Full Day Plan
Full Day Plan
Date Implemented:
Time Daily Routine Resources Intentional Teaching Focus Children and Learning Role of staff
Strategies links to Intentions- EYLF
documentation links
8:30- 9:00 Gather the children around and do Yoga Yoga mats, phone and Model and instruct EYLF 2 Myself and
with the children. Bluetooth speaker for different yoga poses assistant
music Challenge the Logan
9:00 - 9:30 Learning through Play Train tracks, and trucks, children to do and
Indoor cars and trains long winding track.
Truck and Tracks (CI) Beads, Shape papers, Con-construct
Option: Bead colour sorting on the table pebbles
Tracing shape patterns
2:15- 2:45 Transition children to quiet activity. Different cut out shapes,
Sunlight Shape Sorting (CI) double sided tape, and big
shapes to be pasted on
2:45- 3:00 Invite children to wash their hands and the wall with sunlight
transition to afternoon tea.
Contingency Plan:
Changes to indoor/outdoor environment: