Corrected SPT

This document provides the results of a geotechnical investigation for a proposed 24 MLD sewage treatment plant in New Chandrapur. Borehole logs are presented from 3 boreholes drilled on site, with depth profiles of soil types and corrected standard penetration test N-values. The bulk unit weights and groundwater levels are also recorded for analysis of soil strength and compressibility parameters.

Uploaded by

sagar kolhe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
329 views

Corrected SPT

This document provides the results of a geotechnical investigation for a proposed 24 MLD sewage treatment plant in New Chandrapur. Borehole logs are presented from 3 boreholes drilled on site, with depth profiles of soil types and corrected standard penetration test N-values. The bulk unit weights and groundwater levels are also recorded for analysis of soil strength and compressibility parameters.

Uploaded by

sagar kolhe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

GEOTECHNICAL INVESTIGATION FOR 24MLD STP AT NEW CHANDRAPUR

CH-
PROJECT- Geotechnical Investigation for 24 MLD STP at New Chandrapur BH No- 1
GWT (m) 6
CALCULATIONS FOR CORRECTED SPT N VALUES
Final
Corrected
DEPTH OF Bulk Unit Overburde Overburden Overburden Corrected
TYPE OF Observed Value for
SAMPLE Weight n pressure Pressure Correction Value after
SOIL SPT N Value Overburden
(m) (t/m3) in t/m2 (kg/cm2) Factor Dilatancy
N'
N''
1.50 Plastic 1.832 1.248 0.13 1.80 8 8 8
3.00 Plastic 1.837 2.511 0.26 1.42 12 12 12
4.50 Non Plastic 1.842 3.789 0.39 1.23 40 49 32
6.00 Non Plastic 1.849 5.094 0.52 1.20 49 59 37
7.50 Non Plastic 1.858 6.435 0.66 1.08 50 54 35
9.00 Non Plastic 1.858 7.722 0.79 1.02 50 51 33
10.00 Non Plastic 1.858 8.58 0.88 1.01 50 51 33

SPT BLOWS PER 30cm PENETRATION

0 10 20 30 40 50 60
DEPTH BELOW GROUND LEVEL (m)

0.00

1.50

3.00
CORRECTED SPT
4.50 VALUE (N'')

6.00 OBSERVED SPT


VALUE (N)
7.50

9.00

10.50

M/S TARAKUNJ CONSTRUCTION AND CONSULTANCY


c/o Tanbarao Bapurao Gadekar, Tanba Height, Plot No 132, Mitra Vihar Nagar, Kharbi,,
Nagpur-440009
GEOTECHNICAL INVESTIGATION FOR 24MLD STP AT NEW CHANDRAPUR

CH-
PROJECT- Geotechnical Investigation for 24 MLD STP at New Chandrapur BH No- 2
GWT (m) 6
CALCULATIONS FOR CORRECTED SPT N VALUES
Final
Corrected
DEPTH OF Bulk Unit Overburde Overburden Overburden Corrected
TYPE OF Observed Value for
SAMPLE Weight n pressure Pressure Correction Value after
SOIL SPT N Value Overburden
(m) (t/m3) in t/m2 (kg/cm2) Factor Dilatancy
N'
N''
1.50 Plastic 1.837 1.2555 0.13 1.80 11 11 11
3.00 Plastic 1.841 2.523 0.26 1.50 16 16 16
4.50 Non Plastic 1.853 3.8385 0.39 1.36 40 54 35
6.00 Non Plastic 1.857 5.142 0.52 1.20 50 60 38
7.50 Non Plastic 1.858 6.435 0.66 1.12 50 56 36
9.00 Non Plastic 1.858 7.722 0.79 1.01 50 51 33
10.00 Non Plastic 1.858 8.58 0.88 1.01 50 51 33

SPT BLOWS PER 30cm PENETRATION

0 10 20 30 40 50 60
DEPTH BELOW GROUND LEVEL (m)

0.00

1.50

3.00
CORRECTED SPT
4.50 VALUE (N'')

6.00 OBSERVED SPT


VALUE (N)
7.50

9.00

10.50

M/S TARAKUNJ CONSTRUCTION AND CONSULTANCY


c/o Tanbarao Bapurao Gadekar, Tanba Height, Plot No 132, Mitra Vihar Nagar, Kharbi,,
Nagpur-440009
GEOTECHNICAL INVESTIGATION FOR 24MLD STP AT NEW CHANDRAPUR

CH-
PROJECT- Geotechnical Investigation for 24 MLD STP at New Chandrapur BH No- 3
GWT (m) 5.9
CALCULATIONS FOR CORRECTED SPT N VALUES
Final
Corrected
DEPTH OF Bulk Unit Overburde Overburden Overburden Corrected
TYPE OF Observed Value for
SAMPLE Weight n pressure Pressure Correction Value after
SOIL SPT N Value Overburden
(m) (t/m3) in t/m2 (kg/cm2) Factor Dilatancy
N'
N''
1.50 Plastic 1.841 1.2615 0.13 1.80 16 16 16
3.00 Plastic 1.838 2.514 0.26 1.50 20 20 20
4.50 Non Plastic 1.846 3.807 0.39 1.26 23 29 22
6.00 Non Plastic 1.852 5.112 0.52 1.20 27 32 24
7.50 Non Plastic 1.857 6.4275 0.66 1.12 50 56 36
9.00 Non Plastic 1.858 7.722 0.79 1.02 50 51 33
10.00 Non Plastic 1.859 8.59 0.88 1.01 50 51 33

SPT BLOWS PER 30cm PENETRATION

0 10 20 30 40 50 60
DEPTH BELOW GROUND LEVEL (m)

0.00

1.50

3.00
CORRECTED SPT
4.50 VALUE (N'')

6.00 OBSERVED SPT


VALUE (N)
7.50

9.00

10.50

M/S TARAKUNJ CONSTRUCTION AND CONSULTANCY


c/o Tanbarao Bapurao Gadekar, Tanba Height, Plot No 132, Mitra Vihar Nagar, Kharbi,,
Nagpur-440009
GEOTECHNICAL INVESTIGATION FOR 24MLD STP AT NEW CHANDRAPUR

CH-
PROJECT- Geotechnical Investigation for 24 MLD STP at New Chandrapur BH No- 4
GWT (m) 5.7
CALCULATIONS FOR CORRECTED SPT N VALUES
Final
Corrected
DEPTH OF Bulk Unit Overburde Overburden Overburden Corrected
TYPE OF Observed Value for
SAMPLE Weight n pressure Pressure Correction Value after
SOIL SPT N Value Overburden
(m) (t/m3) in t/m2 (kg/cm2) Factor Dilatancy
N'
N''
1.50 Plastic 1.841 1.2615 0.13 1.80 16 16 16
3.00 Plastic 1.842 2.526 0.26 1.60 19 19 19
4.50 Non Plastic 1.847 3.8115 0.39 1.30 24 31 23
6.00 Non Plastic 1.852 5.112 0.52 1.19 27 32 24
7.50 Non Plastic 1.855 6.4125 0.65 1.10 32 35 25
9.00 Non Plastic 1.858 7.722 0.79 1.02 34 35 25
10.50 Non Plastic 1.859 9.0195 0.92 1.01 50 51 33
12.00 Non Plastic 1.86 10.32 1.05 0.92 50 46.0 31
13.50 Non Plastic 1.861 11.6235 1.19 0.90 50 45.0 30
15.00 Non Plastic 1.862 12.93 1.32 0.88 50 44.0 30

SPT BLOWS PER 30cm PENETRATION

0 10 20 30 40 50 60
DEPTH BELOW GROUND LEVEL (m)

0.00
1.50
3.00
4.50
6.00 CORRECTED SPT
VALUE (N'')
7.50
9.00
OBSERVED SPT
10.50 VALUE (N)
12.00
13.50
15.00
16.50

M/S TARAKUNJ CONSTRUCTION AND CONSULTANCY


c/o Tanbarao Bapurao Gadekar, Tanba Height, Plot No 132, Mitra Vihar Nagar, Kharbi,,
Nagpur-440009
GEOTECHNICAL INVESTIGATION FOR 24MLD STP AT NEW CHANDRAPUR

CH-
PROJECT- Geotechnical Investigation for 24 MLD STP at New Chandrapur BH No- 4
GWT (m) 5.7
CALCULATIONS FOR CORRECTED SPT N VALUES
Final
Corrected
DEPTH OF Bulk Unit Overburde Overburden Overburden Corrected
TYPE OF Observed Value for
SAMPLE Weight n pressure Pressure Correction Value after
SOIL SPT N Value Overburden
(m) (t/m3) in t/m2 (kg/cm2) Factor Dilatancy
N'
N''
1.50 Plastic 1.839 1.2585 0.13 1.80 15 15 15
3.00 Plastic 1.841 2.523 0.26 1.60 20 20 20
4.50 Non Plastic 1.846 3.807 0.39 1.30 24 31 23
6.00 Non Plastic 1.842 5.052 0.52 1.19 30 36 25
7.50 Non Plastic 1.849 6.3675 0.65 1.10 50 55 35
9.00 Non Plastic 1.85 7.65 0.78 1.02 50 51 33
10.50 Non Plastic 1.851 8.9355 0.91 1.01 50 51 33
12.00 Non Plastic 1.852 10.224 1.04 0.92 50 46.0 31
13.50 Non Plastic 1.853 11.5155 1.17 0.90 50 45.0 30
15.00 Non Plastic 1.854 12.81 1.31 0.88 50 44.0 30

SPT BLOWS PER 30cm PENETRATION

0 10 20 30 40 50 60
DEPTH BELOW GROUND LEVEL (m)

0.00
1.50
3.00
4.50
6.00 CORRECTED SPT
VALUE (N'')
7.50
9.00
OBSERVED SPT
10.50 VALUE (N)
12.00
13.50
15.00
16.50

M/S TARAKUNJ CONSTRUCTION AND CONSULTANCY


c/o Tanbarao Bapurao Gadekar, Tanba Height, Plot No 132, Mitra Vihar Nagar, Kharbi,,
Nagpur-440009