Pre-Monsoon Inspection Report
[email protected];
[email protected];
[email protected]Cc:
[email protected];
[email protected];
[email protected];
[email protected]Date: Monday, 6 July, 2020, 07:24 pm IST
Dear Sir,
With preference to the subject cited above, please find attached here with the letter under
reference and the Pre-Monsoon Inspection Report.
Thanking You
For Dhar Construction Company & Sri Chanchal Paul (JV)
Pre-Monsoon Inspection Report.pdf
2.6MB
/
MACCABE ROAD, DEMSEINIONG,
DHAR CONSTRUCTION COMPANY SHILLONG.793O1 1, MEGHALAYA
AND SRr CHANCHAL PAUL (JV) Cont No. 70850581 72, 7005161432
Email :- [email protected]
D CC &,CP (JV)/RN/ 20 re -20 I 1 o 6 Dated: 06.07 .2020
To,
The General Manager @)
NHIDCL, Bo-Shillong, House No. 206
Professors Colony, Kharmalki,
Shillong-793001
Subject: - 2 Laning of Ranikor-Nonghyllam-Maheshkhola-Baghmara in the State of Meghalaya
@rom Design Ch. 0+000 to 129+385) under SARDP-NE 'Phase-A on EPC Mod9. .
Package I - Improvement / Widening to 2 Lanes with Earthen shoulder from Ranikor to
Nongjri existing Chainage from Km 0+000 to Km 3 l+700 @esign Length-33.250
Km), - Submission of Pre-Monsoon Inspection Report - Reg.
Reff: LetterNo. PMU-SHG/P/RN/GEN/1798, dated l7thy June 2020
SN,
With reference to the subject cited above and letter under reference, please find enclosed here with the
Pre -Monsoon Inspection Report jointly inspected with representative of NHIDC official.
This is for you kind information and necessary action please.
Your cooperation is highly appreciated, we assure of our best services at all times.
Thanking you.
Yours Faithfirlly
For Dhar Construction Company & Sri Chanchal Paul (fV)
I Manager
Don [lang Khongrymmai
Copy To: (i) Authority's F,ngrneer, Jindals Consortium in Association with MAV Associates
rnfarmation please
(ii) Site Office- Nongjri for information please,
lmprovement,ryVidening to 2 lane with Earthen Shoulders from Ranikorto Nongjri
km 0.000 to km 33.250 (Existing Chaiange 0.000 to 31.700)
Pre-l onsoon lnspection of Existing Bridses
lron Girder and Timber Deck
oesign Chainase : km 0'544
New Proposal : New Construction
sl.
OK
NO
ol(
RCC Bridge
Chainage : km 2+890
New Proposal : Widening
sl.
Status
OK
Erosion ol Embankment
ox
5
RCC Bridge
Chalnaee : Km 3*640
New Proposal : Widening instead of New Construction as in Schedule_B
sl-
Status
OK
NO
NO
ol{
RcC Bridge
Chajnage : Km 4+0'16
New ProposaL : Wjdening
51.
NO
NO
o(
5
RCC Bridge
Chainage : Km 4+629
New Propo5al I Widening
sl.
NO
7
NO
NO
5
Cantilevel Bridge
:
Chainage Km 6+ 000
Reiaine.l with Misct. Works
51.
NO
5
RCC Bridge
-
Loop Portjon Exjsljng Bridge on LHS
New Proposal : To Retained
sl.
NO
NO
o(
5
RCC Bridge
Looo Portion 1st Exktins Bridse on RHS
New Proposal ; Retained
st.
o(
NO
OK
5
RCC Bridge
Loop Portion 2nd Existing Bridge on RHS
New Proposal : ToRetained
51.
Status
Erosion 6f Embankment
o(
NO
NO
Cracking of Side Retaining
Reinlorced con.rete/Pre.
lron Girder & Timber Deck
Chainage: km 17+474
Nev/ Proposal : New construction
overall Remarl - Notinworting Condition
RCC Bridge
chain6ge: km 18.056
New Proposal : widening
sl.
Status
RCC Bridge
Chajnagel km 18+628
New Proposal : widening jnstead of New Constru.tion in Schedule-B
sl.
Frosion of Embankment
Reinf orced Concrete/Pre
RCC Bridge
Chainage : km 19+402
Widenjng instead of New Construction in Schedute
sl.
No. Status
Condition of Pavement
Erosion oi Emba.kment
NO
NO
l
Cracking of Side Retaininq
NO
NO
Reinforced Concrete/P.e,
o(
nrl
RCC Bridge
Chajnage : knr 19*438
Wideninginstead of New Construction in Schedule-B
5t.
Reinf orced Concrete/Pre
OK
5
RCC Bridge
Chainaee : km 20+992
New Proposal : Widening
sl.
Hahdrails/Paraher waLls/ararh Barri.r
RCC Bridge
Chainaee: km 21+187
New Proposai : Wideninq
Status
RCC Bridge
Chainase : km 21+895
New Proposal : widenlng
51.
5
RCC Bridge
Chalnage : kn27*17
New Proposal : Mdening
51.
5
RCC Bridge
Chainage : km 2l*766
N€r ProDosxl: Widenin*
2
NO
NO
NO
RCC Bridge
Chainage 06'07'2020 km 2l+807
New Proposal : widening instead of New Construction in Schedule-B
sl.
0x
o(
5
RCC Bridge
Chainage : km 21.848
New Proposal I Widening
sl.
NO
l
NO
RCC Bridge
Chainage : km 25*459
New Proposal : widening
sl.
NO
NO
RCC Bridge
Chainage : km 25+657
New ProDosat : widenins
5t.
NO
l
NO
OK
RCC Bridge
Chainage : km 26+059
New Propos.l : Widening
NO
RCC Bridge
Chainage : km 26+260
New Proposal : Wdening
51.
NO
NO
0(
RCC Bridge
Design Chainage : Km 28+940
Proposal : Wideninq
Status
NO
RCC Bridge
Chainase : km 29*568
New Proposal : widening
51.
NO
2
NO
l
NO
0t(
5
RCC Bridge
Chainaq€ :km 29+959
New Proposal : Widening
st,
NO
Handrails/Parapet walls
o(
lron Girder with Timber Deck
Chajnage : km 11+575
New Proposal : New Construction
sl.
NO
NO
overall qtanrs - a6llabsed
lron Girder and Timber Deck
Design Chainage : km 12+593
New Proposal : New Construction
sl.
NO