Request For Information: Date: Status Client: Job #: Project: Rfi #

The request for information document provides details regarding issues with four attachments for the Lowman and Marlim Azul Project. Specifically, it notes that bolts collide with plates and hollow sections in attachments 1 and 2, and that an NPT collides with steel in attachment 3. For attachment 4, it states that dimensions between drawings G1-S3791 and G1-T0508 are different, and seeks advice on which drawing to follow. The required response date is July 11th.

Uploaded by

Tee Klong Rung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views

Request For Information: Date: Status Client: Job #: Project: Rfi #

The request for information document provides details regarding issues with four attachments for the Lowman and Marlim Azul Project. Specifically, it notes that bolts collide with plates and hollow sections in attachments 1 and 2, and that an NPT collides with steel in attachment 3. For attachment 4, it states that dimensions between drawings G1-S3791 and G1-T0508 are different, and seeks advice on which drawing to follow. The required response date is July 11th.

Uploaded by

Tee Klong Rung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

REQUEST FOR INFORMATION

DATE: 1-Jul-2020 STATUS OPEN

CLIENT: CIMTAS JOB # : C32002

PROJECT: Lowman and Marlim Azul Project (CIMTAS) RFI # : 013

TO: FROM: DISTRIBUTION:


CIMTAS BJCHI

NUMBER AND TITLE OF DOCUMENTS IN QUESTION:


G1-S3789 G1-T0508 G1-S3791

DESCRIPTION:
Referrent to attachment above , BJCHI would like to clearly issues as below

• ATTACHMENT#1: Bolt collide with the Plate and hollow section steel ,Please advise
• ATTACHMENT#2: Bolt collide with the Plate and hollow section steel ,Please advise
• ATTACHMENT#3: The NPT collide with Steel . please advsise
• ATTACHMENT#4: dimension betwwen G1-S3791 and G1-T0508 is differenct. please advise

Required Schedule Impact? YES NO


Response
Date: 11-Jul-2020
Cost Impact? YES NO

RESPONSE:

Please see my comment inside of the drawing, first three page question we are waiting customer respond

BY: TITLE: Site Manager DATE: 02.07.2020


Ozturk KILIC

CIMTAS-RFI-013.xlsm 7/1/2020 1
Attachment#1

the marking bolt is collides


with the Plate and Hollow
section . please advise
Attachment#2

the marking bolt is


collides with the Plate
and Hollow section .
please advise
Attachment#3

the marking NPT collides


with the Shape steel . please
advise

Sleeve pipe can be


move 20mm right
side
Attachment#4

The marking dimension betwwen this


dwg and G1-T0508 is differenct ,we
intent to do it as per this dwg
dimension , please advise

please follow
dimension pipe
support base dwg
G1-S3791