Pre Monsoon Inspection Report Ranikor Nongjri Project Dhar Construction PDF

The attached document is a pre-monsoon inspection report of existing bridges from Ranikor to Nongjri (km 0.000 to 33.250) submitted by Dhar Construction Company & Sri Chanchal Paul JV. The report provides status updates on various bridges along the route, noting issues like erosion, cracking, and the structural condition of reinforced concrete. It recommends widening of most bridges instead of new construction. Inspections found some bridges to be in a collapsed or degraded state while most bridges were in functioning condition with minor issues.

Uploaded by

Sumit Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
426 views33 pages

Pre Monsoon Inspection Report Ranikor Nongjri Project Dhar Construction PDF

The attached document is a pre-monsoon inspection report of existing bridges from Ranikor to Nongjri (km 0.000 to 33.250) submitted by Dhar Construction Company & Sri Chanchal Paul JV. The report provides status updates on various bridges along the route, noting issues like erosion, cracking, and the structural condition of reinforced concrete. It recommends widening of most bridges instead of new construction. Inspections found some bridges to be in a collapsed or degraded state while most bridges were in functioning condition with minor issues.

Uploaded by

Sumit Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 33

Pre-Monsoon Inspection Report

From: dcc shg ([email protected])

To: [email protected]; [email protected];


[email protected]; [email protected]; [email protected]
Cc: [email protected]; [email protected];
[email protected]; [email protected]

Date: Monday, 6 July, 2020, 07:24 pm IST

Dear Sir,
With preference to the subject cited above, please find attached here with the letter under
reference and the Pre-Monsoon Inspection Report.

Thanking You
For Dhar Construction Company & Sri Chanchal Paul (JV)

Pre-Monsoon Inspection Report.pdf


2.6MB

/
MACCABE ROAD, DEMSEINIONG,
DHAR CONSTRUCTION COMPANY SHILLONG.793O1 1, MEGHALAYA
AND SRr CHANCHAL PAUL (JV) Cont No. 70850581 72, 7005161432
Email :- [email protected]

D CC &,CP (JV)/RN/ 20 re -20 I 1 o 6 Dated: 06.07 .2020

To,
The General Manager @)
NHIDCL, Bo-Shillong, House No. 206
Professors Colony, Kharmalki,
Shillong-793001

Subject: - 2 Laning of Ranikor-Nonghyllam-Maheshkhola-Baghmara in the State of Meghalaya


@rom Design Ch. 0+000 to 129+385) under SARDP-NE 'Phase-A on EPC Mod9. .

Package I - Improvement / Widening to 2 Lanes with Earthen shoulder from Ranikor to


Nongjri existing Chainage from Km 0+000 to Km 3 l+700 @esign Length-33.250
Km), - Submission of Pre-Monsoon Inspection Report - Reg.

Reff: LetterNo. PMU-SHG/P/RN/GEN/1798, dated l7thy June 2020

SN,

With reference to the subject cited above and letter under reference, please find enclosed here with the
Pre -Monsoon Inspection Report jointly inspected with representative of NHIDC official.

This is for you kind information and necessary action please.

Your cooperation is highly appreciated, we assure of our best services at all times.

Thanking you.
Yours Faithfirlly
For Dhar Construction Company & Sri Chanchal Paul (fV)

I Manager
Don [lang Khongrymmai

Copy To: (i) Authority's F,ngrneer, Jindals Consortium in Association with MAV Associates
rnfarmation please
(ii) Site Office- Nongjri for information please,
lmprovement,ryVidening to 2 lane with Earthen Shoulders from Ranikorto Nongjri
km 0.000 to km 33.250 (Existing Chaiange 0.000 to 31.700)
Pre-l onsoon lnspection of Existing Bridses
lron Girder and Timber Deck
oesign Chainase : km 0'544
New Proposal : New Construction
sl.

OK

NO

ol(
RCC Bridge
Chainage : km 2+890
New Proposal : Widening

sl.
Status

OK

Erosion ol Embankment

ox

5
RCC Bridge
Chalnaee : Km 3*640
New Proposal : Widening instead of New Construction as in Schedule_B

sl-
Status

OK

NO

NO

ol{
RcC Bridge
Chajnage : Km 4+0'16
New ProposaL : Wjdening

51.

NO

NO

o(

5
RCC Bridge
Chainage : Km 4+629
New Propo5al I Widening

sl.

NO

7
NO

NO

5
Cantilevel Bridge
:
Chainage Km 6+ 000
Reiaine.l with Misct. Works

51.

NO

5
RCC Bridge
-
Loop Portjon Exjsljng Bridge on LHS
New Proposal : To Retained

sl.

NO

NO

o(

5
RCC Bridge
Looo Portion 1st Exktins Bridse on RHS
New Proposal ; Retained

st.

o(

NO

OK

5
RCC Bridge
Loop Portion 2nd Existing Bridge on RHS
New Proposal : ToRetained

51.
Status

Erosion 6f Embankment

o(

NO
NO

Cracking of Side Retaining

Reinlorced con.rete/Pre.
lron Girder & Timber Deck
Chainage: km 17+474
Nev/ Proposal : New construction

overall Remarl - Notinworting Condition


RCC Bridge
chain6ge: km 18.056
New Proposal : widening

sl.
Status
RCC Bridge
Chajnagel km 18+628
New Proposal : widening jnstead of New Constru.tion in Schedule-B

sl.

Frosion of Embankment

Reinf orced Concrete/Pre


RCC Bridge
Chainage : km 19+402
Widenjng instead of New Construction in Schedute

sl.
No. Status

Condition of Pavement

Erosion oi Emba.kment

NO
NO

l
Cracking of Side Retaininq
NO

NO

Reinforced Concrete/P.e,
o(

nrl
RCC Bridge
Chajnage : knr 19*438
Wideninginstead of New Construction in Schedule-B

5t.

Reinf orced Concrete/Pre


OK

5
RCC Bridge
Chainaee : km 20+992
New Proposal : Widening

sl.

Hahdrails/Paraher waLls/ararh Barri.r


RCC Bridge
Chainaee: km 21+187
New Proposai : Wideninq

Status
RCC Bridge
Chainase : km 21+895
New Proposal : widenlng

51.

5
RCC Bridge
Chalnage : kn27*17
New Proposal : Mdening

51.

5
RCC Bridge
Chainage : km 2l*766
N€r ProDosxl: Widenin*

2
NO
NO

NO
RCC Bridge
Chainage 06'07'2020 km 2l+807
New Proposal : widening instead of New Construction in Schedule-B

sl.

0x

o(

5
RCC Bridge
Chainage : km 21.848
New Proposal I Widening

sl.

NO

l
NO
RCC Bridge
Chainage : km 25*459
New Proposal : widening

sl.

NO

NO
RCC Bridge
Chainage : km 25+657
New ProDosat : widenins

5t.

NO

l
NO

OK
RCC Bridge
Chainage : km 26+059
New Propos.l : Widening

NO
RCC Bridge
Chainage : km 26+260
New Proposal : Wdening

51.

NO

NO

0(
RCC Bridge
Design Chainage : Km 28+940
Proposal : Wideninq

Status

NO
RCC Bridge
Chainase : km 29*568
New Proposal : widening

51.

NO

2
NO

l
NO

0t(

5
RCC Bridge
Chainaq€ :km 29+959
New Proposal : Widening

st,

NO

Handrails/Parapet walls

o(
lron Girder with Timber Deck
Chajnage : km 11+575
New Proposal : New Construction

sl.

NO

NO

overall qtanrs - a6llabsed


lron Girder and Timber Deck
Design Chainage : km 12+593
New Proposal : New Construction

sl.

NO