Release Structure For Intumescent Fireproofing (FP) : Saudi Aramco Test Report
Release Structure For Intumescent Fireproofing (FP) : Saudi Aramco Test Report
00 30-Jun-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Release Structure for Fireproofing SATR-B-2001 24-Jul-18 MECH
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
2 Epoxy coating is clean free of defects with all repairs & touch-up complete.
REMARKS:
□ Structures listed above are released for fireproofing.
□ Structures listed above are not released for fireproofing.
List reasons not released: ______________________________________________________________________________
____________________________________________________________________________________________________
REFERENCE DOCUMENTS:
1- API Publication 2218 -- Fireproofing Practices in Petroleum & Petrochemical Process Plants, 1 August 2009
2- SAES-B-006 -- Fireproofing for Plants, 16 April 2017
3- SAES-H-001 Coating Selection and Application Requirements for Industial Plants and Equipment,21 February 2018
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED