0% found this document useful (0 votes)
57 views1 page

FOIR, IIR, LOIR Work Instructions

This document provides work instructions for performing First Of Inspection Report (FOIR), In-process Inspection Report (IIR) and Last Of Inspection Report (LOIR) in a production process. It outlines the responsibilities of line inspectors, production in-charge and machine operators. It details the procedure for ensuring gauges and documents are available, inspecting dimensions, approving or rejecting parts, recording observations, identifying the last part, and inspecting before a setup change.

Uploaded by

SAKTHIVEL A
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views1 page

FOIR, IIR, LOIR Work Instructions

This document provides work instructions for performing First Of Inspection Report (FOIR), In-process Inspection Report (IIR) and Last Of Inspection Report (LOIR) in a production process. It outlines the responsibilities of line inspectors, production in-charge and machine operators. It details the procedure for ensuring gauges and documents are available, inspecting dimensions, approving or rejecting parts, recording observations, identifying the last part, and inspecting before a setup change.

Uploaded by

SAKTHIVEL A
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

TITLE: WORK INSTRUCTIONS DOC: SSE/WI/19

FOR FOIR,IIR,LOIR [Link].: 01


Date: 01.09.2018

[Link]:-

This Work Instruction is to perform First Of Inspection Report


(FOIR),In-process Inspection Report(IIR) and Last Of Inspection
Report(LOIR) in production process

[Link]:-

Line Inspector, Production In-charge & Machine Operators.

[Link]

3.1) After setting done by CNC supervisor Ensure the gauges, SOP and
instruments available near machines .

3.2) Inspect all dimensions which are mentioned in SOP. If all


dimensions are Ok, inform the supervisor to run the machine. If not-
ok move the set-up parts to Rej. area with Red mark.

3.3) After FOIR approval Ok, Do IIR inspection as per SOP.

3.4) For 100% checking frequency, record the observations for Every
25 pcs.

3.5) In end of the shift, run the last part and identify with mark.

3.6) Before setting change, Do LOIR as per operation standard


and observe the dimensions.

PREPARED BY: APPROVED BY: Page 1 of 1