Republic of The Philippines Municipality of IPIL Barangay:Maasin
Republic of The Philippines Municipality of IPIL Barangay:Maasin
Municipality of IPIL
BARANGAY :MAASIN
Recommended by:
ERNESTO JOSE C. BABIERA,CE CHIDEE S. RI
Municipal Engineer MCT-DAC
Concurred by :
RAM OF WORKS
69 CALINDAR DAYS
DAC/ME
Foreman
Source of Fund
mmunity BLGU MLGU PLGU
Other
In-Kind Cash In-Kind Cash In-Kind Sources
20,150.00
27,001.00
10,000.00
47,151.00 - - 10,000.00 - -
3,000.00
2,000.00
3,000.00
3,000.00
22,000.00
4,865.00
3,000.00
5,000.00
- - - 40,865.00 5,000.00 -
Approved by :
PETER GERONILLA
CTF BSPMC Chairman
Concurred by:
HIDEE S. RICO
MCT-DAC Barangay Chairman
Noted by:
Ext. Wall Area W1 Area W2 Area W3 Area W5 Area W6 Area D1 Area D2 Area
Wall Area Area Total (sq.m.)
(sq.m.) (sq.m.) (sq.m.) (sq.m.) (sq.m.) (sq.m.) (sq.m.) (sq.m.)
Prepared by :
Aljie S. Canete
Civil Engineer
PROJECT TITLE: CONSTRUCTION PERIMETER FENCE
PROJECT LOCATION BALINTAWAK, PAGADIAN CITY, ZAMBOANGA DEL SUR
RATE
BILL OF LABOR AND MATERIALS PER
ITEM QUANTI DAY/
ITEM DESCRIPTION UNIT TOTAL
NO. TY
I CONCRETE WORKS UNIT
Portland Cement 366.00 Bags COST
220.00 80,520.00
Washed Sand 22.00 Cu.m. 600.00 13,200.00
Washed Gravel 29.00 Cu.m. 700.00 20,300.00
MATERIALS
Portland Cement 308.0 BAGS 230.00 70,840.00
SAND 28.0 cu.m. 600.00 16,800.00
6" x 8' x 16" CHB 4,369.0 Pcs 12.00 52,428.00
ALJIE S. CANETE
CIVIL ENGINEER
PROJECT TITLE: ONE STOREY RESIDENTIAL B
PROJECT LOCATION STA. MARIA, PAGADIA CITY Z
SUBJECT: BILL OF LABOR AND MATERI
ITEM ELECTRICAL WORKS
1 4" x 4" Juncton Boxes PVC w/Cover
2 3/4" dia. RSC Pipe
3 5.5mm2 THW Stranded
2.0mm2 THW Stranded
4 3.5mm2 THW Stranded
5 PVC Clamp 3/4"
6 Flexible tube 3/4" dia
7 Electrical Tape (Big)
8 CFL 15 watts
9 2 Gang Switch
10 1 Gang Switcth
11 2 Gang Con. Outlet
12 Ligthing Outlet ( 4" Plastic Receptacle w/Cover)
13 Entrance Cap # 3/4" dia.
14 4B Panel Board w/Circuit Breaker (1-30A, 1-20A,1-15A)
MATERIALS SUB-TOTAL
LABOR SUB-TOTAL
TOTAL FOR ELECTRICAL WORKS
Prepared by :
14,033.00
1,713.00
15,746.00
NEL CANTERO
ELECTRICAL ENGINEER
4" x 8' x 16" CHB - Pcs -
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
Screened Sand (22.00) Cu.m. (13,640.00)
Washed Gravel 29.00 Cu.m. 20,880.00
Washed Sand 22.00 Cu.m. 13,640.00
Washed Sand (48.00) Cu.m. (29,760.00)
Washed Sand (92.00) Cu.m. (57,040.00)
No. of days = - - -
2"x2"x10' Form Lumber 1,084.00 pcs 19,512.00
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
2"x3"x10' Form Lumber 78.00 Bd.Ft 1,404.00
#NAME? #NAME? #NAME? #NAME?
#NAME? DW
MATERIALS COST DW
#NAME? DW
#NAME? DW
#NAME? DW
#NAME? DW
#NAME? DW
#NAME? DW
#NAME? DW
MATERIALS COST DW
MATERIALS COST DW
MATERIALS COST DW
#NAME? DW
MATERIALS COST DW
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? E
#NAME? F
MATERIALS COST H
MATERIALS COST H
MATERIALS COST H
#NAME? TW
#NAME? H
MATERIALS COST H
- H
MATERIALS COST H
#NAME? H
MATERIALS COST H
MATERIALS COST H
#NAME? H
#NAME? H
#NAME? H
#NAME? H
#NAME? H
#NAME? H
MATERIALS COST H
#NAME? H
MATERIALS COST H
#NAME? H
MATERIALS COST H
#NAME? H
MATERIALS COST H
#NAME? H
- L
MATERIALS COST L
#NAME? L
#NAME? L
MATERIALS COST L
#NAME? L
MATERIALS COST PL
#NAME? PL
#NAME? PL
MATERIALS COST PL
MATERIALS COST PL
#NAME? PL
MATERIALS COST PL
MATERIALS COST PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
#NAME? PL
MATERIALS COST PL
#NAME? PL
#NAME? PL
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? PW
#NAME? R
#NAME? R
#NAME? R
#NAME? R
- R
- R
- R
#NAME? R
- R
#NAME? R
#NAME? R
- R
- R
#NAME? R
#NAME? R
- R
#NAME? TW
#NAME? TW
#NAME? TW
#NAME? TW
#NAME? EQ
#NAME? EQ
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
-
-
-
#NAME?
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
#NAME?
#NAME?
#NAME?
-
-
-
-
-
#NAME?
#NAME?
#NAME?
#NAME?
-
-
-
-
-
-
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
#NAME?
#NAME?
-
#NAME?
#NAME?
#NAME?
-
#NAME?
#NAME?
-
-
-
-
-
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
#NAME?
-
-
#NAME?
#NAME?
-
#NAME?
#NAME?
Skilled
-
-
#NAME?
Skilled
Skilled
-
#NAME?
#NAME?
-
-
-
-
#NAME?
-
-
#NAME?
#NAME?
#NAME?
#NAME?
-
-
#NAME?
#NAME?
#NAME?
-
#NAME?
-
#NAME?
#NAME?
#NAME?
-
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
-
#NAME?
#NAME?
-
#NAME?
-
#NAME?
-
#NAME?
#NAME?
-
#NAME?
#NAME?
#NAME?
-
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
#NAME?
#NAME?
#NAME?
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
-
-
-
-
-
#NAME?
#NAME?
#NAME?
-
#NAME?
#NAME?
#NAME?
#NAME?
Unskilled
Unskilled
Unskilled
Unskilled
Unskilled
-
#NAME?
Unskilled
Unskilled
Unskilled
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
Skilled
Skilled
Skilled
#NAME?
-
-
#NAME?
#NAME?
#NAME?
-
-
-
-
#NAME?
-
-
-
#NAME?
#NAME?
#NAME?
-
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
#NAME?
-
#NAME?
#NAME?
#NAME?
Skilled
-
#NAME?
-
#NAME?
-
-
#NAME?
-
#NAME?
-
-
-
-
-
#NAME?
#NAME?
-
#NAME?
#NAME?
#NAME?
#NAME?
Skilled
-
#NAME?
#NAME?
#NAME?
#NAME?
-
-
-
-
#NAME?
-
-
#NAME?
#NAME?
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
#NAME?
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
-
#NAME?
-
#NAME?
-
#NAME?
-
-
-
#NAME?
#NAME?
#NAME?
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
#NAME?
-
-
#NAME?
#NAME?
-
#NAME?
#NAME?
-
-
-
-
-
#NAME?
#NAME?
#NAME?
#NAME?
-
#NAME?
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
-
-
-
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
-
SCHEDULE OF IN-KIND LOCAL COUNTERPART CONTRIBUT
aining Center
IMPLEMENTATION
COST INVOLVED & SCHEDULE OF DELIVERY SCHEDULE
2nd Tranche 3rd Tranche MONTH
TOTAL
In-Kind In-Kind 1 2 3 4 5 6
2,015.00 20,150.00
2,700.10 27,001.00
200.00 2,000.00
300.00 3,000.00
-
5,215.10 5,215.10 52,151.00
Noted by:
6 7 8 9 10 11 12 13 14 15 16 17 18 19
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Checked by:
VA
nt Officer
CONSTRUCTION SCHEDULE
Construction of Livelihood Training Center
Barangay Maasin , Ipil, ZS.
20 21 22 23 24 25 26 27
#NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME?
Approved by:
BSPMC Chairperso
28 29 30 31 32 33 34 35 36 37 38 39 40
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
###
#NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
BSPMC Chairperson
1.2
41 42 43 44 45 46 47 48 1
0.8
a
t
u
0.6 a
l
#NAME? #NAME? R
#NAME? #NAME? 0.4 o
w
Days
1.2
0.8
a
t
u
0.6 a
l
R
0.4 o
w
4
4
0.2
0
KALAHI - CIDSS NATIONAL COMMUNITY
COMMUNITY PROCURE
(Description: 1.22mx2.44m ,#24 Plain sheet signboard,framed with 1/4"thk x 1" angle
bar supported w/ Grade 40 x 2 1/2" dia. G.I Pipe,founded on concrete pedestal)
Sub-Total
AGGREGATE MATERIALS
P-2 1 4" x 8' x 16" CHB -
2 #NAME? #NAME?
3 #NAME? #NAME?
4 Screened Sand (22.00)
5 Washed Gravel 29.00
6 Washed Sand (118.00)
Sub-Total
Sub-Total
P Windows Materials
A
1 #NAME? #NAME?
C
K 2 #NAME? #NAME?
A 3 #NAME? #NAME?
G 4 #NAME? #NAME?
E
5 #NAME? #NAME?
- 6 #NAME? #NAME?
7 #NAME? #NAME?
6
Sub-Total
PAINTING & ELECTRICAL MATERIALS
1 #NAME? #NAME?
2 #NAME? #NAME?
3 #NAME? #NAME?
4 #NAME? #NAME?
5 #NAME? #NAME?
6 #NAME? #NAME?
7 #NAME? #NAME?
8 #NAME? #NAME?
9 #NAME? #NAME?
10 #NAME? #NAME?
11 #NAME? #NAME?
12 #NAME? #NAME?
13 #NAME? #NAME?
14 #NAME? #NAME?
P 15 #NAME? #NAME?
A 16 #NAME? #NAME?
C
K 17 #NAME? #NAME?
A 18 #NAME? #NAME?
G 19 #NAME? #NAME?
E 20 #NAME? #NAME?
- 21 #NAME? #NAME?
7 22 #NAME? #NAME?
23 #NAME? #NAME?
24 #NAME? #NAME?
25 #NAME? #NAME?
26 #NAME? #NAME?
27 #NAME? #NAME?
28 #NAME? #NAME?
29 #NAME? #NAME?
30 #NAME? #NAME?
31 #NAME? #NAME?
32 #NAME? #NAME?
33 #NAME? #NAME?
34 #NAME? #NAME?
35 #NAME? #NAME?
36 #NAME? #NAME?
Sub-Total
EQUIPMENTS
1 #NAME? #NAME?
8
P-
2 #NAME? #NAME?
Sub-Total
LABOR
1.0 Skilled Labor 1.00
P-9
2.0 Unskilled Labor 1.00
Sub-Total
CONSTRUCTION FORMAN
P - 10 1.0 Construction Forman #NAME?
Sub-Total
- a
LS
r
Bd.Ft 1,404.00 1,404.00 - a
#NAME? #NAME? #NAME? - n
- - - - c
#NAME? - - h
1
se
- - t
#NAME? #NAME? #NAME? - T
G
LS
#NAME? - - r
a
- - n
Bags #NAME? #NAME? - c
h
#NAME? #NAME? #NAME? - e
Kgs. 3,510.00 3,510.00 -
- #NAME? #NAME? -
Kgs. 116.00 116.00 -
Kgs. 1,276.00 1,276.00 -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
Length 62,160.00 62,160.00 -
#NAME? #NAME? #NAME? -
Length 106,830.50 106,830.50 - J
#NAME? #NAME? #NAME? - a
Pcs. 1,400.00 1,400.00 - n
#NAME? #NAME? #NAME? - u
shts. 9,250.00 9,250.00 - a
#NAME? #NAME? #NAME? - r
#NAME? #NAME? #NAME? - y
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
3
#NAME? #NAME? #NAME? -
-
boxes 165.00 165.00 -
#NAME? #NAME? #NAME? - 2
- 5,850.00 5,850.00 - 8
#NAME? #NAME? #NAME? - ,
#NAME? #NAME? #NAME? - 2
length 366.00 L 366.00 - 0
length 6,930.00 O 6,930.00 - 1
#NAME? #NAME? C #NAME? - 5
A
#NAME? #NAME? L #NAME? -
Days 1,350.00 1,350.00 -
#NAME? #NAME? S #NAME? -
Sets 108.00 H 108.00 -
O 1
Sets 10,000.00 10,000.00 - s
P
Sets 3,000.00 P 3,000.00 - t
#NAME? #NAME? I #NAME? -
Sets 760.00 N 760.00 - T
G r
Sets 2,250.00 2,250.00 - a
#NAME? #NAME? #NAME? - n
F
#NAME? #NAME? O #NAME? - c
#NAME? #NAME? R #NAME? - h
#NAME? #NAME? #NAME? - e
- - G - -
O
- - O - -
D
Length 900.00 S 900.00 -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
pc. 1,080.00 1,080.00 -
Pcs. 112.00 112.00 -
#NAME? #NAME? #NAME? -
Pcs. 36.00 36.00 -
Pcs. 51.00 51.00 -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
Rolls 24.00 24.00 -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
F
#NAME? e
b
r
#NAME? #NAME? #NAME? - 2 u
#NAME? #NAME? #NAME? - n a
d r
#NAME? #NAME? #NAME? -
L T y
#NAME? #NAME? S #NAME? - r
#NAME? #NAME? G #NAME? - a 6
n
#NAME? #NAME? #NAME? - c
-
#NAME? #NAME? #NAME? - h 1
e 3
,
#NAME? 2
0
#NAME? #NAME? #NAME? - 1
#NAME? #NAME? #NAME? - 5
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
L
#NAME? #NAME? #NAME? -
O
#NAME? #NAME? C #NAME? -
#NAME? #NAME? A #NAME? -
#NAME? #NAME? L #NAME? -
#NAME? #NAME? #NAME? - 3 M
S r a
#NAME? #NAME? H #NAME? -
d r
#NAME? #NAME? O #NAME? - c
#NAME? #NAME? P #NAME? - T h
#NAME? #NAME? P #NAME? - r
I a 5
#NAME? #NAME? N #NAME? -
n -
#NAME? #NAME? G #NAME? - 1
c
#NAME? #NAME? #NAME? - h 3
#NAME? #NAME? F #NAME? - e ,
O 2
#NAME? #NAME? #NAME? -
R 0
#NAME? #NAME? #NAME? - 1
G 5
O
O
D
S
O 2
R 0
1
#NAME? #NAME? G #NAME? - 5
#NAME? #NAME? O #NAME? -
#NAME? #NAME? O #NAME? -
D
#NAME? #NAME? #NAME? -
S
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? #NAME? #NAME? -
#NAME? - -
-
#NAME? #NAME? L #NAME? -
S
#NAME? #NAME? G #NAME? -
#NAME?
- -
L.S. 120,900.00 C 120,900.00 -
L.S. 80,600.00 F 80,600.00 -
201,500.00 A - -
- -
WD #NAME? C #NAME? -
F
#NAME? A - -
- -
- -
mpsum 3,000.00 - 3,000.00
mpsum 3,000.00 - 3,000.00
mpsum 22,000.00 - 22,000.00
mpsum 4,865.00 - 4,865.00
mpsum 3,000.00 - 3,000.00
mpsum 5,000.00 - 5,000.00
mpsum #NAME? #NAME? -
#NAME? - -
#NAME? #NAME? 50,865.00
#NAME?
ed by: Approved by:
A. GENERAL INFORMATION
Name of proposed sub-project:
Category: Public Goods Enterprise Human Resource Dev't.
B. TECHNICAL DESCRIPTION
Physical target: 54.00 Cost parameter:
Person/s who assisted in the preparation of techical proposal: M.E./CTF/CEF/AC
Proposed scope of works to be undertaken: #NAME? CONCRETE WORKS
FORMWORKS & SCAFFOLDING MASONRY WORKS ROOFING WORKS
DOORS AND WINDOWS PLUMBING WORKS
#NAME? #NAME?
Manpower requirement / sources: (skilled) Foreman, carpenter, mason/steelman and welder
Equipment requirement / sources:
Other component included in the proposal (e.g. trainings) n/a
Number of HH currently without access to the needed services that can be served by the
proposed sub-project:
E. SP SUSTAINABILITY
Is there an existing O&M group or still to be organized?
Is the community willing to pay for Tariff and by How much? N/A
Other sources of funds for the operation and maintenance activities?
Identified capability building requirements for O&M group?
How do we plan to maintain the completed sub-project?
#NAME?
Total % total
#NAME? #NAME?
-
47,151.00 #NAME?
55,865.00 #NAME?
- #NAME?
#NAME? #NAME?
50,865.00 #NAME?
52,151.00 #NAME?
Total population
Male Female
% to total
No
others
EMP Only
BSPMC Chairperson
A. DIRECT COSTS
Materials 39,963.50 39,963.50
Equipment Rental 5,850.00 5,850.00
Labor Costs:
a. Skilled 125,100.00 104,950.00
b. Unskilled 104,250.00 77,249.00
Construction Forman #NAME? #NAME?
Signage #NAME?
Sub-Total A #NAME? #NAME?
B. INDIRECT COSTS
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME? #NAME?
__________________________ ______________________________
Barangay Treasurer BSPMC- Chairman
BSPMC Form No. 03
KALAHI-CIDSS: KKB PROJECT
ocal Counterpart Contribution Plan
Barangay : Maasin
Municipality of Ipil
Province of Zamboanga Sibugay
- -
- -
- -
20,150.00 - 20,150.00
27,001.00 - 27,001.00
- -
10,000.00 10,000.00 -
10,000.00 - - - 47,151.00 10,000.00 47,151.00
3,000.00 3,000.00 -
2,000.00 - 2,000.00
3,000.00 3,000.00 -
3,000.00 - 3,000.00
22,000.00 22,000.00
4,865.00 4,865.00
3,000.00 3,000.00
5,000.00 5,000.00 -
- -
________________
Target Date of
Delivery
January 2015
January 2015
February 2015
February 2015
February 2015
January 2015
January 2015
February 2015
February 2015
February 2015
January 2015
January 2015
January 2015
January 2015
March 2015
DSWD-KALAHI-CIDSS: NCDDP
LCC FOR SUB-PROJECT IMPLEMENTATION MONITORING REPORT
GWENDOLYN C. LANG RONALD G. JAVA GARRY V. SANTOS, CPA ZENAIDA L. AREVALO, CESO IV
MFA Area Coordinator Regional Financial Analyst Regional Director
EQUIPMENT RENTAL RATES & CAPABILITIES, ACEL RATES January 2003 Ed.
Table 1: RENTAL RATES & CAPABILITIES WORKING HOURS PER DAY=8 HRS.
Computed Rental
Operated Rate per Rates
Description CA
Hour
rate per day
Asphaltic concrete Plant PhP77,184.00 Asphalt Batching
EQUIPMENT CAPABILITIES
Type of Equipment Average Capabilities
1. Bulldozer (108) (a) Clearing 500 sq.m./hr.
(b) Stripping 200 sq.m./hr.
© Excavation:
1. Common soil 45 cu.m./hr
2. Slightly Hard Materials 25 cu.m./hr.
(d) Quarrying:
107 Common Materials 50 cu.m./hr.
108 Aggregate 40 cu.m./hr.
Boulders 15 cu.m./hr.
200 Needs Screening
(e) Pushing 3 cu.m./hr.
(a) Subgrading 300 sq.m./hr.
2. Road Grader
(b) Spreading 50 cu.m./hr.
3. Payloader (a) Loading 30 cu.m./hr.
4. Crane Shovel (a) Loading 35 cu.m./hr.
(a) Satic rolling ( 12 passes- 15 cm. lift 15 cu.m./hr.
5. Sheep Foot Roller
(b) Vibratory Rolling ( 4 passes- 15 cm. lift) 135 cu.m./hr.
6. 3- Wheel Road Roller (a) Static Rolling ( 6 passes- 20 cm. lift) 24 cu.m./hr.
7. Tractor Drawn Roller (a) Vibratory Rolling (6 passes- 20 cm. lift) 24 cu.m./hr.
(a) Static Rolling ( 6 passes- 20 cm. lift) 24 cu.m./hr.
8. Tandem Roller
(b) Vibratory Rolling (6 passes- 60 cm. lift) 72 cu.m./hr.
(a) Hauling Common Borrow Base Course 3.5 cum./hr.
9. 9 1/2 T Dump Truck (b) Hauling Selected Borrow Base course 5.0 cu.m./hr.
© Hauling Concrete Batch Class 'A' 2 Batch/trip
(a) Hauling Common Borrow Base Course 2.5 cu.m./trip
10. 2 1/2 T Dump Truck (b) Hauling Selected Borrow Base course 4.0 cu.m./trip
© Hauling Concrete Batch Class 'A' 1 Batch/trip
11. Buggy (a) Hauling Concrete Mix 0.17 cu.m./trip
(a) Hauling Aggregates 0.17 cu.m./trip
12. Wheel Borrow
(b) Hauling Concrete Mix 0.05 cu.m./trip
13. Water Tuck (a) Watering 1,000 sq.m./trip
14. Conrete Mixer (a) Mixing Concrete 9 cu.m./hr.
15. Rock Crusher (a) Crushing Mixed Sand & Gravel 30 cu.m./hr.
16. Conrete Virator (a) Vibrating Concrete Mix 40 cu.m./hr.
17. Concrete Floor Finisher (a) Finishing Concrete Floor 140 cu.m./hr.
(a) Drilling Hard Rock 0.23 m./hr.
(b) Drilling Loose Rock 0.30 m./hr.
18. Percussioned Drilling © Drilling Limestone 0.38 m./hr.
(d) Drilling Sticky Clay 0.49 m./hr.
(e) Drilling Loose Clay 0.70 m./hr.
If the length of a culvert exceeds 6 meters, the number of man-days has to be increased accordingly.
Culvert laying - this task consist of the excavation of the trench preparing the bed, laying of culvert,
backfilling and compaction. Number of man-days required varies with the volume of the excavation and the soil type.
In these cases, the work is split over two or more days. First, the trench should be excavated and
then the preparation of the bed, the laying, backfilling and compaction is done. Only 3 times. Therefore the volume
of the excavation has to be limited following rates and then applicable:
After completion of the trench approximately 4 man-days are needed to lay 6 rings, backfill and compact to finish road le
I. MECHANIZED ASPECT
B.2 DOZER
Horse Production ( cu.m./hr. ) Bank Volume
Power Canal Structure
120 30 15
140 35 20
160 40 25
180 45 30
200 50 35
B.3 BACKHOE
Bucket ( cu.m.) Production ( cu.m./hr.) Bank Volume
Canal Structure Creek
0.5 20 15 15
0.75 30 20 20
1 40 30 30
1.25 50 40 40
1.5 60 45 45
C. QUARRYING
Dozer ( H.P.) Production ( cu.m./hr.) Bank Volume
Common Aggregate Cobbles/Boulders
140 55 60 27
160 60 65 29
180 65 70 31
200 70 75 33
D. LOADING
Bucket (cu.m.) Production ( cu.m./hr.) Bank Volume
Common Aggregate Cobbles/Boulders
1 50 55 35
1.5 75 80 55
2 100 110 75
2.5 125 135 90
3 150 165 110
E. SPREADING
Grader ( H.P.) Road ( cu.m./hr. ) cmp.
Common Aggregate
80-100 60 70
100-125 70 80
125-150 90 100
150-175 100 110
H. EMBANKMENT COMPACTION
Capacity ( cu.m./hr.) Compacted Volume
Tons Self- Propelled
Tam. Foot drum Vib. Drum
10 80 60
12 90 70
15 120 90
K. DEMOLITION OF CONCRETE
160 CFN Compressor & two (2) Jack Hammer
Capacity - 8.00 cu.m./day for massive concrete
- 12.00 cu.m./day for slab & wall
L. DRIVING OF PILES
Steel Pipes : Crane 25 tons with 2-tons drop hammer, Capacity= 8 L.M./Hr.
Concrete Piles : Crane 25 tons with 2500 kgs.m. Pile hammer, Capacity= 2.00 L.M. per Hr.,
4.00 L.M./Hr. for thick & thin concrete piles.
M. MANUAL ASPECT
A. EXCAVATION
A.1. Common Materials
Capacity (cu.m./day) Bank Volume & Depth of Excavation
Type of Work ( meter )
Farmditchs 3.00 2.50 2.00
Canal 2.50 2.00 1.75
Structure 2.00 1.75 1.50
E. QUARRYING
Capability cu.m./day/man
Sand & Gravel Cobbles Boulder
3.5 2.5 2
F. DEMOLITION OF CONCRETE
Slab & Wall 0.50 cu.m./man-day
Massive Concrete 0.20 cu.m./man-day
G. SCREENING OF AGGREGATES
Gravel 4.00 cu.m./day/man
Sand 6.00 cu.m./day/man
H. MANUAL BACKFILL
Capacity : 3.00 cu.m./day/man
J. SPREADING OF AGGREGATE
Capacity : 2.50 cu.m./day/man
L. GROUTED RIPRAP
Crew : 1- Foreman, 2- Mason, 10- Laborers, & 1- L.E. Operator
Capacity : 7.50 cu.m./day
N. CONCRETE LINING
Crew : 1- Foreman, 2- Mason, 1- L.E. Operator, 10- Laborers with one (1) bagger mixer
Capacity : 4.50 cu.m./day
OTHER MATERIALS
Class Type of Strength F. Lumber
Structure kgs e bd.ft./cu.m.
A Bridge/ Flume 211 40
A Siphon/Box Cul 211 25
A Other Str. @ me 211 25
A 211 5
B 200 5
A 211 15
B 200 5
A 211 5
Note: The total contract price should be equal to or less than the total COA estimate plus 10% in order to sustain a finding of re
the contract price will be deemed excessive.
Paintings:
Paint Rollers 125 sq.m./man-days
Paint Brush 50 sq.m./man-days
Neutralizer 100 sq.m./man-days
Truss Fabrication 0.25 truss/man-days
Purlins Installation 60 L.M./man-days
Fascia Boards 0.05 cu.m./man-days
Roof Coverings ( G.I. sheets ) 35 pcs./man-days
Concrete Works:
Concrete Pouring 0.30 cu.m./man-days
Rebars 20 - 30 kgs.man-days
Finishing:
Rough Finish 10 sq.m./man-days
Plain/Fine Finish 8 sq.m./man-days
CHB Filling/Laying 6 - 8 sq.m./man-days
A. CEMENT MORTAR
Table- 1. Quantity of Cement and Sand for CHB Mortar per Square Meter Wall
Size of CHB No. per sq.m. 40 Kg. Mixture Cement Bag
B C
4 x 8 x 16 12.5 0.525 0.394
6 x 8 x 16 12.5 1.013 0.759
8 x 8 x 16 12.5 1.500 1.125
Table- 2 Quantity of Cement and Sand for Plastering per Square Meter
40 kg. Cement Bags
Mixture Class 16 mm. thk. 20 mm. thk. 25 mm. thk.
A 0.288 0.360 0.450
B 0.192 0.240 0.300
C 0.144 0.180 0.225
D 0.120 0.150 0.188
Sand 0.016 0.020 0.025
C. CHB FOOTING
Table- 3. Quantity of Cement, Sand, and Gravel for CHB Footing per Meter Length
Dimension Cement in Bags Class Mixture
Centimeters 40 Kg. Cement
t w A B
10 30 0.27 0.225
10 35 0.315 0.263
10 40 0.36 0.3
10 50 0.45 0.38
15 40 0.54 0.45
15 45 0.608 0.506
15 50 0.675 0.563
15 60 0.81 0.675
20 40 0.72 0.6
20 50 0.9 0.75
20 60 1.08 0.9
MAINTENANCE BY CONTRACT
( MBC )
METHODS OF CONSTRUCTION
1. PATCHING POTHOLES - Should be done to the areas specified by the contracts and plans duly approved
by the Engineers. Materials to be used must be suitable to acquire best result when compacted.
SCHEDULE OF WORKS : MONTHLY
2. RESHAPING should also be done to areas required in the plan and contracts. All works should conform
to what will be described in the specification.
SCHEDULE OF WORKS : QUARTERLY
3. VEGETATION CONTROL AND CLEANING DITCHES - All objects subject for the obstruction of the designed
areas should be removed and cleared.
SCHEDULE OF WORKS : TWICE A YEAR
4. REGRAVELLING - All materials shall consist of hard, durable particles or fine divided mineral matter that can be compacted
reaching for stable sub-base. Using especially equipped vehicles material should be distributed in a continous uniform
layer. The uniform thickness of sub-base material shall be adjusted prior to the compaction by watering or by drying as
required in order to obtain the required compaction. Compaction shall continue until a field density of at least 100 per cent
of the maximum dry density.
SCHEDULE OF WORKS : ANNUAL
5. BLADING/GRADING - All unstable materials should be removed in areas subject for Blading/Grading. These areas should
be brought to a grade required in the plans and contracts. Compaction will follow using heavier compacting units until required
density can be obtained.
SCHEDULE OF WORKS : ANNUAL
TES January 2003 Ed.
CAPABILITIES
50 mm
Max 6 3/4 Depth Capacity
15 TONS Capacity
400
1080
192
576
oductivity
Throwing distance in m. )
6-8 m.
3.5-4.5
2.5-3.5
1.7-2.5
the soil type.
CONCRETE
OIL # 10
-
1 liter
1 liter
1 liter
1 liter
1 liter
1 liter
-
-
-
compact to finish road level.
ction
o. of Trees/Hectares )
201-250 251& >
160 130
185 150
210 170
240 195
265 215
Cement R.S. Bars Lumber Ply
bags/hr. kgs./hr. bd,ft./hr. pcs./hr.
300 6,000 4,000 250
Installation
16
14
12
10
8
6
7
Gravel Boulder
cu.m./cu.m. cu.m./cu.m.
0.90 -
1.00 -
0.96 -
0.45 0.75
0.05 1.00
0.10 1.00
1.00 -
1.00 -
- -
Aggregate
Sand Gravel
Cu.m. Cu.m.
0.015 0.03
0.018 0.035
0.02 0.04
0.02 0.05
0.03 0.06
0.034 0.068
0.038 0.075
0.045 0.09
0.04 0.08
0.05 0.1
0.06 0.12
o O. Burdeos
rancisco E. Duarte
A. Samson