SAP PM Feature & Status
SAP PM Feature & Status
SL
Plant Wise Status of SAP PM
No. SAP Features 1301
Status (1 - 5) Remarks
Equipment List (Department
1 Wise) 4 Newly erected project equipments and final end sensing instruments needs to be added
2 Functional Location 5 All locations covered
3 Break Down Maintenance 2 Followed but due to zpp03,iw31 confilct.,order generation not followed.
Statutory Complaince
8 Maintenance 1 Needs to be followed.clarity is missing.
General Maintenance
9 Modification andetc)
(Housekeeping, Expansion 1 Followed .
Maintenance
10 (Non Project) 1 awareness to be increased
11 Civil Maintenance 1 Clarity is missing.Instruction given by COE it will be used for outside plant relative operations like warehouse.
12 RCA 1 brain stroming to be done.currently not entered in SAP
Measuring Documents
13 (with UL/LL notification) 1 Measuring points Not entered in SAP.
14 BOM 1 Not Entered in SAP . Hence not maintained
1
1
1
1
1
1
Plant Wise Status of SAP PM
2200 2201 2203 2204 2300 2301 2302 2350
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
Plant Wise Status of SAP PM
2546 3100 3101 3300 3301 3302 3303 3304
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
Plant Wise Status of SAP PM
3305 3306 4100 4200 4300 5300 6300
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
Rating of status- 1 being least achieved and 5 fully achieved
2 Functional Location 5
4 Predictive Maintenance 2
Preventive Maintenance
5 (Scheduled Check List Plan) 2
ii Maintenance Plan 2
6 Shutdown Maintenance 2
7 Calibration Maintenance 1
11 Civil Maintenance 4
12 RCA 1
Measuring Documents
13 (with UL/LL notification) 1
14 BOM 1
16 Permits 1
17 Warranty
Mobility Claim Management 1
(Remote accessing of SAP PM
19 through mobile devices) 1
fully achieved
1302 1303
Remarks Status (1 - 5)
Newly erected project equipments and final end sensing instruments needs to be added
Break down maintence orders created.But all Break downs are not convered in to BD order
At present Hard copy also filled. Hence final decision to be taken Hard copy or soft to be fill
every month plant 15 days stoppage we got.hence user all shutdown orders are converted in to PM or GN
Not followed in SAP because of soft & hard copy Template difference is there.Hard copy followed
Well maintained
Well maintained
RCA for Equipment stoppage /Break down Separately Made in Excel Sheet.But SAP Not entered at present
Measuring points Not entered in SAP. But Technical Cell vibration readings entered in Excel for each equipment
Separate Software installed for Permit system . Not Following in SAP due to not implementation
n to PM or GN
ered at present
or each equipment
atus of SAP PM
2100 2200 2201
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
2203 2204 2300
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
Plant Wise Status of SAP PM
2301 2302 2350
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
SAP PM
2546 3100 3101
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
3300 3301 3302
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
Plant Wise Status of SAP PM
3303 3304 3305
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
of SAP PM
3306 4100 4200
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
4300 5300 6300
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
Rating of status- 1 being least achieved and 5 fully achieved
Plant Wis
SL No. SAP Features 1303
Status (1 - 5) Remarks
3 Break Down Maintenance 3 Break down maintence orders created.But all Break downs are not convered in to BD order
6 Shutdown Maintenance
4 Followed but to be improved
7 Calibration Maintenance
4 Followed but to be improved
RCA for Equipment stoppage /Break down Separately Made in Excel Sheet.But all the Break Down SAP
12 RCA 2 Not entered at present
Measuring Documents Measuring points Not entered in SAP. But Technical Cell vibration readings Stored in the Meter and
13 (with UL/LL notification) 1 Stored in the Laptop.
16 Permits 5 NA
17 Warranty
Mobility Claim Management 5 NA
(Remote accessing of SAP PM
19 through mobile devices) 5 NA
Plant Wise Status of SAP PM
1351 1353 2100 2200 2201 2203
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
Plant Wise Status of SAP PM
2204 2300 2301 2302 2350 2546
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
3100 3101 3300 3301 3302 3303
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
Plant Wise Status of SAP PM
3304 3305 3306 4100 4200 4300
Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks Status (1 - 5) Remarks
Plant Wise Status of SAP PM
5300 6300
Status (1 - 5) Remarks Status (1 - 5) Remarks