 Structure Work Detail

Total (m) Completed In Progress Balanced


Complete
S. Lengt Lengt Lengt
Description N Lengt N N N d
No h h h
o h (m) o o o % age
(m) (m) (m)
1 Retaining Walls 28 1138 25 1091 0 0 3 47 95.869%
Retaining Walls with Plum
2 16 583 15 577 1 6 0 0 98.970%
Concrete
3 Breast Walls 29 997.00 25 788 1 25 4 184 79.037%
4 Slab Culverts 26 176.20 15 101 0 0 11 65 57.223%
5 Pipe Culverts 17 74 10 50 0 0 7 24 67.567%

- 20 -
6 Causeways 1 20 0 1 20 0 0.00%
7 Bridges 3 2 1 0.00%

- 21 -
SALIENT FEATURES
Rehabilitation and Widening of Earthquake
affected Alpuri – Besham Section of National
Project Name Highway (N-90)
Lot-III (KM. 17+015 to 23+300)

1 Length of Project 6.285 Km.


2 Contractor AM & Company
3 Consultant Associated Consulting Engineers (ACE)
4 Date of Commencement 10-Oct-09
5 Contract Period, Original 365 Calendar Days (12 Months)
6 Contract Period, Revised 263 Calendar Days
7 Date of Completion, Original 10-Oct-10
8 Date of Completion, Revised 30-June-2011
9 Cost of Project Rs. 320,608,457
10 Revised Cost of Project Rs. 454,907,928
11 Mobilization Advance Rs. 48.091 (million)
Mobilization Advance
12 Recovered Rs. 48.091 (million)
13 Value of Work done this Month Rs. 28,560,195
14 Value of Work done to-date Rs. 237,843,185
15 %age Progress this Month
Planned
%age Achieved %age
 2.444% 8.018%

16 %age Progress to-date


Planned
%age Achieved %age
 100% 52.284%

17 Structure Work Detail

Total Completed In progress Balanced


Complete
S.
Description Lengt Lengt Lengt Lengt d
No N N N
h h No h h % age
o o o
(m) (m) (m) (m)
1 Retaining Walls 37 1170 28 876 1 13 8 281 74.871%
Retaining Walls with Plum
2 24 1103 18 766 4 125 2 212 69.446%
Concrete
3 Breast Walls 19 1438 14 855 3 183 2 400 59.457%
4 Slab Culverts 10 76 6 44 2 10 4 22 57.894%
5 Pipe Culverts 16 176.00 12 132 0 0 4 45 75.000%
6 Causeways 1 20 0 0 1 20 0.00%
7 Bridges 2 2 0.00%

- 22 -
SALIENT FEATURES

Project Name Rehabilitation and Widening of Earthquake affected


Alpuri – Besham Section of National Highway (N-90)
Lot-IV (KM. 25+000 to 33+502)

1 Length of Project 8.502 Km.


2 Contractor AM & Company
3 Consultant Associated Consulting Engineers (ACE)
4 Date of Commencement 10-Oct-09
5 Contract Period, Original 365 Calendar Days (12 Months)
6 Contract Period, Revised 263 Calendar Days
7 Date of Completion, Original 10-Oct-10
8 Date of Completion, Revised 30-June-2011
9 Cost of Project Rs. 296,914,934
10 Revised Cost of Project Rs. 679,611,040
11 Mobilization Advance Rs. 44.537 (million)
12 Mobilization Advance Recovered Rs. 19.453 (million)
13 Value of Work done this Month Rs. 67,726,799
14 Value of Work done to-date Rs. 378,090,722
15 %age Progress this Month
Planned
%age Achieved %age
2.444 % 15.291%
16 %age Progress to-date
Planned
%age Achieved %age
 100% 55.633%

17 Structure Work Detail

Total Completed In progress Balanced


S. Length
Description Length Length Length Completed %
No No No No No
(m) (m) (m)
(m)
1 Retaining Walls 44 2247 37 2120 2 57 5 70 94.348%
2 Retaining Walls with Plum Concrete 32 1183 24 1080 8 103 0 0 91.293%
3 Breast Walls 15 920 9 555 0 0 6 365 60.32%
4 Slab Culverts 8 74.70 5 51.20 0 0 3 23.50 68.540%
5 Pipe Culverts 22 219.8 16 154 0 0 6 66 70.06%
6 Causeways 3 93 1 23 1 50 1 20 24.73%

- 23 -
6 (b). Physical progress Summary (Up to Date)

- 24 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
NATIONAL HIGHWAY AUTHORITY

REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-
90)
IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)

PLANNED & ACHIEVED PROGRESS


UPTO 30-JUNE-2011

Section Planned Achieved


Lagging
Progress Progress Remarks
(%age)
LOT RDs (%age) (%age)

LOT-I 00+000 TO 08+500 100.000% 51.618% -48.382%  

LOT-II 08+500 TO 17+015 100.000% 65.261% -34.739%  

LOT-III 17+015 TO 25+000 100.000% 52.284% -47.716%  

LOT-IV 25+000 TO 33+502 100.000% 55.633% -44.367%  

- 25 -
6 (c). Financial progress Summary (Up to Date)

- 26 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
NATIONAL HIGHWAY AUTHORITY
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)

PHYSICAL PROGRESS SUMMARY


UPTO 30-JUNE-2011

Section Contract Cost Percentage


To date Work
Remarks
done Original Revised
LOT RDs Original Cost Revised Cost
% %

LOT-I 00+000 TO 08+500 353,114,775.000 580,896,033 299,845,815 84.915% 51.618%  

LOT-II 08+500 TO 17+015 332,520,534.000 433,984,484 283,222,284 85.174% 65.261%  

LOT-
17+015 TO 25+000 320,608,457.000 454,907,928 237,843,185 74.185% 52.284%  
III
LOT-
25+000 TO 33+502 296,914,934.000 679,611,040 378,090,722 127.340% 55.633%  
IV
Total 1,303,158,700.000 2,149,399,485 1,199,002,007      

- 27 -
7. Design Parameters

(a) Pavement Layers and Thickness

- 28 -
PAVEMENT LAYERS AND THICKNESS (REVISED)

1. Total Length = 33.502 Km

2. Existing width of – 3.3 to 4.6 Meters pavement.

3. Proposed width of – 6.1 meters pavement.

4. Shoulders (Earthen) – 1 m on either side.

5. Asphaltic Wearing Course = 35 mm

6. Aggregate Base Course = 150 mm

7. Sub-Base Course = 150 mm

PAVEMENT LAYERS AND THICKNESS (ORIGINAL)

1. Total Length = 33.502 Km

2. Existing width of – 3.3 to 4.6 Meters pavement.

3. Proposed width of – 6.1 meters pavement.

5. Asphaltic Wearing Course = 50 mm

6. Asphaltic Base Course = 80 mm

7. Aggregate Base Course = 150 mm

8. Sub-Base Course = 150 mm

- 29 -
8. Project Status
(a) Physical Progress w.r.t to laying courses
(b) Physical and Financial Progress w.r.t to B.O.Q Items
(c) Bridges, Culverts & Causeways Details with Progress
(i) Bridges
(ii) Culverts
(iii) Causeways
(d) Retaining Walls
(e) Breast Walls
(f) Linear Chart Showing updated Progress
(g) S-Curve
(h) Summary of IPC’s

- 30 -
PROJECT STATUS

Project Name: Earthquake Emergency Assistance Project (EEAP)


Rehabilitation and Widening of Earthquake affected Alpuri
– Besham section of National Highway (N-90) in Distt.
Shangla, KPK.
Length of Project: 33.502 KM
Contractor (Name/Address):
o LOT – I AM & Company.
o LOT – II Muhammad Irashad & Company.
o LOT – III AM & Company.
o LOT – IV AM & Company.

Consultant: ASSOCIATED CONSULTING ENGINEERS


ACE (PVT.) LTD., LAHORE.
Contract Signed on:
Date of Commencement: October 15, 2009
Date of Completion Original: October 14, 2010
Date of Completion Revised: June 30, 2011
Original Cost of Project:
 LOT-I Rs. 353,114,775
 LOT-II Rs. 332,520,534
 LOT-III Rs. 320,608,457
 LOT-IV Rs. 296,914,934
Total Rs. 1,303.158,700

Revised Cost of Project: LOT-I Rs. 580,896,033


LOT-II Rs. 433,984,484
LOT-III Rs. 454,907,928
LOT-IV Rs. 679,611,040
Total RS. 2,149,399,485
Width of carriageway: 6.10M
Shoulders: Right = 1M, Left = 1M Original Revised
Pavement Structure:
AC Wearing Course 5cm 3.5
AC Base Course 8cm -
Project Director (NHA)
Agg. Base Course 15cm 15
Habib-u-Rehman
The Engineer: Sub Base 15cm 15
Muhammad Azad Khan
Resident Engineer: Muhammad Ayaz
Project Manager (Contractor): Muhammad Iqbal Shah (for LOT-I, III & IV)
Project Manager (Contractor): Wahid Ullah (for LOT-II)

- 31 -
a. Physical Progress w.r.t to laying courses

- 32 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM
NATIONAL HIGHWAY (N-90) (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP
PROGRESS OF WORK (LOT - I)
1. Survey
Setting out of new C/L according to design has been completed (From Km. 00+000 to 08+500)
NSL X-sections on new C/L has been completed (From Km. 00+000 to 08+500)
2. Earth Work
Completed In Progress
S.
Location Length Location Length Remarks
No
From KM. To KM. (M) From KM. To KM. (M)
1 Embankment  
  04+375 04+463 87.5        
  04+688 04+863 175        
  05+525 05+600 75        
  05+788 05+863 75        
  Total 412.5        
1 Sub-Grade  
  00+300 00+387 87        
  00+600 01+725 1125        
  01+875 04+412 2537        
  04+587 05+000 413        
  05+200 05+875 675        
  05+972 06+350 378        
  06+500 08+500 2000        
  Total 7215        
2 Sub-Base  
  00+300 00+387 87     0  
  00+600 01+725 1125     0  
  01+887 04+200 2313     0  
  04+350 04+412 62        
  04+587 05+000 413        
  05+200 05+875 675        
  06+037 06+350 313        
  06+500 08+500 2000        
      0        
  Total 6988 Total 0  
3 Base Course
  03+025 04+087 1062 00+300 00+387 87  
  06+500 08+500 2000 00+600 01+000 400  
  03+362 04+100 738 01+175 01+275 100  
  02+450 03+162 712 01+450 01+725 275  
  02+000 02+262 262 01+885 02+162 277  
      0 02+450 02+925 475  
      0 05+200 05+325 125  
  Total 4774 Total 1739  
4 Asphalt Base Course
  07+350 07+666 316 07+666 08+333 667  
  Total 316 Total 667  

- 33 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI -
BESHAM NATIONAL HIGHWAY (N-90) (KM 08+500 TO 17+015) IN DISTRICT
SHANGAL, NWFP
PROGRESS OF WORK (LOT - II)
1.
Survey
Setting out of new C/L according to design has been completed (From Km.
08+000 to 17+015)
NSL X-sections on new C/L has been completed (From Km. 08+000 to 17+015)
Completed In progress
Location Location Remark
Sr. No. Length Length s
From (M) From To (M)
To KM.
KM. KM. KM.
1 Sub Grade  
  08+500 09+300 800        
  09+650 10+500 850        
  10+700 12+600 1900        
  12+712 15+025 2313        
  15+150 15+535 385        
  15+625 17+015 1390        
  Total (Km) 7638        
2 Sub Base  
  08+500 09+300 800        
  09+650 10+500 850        
  10+700 12+600 1900        
  12+712 15+025 2313        
  15+150 15+535 385        
  15+625 17+015 1390        
  Total (Km) 7638.00        
3 Base Course  
  8+500.0 9+250.0 750        
  9+650.0 10+500.0 850        
  10+500.0 11+150.0 650        
  11+150.0 11+362.0 212        
  12+300.0 12+600.0 300        
  12+712.0 13+150.0 438        
  13+350.0 14+250.0 900        
  14+325.0 14+750.0 425        
  14+750.0 15+025.0 275        
  Total (Km) 4800.00 Total    

- 34 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI -
BESHAM NATIONAL HIGHWAY (N-90) (From Km. 17+015 to 25+000) IN DISTRICT
SHANGAL, NWFP
PROGRESS OF WORK (LOT - III)
1. Survey
Setting out of new C/L according to design has been completed (From Km. 17+015 to 25+000)
NSL X-sections on new C/L has been completed (From Km. 17+015 to 25+000)
Completed In progress
S.
Location Length Location Length Remarks
No.
(M) (M)
From KM. To KM. From KM. To KM.
1 Sub Grade  
  17+015 20+100 3085.00     0.00  
  20+137 23+175 3038.00        
Total Length (m) 6123.00 Total Length (m) 0.00  
2 Sub-Base  
  17+015 18+850 1835.00     0.00  
  19+000 19+900 900.00     0.00  
  20+225 20+500 275.00     0.00  
  20+700 21+100 400.00        
  21+275 21+475 200.00        
  22+500 22+800 300.00        
Total Length (m) 3910.00 Total Length (m) 0.00  
3 Base Course  
  17+015 17+575 560.00 17+800 18+300 500.00  
  17+675 17+800 125.00     0.00  
Total Length (m) 685.00 Total Length (m) 500.00  

- 35 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM
NATIONAL HIGHWAY (N-90) (From Km. 25+000 to 33+502) IN DISTRICT SHANGLA, NWFP
PROGRESS OF WORK (LOT - IV)
1. Survey
Setting out of new C/L according to design has been completed (From Km. 25+000 to 33+502)
NSL X-sections on new C/L has been completed (From Km. 25+000 to 33+502)
2. Earth Work
Completed In progress
Sr.
Location Length Location Length Remarks
No.
(M) (M)
From To From KM. To KM.
i Roadway Excavation  
  25+475 25+525 50        
  25+725 26+260 535        
  26+375 29+530 3155        
  29+550 29+900 350        
  30+000 32+550 2550        
  32+875 32+937 62        
  33+025 33+150 125        
TOTAL 6827        
ii Sub-Grade  
  25+450 30+500 5050.00        
  30+800 33+300 2500.00 30+500 30+800 300.00  
TOTAL 7550 TOTAL 300.00  
iii. Sub-Base
  25+825 27+900 2075.00 25+600 25+725 125.00  
  27+900 28+150 250.00     0.00  
  28+150 28+350 200.00     0.00  
  28+450 28+575 125.00     0.00  
  28+575 28+675 100.00     0.00  
  28+675 28+750 75.00     0.00  
  28+750 29+000 250.00     0.00  
  29+000 29+500 500.00     0.00  
  29+500 29+750 250.00     0.00  
  29+750 30+500 750.00     0.00  
  30+850 31+400 550.00     0.00  
  31+550 31+750 200.00     0.00  
  32+187 33+300 1113.00     0.00  
TOTAL 6438.00 TOTAL 125.00  
iv. Aggregate Base Course
  25+762 26+730 968.00        
  26+000 26+700 700.00 29+575 29+700 125.00  
  26+800 27+100 300.00 31+075 31+375 300.00  
  29+575 29+800 225.00     0.00  
  31+000 31+325 325.00        
  32+180 33+330 1150.00        
TOTAL 3668.00 TOTAL 425.00  

- 36 -
b. Physical & Financial Progress w.r.t to B.O.Q items
According to Revised Scope of Work

- 37 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 2 EARTH WORK                        

101 Cleaning and Grubbing m2 0.50 5233.00 2616.50 0.00


- - - - - - -
103 Stripping m3 10.00 1051.00 10510.00 0.00    
- - - - -
104 Compaction of Natural Ground m2 30.00 34683.00 1040490.00 0.00    
- - - - -
19,009,800. 63,4 19,046,463. 63,4 19,046,463.
106c Excavate Surplus Common Material m3 300.00 49738.00 14921400.00 63366.00
00 88 00 - - 88 00
112,322,400 193,4 116,057,37 178,4 107,057,094
106di Excavate Surplus Hard Rock Material m3 600.00 24869.00 14921400.00 187204.00
.00 29 0.00 - - 28 .00
106dii Excavate Surplus Medium Rock Material m3 450.00 24869.00 11191050.00 0.00
- - - - - - -
3 800,000. 1,806. 722,536 1,806. 722,536
106diii Excavate Surplus Soft Rock Material m 400.00 24869.00 9947600.00 2000.00
00 34 .00 - - 34 .00
16,575. 4,972,51 8,507 2,552,133
106c Excavate Surplus Common Material m3 300.00      
- 06 8.00 - - .11 .00
3 40,216. 24,130,122 40,216. 24,130,122
106di Excavate Surplus Hard Rock Material m 600.00      
- 87 .00 - - 87 .00
106dii Excavate Surplus Medium Rock Material m3 450.00          
- - - - -
3 490. 196,10 490. 196,10
106diii Excavate Surplus Soft Rock Material m 400.00      
- 25 0.00 - - 25 0.00
Formation of embankment from Roadway 7,027,16 1,17 410,08 1,17 410,08
108a m3 350.00 9865.00 3452750.00 20077.60
Excavation in Common Material 0.00 1.66 1.00 - - 1.66 1.00
Formation of embankment from Roadway 13,452,320
108bi m3 800.00 5719.00 4575200.00 16815.40    
Excavation in Hard Rock Material .00 - - - -
Formation of embankment from Roadway 3 3,339,840.
108bii m 600.00 3812.00 2287200.00 5566.40    
Excavation in Medium Rock Material 00 - - - -
Formation of embankment from Roadway 1,691,58
108biii m3 550.00 1906.00 1048300.00 3075.60    
Excavation in Soft Rock Material 0.00 - - - -
300,000. 7,945. 7,945,800.
108c Formation of embankment from Borrow Excavation m3 1000.00 300.00 300000.00 300.00    
00 - 80 00 -
2,240,000. 64,121. 5,129,75 5,129,75
109a Sub-grade Preparation in Earth cut m2 80.00 8508.00 680640.00 28000.00   64121.99
00 99 9.20 - 9.20
150,00
109b Sub-grade Preparation in Existing Road m2 100.00 13050.00 1305000.00 1500.00            
0.00
Total of Bill No. 2 C/O to Summary 65,684,156.50   160,333,100.00   170,664,949.20   7,945,800.00   159,244,288.20

- 38 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011

Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 3 SUB-BASE AND BASE COURSES                        


8,275. 9,930,000. 3,087. 3,705,300. 11,36 13,635,300.
201 Granular Sub-base m3 1200.00 12503.00 15003600.00 11000.00 13200000.00
00 00 75 00 2.75 00
3 5,799 11,598,54 2,036. 4,072,560. 7,835 15,671,10
202 Aggregate Base Course m 2000.00 10470.00 20940000.00 10300.00 20600000.00
.27 0.00 28 00 .55 0.00
3 481. 7,215,000 481 7,215,000.
203b Asphaltic Base Course Plant Mix Class-B m 15000.00 2882.00 43230000.00 4498.00 67470000.00    
00 .00 .00 00
209A Breaking of Existing Road Pavement Structures m3 1000.00 75.00 75000.00 75.00 75000.00      
- - -
2 20,834. 416,694
209b Scarification of Existing Road Pavement m 20.00 19675.00 393500.00 32431.00 648620.00 0 20834.73 416694.6
73 .60 -

  Total of Bill No. 3 C/O to Summary       79,642,100.00   101,993,620.00   21,945,234.60   14,992,860.00   36,938,094.60

Bill No. 4 SURFACING                        

302 Bituminous Prime Coat m2 40.00 63465.00 2538600.00 57500.00 2300000.00     6894.1 6894.1
275,764.00 275,764.00
303 Bituminous Tack Coat m2 50.00 57082.00 2854100.00 54450.00 2722500.00        
- -
305b Asphaltic Concrete for Wearing Course Class-B m3 16000.00 2916.00 46656000.00 2730.00 43680000.00        
- -
304b Double Surface Treatment m2 300.00 9413.00 2823900.00 8395.00 2518500.00            

Total of Bill No. 4 C/O to Summary 54,872,600.00   51,221,000.00            

- 39 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011

Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 5A STRUCTURES (Culverts, Retaining Walls,


                       
Causeways)
6, 1,976,70 4,246. 1,273,841 6,5 1,976,700.
107a Structural Excavation in Common Material m3 300.00 2300.00 690000.00 15724.00 4717200.00
589 0.00 14 .09 89 00
Structural Excavation in Common Material
107bi m3 300.00 1150.00 345000.00 0.00 0.00
Below Water Level - - - - - -
3 3, 2,167,900 1,985 1,390,051 5,0 3,557,951
107ci Structural Excavation in Hard Rock Material m 700.00 1150.00 805000.00 6691.00 4683700.00
097 .00 .79 .49 83 .49
107cii Structural Excavation in Medium Rock Material m3 400.00 1150.00 460000.00 2290.00 916000.00
- - - - - -
107ciii Structural Excavation in Soft Rock Material m3 400.00 1494.00 597600.00 2290.00 916000.00
- - - - - -
663,250 6 663,248.
107d Granular Backfill m3 1000.00 744.00 744000.00 4199.00 4199000.00
663 .00 - - 63 00
107e Common Backfill m3 500.00 7443.00 3721500.00 4406.00 2203000.00
- - - - - -
Concrete Class-A Underground or Elevated 193,280 41,322 193,280.
401a m3 8000.00 4965.00 39720000.00 2150.00 17200000.00
(210 Kg/Cm2 of 28 Days Cylinder Strength) 24 .00 5.17 .88 24 00
Concrete Class-B (170 Kg/Cm2 of 28 Days 517,40 22. 129,666. 647,067.
401b m3 5800.00 129.00 748200.00 143.00 829400.00
Cylinder Strength) 89 0.60 36 89 112 49
Lean Concrete (100 Kg/Cm2 of 28 Days 5,202. 23,409,000. 1,321 5,947,423 5,202. 23,409,000.0
401f m3 4500.00 1150.00 5175000.00 4698.78 21144523.50
Cylinder Strength) 00 00 .65 .15 00 0
476,000 1 132,800. 6. 608,800.
404b Reinforcement as per AASHTO M31 Grade 60 Ton 100000.00 87.00 8700000.00 10.00 1000000.00
5 .00 .33 00 09 00
Premoulded Joint Filler 12mm Thick with
406a m2 50.00 1093.00 54650.00 1093.00 54650.00
Bitumastic Joint Seal - - - - - -
1,379 413,808 96. 28,969. 1,475. 442,777
SIW-8 Provide PVC Pipe 76mm dia m 300.00 684.00 205200.00 2186.00 655800.00
.36 .00 56 50 93 .50
410 Brick Work m3 10000.00 122.00 1220000.00 0.00 0.00
- - - - - -
719,00 3,773. 7,546,435. 4,1 8,265,435.
411a Stone Masonry Random Dry m3 2000.00 414.00 828000.00 10572.00 21144000.00
360 0.00 22 34 33 34
6,783. 14,924,492. 1,370. 3,014,953. 8,154. 17,939,445.
411b Stone Masonry Random with Mortar m3 2200.00 8531.00 18768200.00 13724.00 30192800.00
86 00 43 84 29 84
972,000 84. 202,665. 4 1,174,66
412a Stone Masonry Dressed Course with Mortar m3 2400.00 2951.00 7082400.00 2076.00 4982400.00
405 .00 44 74 89 5.74
2 24,25 2 24,255.
411g Roll Pointing m 100.00 966.00 96600.00 2885.00 288500.00
243 5.00 - - 43 00
SIW-9 Cement Sand Plaster (1:3) m2 300.00 276.00 82800.00 0.00 0.00 0  
- - - -
NON 7, 38,459,724. 6,2 33,341,563 6,5 35,159,196
Plum Concrete (Concrete Class B) m2 5358.00     10999.59 58935800
BOQ 178 00 23 .16 62 .00

Total of Bill No. 5A C/O to Summary 90,044,150.00   174,062,773.51   46,457,085.60   19,708,129.93   94,061,822.40

- 40 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011

Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 5B BRIDGES                        


50,18 50,18
107a Structural Excavation in Common Material m3 300.00 212.96 63888.00 212.96 63888.00 167.28 167.28
4.00 - - 4.00
Structural Excavation in Common Material
107b m3 400.00 212.96 85184.00 212.96 85184.00    
Below Water Level - - - -
348,096. 348,096.
107c Structural Excavation in Rock Material m3 700.00 1703.64 1192548.00 1703.64 1192548.00 497.28 497.28
00 - - 00
107d Granular Backfill m3 1000.00 731.85 731850.00 731.85 731850.00
1,977.00 1,977,000.00 - - 1,977.00 1,977,000.00
107e Common Backfill m3 800.00 731.85 585480.00 731.85 585480.00
532.00 425,600.00 - - 532.00 425,600.00
Concrete Class-A Underground, On Ground or
401a
Elevated (210 Kg/Cm2 of 28 Days Cylinder m3 8200.00 1054.67 8648294.00 1128.75 9255750.00    
(I,ii,iii) - - - -
Strength)
Concrete Class-A3 Underground Onground or
401a3
Elevated (210 Kg/Cm2 of 28 Days Cylinder m3 15000.00 244.20 3663000.00 271.70 4075500.00    
(I,ii,iii) - - - -
Strength)
Lean Concrete (100 Kg/Cm2 of 28 Days
401f m3 8000.00 37.62 300960.00 40.38 323040.00    
Cylinder Strength) - - - -

404b Reinforcement as per AASHTO M31 Grade 60 Ton 130000.00 129.89 16885700.00 136.50 17745000.00    
- - - -
Premoulded Joint Filler 25mm Thick with
406a m2 1000.00 14.59 14590.00 28.13 28125.00          
Bitumastic Joint Seal -

406c Steel Expansion Joint Kg 100.00 2394.00 239400.00 2479.70 247970.00          


-
Providing Elastomeric Bearing Pad (according
406e cm3 5.00 171640.00 858200.00 204970.00 1024850.00          
to Size and Thickness) -

412a Stone Masonry Dressed Course with Mortar m3 3200.00 33.00 105600.00 33.00 105600.00          
-
SIW- Provide and Fix Drainage G.I Pipe 100mm in
m 3000.00 10.00 30000.00 14.00 42000.00          
6(a) Bridge Deck Slab including Accessories -
SIW- Provide and Fix Drainage PVC Pipe 150mm in
m 3000.00 550.00 1650000.00 550.00 1650000.00            
6(b) Bridge Deck Slab including Accessories
NON P/Fixing Pre cast Pre stressed Concrete Girder
No 750000.00 0.00 0.00 4.00 3000000.00            
BOQ 25M, Complete in all respect as per drawings

Total of Bill No. 5B C/O to Summary 35,054,694.00   40,156,785.00   2,800,880.00   -   2,800,880.00

- 41 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 6 DRAINAGE AND EROSION WORKS                        


27,600 27,600
107a Structural Excavation in Common Material m3 300.00 92.00 27600.00 92.00 27600.00 92 92
.00 - - .00
Structural Excavation in Common Material Below
107b m3 400.00 18.00 7200.00 0.00 0.00    
Water Level - - - -
3 126,000 126,000
107c Structural Excavation in Rock Material m 700.00 257.00 179900.00 257.00 179900.00 180 180
.00 - - .00
107d Granular Backfill m3 1000.00 12.00 12000.00 12.00 12000.00    
- - - -
107e Common Backfill m3 800.00 104.00 83200.00 100.00 80000.00    
- - - -
501e AASHTO M 170 Class-II Reinforced Concrete Pipe m3     0.00 0.00 0.00      
- - -
40. 402,600. 1 110,000 402,600.
  (i) Diameter 610mm m 10000.00 44.00 440000.00 55.00 550000.00 40.26
26 00 1.00 .00 00
122 1,830,900 36 549,150 15 2,380,050.
  (ii) Diameter 760mm m 15000.00 114.00 1710000.00 196.00 2940000.00
.06 .00 .61 .00 8.67 00
502a Granular Material in Bed to Concrete Pipe Culvert m3 1000.00 50.00 50000.00 50.00 50000.00    
- - - -
Concrete Class-B in Bedding and Encasement of 31 3,151,30 70 708,479. 385. 3,859,779
502b m3 10000.00 29.00 290000.00 423.00 4230000.00
Concrete Pipe Culvert 5.13 0.00 .85 98 98 .98
507a Steel Wire Mesh for Gabions Kg 400.00 264.00 105600.00 123.00 49200.00    
- - - -
2
507b Rock fill in Gabions m 1200.00 165.00 198000.00 84.00 100800.00    
- - - -
509a Rip Rap Class-A m3 1500.00 172.00 258000.00 50.00 75000.00    
- - - -
4,70 4,700
509b Rip Rap Class-b m3 2000.00 72.00 144000.00 92.00 184000.00 2.35 0 2.35
0.00 - .00
509e Grouted Rip Rap Class-B m3 2000.00 34.00 68000.00 34.00 68000.00      
- - -
3
509h Filter Layer of Granular Material m 800.00 64.00 51200.00 264.00 211200.00      
- - -
510 Dismantling of Structures and Obstructions m3 500.00 149.00 74500.00 0.00 0.00      
- - -
SIW- Unlined Water Courses, Cross Sectional area not
m 500.00 320.00 160000.00 0.00 0.00      
4(a) exceeding 1.5m2 - - -
SIW-
25mm Dia G.I Pipes m 500.00 115.00 57500.00 115.00 57500.00      
5(a) - - -
3
511a Dry Stone Pitching (Hand Packed Stone) m 1000.00 80.00 80000.00 0.00 0.00      
- - -
411b Stone Masonry Random with Mortar m3 2500.00 40.00 100000.00 0.00 0.00      
- - -
Lean Concrete (100 Kg/Cm2 of 28 Days Cylinder
401f m3 8000.00 6.00 48000.00 6.00 48000.00      
Strength) - - -

Total of Bill No. 6 C/O to Summary       4,144,700.00   8,863,200.00   5,543,100.00   1,367,629.98   6,800,729.98

- 42 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
LOT - I (KM 00+000 TO 08+500) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011

Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 7 ANCILLARY WORKS                        

601dii Concrete Kerbs in place, Single Face m 1000.00 675.00 675000.00 0.00 0.00            

604a Metal Beam Guard Rail m 1000.00 1500.00 1500000.00 1700.00 1700000.00            

604b Guard Rail End Pieces Each 1500.00 200.00 300000.00 207.00 310500.00            

604d Steel Post for Guard Rail Each 2000.00 806.00 1612000.00 1140.00 2280000.00            

607a Traffic Road Sign Category 1 Each 5000.00 99.00 495000.00 85.00 425000.00            

607b Traffic Road Sign Category 2 Each 5000.00 49.00 245000.00 40.00 200000.00            

607c Traffic Road Sign Category 3(a) Each 5000.00 45.00 225000.00 20.00 100000.00            

607d Traffic Road Sign Category 3(b) Each 5000.00 18.00 90000.00 18.00 90000.00            

607e Traffic Road Sign Category 3(c) Each 15000.00 4.00 60000.00 4.00 60000.00            
Pavement Marking in Reflective TP Paint for
608g m 100.00 3002.00 300200.00 0.00 0.00            
Lines of 12cm width
Pavement Marking in Reflective TP Paint for
608h2 m 70.00 18008.00 1260560.00 17000.00 1190000.00            
Lines of 15cm width
Pavement Marking in Reflective TP Paint for
608j2 Each 1125.00 13.00 14625.00 0.00 0.00            
Lines of 4.0M Arrows
610c Kilometre Post Each 20000.00 4.00 80000.00 0.00 0.00            

Total of Bill No. 7 C/O to Summary 6,857,385   6,355,500            

Sub-Total Amount 336,299,786   542,985,979   247,411,249   44,014,420   299,845,815

Add 5% Premium (Rs) 16,814,989 - 27,149,299 - 12,370,562 - 2,200,721 - 14,992,291

Grand Total (Rs) 353,114,775 - 570,135,277 - 259,781,812 - 46,215,141 - 314,838,106

- 43 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Rate Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit
No (Rs.) Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 2 EARTH WORK                        

101 Cleaning and Grubbing m2 10.00 5233.30 52333.00 0.00 0.00      


- - -
3
103 Stripping m 20.00 1051.10 21022.00 0.00 0.00      
- - -
104 Compaction of Natural Ground m2 50.00 34683.00 1734150.00 0.00 0.00      
- - -
106c Excavate Surplus Common Material m3 350.00 49738.10 17408335.00 102404.00 35841400.00
112,762.2 39,466,755.65 32,107.97 11,237,788.80 144,870.1 50,704,544.45
106di Excavate Surplus Hard Rock Material m3 590.00 24869.00 14672710.00 121403.00 71627770.00
134,760.0 79,508,389.97 12,094.64 7,135,839.37 146,854.6 86,644,229.34
106dii Excavate Surplus Medium Rock Material m3 480.00 24869.00 11937120.00 0.00 0.00  
- - - - -
106diii Excavate Surplus Soft Rock Material m3 450.00 24869.00 11191050.00 6721.00 3024450.00
11,654.25 5,244,414.30 - - 11,654.25 5,244,414.30
Formation of embankment from Roadway
108a m3 360.00 9864.80 3551328.00 11167.60 4020336.00
Excavation in Common Material 5,788.69 2,083,929.84 2,314.55 833,236.56 8,103.24 2,917,166.40
Formation of embankment from Roadway
108bi m3 820.00 5718.70 4689334.00 7307.90 5992478.00    
Excavation in Hard Rock Material - - - -
Formation of embankment from Roadway
108bii m3 620.00 3812.50 2363750.00 4641.70 2877854.00    
Excavation in Medium Rock Material - - - -
Formation of embankment from Roadway
108biii m3 570.00 1906.20 1086534.00 2459.20 1401744.00    
Excavation in Soft Rock Material - - - -
Formation of embankment from Borrow
108c m3 1020.00 300.00 306000.00 300.00 306000.00    
Excavation - - - -
109a Sub-grade Preparation in Earth cut m2 100.00 8507.50 850750.00 30000.00 3000000.00 26200 26200
2,620,000.00 - - 2,620,000.00
109b Sub-grade Preparation in Existing Road m2 110.00 13050.00 1435500.00 100.00 11000.00     30521.6 3357376
30,521.60 3,357,376.00
Total of Bill No. 2 C/O to Summary 71299916.00   128103032.00   128,923,489.76   22,564,240.73   151,487,730.49

- 44 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Rate Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit
No (Rs.) Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 3 SUB-BASE AND BASE COURSES                        

201 Granular Sub-base m3 1220.00 12503.00 15253660.00 13177.00 16075940.00 3124.913 9605.96
3,812,393.86 6,481.05 7,906,877.34 11,719,271.20
202 Aggregate Base Course m3 1980.00 10470.00 20730600.00 11207.00 22189860.00 2736 5417280 4326913.8 4921.31 9744193.8
2,185.31
203b Asphaltic Base Course Plant Mix Class-B m3 13900.00 2882.00 40059800.00 4506.14 62635318.20            
Breaking of Existing Road Pavement
209A m3 1500.00 75.00 112500.00 3028.20 4542300.00 3028.2 4693.78
Structures 4,542,300.00 1,665.58 2,498,370.00 7,040,670.00
209b Scarification of Existing Road Pavement m2 30.00 19675.00 590250.00 19675.00 590250.00 9560.8 286824 5148.61 154458.3 14709.41
441,282.30
  Total of Bill No. 3 C/O to Summary       76746810.00   106033668   14,058,797.86   14,886,619.44   28,945,417.30

Bill No. 4 SURFACING                        


302 Bituminous Prime Coat m2 45.00 63465.00 2855925.00 53240.00 2395800.00            

303 Bituminous Tack Coat m2 60.00 57082.00 3424920.00 52793.00 3167580.00            


Asphaltic Concrete for Wearing Course
305b m3 15000.00 2916.00 43740000.00 2735.00 41025000.00            
Class-B
304b Double Surface Treatment m2 350.00 9413.00 3294550.00 7740.00 2709000.00            

Total of Bill No. 4 C/O to Summary 53315395.00   49297380.00            

- 45 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit Rate (Rs.)
No Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 5A STRUCTURES (Culverts, Retaining Walls,
                       
Causeways)
107a Structural Excavation in Common Material m3 350.00 2700.00 945000.00 6668.40 2333940.00
7,256.00 2,539,600.00 1,716.56 600,796.00 8,972.56 3,140,396.00
Structural Excavation in Common Material Below
107bi m3 350.00 1350.00 472500.00 0.00 0.00 0  
Water Level - - - -
107ci Structural Excavation in Hard Rock Material m3 680.00 1350.00 918000.00 4270.00 2903600.00 4051.58 6359.81
2,755,074.40 2,308.23 1,569,596.40 4,324,670.80
107cii Structural Excavation in Medium Rock Material m3 400.00 1350.00 540000.00 0.00 0.00 0  
- - - -
107ciii Structural Excavation in Soft Rock Material m3 380.00 1753.00 666140.00 0.00 0.00 0  
- - - -
107d Granular Backfill m3 1000.00 874.00 874000.00 6005.30 6005300.00 0  
- - - -
107e Common Backfill m3 500.00 8737.00 4368500.00 3513.00 1756500.00 0  
- - - -
Concrete Class-A Underground or Elevated (210
401a m3 8300.00 5828.00 48372400.00 643.80 5343540.00 33.701 137.98
Kg/Cm2 of 28 Days Cylinder Strength) 279,718.30 104.28 865,515.70 1,145,234.00
Concrete Class-B (170 Kg/Cm2 of 28 Days Cylinder
401b m3 6400.00 151.00 966400.00 513.10 3283840.00 14.89 42.55
Strength) 95,296.00 27.66 177,024.00 272,320.00
Lean Concrete (100 Kg/Cm2 of 28 Days Cylinder
401f m3 4500.00 1350.00 6075000.00 5344.70 24051150.00 3256 3741.9
Strength) 14,652,000.00 485.90 2,186,550.00 16,838,550.00
404b Reinforcement as per AASHTO M31 Grade 60 Ton 105000.00 102.00 10710000.00 25.00 2625000.00 0 14.75
- 14.75 1,548,750.00 1,548,750.00
Premoulded Joint Filler 12mm Thick with Bitumastic
406a m2 70.00 1283.00 89810.00 1283.00 89810.00 0  
Joint Seal - - - -
SIW-8 Provide PVC Pipe 76mm dia m 300.00 803.00 240900.00 5495.00 1648500.00 2312 2862.52
693,600.00 550.52 165,156.00 858,756.00
410 Brick Work m3 10000.00 144.00 1440000.00 0.00 0.00 0  
- - - -
411a Stone Masonry Random Dry m3 2100.00 486.00 1020600.00 5475.80 11499180.00 170.08 2668.79
357,168.00 2,498.71 5,247,291.00 5,604,459.00
411b Stone Masonry Random with Mortar m3 2250.00 10014.00 22531500.00 11550.20 25987950.00 11399.66 12468.29
25,649,235.00 1,068.63 2,404,417.50 28,053,652.50
412a Stone Masonry Dressed Course with Mortar m3 2490.00 3464.00 8625360.00 2053.00 5111970.00 416.29 1004.67
1,036,562.10 588.38 1,465,066.20 2,501,628.30
411g Roll Pointing m2 150.00 1134.00 170100.00 4400.00 660000.00 416.29 5564.38
62,443.50 5,148.09 772,213.50 834,657.00
SIW-9 Cement Sand Plaster (1:3) m2 350.00 324.00 113400.00 0.00 0.00 0        
-
Non 3
Plum Concrete m 5358.00 0.00 0.00 7049.00 37768542.00 6013 32217654 22 117876 6035 32335530
BOQ
Total of Bill No. 5A C/O to Summary 109139610.00   131068822.00   80338351.30   17120252.30   97458603.60

- 46 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit Rate (Rs.)
No Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 5B BRIDGES                        
107a Structural Excavation in Common Material m3 350.00 44.40 15540.00 144.00 50400.00            
Structural Excavation in Common Material 3
107b m 400.00 44.40 17760.00 0.00 0.00            
Below Water Level
107c Structural Excavation in Rock Material m3 680.00 355.16 241508.80 144.00 97920.00
144.00 97,920.00 102.00 69,360.00 246.00 167,280.00
107d Granular Backfill m3 1000.00 123.87 123870.00 60.00 60000.00      
- - -
107e Common Backfill m3 800.00 123.87 99096.00 181.00 144800.00      
- - -
Concrete Class-A Underground, On
401a
Ground or Elevated (210 Kg/Cm2 of 28 m 3
8500.00 248.44 2111740.00 211.00 1793500.00
(I,ii,iii) 33.70 286,450.00 108.79 924,681.00 142.49 1,211,131.00
Days Cylinder Strength)
Concrete Class-A3 Underground
401a3
Onground or Elevated (210 Kg/Cm2 of 28 m3 15050.00 55.52 835576.00 34.38 517419.00  
(I,ii,iii) - 26.82 403,641.00 26.82 403,641.00
Days Cylinder Strength)
Lean Concrete (100 Kg/Cm2 of 28 Days 3
401f m 8050.00 9.64 77602.00 15.19 122279.50
Cylinder Strength) 3.75 30,187.50 11.44 92,092.00 15.19 122,279.50
Reinforcement as per AASHTO M31
404b Ton 110000.00 30.40 3344000.00 25.18 2769580.00
Grade 60 9.70 1,067,000.00 8.21 902,880.00 17.91 1,969,880.00
Premoulded Joint Filler 25mm Thick with
406a m2 1100.00 3.20 3520.00 0.00 0.00      
Bitumastic Joint Seal - - -
406c Steel Expansion Joint Kg 200.00 511.20 102240.00 511.00 102200.00      
- - -
Providing Elastomeric Bearing Pad
406e cm3 10.00 43470.00 434700.00 43470.00 434700.00  
(according to Size and Thickness) - 43,470.00 434,700.00 43,470.00 434,700.00
Provide and Fix Drainage G.I Pipe 100mm
SIW-6(a) m 4000.00 3.00 12000.00 3.00 12000.00      
in Bridge Deck Slab including Accessories - - -
Provide and Fix Drainage PVC Pipe
SIW-6(b) 150mm in Bridge Deck Slab including m 5000.00 50.00 250000.00 50.00 250000.00            
Accessories
Total of Bill No. 5B C/O to Summary 7669152.80   6,354,799   1,481,557.50   2,827,354.00   4,308,911.50

- 47 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Rate Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit
No (Rs.) Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 6 DRAINAGE AND EROSION WORKS                        

107a Structural Excavation in Common Material m3 350.00 138.00 48300.00 852.00 298200.00     28.896 10113.6 28.896
10,113.60
Structural Excavation in Common Material
107b m3 400.00 28.00 11200.00 0.00 0.00          
Below Water Level -
107c Structural Excavation in Rock Material m3 680.00 386.00 262480.00 1278.00 869040.00     16.532 11241.76 16.532
11,241.76
107d Granular Backfill m3 1000.00 17.00 17000.00 40.95 40950.00        
- -
107e Common Backfill m3 800.00 157.00 125600.00 41.00 32800.00        
- -
AASHTO M 170 Class-II Reinforced Concrete
501e m3                  
Pipe - -
  (i) Diameter 610mm m 10100.00 66.00 666600.00 127.00 1282700.00     38.895 392839.5 38.895
392,839.50
  (ii) Diameter 760mm m 15200.00 170.00 2584000.00 37.00 562400.00 27 410400    
- -
Granular Material in Bed to Concrete Pipe
502a m3 1000.00 74.00 74000.00 74.00 74000.00        
Culvert - -
Concrete Class-B in Bedding and
502b m3 10100.00 44.00 444400.00 74.00 747400.00     54.429 549732.9 54.429
Encasement of Concrete Pipe Culvert 549,732.90
507a Steel Wire Mesh for Gabions Kg 500.00 396.00 198000.00 50.00 25000.00        
- -
507b Rock fill in Gabions m2 1700.00 248.00 421600.00 30.00 51000.00        
- -
509a Rip Rap Class-A m3 2000.00 258.00 516000.00 258.00 516000.00        
- -
509b Rip Rap Class-b m3 2050.00 108.00 221400.00 108.00 221400.00        
- -
509e Grouted Rip Rap Class-B m3 2050.00 51.00 104550.00 51.00 104550.00        
- -
509h Filter Layer of Granular Material m3 850.00 96.00 81600.00 96.00 81600.00        
- -
510 Dismantling of Structures and Obstructions m3 600.00 223.00 133800.00 150.00 90000.00 96.157 0 96.157
57,694.20 - 57,694.20
SIW- Unlined Water Courses, Cross Sectional area
m 550.00 480.00 264000.00 480.00 264000.00          
4(a) not exceeding 1.5m2 -
SIW-
25mm Dia G.I Pipes m 550.00 173.00 95150.00 173.00 95150.00          
5(a) -
511a Dry Stone Pitching (Hand Packed Stone) m3 1050.00 120.00 126000.00 120.00 126000.00            

411b Stone Masonry Random with Mortar m3 2600.00 60.00 156000.00 3.00 7800.00            
Lean Concrete (100 Kg/Cm2 of 28 Days 3
401f m 8050.00 10.00 80500.00 25.00 201250.00            
Cylinder Strength)
Total of Bill No. 6 C/O to Summary       6632180.00   5691240.00   468,094.20   963,927.76   1,021,621.96

- 48 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-II KM 08+500 TO 17+015) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE- 2011
Item Rate Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Description Unit
No (Rs.) Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.
Bill No. 7 ANCILLARY WORKS                        
601dii Concrete Kerbs in place, Single Face m 980.00 675.00 661500.00 0.00 0.00            

604a Metal Beam Guard Rail m 1050.00 1500.00 1575000.00 200.00 210000.00            

604b Guard Rail End Pieces Each 1450.00 200.00 290000.00 20.00 29000.00            

604d Steel Post for Guard Rail Each 2000.00 806.00 1612000.00 120.00 240000.00            

607a Traffic Road Sign Category 1 Each 5000.00 99.00 495000.00 80.00 400000.00            

607b Traffic Road Sign Category 2 Each 6000.00 49.00 294000.00 40.00 240000.00            

607c Traffic Road Sign Category 3(a) Each 7000.00 45.00 315000.00 25.00 175000.00            

607d Traffic Road Sign Category 3(b) Each 8000.00 18.00 144000.00 12.00 96000.00            

607e Traffic Road Sign Category 3(c) Each 15000.00 4.00 60000.00 2.00 30000.00            
Pavement Marking in Reflective TP Paint for
608g m 110.00 3002.00 330220.00 0.00 0.00            
Lines of 12cm width
Pavement Marking in Reflective TP Paint for
608h2 m 100.00 18008.00 1800800.00 18008.00 1800800.00            
Lines of 15cm width
Pavement Marking in Reflective TP Paint for
608j2 Each 1150.00 13.00 14950.00 0.00 0.00            
Lines of 4.0M Arrows
610c Kilometre Post Each 25000.00 5.00 125000.00 0.00 0.00            

Total of Bill No. 7 C/O to Summary 7717470   3220800.00            

Total Bill No. 2, 3, 4 5A, 5B, 6 & 7 332520533.80   429,769,741   225,270,290.62   57,951,994.23   283,222,284.85

- 49 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011

Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 2 EARTH WORK                        


101 Cleaning and Grubbing m2 0.50 4825.00 2412.50 0.00 0.00    
- - - -
103 Stripping m3 10.00 1030.00 10300.00 0.00 0.00    
- - - -
104 Compaction of Natural Ground m2 30.00 32344.00 970320.00 0.00 0.00    
- - - -
106c Excavate Surplus Common Material m3 300.00 42011.00 12603300.00 39758.00 11927400.00 33,268.90
9,980,670.00 - - 33,268.90 9,980,670.00
106di Excavate Surplus Hard Rock Material m3 600.00 21006.00 12603600.00 143185.00 85911000.00
133,178.71 79,907,226.00 - - 133,178.71 79,907,226.00
106dii Excavate Surplus Medium Rock Material m3 450.00 21006.00 9452700.00 0.00 0.00
- - - - - -
106diii Excavate Surplus Soft Rock Material m3 400.00 21006.00 8402400.00 0.00 0.00
- - - - - -
106c Excavate Surplus Common Material m3 300.00       0.00
3,162.00 948,600.00 - - 3,162.00 948,600.00
106di Excavate Surplus Hard Rock Material m3 600.00       0.00
27,105.00 16,263,000.00 - - 27,105.00 16,263,000.00
106dii Excavate Surplus Medium Rock Material m3 450.00       0.00      
- - -
106diii Excavate Surplus Soft Rock Material m3 400.00       0.00      
- - -
Formation of embankment from Roadway 3
108a m 350.00 9082.00 3178700.00 19607.80 6862730.00    
Excavation in Common Material - - - -
Formation of embankment from Roadway
108bi m3 800.00 5265.00 4212000.00 16630.70 13304560.00    
Excavation in Hard Rock Material - - - -
Formation of embankment from Roadway
108bii m3 600.00 3510.00 2106000.00 2000.00 1200000.00    
Excavation in Medium Rock Material - - - -
Formation of embankment from Roadway
108biii m3 550.00 1755.00 965250.00 2000.00 1100000.00    
Excavation in Soft Rock Material - - - -
Formation of embankment from Borrow
108c m3 1000.00 294.00 294000.00 294.00 294000.00    
Excavation - - - -
109a Sub-grade Preparation in Earth cut m2 80.00 8036.00 642880.00 57900.00 4632000.00
55,046.61 4,403,728.80 - - 55,046.61 4,403,728.80
109b Sub-grade Preparation in Existing Road m2 100.00 8036.00 803600.00 0.00 0.00            
Total of Bill No. 2 C/O to Summary 56247462.50   125,231,690   111,503,224.80   -   111,503,224.80

- 50 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011

Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 3 SUB-BASE AND BASE COURSES                        


201 Granular Sub-base m3 1200.00 11687.00 14024400.00 8919.03 10702840.80
6,365.15 7,638,180.00 3,837.75 4,605,300.00 10,202.90 12,243,480.00
202 Aggregate Base Course m3 2000.00 9819.00 19638000.00 6500.00 13000000.00 682
1,364,000.00 - - 682.00 1,364,000.00
203b Asphaltic Base Course Plant Mix Class-B m3 15000.00 2699.00 40485000.00 3253.00 48795000.00    
- - - -
209A Breaking of Existing Road Pavement Structures m3 1000.00 74.00 74000.00 0.00 0.00    
- - - -
209b Scarification of Existing Road Pavement m2 20.00 18190.00 363800.00 18190.00 363800.00 12958 12958 259160
259,160.00 - -
  Total of Bill No. 3 C/O to Summary       74585200.00   72,861,641   9,261,340.00   4,605,300   13,866,640
Bill No. 4 SURFACING                        
302 Bituminous Prime Coat m2 40.00 59276.00 2371040.00 40748.00 1629920.00            
303 Bituminous Tack Coat m2 50.00 53593.00 2679650.00 38111.00 1905550.00            
305b Asphaltic Concrete for Wearing Course Class-B m3 16000.00 2738.00 43808000.00 2030.00 32480000.00            
304b Double Surface Treatment m2 300.00 8814.00 2644200.00 5777.00 1733100.00            
Total of Bill No. 4 C/O to Summary 51502890.00   37,748,570            

- 51 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011

Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 5A STRUCTURES (Culverts, Retaining Walls,


                       
Causeways)
3
107a Structural Excavation in Common Material m 300.00 2254.00 676200.00 9323.00 2796900.00
5,347.81 1,604,343.60 1,584.75 475,423.52 6,932.56 2,079,767.12
Structural Excavation in Common Material Below
107bi m3 300.00 1127.00 338100.00 0.00 0.00      
Water Level - - -
107ci Structural Excavation in Hard Rock Material m3 700.00 1127.00 788900.00 5974.00 4181800.00
6,463.00 4,524,100.00 576.51 403,556.06 7,039.51 4,927,656.06
107cii Structural Excavation in Medium Rock Material m3 400.00 1127.00 450800.00 0.00 0.00      
- - -
107ciii Structural Excavation in Soft Rock Material m3 400.00 1591.00 636400.00 0.00 0.00      
- - -
107d Granular Backfill m3 1000.00 575.00 575000.00 1766.24 1766240.00  
3,974.00 3,974,000.00 - 3,974.00 3,974,000.00
107e Common Backfill m3 500.00 5753.00 2876500.00 3550.00 1775000.00  
1,399.00 699,500.00 - 1,399.00 699,500.00
Concrete Class-A Underground or Elevated (210
401a m3 8000.00 6200.00 49600000.00 1085.00 8680000.00 12.91
Kg/Cm2 of 28 Days Cylinder Strength) 103,280.00 17.59 140,720.00 12.91 103,280.00
Concrete Class-B (170 Kg/Cm2 of 28 Days Cylinder
401b m3 5800.00 131.00 759800.00 0.00 0.00
Strength) 528.00 3,062,400.00 11.82 68,527.00 528.00 3,062,400.00
Lean Concrete (100 Kg/Cm2 of 28 Days Cylinder
401f m3 4500.00 1176.00 5292000.00 3692.00 16614000.00 1677.14
Strength) 7,547,130.00 680.43 3,061,922.23 1,677.14 7,547,130.00
404b Reinforcement as per AASHTO M31 Grade 60 Ton ###### 86.00 8600000.00 15.00 1500000.00 1.7 1.7
170,000.00 3.52 351,700.00 170,000.00
Premoulded Joint Filler 12mm Thick with Bitumastic
406a m2 50.00 791.00 39550.00 0.00 0.00    
Joint Seal - - - -
SIW-8 Provide PVC Pipe 76mm dia m 300.00 496.00 148800.00 3000.00 900000.00 456 456
136,800.00 - - 136,800.00
410 Brick Work m3 10000.00 132.00 1320000.00 0.00 0.00    
- - - -
411a Stone Masonry Random Dry m3 2000.00 429.00 858000.00 120.00 240000.00
2,605.00 5,210,000.00 - - 2,605.00 5,210,000.00
411b Stone Masonry Random with Mortar m3 2200.00 9359.00 20589800.00 24948.00 54885600.00 9468.000
20,829,600.00 3,278.58 7,212,876.97 12,746.580 28,042,476.97
412a Stone Masonry Dressed Course with Mortar m3 2400.00 3234.00 7761600.00 2000.00 4800000.00 302.19
302.19 725,256.00 195.88 470,113.96 725,256.00
411g Roll Pointing m2 100.00 1078.00 107800.00 1663.00 166300.00 1102
1,102.00 110,200.00 - - 110,200.00
SIW-9 Cement Sand Plaster (1:3) m2 300.00 343.00 102900.00 0.00 0.00    
- - - -
non
Plum Concerete Cum 5358.00 0.00 0.00 15000.00 80370000.00
BOQ 6,589.42 35,306,112.36 3,757.18 20,130,970.44 10,346.60 55,437,082.80
Total of Bill No. 5A C/O to Summary 101522150.00   178,675,840   84002721.96   32315810.18   112225548.95

- 52 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011

Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 5B BRIDGES                        


107a Structural Excavation in Common Material m3 300.00 146.61 43983.00 146.61 43983.00
67.00 20,100.00 - - 67.00 20,100.00
Structural Excavation in Common Material
107b m3 400.00 146.61 58644.00 0.00 0.00    
Below Water Level - - - -
107c Structural Excavation in Rock Material m3 700.00 1172.90 821030.00 1172.90 821030.00
697.00 487,900.00 - - 697.00 487,900.00
107d Granular Backfill m3 1000.00 434.74 434740.00 434.74 434740.00    
- - - -
107e Common Backfill m3 800.00 434.74 347792.00 434.74 347792.00    
- - - -
Concrete Class-A Underground, On Ground
401a
or Elevated (210 Kg/Cm2 of 28 Days m 3
8200.00 717.93 5887026.00 530.00 4346000.00 14.72
(I,ii,iii) 120,704.00 100.42 823,456.10 115.14 944,160.10
Cylinder Strength)
Concrete Class-A3 Underground Onground
401a3
or Elevated (210 Kg/Cm2 of 28 Days m 3
15000.00 136.26 2043900.00 65.00 975000.00    
(I,ii,iii) - - - -
Cylinder Strength)
Lean Concrete (100 Kg/Cm2 of 28 Days
401f m3 8000.00 22.74 181920.00 16.00 128000.00 8.6 8.6
Cylinder Strength) 68,800.00 - - 68,800.00
Reinforcement as per AASHTO M31 Grade
404b Ton ###### 85.42 11104600.00 53.00 6890000.00
60 8.06 1,047,800.00 10.96 1,424,670.00 19.02 2,472,470.00
Premoulded Joint Filler 25mm Thick with
406a m2 1000.00 6.05 6050.00 6.05 6050.00    
Bitumastic Joint Seal - - - -
406c Steel Expansion Joint Kg 100.00 968.40 96840.00 968.40 96840.00    
- - - -
Providing Elastomeric Bearing Pad
406e cm3 5.00 86940.00 434700.00 86940.00 434700.00    
(according to Size and Thickness) - - - -
Provide and Fix Drainage G.I Pipe 100mm
SIW-6(a) m 3000.00 6.50 19500.00 6.50 19500.00    
in Bridge Deck Slab including Accessories - - - -
Provide and Fix Drainage PVC Pipe 150mm
SIW-6(b) m 3000.00 140.00 420000.00 140.00 420000.00    
in Bridge Deck Slab including Accessories - - - -
Total of Bill No. 5B C/O to Summary 21900725.00   14,963,635   1,745,304.00   2,248,126.10   3,993,430.10

- 53 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011

Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 6 DRAINAGE AND EROSION WORKS                        


107a Structural Excavation in Common Material m3 300.00 123.00 36900.00 123.00 36900.00 160 160
48,000.00 - - 48,000.00
Structural Excavation in Common Material
107b m3 400.00 25.00 10000.00 0.00 0.00    
Below Water Level - - - -
107c Structural Excavation in Rock Material m3 700.00 343.00 240100.00 109.00 76300.00 323 323
226,100.00 - - 226,100.00
107d Granular Backfill m3 1000.00 17.00 17000.00 17.00 17000.00    
- - - -
107e Common Backfill m3 800.00 147.00 117600.00 147.00 117600.00    
- - - -
AASHTO M 170 Class-II Reinforced Concrete
501e m3     0.00        
Pipe - - - -
  (i) Diameter 610mm m 10000.00 98.00 980000.00 33.00 330000.00    
- - - -
  (ii) Diameter 760mm m 15000.00 142.00 2130000.00 154.90 2323500.00 102.9
82.50 1,237,500.00 21.56 323,400.00 1,543,500.00
Granular Material in Bed to Concrete Pipe
502a m3 1000.00 64.00 64000.00 0.00 0.00    
Culvert - - - -
Concrete Class-B in Bedding and Encasement
502b m3 10000.00 37.00 370000.00 310.00 3100000.00 95.28 95.28
of Concrete Pipe Culvert 952,800.00 20.73 207,310.78 952,800.00
507a Steel Wire Mesh for Gabions Kg 400.00 2587.00 1034800.00 0.00 0.00    
- - - -
507b Rock fill in Gabions m2 1200.00 1617.00 1940400.00 0.00 0.00    
- - - -
509a Rip Rap Class-A m3 1500.00 221.00 331500.00 221.00 331500.00      
- - -
509b Rip Rap Class-b m3 2000.00 12.25 24500.00 121.00 242000.00      
- - -
509e Grouted Rip Rap Class-B m3 2000.00 49.00 98000.00 349.00 698000.00      
- - -
509h Filter Layer of Granular Material m3 800.00 78.40 62720.00 61.00 48800.00      
- - -
510 Dismantling of Structures and Obstructions m3 500.00 183.75 91875.00 0.00 0.00      
- - -
SIW- Unlined Water Courses, Cross Sectional area
m 500.00 490.00 245000.00 0.00 0.00      
4(a) not exceeding 1.5m2 - - -
SIW-
25mm Dia G.I Pipes m 500.00 147.00 73500.00 147.00 73500.00      
5(a) - - -
511a Dry Stone Pitching (Hand Packed Stone) m3 1000.00 98.00 98000.00 50.00 50000.00      
- - -
411b Stone Masonry Random with Mortar m3 2500.00 49.00 122500.00 49.00 122500.00      
- - -
Lean Concrete (100 Kg/Cm2 of 28 Days
401f m3 8000.00 7.84 62720.00 0.00 0.00            
Cylinder Strength)
Total of Bill No. 6 C/O to Summary       8151115.00   7,567,600   2,464,400.00   530,710.78   2,770,400.00

- 54 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-III KM 17+015 TO 25+000) IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE-2011

Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 7 ANCILLARY WORKS                        


601dii Concrete Kerbs in place, Single Face m 1000.00 662.00 662000.00 0.00 0.00            
604a Metal Beam Guard Rail m 1000.00 1470.00 1470000.00 1770.00 1770000.00            
604b Guard Rail End Pieces Each 1500.00 196.00 294000.00 198.00 297000.00            
604d Steel Post for Guard Rail Each 2000.00 790.00 1580000.00 1135.00 2270000.00            
607a Traffic Road Sign Category 1 Each 5000.00 97.00 485000.00 80.00 400000.00            
607b Traffic Road Sign Category 2 Each 5000.00 48.00 240000.00 40.00 200000.00            
607c Traffic Road Sign Category 3(a) Each 5000.00 44.00 220000.00 20.00 100000.00            
607d Traffic Road Sign Category 3(b) Each 5000.00 17.00 85000.00 17.00 85000.00            
607e Traffic Road Sign Category 3(c) Each 15000.00 4.00 60000.00 3.00 45000.00            
Pavement Marking in Reflective TP Paint for
608g m 100.00 2941.00 294100.00 0.00 0.00            
Lines of 12cm width
Pavement Marking in Reflective TP Paint for
608h2 m 70.00 17647.35 1235314.50 17000.00 1190000.00            
Lines of 15cm width
Pavement Marking in Reflective TP Paint for
608j2 Each 1125.00 12.00 13500.00 0.00 0.00            
Lines of 4.0M Arrows
610c Kilometre Post Each 20000.00 3.00 60000.00 0.00 0.00            

Total of Bill No. 7 C/O to Summary 6698914.5   6,357,000            

Total Bill No. 2, 3, 4 5A, 5B, 6 & 7 320608457   443,405,976   208,976,990.76   39,699,947.06   244,359,243.84

- 55 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-IV KM 25+000 TO 33+502) IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE - 2011
Revised Bill of Quantities
Bill of Quantities BOQ Previous Month This Month To - Date
BOQ
Item Rate
Description Unit
No (Rs.) Amount
Quantity Amount Rs. Quantity Amount Rs. Quantity Quantity Amount Rs. Quantity Amount Rs.
Rs.

Bill No. 2 EARTH WORK                        


101 Cleaning and Grubbing m2 1 5022 2511 0 0            
103 Stripping m3 10 1072 10720 0 0            
104 Compaction of Natural Ground m2 30 33664 1009920 0 0            
106c Excavate Surplus Common Material m3 300 43726 13117800 63028 18908400 63181 18954389 0 0 63181 18954389
106di Excavate Surplus Hard Rock Material m3 600 21863 13117800 236732 142039200 192847 115708006 -7922 -4753200 184925 110954806

106dii Excavate Surplus Medium Rock Material m3 450 21863 9838350 6861 3087450 6028 2712758 0 0 6028 2712758

106diii Excavate Surplus Soft Rock Material m3 400 21863 8745200 5563 2225200 7501 3000573 0 0 7501 3000573
106c Excavate Surplus Common Material m4 300       0 4103 1231014 0 0 4103 1231014

106di Excavate Surplus Hard Rock Material m5 600       0 46823 28093675 0 0 46823 28093675

106dii Excavate Surplus Medium Rock Material m6 450       0 364 163901 0 0 364 163901

106diii Excavate Surplus Soft Rock Material m7 400       0 429 171496 0 0 429 171496

Formation of embankment from Roadway


108a m3 350 9452 3308200 23165 8107750 4200 1470000 0 0 4200 1470000
Excavation in Common Material

Formation of embankment from Roadway


108bi m3 800 5480 4384000 19299 15439200   0 0 0   0
Excavation in Hard Rock Material

Formation of embankment from Roadway


108bii m3 600 3653 2191800 3972 2383200   0 0 0   0
Excavation in Medium Rock Material

Formation of embankment from Roadway


108biii m3 550 1827 1004850 2040 1122000   0 0 0   0
Excavation in Soft Rock Material
Formation of embankment from Borrow
108c m3 1000 306 306000 306 306000   0 0 0   0
Excavation
109a Sub-grade Preparation in Earth cut m2 80 8364 669120 22250 1780000 22211 1776900 0 0 22211 1776900

109b Sub-grade Preparation in Existing Road m2 100 8364 836400 500 50000            

Total of Bill No. 2 C/O to Summary 58542671   195448400   173282712   -4753200   168529512

- 56 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-IV KM 25+000 TO 33+502) IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE - 2011
Revised Bill of Quantities
Bill of Quantities BOQ Previous Month This Month To - Date
BOQ
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 3 SUB-BASE AND BASE COURSES                        

201 Granular Sub-base m3 1200 12164 14596800 10973 13167600 6658 7989600 0 0 6658 7989600
202 Aggregate Base Course m3 2000 10220 20440000 10040 20080000 3048 6096000 512 1024000 3560 7120000
203b Asphaltic Base Course Plant Mix Class-B m3 15000 2809 42135000 4274 64110000   0 0 0   0
Breaking of Existing Road Pavement
209A m3 1000 77 77000 0 0   0 0 0   0
Structures
209b Scarification of Existing Road Pavement m2 20 18932 378640 18932 378640 1511 30225 0 0 1511 30225

  Total of Bill No. 3 C/O to Summary 77627440.00   97,736,240   14,115,825.00   1,024,000.00   15,139,825.00

Bill No. 4 SURFACING                        

302 Bituminous Prime Coat m2 40 61696 2467840 53159 2126350            


303 Bituminous Tack Coat m2 50 55780 2789000 50077 2503850            
Asphaltic Concrete for Wearing Course Class-
305b m3 16000 2850 45600000 2652 42432000            
B
304b Double Surface Treatment m2 300 9173 2751900 7902 2370600            

Total of Bill No. 4 C/O to Summary 53608740.00   49,432,800            

- 57 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-IV KM 25+000 TO 33+502) IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE - 2011
Revised Bill of Quantities
Bill of Quantities BOQ Previous Month This Month To - Date
BOQ
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 5 STRUCTURES (Culverts, Retaining Walls, Causeways)                  

107a Structural Excavation in Common Material m3 300 2346 703800 16191 4857300 8452 2535600 4277 1283172 12729 3818772
Structural Excavation in Common Material
107bi m3 300 1173 351900 0 0 0 0 0 0   0
Below Water Level
107ci Structural Excavation in Hard Rock Material m3 700 1173 821100 5229 3660300 8654 6057464 610 426977 9263 6484441
Structural Excavation in Medium Rock
107cii m3 400 1173 469200 2260 904000 73 29300 0 0 73 29300
Material

107ciii Structural Excavation in Soft Rock Material m3 400 1656 662400 0 0 117 46856 0 2 117 46858

3
107d Granular Backfill m 1000 599 599000 2180 2180000 607 606740 0 0 1231 1231068
107e Common Backfill m3 500 5987 2993500 2553 1276250 0 0 0 0 0 0
Concrete Class-A Underground or Elevated
401a m3 8000 6453 51624000 2322 18576000 28 224880 0 30 28 224910
(210 Kg/Cm2 of 28 Days Cylinder Strength)
Concrete Class-B (170 Kg/Cm2 of 28 Days
401b m3 5800 137 794600 338 1960400 47 271092 0 13 47 271105
Cylinder Strength)
Lean Concrete (100 Kg/Cm2 of 28 Days 3
401f m 5800 1224 7099200 7318 42443240 3032 17587282 580 3362318 3612 20949600
Cylinder Strength)
Reinforcement as per AASHTO M31 Grade
404b Ton 100000 90 9000000 11 1100000 4 403000 0 400 4 403400
60
Premoulded Joint Filler 12mm Thick with 2
406a m 50 824 41200 824 41200 0 0 0 0 0 0
Bitumastic Joint Seal
SIW-8 Provide PVC Pipe 76mm dia m 300 516 154800 8423 2526900 644 193278 0 -1 644 193277
410 Brick Work m3 10000 138 1380000 0 0 0 0 0 0 0 0
411a Stone Masonry Random Dry m3 2000 446 892000 1845 3690000 1602 3203520 114 227014 1715 3430534
411b Stone Masonry Random with Mortar m3 2200 9741 21430200 48872 107518400 8933 19652402 8713 19169578 17646 38821980
412a Stone Masonry Dressed Course with Mortar m3 2400 3366 8078400 1872 4492800 159 381744 0 1198 160 382942
411g Roll Pointing m2 100 1122 112200 4170 417000 1404 140406 -825 -82500 579 57906
SIW-9 Cement Sand Plaster (1:3) m2 300 357 107100 0 0 0     0 0 0
Non
Plum Concrete Cum 5358 0 0 27499 147339500 20092 107651597 1112 5959436 21204 113611032
BOQ

Total of Bill No. 5A C/O to Summary 107,314,600   342,983,290   158,985,161   30,347,637   189,957,125

- 58 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-IV KM 25+000 TO 33+502) IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE - 2011
Revised Bill of Quantities
Bill of Quantities BOQ Previous Month This Month To - Date
BOQ
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 6 DRAINAGE AND EROSION WORKS                        

107a Structural Excavation in Common Material m3 300 128 38400 128 38400 81 24366 55 16518 136 40884

Structural Excavation in Common Material


107b m3 400 26 10400 0 0 0 0 0 0 0  
Below Water Level
107c Structural Excavation in Rock Material m3 700 357 249900 986 690200 348 243887 49 34291 397 278178
107d Granular Backfill m3 1000 18 18000 18 18000 0 0 0 0 0 0
107e Common Backfill m3 800 153 122400 153 122400 0 0 0 0 0 0
AASHTO M 170 Class-II Reinforced Concrete
501e m3     0 0 0 0 0 0 0 0 0
Pipe
  (i) Diameter 610mm m 10000 102 1020000 44 440000 0 0 0 0 0 0
  (ii) Diameter 760mm m 15000 148 2220000 166 2490000 128 1921500 0 0 128 1921500
Granular Material in Bed to Concrete Pipe
502a m3 1000 66 66000 0 0 0 0 0 0 0 0
Culvert
Concrete Class-B in Bedding and Encasement 3
502b m 10000 38 380000 305 3050000 216 2163700 0 0 216 2163700
of Concrete Pipe Culvert
507a Steel Wire Mesh for Gabions Kg 400 2693 1077200 0 0   0 0 0 0  
507b Rock fill in Gabions m2 1200 1683 2019600 0 0   0 0 0 0  
509a Rip Rap Class-A m3 1500 230 345000 230 345000   0 0 0 0  
509b Rip Rap Class-b m3 2000 13 26000 176 352000   0 0 0 0  
509e Grouted Rip Rap Class-B m3 2000 51 102000 300 600000   0 0 0 0  
509h Filter Layer of Granular Material m3 800 82 65600 0 0   0 0 0 0  
510 Dismantling of Structures and Obstructions m3 500 191 95500 0 0   0 0 0 0  
SIW- Unlined Water Courses, Cross Sectional area
m 500 510 255000 510 255000   0 0 0 0  
4(a) not exceeding 1.5m2
SIW-
25mm Dia G.I Pipes m 500 153 76500 153 76500   0 0 0 0  
5(a)
511a Dry Stone Pitching (Hand Packed Stone) m3 1000 102 102000 190 190000   0 0 0 0  
411b Stone Masonry Random with Mortar m3 2500 51 127500 67 167500   0 0 0 0  
Lean Concrete (100 Kg/Cm2 of 28 Days
401f m3 8000 8 64000 8 64000 8 60000 0 0 8 60000
Cylinder Strength)

Total of Bill No. 6 C/O to Summary       8481000.00   08,899,000   4413453.00   50,808.51   4,464,261.51

- 59 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
(LOT-IV KM 25+000 TO 33+502) IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
MONTHLY FINANCIAL PROGRESS
UPTO JUNE - 2011
Bill of Quantities BOQ Revised Bill of Quantities BOQ Previous Month This Month To - Date
Item Rate
Description Unit
No (Rs.)
Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs. Quantity Amount Rs.

Bill No. 7 ANCILLARY WORKS                        

601dii Concrete Kerbs in place, Single Face m 1000 689 689000 0 0            


604a Metal Beam Guard Rail m 1000 1530 1530000 1830 1830000            
604b Guard Rail End Pieces Each 1500 204 306000 206 309000            
604d Steel Post for Guard Rail Each 2000 823 1646000 1197 2394000            
607a Traffic Road Sign Category 1 Each 5000 100 500000 80 400000            
607b Traffic Road Sign Category 2 Each 5000 50 250000 40 200000            
607c Traffic Road Sign Category 3(a) Each 5000 46 230000 20 100000            
607d Traffic Road Sign Category 3(b) Each 5000 18 90000 18 90000            
607e Traffic Road Sign Category 3(c) Each 15000 4 60000 2 30000            
Pavement Marking in Reflective TP Paint for
608g m 100 3062 306200 0 0            
Lines of 12cm width
Pavement Marking in Reflective TP Paint for
608h2 m 70 18368 1285760 17000 1190000            
Lines of 15cm width
Pavement Marking in Reflective TP Paint for
608j2 Each 1125 13 14625 0 0            
Lines of 4.0M Arrows
610c Kilometre Post Each 20000 3 60000 0 0            

Total of Bill No. 7 C/O to Summary 6967585   6,543,000            

Total Bill No. 2, 3, 4 5A, 5B, 6 & 7 312542036.00   701,042,730   350,797,150.00   26,669,245.25   378,090,722.75

Less Rebate @ 5 % (Rs) -15627101.80   -35052136.50   -17539857.50   -1333462.26   -18904536.14

GRAND TOTAL (Rs) 296,914,934   665,990,594   333,257,293   025,335,783   359,186,187

- 60 -
c. Bridges, Culverts & Causeways Details with Progress

- 61 -
c (i). Bridges

- 62 -
NATIONAL HIGHWAY AUTHORITY
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
IN DISTRICT SHANGAL, NWFP (LOAN 2213 PAK (SF)
LIST OF BRIDGES

Sr. Abutment
Deck
No LOTs Location Status Transom Girders Remarks
slab
.
A B

1 00+010 Both sides Extension 2 2 2 4 2 Deleted due Shortage of time

2 05+054 R/S Extension 2 2 2 3 1 Nil Progress


LOT - I

Excavation in progress for Foundation, Steel


3 05+925 New Construction 2 2 2 3 1
binding Completed for 3 no Girder
4 06+996 F/W Repair 0 0 0 4 1 Nil Progress
Exiting Exiting
5 10+763 Minor Repair   Exiting OK Exiting OK Parapet wall completed
OK OK
LOT - II

Steel Binding for 1 no Girder (Cost in Situ) In


6 15+045 R/S Extension Completed Completed Completed 3 1
progress & 2 no Girders completed
Exiting Exiting
7 16+495 Minor Repair Exiting OK Exiting OK Exiting OK Nil Progress
OK OK
In
8 20+115 R/S Extension Nil 2 3 1 Abutment up to 3 m Completed
LOT - III

Progress

9 21+682 L/S Extension Completed Completed Completed 3 1 Steel binding completed for 1 no Girder 

- 63 -
C (ii).Culverts

- 64 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
5 Pipe Culverts in Lot - I
Dia Length Lean Class - B
Location Status Excavation Backfill Remarks
S.No (M) (m) Concrete Pipe Concrete
1 00+451 Replace 0.61 10.00 √ √ √ √ √ Full Completed
L/S
2 00+773
Extension
0.61 3.66 √ √ √ √ √ Full Completed
3 00+858 Extension 0.61 2.82 √ √ √ √ √ Full Completed
4 00+959 Replace 0.61 11.10 √         Full Completed
5 01+622 New 0.76 10.00 √ √ √ √ √ Full Completed
L/S
6 02+221 0.61 2.50           Disputed
Extension
7 02+398     10.00           Full Completed
L/S
8 03+556
Extension
0.61 3.66 √ √ √ √ √ Full Completed
9 03+900 New 0.61 11.10 √ √ √ √ √ Full Completed
10 04+315 Replace 0.76 11.10           R/S Completed
11 04+490 New 0.76 11.10            
12 04+710 New 0.76 11.10 √         R/S Completed
13 05+176 New 0.76 11.10 √ √ √ √   Full Completed
14 05+325 New 0.61 11.00 √ √ √ √   Full Completed
15 06+200 New 0.76 11.00            
R/S
16 07+075 0.61 11.10 √ √ √ √   Full Completed
Extension
R/S
17 07+178 0.61 2.50 √ √ √ √ √ Full Completed
Extension
18 07+470 Replace 0.76 11.10 √ √ √ √ √ Full Completed
19 07+785 Replace 0.76 11.10 √ √ √ √ √ Full Completed
20 07+884 Replace 0.76 11.10 √ √ √ √ √ Full Completed
21 08+041 Replace 0.76 11.10 √ √       Full Completed
Total Length (m) 189.24            

- 65 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
3 SLAB CULVERTS IN LOT - II
Lean Concrete
Slab
S. Height Length Concrete Stone
Location Status Exc Coping Backfill Remarks
No (M) (m) Wing Masonry
Abutment Steel Concrete
wall
1 08+930 R/S Extension   4.00 √ √ √ √ √ √ √   Full Completed
2 09+300 New   10.00                  
3 09+830 R/S Extension   3.00 √ √ √ √ √ √ √   Full Completed
4 10+070 R/S Extension   4.00 √ √ √ √ √ √ √   Full Completed
5 10+475 New   10.00                  
6 11+070 R/S Extension   2.70 √ √ √ √ √ √ √   Full Completed
7 11+550 New   10.00                  
8 11+700 New   10.00                 L/S 5.0m completed
9 11+868 R/S Extension   2.00 √ √ √ √ √ √ √   Full Completed
10 12+104 New   11.00                 R/S Completed
11 12+266 R/S Extension   2.00 √ √ √ √          
12 12+575 Replace   10.00                 Washed area
13 12+958 R/S Extension   5.00 √ √ √ √ √ √ √   Full Completed
14 13+073 Replace 2.5 10.00 √ √ √ √ √ √ √   Full Completed
15 13+168 Replace 3 10.00 √ √ √ √ √ √ √ √ Full Completed
16 13+234 Replace   10.00                  
17 13+634 R/S Extension   4.50 √ √ √ √ √ √ √ √ Full Completed
18 13+947 R/S Extension   4.00 √ √ √ √ √ √ √ √ Full Completed
19 14+169 R/S Extension   6.00 √ √ √ √ √ √ √   Full Completed
20 14+370 New   10.00 √ √ √ √ √ √ √   Full Completed
21 15+237 New   10.00 √ √ √ √ √ √ √ √ Full Completed
22 15+535 R/S Extension   6.00 √                
23 15+756 R/S Extension   4.00 √                
24 15+945 Replace   10.00 √ √ √ √ √ √ √ √ Full Completed
25 16+885 R/S Extension   5.00 √ √ √ √ √ √ √ √ Full Completed
26 16+928 R/S Extension   3.00 √                
Total Length (m) 176.20                  

- 66 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
4 Pipe Culverts in Lot - II
Dia Length Lean Class - B
Location Status Excavation Backfill Remarks
S.No (M) (m) Concrete Pipe Concrete
1 08+750 New 0.60 10.00 √ √ √ √ √ Full Completed
R/S
2 08+661 Extension
0.60 4.00 √ √ √ √ √ Full Completed
3 09+080 New 0.60 10.00 √ √ √ √ √ Full Completed
4 09+657 New   10.00 √ √ √ √ √ Full Completed
R/S
5 09+770
Extension
0.60 3.00 √ √ √ √ √ Full Completed
R/S
6 10+871
Extension
0.60 2.00 √ √ √ √ √ Full Completed
R/S
7 11+000
Extension
0.60 2.00           Existing Culvert is OK
R/S
8 13+494
Extension
0.60 4.00 √ √ √ √ √ Full Completed
R/S
9 13+534
Extension
0.60 4.00 √ √ √ √ √ Full Completed
R/S
10 14+288
Extension
0.60 3.00            
11 14+515 Replaced 0.60 10.00            
R/S
12 15+625 0.60 3.50            
Extension
R/S
13 16+190 0.60 3.00 √ √ √ √ √ Full Completed
Extension
R/S
14 16+275 0.60 3.00            
Extension
R/S
15 16+368 0.60 1.50            
Extension
16 16+422 Proposed 0.60 10.00 √ √ √ √ √ Full Completed
R/S
17 16+717
Extension
0.60 1.00            
Total Length (m) 74.00            

- 67 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD NHA (N-90)
3 SLAB CULVERTS IN LOT - III
Lean
Heigh Slab
Locatio Span Length Concrete Stone
Sr Status t Exc Coping Backfill Remarks
n (M) (m) Wing Masonry
(M) Abutment Steel Concrete
wall
1 17+075 R/S Ext 1 1.5 4.00 √ √ √ √         In Progress
1 17+075 R/S Ext 1 1.5 4.00 √ √ √ √ √ √ √   Full Completed
2 17+550 R/S Ext 2 2.75 4.50 √ √ √ √ √ √ √   Full Completed
in
3 17+825 L/S Ext 3 9 4.50 √ √ √ progress          
4 18+000 New 1.8 1.6 12.00 √ √ √           Full Completed
5 18+045 R/S Ext 1.7 2 4.50 √ √ √ √ √ √ √   Full Completed
in
6 18+311 New 1 1.75 11.00 √ √ √ progress         R/Side Completed
7 19+110 R/S Ext 1 1 2.50 √ √ √ √ √ √ √   Full Completed
8 21+130 New 2 2 11.00                 Washed Area
9 21+900 New 1.5 1.5 11.00                 Washed Area
1
22+445 New 3 3 11.00 √ √ √ √ √ √ √   Full Completed
0
Total Length (m) 76.00                  

- 68 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD NHA (N-90)
4 Pipe Culverts in Lot - III
Dia Length Lean Class - B
Location Status Excavation Backfill Remarks
S.No (M) (m) Concrete Pipe Concrete
1 17+187 New 0.76 11.00 √ √ √ √ √ Full width Completed
2 17+737 New 0.76 11.00 √ √ √ √ √ Full width Completed
3 18+100 New 0.76 11.00 √ √ √ √ √ Full width Completed
4 18+787 New 0.76 11.00 √ √ √ √ √ Full width Completed
5 19+000 New 0.76 11.00 √ √ √ √ √ Full width Completed
6 19+809 New 0.76 11.00 √ √ √ √ √ Full width Completed
7 20+375 New 0.76 11.00 √ √ √ √ √ Full width Completed
8 20+635 New 0.76 11.00 √ √ √ √ √ Full width Completed
9 20+987 New 0.76 11.00 √ √ √ √ √ Full width Completed
10 21+425 New 0.76 11.00 √ √ √ √ √ Full width Completed
11 21+550 New 0.76 11.00 √ √ √ √ √ Full width Completed
12 22+012 New 0.76 11.00           Washed Area
13 22+340 New 0.76 11.00           Washed Area
14 22+825 New 0.76 11.00           L/Side Washed Area
15 22+900 New 0.76 11.00           L/Side Washed Area
16 23+112 New 0.76 11.00 √ √ √ √ √ Full width Completed
Total Length (m) 176.00            

- 69 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
3 SLAB CULVERTS IN LOT - IV
Lean
Heigt Slab
Span Length Concrete Stone
S.No Location Status h Exc Coping Backfill Remarks
(M) (m) Wing Masonry
(M) Abutment Steel Concrete
wall
R/S
1 25+948 1.5 1 4.20 √ √ √ √ √ √ √ √ Full Completed
Extension
R/S
2 26+465 1.3 1 3.50 √ √ √ √ √ √ √ √ Full Completed
Extension
3 27+950 New 1.5 2 11.00 √ √ √ √ √ √ √ √ Full Completed

4 28+125 New 1 1 11.00 √ √ √ √ √ √ √ √ Full Completed

5 29+375 New 2 1.5 12.00 √ √ √ √ √ √ √ √ Full Completed

6 30+363 New 2 1.5 11.00                 Completed but Washed

7 30+587 New 1 1 11.00                 4.0m L/S completed

8 31+950 New 1 1 11.00                 5.5m L/Side Completed

Total Length (m) 74.70                  

- 70 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
4 Pipe Culverts in Lot - IV
Dia Length Lean Class-B
Location Status Excavation Backfill Remarks
S.No (M) (m) Concrete Pipe Concrete
1 25+585 New   9.60 √ √ √ √ √ Full width Completed
2 26+012 New 0.76 11.00 √ √ √ √ √ Full width Completed
3 26+175 New 0.76 11.00 √ √ √ √ √ Full width Completed
4 26+557 New 0.76 11.00 √ √ √ √ √ Full width Completed
5 26+955 New 0.76 11.00 √ √ √ √ √ Full width Completed
6 27+375 New 0.76 11.00 √ √ √ √ √ Full width Completed
7 27+680 New 0.76 11.00 √ √ √ √ √ Full width Completed
8 27+860 New 0.76 11.00 √ √ √ √ √ Full width Completed
9 28+197   0.76 11.00           Washed Area
10 28+400 New 0.76 11.00 √ √ √ √ √ Full width Completed
11 28+987   0.61 11.00           Washed Area
12 29+075 New 0.76 11.00 √ √ √ √ √ Full width Completed
13 29+675   0.61 11.00            
14 30+000 New 0.76 11.00 √ √ √ √ √ Full width Completed
15 30+185 New 0.76 11.00 √ √ √ √ √ Full width Completed
16 31+325   2 11.00            
17 31+443   0.76 11.00           Washed Area
18 31+660   0.76 11.00            
19 32+182 New 0.76 10.00 √ √ √ √ √ Full width Completed
20 32+365 New 0.76 10.00 √ √ √ √ √ Full width Completed
21 33+135 New 0.76 11.00 √ √ √ √   Full width Completed
22 33+300 Extention 0.6 1.80 √ √       Full width Completed
Total Length (m) 219.80            

- 71 -
C (iii) Causeways

- 72 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
5 Causeway in Lot - II
Height Lean Stone Masonry SLAB Backfill Remarks
S. Location Length (m) Exc.
No (M) Conc. D/S U/S Steel Concrete    
1 16+095 20.00   √ √ √         L/S
Total Length (m) 20.00                  

5 Causeway in Lot - III


S. Height Lean Class-B SLAB
Location Length (m) Exc. Backfill Remarks
No (M) Conc. Bed Coping Steel Concrete
1 20+525 20                  
Total Length (m) 20                  

5 Causeway in Lot - IV
Height Lean Stone Masonry Class-B Backfill Remarks
S. Location Length (m) Exc.
No (M) Conc. U/S D/S Bed Coping    
1 25+750 50   √ √   √        
2 26+750 23   √ √ √ √ √ √  √  Completed
3 28+880 20                  
Total Length (m) 93                  

- 73 -
d. Retaining Walls

- 74 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
2 RETAINING WALLS WITH PLUMB CONCRETE IN LOT - I
CONCRETE
S.N Location (RD) Length H Lean Plum STONE MASONRY
Excavation CLASS-B PARAPETS REMARKS
O (M) (m) Concrete Concrete
From To Mortar Dry Band Coping
1 01+745 01+768 23.0 4.0  √  √  √    √  √      
1 04+312 04+325 13.0 4.0  √  √  √    √  √      
1 04+325 04+387 62.0 4.0  √  √  √    √  √      
2 04+387 04+440 53.0 4.0  √  √  √    √  √  √    
3 04+400 04+470 70.0 4.0  √  √  √    √        
In
4 04+628 04+648 20.0    √  √            
Progress
5 04+648 04+700 52.0    √  √  √    √  √      
6 04+700 04+741 41.0 3.5  √  √  √    √  √      
7 04+743 04+800 57.0    √  √  √    √  √      
8 04+800 04+825 25.0    √  √  √    √  √      
9 04+825 04+865 40.0    √  √  √    √  √  √    
10 05+225 05+250 25.0 7.0                  
11 05+480 05+540 60.0 6.0  √  √  √    √        
12 05+540 05+561 21.0    √  √  √  √  √  √      
13 05+561 05+609 48.0    √  √  √  √  √  √      
14 05+712 05+743 31.0    √  √  √            
15 05+800 05+825 25.0 3.0  √  √  √  √  √  √      
16 05+825 05+866 41.0    √  √  √  √  √  √      
17 06+025 06+080 55.0 2.0  √  √  √    √  √      
In
18 06+080 06+112 32.0    √  √  √          
Progress
In
19 06+350 06+465 115.0 5.0  √  √  √          
Progress
Total Length (m) 909.0                    

- 75 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - I
CONCRETE
Location (RD) LENGTH Lean STONE MASONRY ROLL
S.NO Excavation CLASS-B PARAPETS REMARKS
(M) Concrete POINTING
From To Mortar Dry Band Coping
1 00+445 00+461 16.0  √  √  √ -  √        
1 00+549 00+580 31.0  √  √  √ -  √  √      
2 00+862 00+879 17.0  √  √  √ -  √  √      
3 00+906 00+916 10.0  √  √  √ -  √        
4 00+931 00+959 28.0  √  √  √ -  √        
5 00+962 00+988 26.0  √  √  √    √  √      
6 01+003 01+013 10.0  √  √  √ -  √        
7 01+050 01+075 25.0  √  √  √ -  √        
8 01+260 01+272 12.0  √  √  √ -  √        
8 01+283 01+290 7.0  √  √  √ -  √        
9 01+540 01+568 28.0  √  √  √ -  √        
10 01+595 01+615 20.0  √  √  √ -  √        
11 01+625 01+670 45.0     - -          
12 01+675 01+689 14.0  √  √  √ -  √        
13 01+700 01+707 7.0  √  √  √    √        
13 01+745 01+768 23.0  √  √  √    √        
15 01+806 01+821 15.0  √  √  √    √        
16 01+830 01+840 10.0  √  √  √    √        
17 01+859 01+876 17.0  √  √  √ -          
18 01+859 01+876 17.0  √  √  √            
19 02+062 02+083 21.0  √  √  √ -  √        
20 02+167 02+172 5.0  √  √  √ -  √        
20 02+387 02+418 31.0  √  √  √ -  √        
21 02+432 02+487 55.0     - -          
22 02+716 02+726 10.0  √  √  √ -  √        
22 02+980 03+000 20.0  √  √  √ -  √        
23 03+515 03+525 10.0  √  √  √ -          
24 03+950 03+962 12.0  √  √  √ -          
25 03+987 04+009 22.0  √  √  √ -  √  √      

- 76 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - I
CONCRETE
Location (RD) LENGTH Lean STONE MASONRY ROLL
S.NO Excavation CLASS-B PARAPETS REMARKS
(M) Concrete POINTING
From To Mortar Dry Band Coping
26 04+087 04+116 29.0     - -          
27 04+350 04+390 40.0  √  √  √ -  √  √     washed
28 04+440 04+464 24.0  √  √  √ -  √  √      
29 04+470 04+490 20.0  √  √  √ -  √  √     washed
30 04+657 04+700 43.0  √  √  √ -  √  √     Dry washed
31 04+743 04+825 82.0  √  √  √ -  √  √      
32 04+843 04+865 22.0  √  √ -  √  √  √      
33 04+875 04+887 12.0  √  √ -  √  √  √      
34 04+930 04+945 15.0  √  √ -  √  √  √      
35 04+987 05+012 25.0  √  √  √ -  √  √      
36 05+083 05+125 42.0     - -          
37 05+150 05+178 28.0  √  √ - -          
38 05+272 05+285 13.0  √  √  √ -  √  √      
39 05+285 05+297 12.0  √  √  √ -  √  √      
40 05+417 05+430 13.0  √  √  √ -  √  √      
41 05+430 05+439 9.0  √  √  √ -  √        
42 05+445 05+464 19.0  √  √  √ -  √  √      
43 05+475 05+509 34.0  √  √  √ -  √  √     P. Damaged
44 05+510 05+535 25.0  √  √  √ -  √  √     washed
45 05+540 05+550 10.0  √  √  √ -  √  √     washed
46 05+571 05+609 38.0  √  √  √ -  √  √     washed
47 05+656 05+676 20.0  √  √ -  √  √  √      
48 05+685 05+700 15.0  √  √  √ -  √  √     washed
49 05+807 05+879 72.0  √  √  √ -  √  √      
50 06+020 06+080 60.0  √  √  √ -  √  √     washed

- 77 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - I
CONCRETE
Location (RD) LENGTH Lean STONE MASONRY ROLL
S.NO Excavation CLASS-B PARAPETS REMARKS
(M) Concrete POINTING
From To Mortar Dry Band Coping
51 06+021 06+112 91.0  √  √  √ -  √  √      
52 06+200 06+240 40.0  √  √  √    √  √      
53 06+400 06+440 40.0  √  √  √ -  √  √     washed
54 06+409 06+450 41.0  √  √  √ -  √  √      
55 06+462 06+475 13.0  √  √  √ -  √  √     P. Damaged
56 06+925 06+935 10.0  √  √  √ -  √  √     P. Damaged
57 07+062 07+090 28.0  √  √  √ -  √  √      
58 07+107 07+152 45.0  √  √  √ -  √  √      
59 07+190 07+214 24.0  √  √  √ -  √  √      
60 07+370 07+396 26.0  √  √  √ -  √  √      
61 07+616 07+628 12.0  √  √  √ -  √  √      
62 07+750 07+790 40.0     - -          
63 07+872 07+882 10.0  √  √ -  √          
64 08+025 08+032 7.0  √  √  √ -          
65 08+089 08+109 20.0  √  √  √ -          
66 08+158 08+165 7.0  √  √  √ -          
67 08+190 08+198 8.0  √  √  √ -          
68 08+217 08+231 14.0  √  √  √ -          
69 08+294 08+315 21.0  √  √  √ -          
70 08+315 08+329 14.0  √  √  √ -  √  √      
71 08+379 08+388 9.0  √  √  √ -          
72 08+403 08+412 9.0  √  √  √ -          
73 08+462 08+500 38.0  √  √  √ -          
Total Length (m) 1,853.0                  

- 78 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 Retaining Walls with Plumb Concrete II
STONE CONCRETE
Location (RD) Length H Lean Plum
S.NO Excavation MASONRY CLASS-B PARAPETS REMARKS
(M) (m) Concrete Concrete
From To RRM Dry Band Coping
1 09+252 09+275 23    √  √  √   In progress  √      
2 09+377 09+403 26    √  √  √    √  √      
  09+455 09+500 45    √  √  √    √  √      
3 10+840 10+880 40    √  √  √  √    √      
4 10+880 10+923 43    √  √  √  √          
5 12+170 12+209 39    √  √  √  √          
6 12+209 12+283 74    √  √  √   In progress        
7 12+450 12+466 16    √  √  √            
8 12+475 12+489 14    √  √ In progress            
9 12+525 12+575 50    √  √  √            
10 12+571 12+630 59    √  √  √  √          
11 12+630 12+662 32    √  √  √            
12 12+662 12+700 38    √  √  √            
13 15+537 15+552 15    √  √  √   In progress        
14 15+552 15+572 20    √  √  √            
15 15+572 15+592 20    √  √  √   In progress        
16 15+596 15+625 29    √  √  √   In progress        
Total Length (m) 583                    

- 79 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - II
S. Location (RD) Length Lean Stone Masonry Class-B Roll
Exc Remarks
No From To (M) Concrete Mortor Dry Band Coping Pointing
1 08+500 08+522 22.0  √  √  √    √      
2 08+661 08+683 22.0  √  √  √    √      
3 08+737 08+757 20.0  √  √  √    √      
4 09+052 09+080 28.0                
5 09+200 09+225 25.0  √  √  √    √      
6 09+407 09+455 48.0  √  √  √    √      
7 09+510 09+520 10.0  √  √  √    √     Completed and washed
8 09+830 09+875 45.0  √  √  √    √      
9 10+112 10+170 58.0  √  √  √    √      
10 11+025 11+034 9.0  √  √  √    √      
11 11+406 11+423 17.0  √  √  √    √      
12 11+425 11+550 125.0  √  √  √    √      
13 11+990 12+027 37.0  √  √  √    √      
14 12+033 12+085 52.0  √  √ -  √  √  √   P. Damaged
15 12+125 12+232 107.0  √  √  √    √  √    
16 12+575 12+625 50.0  √  √  √    √  √    
17 12+612 12+700 88.0  √  √  √    √  √   Completed and washed
18 13+150 13+160 10.0  √  √  √    √  √    
19 14+237 14+271 34.0  √  √  √    √      
20 14+462 14+472 10.0  √  √  √    √  √    
21 14+755 14+816 61.0  √  √  √    √  √    
22 15+005 15+020 15.0  √  √    √  √      
23 15+162 15+262 100.0  √  √    √  √  √   Completed and washed
24 15+383 15+430 47.0  √  √  √    √      
25 15+637 15+675 38.0  √  √  √    √      
26 16+312 16+332 20.0  √  √  √    √  √    
27 16+370 16+410 40.0  √  √  √    √  √    
28 16+508 16+535 27.0  √  √  √    √  √    
Total Length 1138.0                

- 80 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS WITH PLUMB CONCRETE IN LOT - III
S. Location (RD) Length Height Lean Plum STONE MASONRY CLASS-B
Excavation PARAPETS REMARKS
NO From To (M) (M) Concrete Concrete Mortar Dry Band Coping
1 18+862 18+912 50.0 2.5  √  √  √  √    √      
2 21+125 21+237 112.0 8.0                  
3 21+475 21+500 25.0 3.0  √  √  √ in progress          
4 21+512 21+600 88.0    √  √ in progress            
5 21+800 21+850 50.0 3.5  √  √  √ in progress          
6 21+850 21+907 57.0    √  √ in progress            
7 21+900 22+018 118.0    √  √  √  √    √      
8 22+025 22+041 16.0    √  √  √  √    √      
9 22+050 22+062 12.0    √  √ in progress            
10 22+062 22+075 13.0 7.0  √  √  √  √    √      
11 22+087 22+127 40.0    √  √  √  √    √      
12 22+125 22+137 12.0    √  √ in progress            
13 22+137 22+162 25.0    √  √  √  √    √      
14 22+162 22+200 38.0    √  √  √  √    √      
15 22+200 22+250 50.0    √  √  √  √    √      
16 22+250 22+300 50.0    √  √ in progress            
17 22+300 22+318 18.0    √  √ in progress            
18 22+325 22+362 37.0    √  √  √  √    √      
19 22+817 22+870 53.0    √  √  √ in progress          
20 22+870 22+884 14.0    √  √  √  √    √  √    
21 22+900 22+931 31.0    √  √  √ in progress          
22 22+931 22+975 44.0    √  √  √ in progress          
23 22+825 22+875 50.0 5.0  √  √ in progress            
24 22+875 22+975 100.0 4.0                  
Total Length (m) 1,103.0                    

- 81 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - III
CONCRETE CLASS-
Location (RD) LENGTH Lean STONE MASONRY ROLL
S.NO Excavation B PARAPETS REMARKS
(M) Concrete POINTING
From To Mortar Dry Band Coping
1 17+173 17+187 14.0  √  √  √    √        
2 17+187 17+214 27.0  √  √  √    √        
3 17+424 17+429 5.0  √  √  √            
4 17+429 17+441 12.0  √  √  √    √        
4 17+474 17+480 6.0  √  √  √    √        
4 17+595 17+612 17.0  √  √  √    √        
4 17+686 17+700 14.0  √  √  √    √        
5 17+762 17+772 10.0  √  √  √    √        
5 17+808 17+817 9.0  √  √  √    √        
6 17+875 17+900 25.0  √  √  √    √        
7 18+000 18+012 12.0  √  √  √    √        
8 18+237 18+250 13.0  √  √  √    √        
9 18+372 18+382 10.0  √  √  √    √        
10 18+525 18+550 25.0  √  √  √    √        
11 18+650 18+700 50.0  √  √  √    √        
12 18+862 18+897 35.0  √  √  √            
12 18+897 18+912 15.0  √  √  √    √        
13 18+937 18+962 25.0  √  √  √            
14 19+787 19+862 75.0  √  √  √    √        
15 19+930 19+941 11.0  √  √  √    √        
16 19+955 19+970 15.0                  
17 20+025 20+037 12.0  √  √  √    √        
18 20+362 20+375 13.0  √  √  √    √        
18 20+512 20+537 25.0  √  √  √    √        
19 20+537 20+550 13.0                  
20 20+937 20+960 23.0                  

- 82 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - III
CONCRETE
Location (RD) LENGTH Lean STONE MASONRY ROLL
S.NO Excavation CLASS-B PARAPETS REMARKS
(M) Concrete POINTING
From To Mortar Dry Band Coping
21 21+005 21+020 15.0                  
22 21+175 21+185 10.0  √  √  √    √        
23 21+237 21+275 38.0  √  √  √    √        
24 21+425 21+475 50.0  √  √  √    √        
25 21+800 21+825 25.0  √  √  √    √        
26 21+825 21+850 25.0  √  √  √    √        
27 21+850 21+913 63.0  √  √  √    √        
28 22+025 22+041 16.0  √  √  √    √        
28 22+062 22+079 17.0  √  √  √    √        
28 22+100 22+112 12.0                  
30 22+137 22+250 113.0  √  √  √    √        
30 22+500 22+512 12.0  √  √  √    √        
31 22+670 22+685 15.0  √  √  √    √        
32 22+725 22+741 16.0  √  √  √    √        
33 22+812 22+887 75.0                  
34 22+912 22+962 50.0                  
35 22+980 22+992 12.0                  
36 23+005 23+050 45.0                  
37 23+150 23+200 50.0                  
Total Length 1,170.0                  

- 83 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS WITH PLUMB CONCRETE IN LOT - IV

Location (RD) Length H Lean Plum STONE MASONRY CONCRETE CLASS-B


S.NO Excavation PARAPETS REMARKS
(M) (m) Concrete Concrete
From To RRM Dry Band Coping
1 27+085 27+144 59.0    √  √  √ In progress          
2 27+175 27+201 26.0    √  √  √  √          
3 28+000 28+100 100.0    √  √  √ In progress          
4 28+089 28+150 61.0 8.0  √  √ In progress            
5 28+837 28+858 21.0 7.0  √  √  √  √          
6 28+858 28+883 25.0    √  √  √  √          
7 28+891 28+899 8.0    √  √  √  √          
8 28+912 28+925 13.0    √  √  √  √          
9 28+975 28+990 15.0    √  √ In progress            
10 29+150 29+185 35.0 10.0  √  √  √  √          
11 30+362 30+385 23.0 10.0  √  √ In progress            
12 30+385 30+433 48.0    √  √ In progress            
13 30+433 30+470 37.0    √  √ In progress            
14 30+470 30+505 35.0    √  √  √ In progress    √      
15 30+712 30+750 38.0    √  √ In progress            
16 30+775 30+801 26.0 7.0  √  √  √ -  √  √      
17 30+900 30+944 44.0    √  √  √ In progress          
18 30+944 30+962 18.0    √  √  √ In progress          
19 30+962 31+051 89.0 7.0  √  √  √ In progress    √      
20 31+362 31+390 28.0 7.0  √  √ In progress            

- 84 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS WITH PLUMB CONCRETE IN LOT - IV

Location (RD) Length H Lean Plum STONE MASONRY CONCRETE CLASS-B


S.NO Excavation PARAPETS REMARKS
(M) (m) Concrete Concrete
From To RRM Dry Band Coping
21 31+420 31+455 35.0 4.0  √  √  √ - In progress        
22 31+455 31+475 20.0 4.5  √  √  √ In progress          
23 31+475 31+545 70.0 7.0  √  √  √ In progress          
24 31+762 31+812 50.0    √  √  √  √  √  √  √    
25 31+812 31+916 104.0    √  √  √ In progress          
26 31+926 31+956 30.0    √  √  √ In progress          
27 31+956 31+977 21.0    √  √  √ In progress          
28 31+980 31+997 17.0    √  √  √ - In progress        
29 31+997 32+008 11.0    √  √  √ In progress          
30 32+008 32+025 17.0    √  √  √   In progress        
31 32+040 32+062 22.0 7.0  √  √  √   In progress        
32 32+072 32+109 37.0 7.0  √  √  √   In progress        
Total Length (m) 1,183.0                    

- 85 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - IV

S. Location (RD) LENGTH Lean STONE MASONRY CLASS-B


Excavation PARAPETS REMARKS
NO From To (M) Concrete Mortar Dry Band Coping
1 25+700 25+746 46.0  √  √  √    √      
2 26+009 26+079 70.0  √  √  √    √      
3 26+448 26+463 15.0  √  √  √    √      
4 26+687 26+725 38.0  √  √  √    √      
5 26+900 26+912 12.0  √  √  √    √      
6 26+945 27+011 66.0  √  √  √    √      
7 27+087 27+150 63.0  √  √  √          
8 27+175 27+201 26.0  √  √  √          
9 27+305 27+322 17.0  √  √  √          
10 27+406 27+422 16.0  √  √  √    √      
11 27+672 27+683 11.0  √  √  √    √      
12 27+720 27+736 16.0  √  √  √    √      
13 27+765 27+785 20.0  √  √  √    √      
14 27+883 27+925 42.0  √  √  √    √      
15 28+072 28+085 13.0  √  √  √    √     Washed
16 28+170 28+195 25.0  √  √  √    √      
17 28+220 28+230 10.0  √  √  √    √      
18 28+250 28+300 50.0               not done
19 28+450 28+460 10.0  √  √  √    √      
20 28+837 28+890 53.0  √  √  √    √      
21 29+150 29+187 37.0  √  √  √    √      
22 29+208 29+287 79.0  √  √  √    √      
23 29+490 29+525 35.0  √  √  √    √      
24 29+527 29+750 223.0  √  √  √    √      
25 30+362 30+406 44.0               Washed

- 86 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
1 RETAINING WALLS IN LOT - IV

S. Location (RD) LENGTH Lean STONE MASONRY CLASS-B


Excavation PARAPETS REMARKS
NO From To (M) Concrete Mortar Dry Band Coping
26 30+583 30+606 23.0  √  √  √    √      
27 30+812 30+834 22.0  √  √  √    √      
28 30+900 31+050 150.0  √  √  √    √      
29 31+050 31+118 68.0  √  √  √    √      
30 31+362 31+392 30.0  √  √  √    √      
31 31+425 31+549 124.0  √  √  √    √      
32 31+762 31+991 229.0                
33 32+011 32+107 96.0                
34 32+139 32+163 24.0                
35 32+163 32+237 74.0  √  √  √    √      
36 32+380 32+412 32.0  √  √  √    √      
37 32+635 32+845 210.0  √  √  √    √      
38 32+900 33+000 100.0                
39 33+100 33+137 37.0  √  √  √    √      
40 33+140 33+150 10.0                
41 33+195 33+225 30.0  √  √  √    √      
42 33+227 33+245 18.0  √  √  √    √      
43 33+275 33+287 12.0                
44 33+300 33+337 37.0                
Total Length 2247.0                

- 87 -
e. Breast Walls

- 88 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
3 BREAST WALLS IN LOT - I
Location (RD) Length Lean Stone Masonry Concrete Class-B Roll
S.No Exc Remarks
From To (M) Concrete Mortar Dry Band Coping Pointing
1 01+283 01+290 7.0  √  √  √    √      
2 01+258 01+299 41.0                
3 01+442 01+480 38.0                
4 01+520 01+562 42.0                
5 01+915 01+945 30.0                
6 02+450 02+510 60.0                
7 02+625 02+673 48.0                
8 02+880 02+906 26.0                
9 03+025 03+070 45.0  √  √  √    √      
In
10 03+162 03+212 50.0  √  √          
Progress
11 03+437 03+550 113.0  √  √  √    √      
12 04+020 04+050 30.0  √  √  √    √      
13 04+050 04+087 37.0  √  √  √    √     P. Damaged
14 05+170 05+207 37.0                
15 05+600 05+650 50.0  √  √  √    √      
In
16 07+137 07+162 25.0  √  √          
Progress
In
17 07+425 07+470 45.0  √  √          
Progress
18 07+805 07+817 12.0                
19 08+212 08+237 25.0  √  √  √    √      
20 08+237 08+267 30.0  √  √  √    √      
21 08+270 08+320 50.0  √  √  √    √      
22 08+340 08+370 30.0  √  √  √    √      
Total Length 871.0                

- 89 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
2 BREAST WALLS IN LOT - II
S Location (RD) Length Lean Stone Masonry Concrete Class-B
Exc Roll Pointing Remarks
No From To (M) Concrete Mortar Dry Band Coping
1 08+953 08+970 17.00  √  √  √    √      
2 08+970 09+000 30.00  √  √  √    √      
3 09+000 09+061 61.00  √  √  √    √      
4 09+100 09+125 25.00  √  √  √    √      
5 09+127 09+137 10.00                
6 09+590 09+620 30.00  √  √  √    √     P. Damaged
7 09+712 09+750 38.00                
8 09+762 09+777 15.00  √  √  √    √      
9 09+800 09+828 28.00                
10 09+880 10+050 170.00  √  √  √    √      
11 11+225 11+250 25.00  √  √  √    √      
12 12+410 12+455 45.00  √  √  √    √      
13 12+535 12+566 31.00  √  √  √    √      
14 13+560 13+600 40.00  √  √  √    √      
15 13+663 13+687 24.00  √  √  √    √      
16 14+037 14+125 88.00  √  √  √    √     P. Damaged
17 14+230 14+240 10.00  √  √  √    √      
18 14+252 14+270 18.00  √  √  √    √      
19 14+940 14+960 20.00  √  √  √    √      
20 15+000 15+025 25.00  √  √ in progress          
21 15+280 15+304 24.00  √  √  √    √      
22 15+625 15+680 55.00  √  √  √    √      
23 15+687 15+750 63.00  √  √  √    √      
24 16+322 16+360 38.00  √  √  √    √      
25 16+360 16+390 30.00  √  √  √    √      
26 16+730 16+762 32.00  √  √  √    √      
27 16+762 16+782 20.00  √  √  √    √      
28 16+782 16+820 38.00  √  √  √    √      
29 16+820 16+875 55.00  √  √  √    √      
Total Length 997.00                

- 90 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD NHA (N-90)
2 BREAST WALLS IN LOT - III
STONE CONCRETE
Location (RD) LENGTH Lean ROLL
S.NO Excavation MASONRY CLASS-B REMARKS
(M) Concrete POINTING
From To Mortar Dry Bond Coping
1 17+312 17+337 25.0  √  √  √    √      
2 17+583 17+606 23.0  √  √  √    √      
in
3 17+817 17+825 8.0  √  √ Progress
         
4 17+825 18+100 275.0                
5 18+200 18+275 75.0                
6 18+322 18+350 28.0  √  √  √          
7 18+475 18+522 47.0  √  √  √    √      
in
8 18+675 18+800 125.0  √  √ Progress
         
8 18+732 18+763 31.0  √  √  √    √      
9 19+825 19+925 100.0                
10 20+140 20+325 185.0  √  √  √    √    √  
11 20+412 20+500 88.0  √  √  √    √  √  √  
12 20+725 20+840 115.0  √  √  √    √    √  
13 21+075 21+100 25.0  √  √  √    √    √  
14 21+295 21+350 55.0  √  √  √    √    √  
15 21+351 21+387 36.0  √  √  √    √    √  
16 21+425 21+475 50.0  √  √  √    √      
17 22+375 22+425 50.0  √  √  √    √    √  
18 22+455 22+512 57.0  √  √  √    √      
19 22+547 22+587 40.0  √  √  √    √      
Total Length 1438.0                

- 91 -
EARTHQUAKE EMERGANCY ASSISTANCE PROJECT (EEAP)
ALPURI - BESHAM ROAD PROJECT (N-90)
2 BREAST WALLS IN LOT - IV
STONE CONCRETE
S Location (RD) LENGTH Lean ROLL
Excavation MASONRY CLASS-B REMARKS
NO (M) Concrete POINTING
From To Mortar Dry Band Coping
1 25+850 25+912 62.0                
2 26+787 26+825 38.0  √  √  √ -  √      
3 27+883 27+913 30.0  √  √  √ -  √  √  √  
4 28+000 28+050 30.0  √  √  √ -  √      
5 28+130 28+175 45.0  √  √  √ -  √      
6 28+450 28+612 162.0  √  √  √ -  √    √  
7 29+330 29+375 45.0  √  √  √ -  √  √  √ 35.o m completed
8 29+425 29+500 75.0  √  √  √  √  √      
9 29+525 29+570 45.0                
10 29+712 29+850 138.0                
11 30+146 30+176 30.0  √  √  √  √  √  √  √ 30.0 m completed
12 30+466 30+544 78.0  √  √  √  √  √  √  √ P. Damaged
13 31+085 31+125 40.0                
14 32+143 32+175 32.0  √  √  √  √  √  √  √  
15 32+480 32+550 70.0               Disputed
Total Length 920.0                

- 92 -
f. Linear Chart showing updated progress

- 93 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ROAD ALPURI - BESHAM (N-90)
PROGRESS BAR CHART (FROM 0+000 TO 08+500 )
LOT - 1
ITEMS Linear Progress Chart up to JUNE-11
Shoulder                                                                                        
Asphaltic
Wearing Course                                                                                        
Tack Coat                                                                                        
Asphaltic Base
Course                                                                                        
Prime Coat                                                                                        
Agg. Base Course                                                                                        
Sub-Base                                                                                        
Sub-Grade                                                                                        
Formation of
Embankment                                                                                        
Roadway
Excavation                                                                                        
00+000

00+100

00+200

00+300

00+400

00+500

00+600

00+700

00+800

00+900

01+000

01+100

01+200

01+300

01+400

01+500

01+600

01+700

01+800

01+900

02+000

02+100

02+200

02+300

02+400

02+500

02+600

02+700

02+800

02+900

03+000

03+100

03+200

03+300

03+400

03+500

03+600

03+700

03+800

03+900

04+000

04+100

04+200

04+300
Location

ITEMS Linear Progress Chart up to JUNE-11


Shoulder                                                                                        
Asphaltic
Wearing Course                                                                                        
Tack Coat                                                                                        
Asphaltic Base
Course                                                                                        
Prime Coat                                                                                        
Agg. Base Course                                                                                        
Sub-Base                                                                                        
Sub-Grade                                                                                        
Formation of
Embankment                                                                                        
Roadway
Excavation                                                                                        
04+300

04+400

04+500

04+600

04+700

04+800

04+900

05+000

05+100

05+200

05+300

05+400

05+500

05+600

05+700

05+800

05+900

06+000

06+100

06+200

06+300

06+400

06+500

06+600

06+700

06+800

06+900

07+000

07+100

07+200

07+300

07+400

07+500

07+600

07+700

07+800

07+900

08+000

08+100

08+200

08+300

08+400

08+500

08+600
Location

- 94 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ROAD ALPURI - BESHAM (N-90)
PROGRESS BAR CHART (FROM 08+500 TO 17+015 )
LOT-2
ITEMS Linear Progress Chart up to JUNE 2011
Shoulder                                                                                        
Asphaltic
Wearing Course                                                                                        
Prime Coat                                                                                        
Agg. Base Course                                                                                        
Sub-Base                                                                                        
Sub-Grade                                                                                        
Formation of
Embankment                                                                                        
Roadway
Excavation                                                                                        
08+500

08+600

08+700

08+800

08+900

09+000

09+100

09+200

09+300

09+400

09+500

09+600

09+700

09+800

09+900

10+000

10+100

10+200

10+300

10+400

10+500

10+600

10+700

10+800

10+900

11+000

11+100

11+200

11+300

11+400

11+500

11+600

11+700

11+800

11+900

12+000

12+100

12+200

12+300

12+400

12+500

12+600

12+700

12+800
LOCATIONS

ITEMS Linear Progress Chart up to JUNE 2011


Shoulder                                                                                        
Asphaltic
Wearing Course                                                                                        
Prime Coat                                                                                        
Agg. Base Course                                                                                        
Sub-Base                                                                                        
Sub-Grade                                                                                        
Formation of
Embankment                                                                                        
Roadway
Excavation                                                                                        
12+800

12+900

13+000

13+100

13+200

13+300

13+400

13+500

13+600

13+700

13+800

13+900

14+000

14+100

14+200

14+300

14+400

14+500

14+600

14+700

14+800

14+900

15+000

15+100

15+200

15+300

15+400

15+500

15+600

15+700

15+800

15+900

16+000

16+100

16+200

16+300

16+400

16+500

16+600

16+700

16+800

16+900

17+000

17+015
LOCATIONS

- 95 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ROAD ALPURI - BESHAM (N-90)
PROGRESS BAR CHART (FROM 17+015 TO 25+000 )
LOT - 03
ITEMS Linear Progress Chart up to JUNE 2011
Shoulder                                                                                        
Asphaltic Wearing
Course                                                                                        
Prime Coat                                                                                        
Agg. Base Course                                                                                        
Sub-Base                                                                                        
Sub-Grade                                                                                        
Formation of
Embankment                                                                                        
Roadway
Excavation                                                                                        
17+015

17+200

17+300

17+400

17+500

17+600

17+700

17+800

17+900

18+000

18+100

18+200

18+300

18+400

18+500

18+600

18+700

18+800

18+900

19+000

19+100

19+200

19+300

19+400

19+500

19+600

19+700

19+800

19+900

20+000

20+100

20+200

20+300

20+400

20+500

20+600

20+700

20+800

20+900

21+000

21+100

21+200

21+300

21+400
Location

ITEMS Linear Progress Chart up to JUNE 2011


Shoulder                                                                                        
Asphaltic Wearing
Course                                                                                        
Prime Coat                                                                                        
Agg. Base Course                                                                                        
Sub-Base                                                                                        
Sub-Grade                                                                                        
Formation of
Embankment                                                                                        
Roadway
Excavation                                                                                        
21+400

21+500

21+600

21+700

21+800

21+900

22+000

22+100

22+200

22+300

22+400

22+500

22+600

22+700

22+800

22+900

23+000

23+100

23+200

23+300

23+400

23+500

23+600

23+700

23+800

23+900

24+000

24+100

24+200

24+300

24+400

24+500

24+600

24+700

24+800

24+900

25+000
Location

 
- 96 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ROAD ALPURI - BESHAM (N-90)
PROGRESS BAR CHART (FROM 25+000 TO 33+502 )
LOT - 04
ITEMS Linear Progress Chart up to JUNE 2011
Shoulder                                                                                        
Asphaltic Wearing
Course                                                                                        
Prime Coat                                                                                        
Agg. Base Course                                                                                        
Sub-Base                                                                                        
Sub-Grade                                                                                        
Formation of
Embankment                                                                                        
Roadway
Excavation                                                                                        
25+000

25+100

25+200

25+300

25+400

25+500

25+600

25+700

25+800

25+900

26+000

26+100

26+200

26+300

26+400

26+500

26+600

26+700

26+800

26+900

27+000

27+100

27+200

27+300

27+400

27+500

27+600

27+700

27+800

27+900

28+000

28+100

28+200

28+300

28+400

28+500

28+600

28+700

28+800

28+900

29+000

29+100

29+200

29+300
Location

ITEMS Linear Progress Chart up to JUNE 2011


Shoulder                                                                                        
Asphaltic Wearing
Course                                                                                        
Prime Coat                                                                                        
Agg. Base Course                                                                                        
Sub-Base                                                                                        
Sub-Grade                                                                                        
Formation of
Embankment                                                                                        
Roadway
Excavation                                                                                        
29+300

29+400

29+500

29+600

29+700

29+800

29+900

30+000

30+100

30+200

30+300

30+400

30+500

30+600

30+700

30+800

30+900

31+000

31+100

31+200

31+300

31+400

31+500

31+600

31+700

31+800

31+900

32+000

32+100

32+200

32+300

32+400

32+500

32+600

32+700

32+800

32+900

33+000

33+100

33+200

33+300

33+400

33+502
Location

 
- 97 -
g. S-Curve

- 98 -
- 99 -
- 100 -
- 101 -
- 102 -
h. Summary of IPC’s

- 103 -
EARTHQUAKE EMERGENCY ASSISTANCE PROJECT (EEAP)
NATIONAL HIGHWAY AUTHORITY

REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM NATIONAL HIGHWAY (N-90)
IN DISTRICT SHANGLA, NWFP (LOAN 2213 PAK (SF)
FINANCIAL PROGRESS
UPTO 30-JUNE-2011

LOT-I (00+000 TO 08+500) LOT-II (08+500 TO 17+015) LOT-III (17+015 TO 25+000) LOT-IV (25+000 TO 33+502)

IPC NO AMOUNT (RS) IPC NO AMOUNT (RS) IPC NO AMOUNT (RS) IPC NO AMOUNT (RS)

40,028,231.2 15,831,238.0 50,544,684.0 110,559,409.0


1 1 1 1
5 0 0 0
51,333,797.5 38,024,825.3 66,627,173.0 82,253,762.0
2 2 2 2
5 4 0 0
3/
47,702,116.0 41,813,880.0 3/ (Day 11,504,952.0 13,620,446.0
3 3 (Day
0 0 work) 0 0
work)
4/ (Day 10,760,756.5 23,122,002.0 69,491,265.0 113,142,172.0
4 4 4
work) 0 0 0 0
52,008,265.0 6/ (Day 4,214,741.0
5 5 43,893,086.00  5  
0 work) 0
46,443,729.7
6  79,143,903.00 5 6   6  
0

7   7   7   7  

280,977,06 169,450,41 242,061,16 319,575,78


Total      
9 6 1 9

1,609,103,526.000
Total Project Cost =
Total Payment Recommended = 1,012,064,435.337
% Age = 47.086%

- 104 -
9. Project Issues

- 105 -
PARTICULAR ISSUES / RECOMMENDATIONS
ISSUES
1. Extension of Time.
2. Insufficient Machinery with the Contractor.
3. Removal of Electric Pole in Lot – I.
4. Slow progress of work on Back filling, Bridges.
5. ADB Loan closing date June 30, 2011 approaching fast.
6. LARP implementation.
7. Work Schedule.
RECOMMENDATIONS

1. EOT (beyond ADB Loan closing date) has been discussed and communicated
through various letter by ACE to GM – NHA (ADB-P) but no action has been taken in
this regard so far.
2. The contractor has been directed to provide the required machineries as listed in the
contract documents i.e without the required machineries the required progress
cannot be achieved.
3. Removal of electric pole in Lot – I has been discussed with the concern department
by PD – NHA (N-90) and RE – ACE (N-90), but till date the same have not be
removed/shifted.
4. The contractors are still lagging from the schedule submitted. The contractor has
been directed by the consultants for expedition of the work specially on bridges and
back filling of completed structure but no steps have been taken from their end.
5. Closing date of ADB’s loan is June 30, 2011. The consultants and the contractors
should be notified in writing as to the arrangements for payment after June 30, 2011
in terms of Clause 2.4, Employer’s Financial Arrangements, General Conditions of
Contract, Volume – 1 of Contract Documents.
6. Non implementation of LARP is the major factor of the slow progress especially on
bridges. It is requested that efforts for the same should be initiated positively that
progress may not be suffered.
7. The contractor has been directed to submit the work schedule for remaining work on
original scope of work that achieved and planned progress may be compare easily.

- 106 -
10. Environmental Issues

- 107 -
ENVIRONMENTAL ISSUES

1.0 ENVIRONMENTAL AND SOCIAL ISSUES

a. Mitigation on dust along the corridor of the works carried out through periodic
water spraying.
b. Road safety and traffic control along the corridor of the road is being
implemented by the Contractor.
c. Air and noise pollution is still manageable within the limit of the environmental
requirements.
d. The Contractors were advised to follow the Labor Laws of Pakistan. So far no
complaint has been lodged against any of them.
e. Land Acquisition and compensation to project affected person of land,
residential, commercial and agriculture is under process.
f. In addition to the unavoidable losses to property due to implementation of the
project, losses to private property have also occurred due to dumping of
excavated materials by the Contractor into the river. The contractor, however,
was of the view that they have dumped the excavated materials in the private
lands at the will of the owners, but could not produce any documentary proof to
this effect.
g. During field survey, it is observed that various utility supply infrastructures such
as water supply line, PTCL cable and electric poles are affected by construction
activities. Being the NHA’s responsibility, according to contractor, the situation
was brought into the notice of the Project Director NHA for its resolution. Except
relocation of some Electric poles almost other issues stands resolved.

1.1 RECOMMENDATIONS

The Contractors have already been advised not dump waste material in the river bed.
The matter has also been brought to the knowledge of the PD. In case the contractors
violate this instruction again, we suggest that penalties as per contract documents be
imposed on them. An assessment of the resettlement impacts at affected locations
would be made and expected loss to private properties on both sides of the river would
be made good at the cost of the Contractor.

Note: Due to unprecedented floods of July 2010, ground situation at many locations have
changed.

- 108 -
8. Detail of Consultancy services
(a) Financial Details for Consultancy Services
(b) List of Consultant Staff

- 109 -
a. Financial details for Consultancy Services

- 110 -
ASSOCIATED CONSULTING ENGINEERS (TRANSPORTATION DIVISION) ACE (PVT) LTD.
BILLING POSITION UPTO Feb-2011

ALPURI-BESHAM PROJECT
 
NET
INVOICED STAM MOBI TAX
INVOICE ADJ. APPROVE AMOUNT RECEIVE
BILL NO. AMOUNT P ADVANC DEDUCTE RECEIVABLE
PERIOD (+VE/-VE) D AMOUNT APPROVE D
(RUPEES) DUTY E D
D
                     
TOTAl COST AS PER AMMENDMENT NO. 1 = Rs. 44,455,100  
                     
DESIGN
PHASE                    
1st Running Invoice 2,886,380 2,886,380 2,886,380 4,406,415
2nd Running 921,205
2,441,240 2,441,240 2,441,240
Invoice
3rd Running Invoice 727,702 727,702 727,702 727,702 -

6,055,322 6,055,322 6,055,322 5,134,117 921,205

SUPERVISION
Apr to Jun-09 ACE/TD/JB-40/01 137,120 137,120 137,120 137,120
Jul to Aug-09 ACE/TD/JB-40/02 113,034 113,034 113,034 113,034
Sep to Nov-09 ACE/TD/JB-40/03 1,993,914 - 1,993,914 401,310 1,592,604 1,592,604 -
Inv Dec-09 ACE/TD/JB-40/04 2,273,620 - 2,273,620 401,310 1,872,310 1,872,310 -
Inv Jan-10 ACE/TD/JB-40/05 1,552,762 - 1,552,762 401,310 1,151,452 1,151,452 -
Inv Feb-10 ACE/TD/JB-40/06 1,457,696 1,457,696 156,549 1,301,147 1,301,147 -
Inv Mar-10 ACE/TD/JB-40/07 2,216,428 2,216,428
249,968 3,916,174 3,916,174 -
Inv April-10 ACE/TD/JB-40/08 1,949,714 1,949,714
Inv May-10 ACE/TD/JB-40/09 1,659,476 1,659,476 87,823 1,571,653 1,375,895 195,758
Inv Jun-10 ACE/TD/JB-40/10 1,723,387 1,723,387 1,723,387 1,723,387
Inv Jul-10 ACE/TD/JB-40/11 1,650,452 1,650,452 1,650,452 1,650,452
Inv Aug-10 ACE/TD/JB-40/12 1,641,183 1,641,183 1,641,183 1,641,183
Inv Sep-10 ACE/TD/JB-40/13 2,725,374 2,725,374 2,725,374 2,725,374

- 111 -
21,094,16
Total 21,094,160 1,203,930 494,340 19,395,890 11,209,582 8,186,308
0
AMOUNT RECEIVABLE 9,107,513

- 112 -
b. List of Consultant Staff

- 113 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI-BESHAM
NATIONAL HIGHWAY (N-90)
LIST OF CONSULTANT’S STAFF
Sr. Date of
Name Designation Remarks
No. Joining
1 Muhammad Ayaz Resident Engineer 19-Mar-11
Muhammad Arshad
2 ARE (Structure)  3-Jan-11
Khan
3 Yousaf Zaman ARE (Highway) 09-Feb-11
4 Muhammad Farooq Material Engineer 5-Aug-10
5 Muhammad Nawaz Quantity Surveyor 15-Jun-2011
Computer
6 Muhammad Jeyad 10-Dec-09  
Operator
7 Misbahullah CAD Operator 1-Feb-10  
8 Abdullah Ben Ahmad Site Inspector 1-Jan-10  
9 Asghar Ali Khan Site Inspector 18-Dec-09  
10 Shahzad Khan Site Inspector 18-Dec-09  
11 Sohail Imran Site Inspector 24-Mar-10  
12 Riaz Ahmad Surveyor 4-Apr-09  
13 Asmat Ullah Khan Surveyor 16-Nov-09  
14 Muhammad Javeed Surveyor 10- Mar -11
15 Imran Nazir Accountant 1-Jun-10  
16 Muhammad Imran Tahir Lab. Tech. 1-Mar-11  
17 Shahid Mehmood Lab. Tech. 14-Dec-09  
18 Zegham Abbas Lab. Tech. 1-Apr-10  
19 Wahid Azam Sur. Helper 1-Feb-10  
20 Ahsan Ullah Sur. Helper 1-Apr-10  
21 Umer Ali Sur. Helper 1-Apr-10  
22 Johar Ali Sur. Helper 1-Mar-11  
23 Ahsan Ul Haq Sur. Helper 1-May-10  
24 Fazal Bacha Sur. Helper 1-May-10  
25 Sultan Alam Lab. Helper 1-Mar-11
26 Muhammad Umair Lab. Helper 1-Mar-11
27 Khalid Khan Lab. Helper 20-Dec-09  
28 Said Qayum Lab. Helper 1-Nov-10  
29 Tariq Khan Lab. Helper 1-Nov-10  
30 Abdul Sattar Lab. Helper 1-Feb-11  
31 Fazal Khan Driver 1-Mar-11  
32 Lahore Khan Cook 1-Mar-11 Besham Residency
33 Abdur Khan Cook 1-Apr-10 Karora Residency
34 Naseeb Zada Astt.Cook 1-Mar-11 Karora Residency
35 Fazil Muhammad Astt.Cook 1-Mar-11 Besham Residency
36 Naimat Ullah Office Boy 7-Jan-10 Besham Residency
37 Jan Muhammad Watchman 18-Nov-09 Besham Residency
38 Malang Jan Watchman 1-Apr-10 Karora Residency

- 114 -
Rehabilitation and Widening of Earthquake Effected Alpuri – Besham Section of National
Highway (N-90)
Earthquake Emergency Assistance Project (EEAP)

CONSULTANT TRANSPORT (VEHICLES)

Provision as per
Sr. No. Description Provided Remarks
Contract

1 Toyota Helix Vigo LZX-835 1 1 -

2 Toyota Pickup PSD-297 1 1 Hired

3 Toyota Pickup PSD-398 1 1 Hired

4 Toyota Pickup PSD-190 1 1 Hired

Total 4 4

- 115 -
9. Quality Control / Material Test Results

- 116 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Contractor : AM & Consultant :
Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 1 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city

Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation / Classification 4 0 25  
P.I   0 21  
MDR 9 0 24  
Sub Grade
Swelling 4 0 28  
F. D. T 43 0 44  
C. B. R 4 0 3 1
Gradation   0 0  
Existing Material P.I   0 0  
C. B. R   0 0  
Gradation 12 0 33  
P.I 3 0 30  
C. B. R 3 0 4  
MDR 12 0 23  
Granular Sub Base
F. D. T 22 0 31  
Specific Gravity   0 8  
LA 24 0 9 11
Sand Equi. 3 0 7  
Gradation 12 1 22  
Plasticity Index 3 1 16  
C. B. R 3 1 8  
MDR 9 1 8  
Aggregate Base Course Specific Gravity   1 7  
Soundness 4 0 5  
Sand Equi. 3 1 8  
LA 4 1 8  
F. D. T 85 22 22 63
Submitted By: Checked By: Noted By:

Material Engineer Material Engineer Engineer

- 117 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)

Consultant :
Contractor : AM & Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 1 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city

Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File

Gradation        

Fine Agg 8 2 52  

Coarse Agg 8 3 65  
Concrete
Compressive
Strength        

Costing 902 144 1806  

Crushed 902 174 1656  

Submitted By: Checked By: Noted By:

Material
Engineer Material Engineer Engineer

- 118 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Contractor : AM & Consultant :
Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 2 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city

Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation / Classification 4 0 12  
P.I   0 12  
MDR 9 0 10  
Sub Grade
Swelling 4 0 3 1
F. D. T 43 4 31 12
C. B. R 4 0 2 2
Gradation   0 0  
Existing Material P.I   0 0  
C. B. R   0 0  
Gradation 12 0 30  
P.I 3 0 30  
C. B. R 3 0 6  
MDR 12 0 18  
Granular Sub Base
F. D. T 22 0 17 5
Specific Gravity   0 7  
LA 24 2 6 18
Sand Equi. 3 0 18  
Gradation 12 3 10 2
Plasticity Index 3 0 1 2
C. B. R 3 0 1 2
MDR 9 0 2 7
Aggregate Base Course Specific Gravity   0 2  
Soundness 4 0 2 2
Sand Equi. 3 0 2 1
LA 4 0 1 3
F. D. T 85 0 0 85
Submitted By: Checked By: Noted By:

Material Engineer Material Engineer Engineer

- 119 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)

Consultant :
Contractor : AM & Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 2 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city

Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File

Gradation       0

Fine Agg 7 1 42  

Coarse Agg 7 3 45  
Concrete
Compressive
Strength        

Costing 840 192 1174  

Crushed 840 180 1153  

Submitted By: Checked By: Noted By:

Material
Engineer Material Engineer Engineer

- 120 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Contractor : AM & Consultant :
Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 3 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city

Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation / Classification 4 0 22  
P.I   0 17  
MDR 9 0 12  
Sub Grade
Swelling 4 0 0 4
F. D. T 43 44 44  
C. B. R 4 0 1 3
Gradation   0 0  
Existing Material P.I   0 0  
C. B. R   0 0  
Gradation 12 2 45  
P.I 3 1 37  
C. B. R 3 1 10  
MDR 12 3 24  
Granular Sub Base
F. D. T 22 16 36 -2
Specific Gravity   1 7  
LA 24 1 12 8
Sand Equi. 3 1 26  
Gradation 12 0 0 12
Plasticity Index 3 0 0 3
C. B. R 3 0 0 3
MDR 9 0 0 9
Aggregate Base Course Specific Gravity   0 0 0
Soundness 4 0 0 4
Sand Equi. 3 0 0 3
LA 4 0 0 4
F. D. T 85 0 0 85
Submitted By: Checked By: Noted By:

Material Engineer Material Engineer Engineer

- 121 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)

Consultant :
Contractor : AM & Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 3 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city

Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File

Gradation        

Fine Agg 8 2 45  

Coarse Agg 8 4 62  
Concrete
Compressive
Strength        

Costing 984 168 1606  

Crushed 984 153 1558  

Submitted By: Checked By: Noted By:

Material
Engineer Material Engineer Engineer

- 122 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Contractor : AM & Consultant :
Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 4 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city

Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File
Gradation / Classification 4 0 22  
P.I   0 16  
MDR 9 0 17  
Sub Grade
Swelling 4 0 5  
F. D. T 43 0 49  
C. B. R 4 0 4  
Gradation   0 0  
Existing Material P.I   0 0  
C. B. R   0 0  
Gradation 12 1 28  
P.I 3 1 26  
C. B. R 3 1 24  
MDR 12 1 16  
Granular Sub Base
F. D. T 22 4 31 13
Specific Gravity   0 3  
LA 24 1 10 15
Sand Equi. 3 1 18  
Gradation 12 1 25  
Plasticity Index 3 1 13  
C. B. R 3 1 9  
MDR 9 1 10  
Aggregate Base Course Specific Gravity   1 10  
Soundness 4 1 4 0
Sand Equi. 3 1 12  
LA 4 1 6  
F. D. T 85 6 6 79
Submitted By: Checked By: Noted By:

Material Engineer Material Engineer Engineer

- 123 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)

Consultant :
Contractor : AM & Company ACE
STATUS OF QUALITY CONTROL TEST
As of June, 2011
Lot # 4 ALPURI TO BESHAM N.W.F.P
Section No. ROAD NAME Province/city

Test Performed
Contract
Description Types of Test This On
Quantity Balance
Period File

Gradation       0

Fine Agg 8 2 46  

Coarse Agg 8 3 65  
Concrete
Compressive
Strength        

Costing 960 132 1208  

Crushed 960 123 1114 59

Submitted By: Checked By: Noted By:

Material
Engineer Material Engineer Engineer

- 124 -
10. Weather Report

- 125 -
MINISTRY OF COMMUNICATION
WIDENING AND IMPROVEMENT OF NATIONAL HIGHWAY
EARTHQUAKE EMERGNCY ASSISTANCE PROJECT NWFP
ALPURI - BESHAM ROAD PROJECT (N-90)
Contractor : AM & Company Consultant : ACE
WEATHER RECORD FOR THE MONTH OF JUNE 2011
Weather
S.No Date Temperature Weather Remarks
Min (C o) Max (C o)
1 1-Jun-11 23 38 Sunny  
2 2-Jun-11 22 39 Sunny  
3 3-Jun-11 24 40 Sunny  
4 4-Jun-11 21 37 Sunny  
5 5-Jun-11 24 38 Cloudy  
6 6-Jun-11 20 36 Sunny  
7 7-Jun-11 23 39 Cloudy  
8 8-Jun-11 22 38 Rainy  
9 9-Jun-11 25 40 Cloudy  
10 10-Jun-11 21 36 Sunny  
11 11-Jun-11 24 37 Cloudy  
12 12-Jun-11 23 35 Rainy  
13 13-Jun-11 22 36 Sunny  
14 14-Jun-11 24 39 Sunny  
15 15-Jun-11 23 40 Cloudy  
16 16-Jun-11 21 34 Rainy  
17 17-Jun-11 22 34 Sunny  
18 18-Jun-11 21 35 Rainy  
19 19-Jun-11 23 38 Sunny  
20 20-Jun-11 25 41 Cloudy  
21 21-Jun-11 22 36 Sunny  
22 22-Jun-11 22 37 Cloudy  
23 23-Jun-11 21 35 Rainy  
24 24-Jun-11 24 39 Rainy  
25 25-Jun-11 23 37 Rainy  
26 26-Jun-11 21 36 Sunny  
27 27-Jun-11 20 34 Rainy  
28 28-Jun-11 22 37 Cloudy  
29 29-Jun-11 24 39 Rainy  
30 30-Jun-11 21 35 Sunny  
Submitted By: Checked By: Noted By:

Material Engineer Material Engineer Engineer

- 126 -
11. Detail of Contractor’s Resources
(a) List of Manpower
(b) List of Plants & Machinery

- 127 -
a. List of Manpower

- 128 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM ROAD PROJECT (N-90)
MANPOWER JUNE-2011
LOT - I LOT - II LOT - III LOT - IV
Sr.
Designation As per Available As per Available As per Available As per Available Remarks
No.
Contract at Site Contract at Site Contract at Site Contract at Site

1 Project Manager 1 1 1 1* 1 Nil 1 Nil  


2 Contract Manager 1 Nil 1 Nil 1 Nil 1 Nil  
3 Planning Engineer 1 Nil 1 Nil 1 Nil 1 Nil  
4 Highway Engineer 1 Nil 1 Nil 1 Nil 1 Nil  
5 Bridge Engineer 1 1 1 Nil 1 Nil 1 Nil  
6 Mechanical Engineer 1 Nil 1 Nil 1 Nil 1 Nil  
7 Material Engineer 1 1 1 Nil 1 Nil 1 Nil  
Site Engr (Earth
8 1 1 1 Nil 1 1 1 Nil
Work)  
9 Site Engr(Str-Work ) 1 Nil 1 1 1 Nil 1 Nil  
10 Quantity Surveyor 1 1 1 1 1 Nil 1 Nil  
11 Foreman 2 2 2 2 2 4 2 3  
12 Surveyor 2 2 2 2 2 2 2 Nil  
13 Lab tech 1 1 1 1 1 2 1 1  
14 Operators/Drivers 48 45 52 40 48 14 48 22  
15 Supporting Staff 50 40 50 35 50 28 50 40  

- 129 -
b. List of Plant & Machinery

- 130 -
REHABILITATION AND WIDENING OF EARTHQUAKE AFFECTED ALPURI - BESHAM ROAD PROJECT (N-90)
Plant/Equipment at Site during June - 2011
LOT - I LOT - II LOT - III LOT - IV
Sr.
Description As per Available As per Available As per Available As per Available Remarks
No
Contract at Site Contract at Site Contract at Site Contract at Site
1 Asphalt Mixing Plant 1 1 1 Nil 1 Nil 1 1  
2 Bulldozer D-8 1 Nil 1 Nil 1 Nil 1 1  
4 Bulldozer D-6 1 Nil 1 Nil 1 Nil 1 Nil  
5 Excavators 2 7 2 3 2 1 2 2  
6 Front End Loaders 2 1 2 1 2 Nil 2 1  
7 Dump Trucks 10 11 10 6 10 2 10 1  
8 Motor Graders 2 1 2 1 2 1 2 1  
9 Tractors 2 2 2 6 2 2 2 4  
10 Transit Mixers 1 Nil 1 Nil 1 Nil 1 Nil  
11 Concrete Batching Plant 1 Nil 1 Nil 1 Nil 1 Nil  
12 Concrete Mixer 1 7 1 5 1 2 1 2  
13 Asphalt Pavers 1 1 1 Nil 1 Nil 1 Nil  
14 Steel Wheel Rollers 8 Ton 2w Nil 2w 1 2w 1 2w Nil  
15 Pneumatic Tire Rollers 2 1 2 Nil 2 Nil 2 Nil  
16 Vibratory Rollers-15-20T 2 1 2 2 2 1 2 1  
17 Static Tandem Roller-8-12T 1 1 1 1 1 Nil 1 Nil  
18 Water Tankers 2 4 2 1 2 1 2 1  
19 Generators 1 2 1 2 1 Nil 1 1  
20 Crushing Plant 1 1 1 2 1 1 1 1  
21 Road Broom 1 Nil 1 Nil 1 Nil 1 Nil  
22 Air compressors 1 1 1 1 1 Nil 1 1  
23 Crawler Rock Drill 1 1 1 Nil 1 Nil 1 Nil  
24 Air Drill (Manual) 2 2 2 2 2 Nil 2 Nil  
25 Jack Hammer 2 Nil 2 Nil 2 Nil 2 Nil  
26 Crane 1 Nil 1 Nil 1 Nil 1 Nil  
27 Concrete Vibrators 2 Nil 2 2 2 Nil 2 2  
28 Vehicles 2 3 2 4 2 2 2 2  
29 Asphalt Cutter 1 Nil 1 Nil 1 Nil 1 Nil  
30 Concrete Pump 0 Nil 0 Nil 0 Nil 0 Nil  
31 Bitumen Distributor 1 Nil 1 Nil 1 Nil 1 Nil  

- 131 -
16. Site Photographs

- 132 -

You might also like