This document is a technical study application form for connecting a solar photovoltaic system to the electricity grid under Malaysia's Net Energy Metering (NEM) program. The form collects information about the consumer, solar installation details, and documents required for review. It notes that consumers cannot operate their solar system until approved, and systems over 72kW require a generating license. The competent person signing the form confirms the system design complies with standards and the site is suitable for installation.
This document is a technical study application form for connecting a solar photovoltaic system to the electricity grid under Malaysia's Net Energy Metering (NEM) program. The form collects information about the consumer, solar installation details, and documents required for review. It notes that consumers cannot operate their solar system until approved, and systems over 72kW require a generating license. The competent person signing the form confirms the system design complies with standards and the site is suitable for installation.
PART 1: INFORMATION · Customers may not operate their Solar Photovoltaic (PV) system while interconnected to the DL Distribution System until they receive written permission from the Authority · For solar PV system more than 72kW customer need to apply for generating license from Suruhanjaya Tenaga (ST) PART 2: CONSUMER INFORMATION – to be filled by the Registered Customer
Electricity Bill account number:______________________________ I hereby authorize the Competent Person as described in PART 3 to act on my behalf to manage my NEM application
Signature: Date:
PART 3: COMPETENT PERSON (SERVICE PROVIDER/CONTRACTOR) DETAILS
Name:______________________________________ Company ROC No. :__________________________
Is the applicant an existing : Yes If yes, please provide the existing
FIAH? No solar capacity installed(kW) ________________ Voltage at point of common coupling: Low Voltage (230V/400V) Medium Voltage (11kV/33kV) @TNB meter
If Medium Voltage connected customer: Maximum Demand ________________kW
If Low Voltage connected customer : Fuse Rating: ____________(Amps) or CT rating:___________________
Reasons for installing NEM Reduce electricity bill Peak Shaving
Reduce Green House effect Other reasons:______________________ PART 5: TECHNICAL SELF ASSESSMENT
a) Installed NEM PV Capacity ______________in kWp b) ____________________in kWac
c) Estimated Monthly Generation:__________kWh d) Distributed Annual Availability Data (DAA):_________kWh e) Expected Date of Commissioning of NEM solar system: _____________________(dd/mm/yyyy) f) Installation of Battery Energy Storage System: Yes No If yes, Battery capacity __________ kW Battery Manufacturer:________________ Information below is only for generation capacity >12kW. Competent Person shall fill in and attach the Load Profile (LP) Form g) Daytime Peak Demand (11am to 3pm)___________kW (Friday to Monday) h) Daytime Lowest Demand ______________kW i) Export during daytime peak (b-g) ___________kWac j) Export during daytime lowest (b-h) ____________kWac NEM TECHNICAL STUDY APPLICATION FORM V1.2
PART 6: PHOTOVOLTAIC (PV) INSTALLATION INFORMATION
a) PV Module : i) Type: Monocrystalline Polycrystalline Thin Film Others:_______________
b) PV Inverter i) Number of inverter installed __________________________
ii) Type: Single Phase Three Phase
iii) Manufacturer _____________________
iv) Power Factor: __________ lagging ______________ leading unity
PART 7: CHECKLIST OF DOCUMENTS REQUIRED
i. Single line diagram with Solar PV schematic(endorsed by Competent Person)
ii. Photo of existing DL meter and service line iii. 4 days Load profiling (Friday to Monday for capacity >12kW)Form LP iv. A copy of electricity bill (latest) v. CD (contains) all of the above documents saved under 1 pdf file <3MB
PART 8: DECLARATION
By signing this form, I declare that:
· I am representing the owner of the premise and the information furnished above is true to my knowledge and belief. · I confirm that the solar PV system design comply to the standards (IEEE 1547, IEC 61727, MS 1837,NEM Technical Guideline) and the inverter (s) used are as per approved lists. · I also verify that the site condition is fit for installation of the solar PV system as per applicable regulations.